Loading...
HomeMy WebLinkAboutContract 45302-CO1 FORT WORTH City of Fort Worth W 000— Change Order Request AW CONMCT No. Project*hme I Water Relocation on State Highway 114,Part 2 City Sec No. 45302 Project No-(s) PW77-060770140610 DOE No. 6759 City Proj.No. 1515 Project Description: Relocation of water on State Highway 114 from Championship Parkway to IH-35W to accommodate TxDOT road widening project of State Highway 114 from Blue Mound Road to IH-35W. Contractor.I S.J.Louis Construction of TX,Ltd. Change Order: �] Date: 1 8/22/2014 City Project Mgr.1 Roberto C.Sauceda City Inspector: Carlos Vasquez Phone Number.1 817-392-2387 Phone Number: 817-992-2600 Dept. Water Totals Contract Time (Calender days) Original Contract Amount $1,048,899.50 $1,048,899.50 180 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,048,899.50 $1,048,899.50 180 Amount of Proposed Change Order $7212,340.00 $212,340.00 020 Revised Contract Amount $1,261,239.50 $1,261,239.50 200 Original Funds Available for Change Orders $31,500.00 $31,500.00 Remaining Funds Available for this CO $31,500.00 $31,500.00 Additional Funding(if necessary) $180,840.00 $180,840.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 20.24% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,311,124.38 6- -1111111! 11111 Oil 1W Change Order No. 1 will allow for by other than open cut pipe installation across a storm water detention pond located on Doral Tesoro Golf Club. Subsequent to advertising the project for bid, the Texas Department of Transportation increased the size of the pond such that a 280 feet segment of the casing pipe could no longer be constructed by open trench installation as originally proposed.The change order will also allow for the replacement of sidewalk that is in direct conflict with the pro i . pRT Staff concurs with the contractors r � al calendar days on the change order. 0 ' '$J1 0 0 8 Auested by' j � %°°�°°°°°°°� OFFICIAL RECORD TEMP' CITY SECRETARY Mari J.kay Oty WY FT.WORTH,TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. t S.J.Louis Construction of TX,Ltd. Pete Stahl a30 - t r LAV M&C Number C-27050 RECEIVED , ate Approved ( 10/21n201E] FOR-' WORTH City of Fort Worth W 0001, Change Order Additions Project Name Water Relocation on State Highway 114,Part 2 City Sec No. 1 45302 Project No.(s) PW77-060770140610 DOE No. 6759 City Proj.No. 1 1515 Project Relocation of water on State Highway 114 from Championship Parkway to IH-35W to accommodate TxDOT road widening project of Description State Highway 114 from Blue Mound Road to IH-35W. Contractor r S.J.Louis Construction of TX,Ltd. Change Order: I_..-J Date: 8/22/2014 City Project Mgr. Roberto C.Sauceda City Inspector f Carlos Vasquez ADDITIONS 6 36 Inch Casing By Other Than Open Cut Water 320.00 LF $627.00 $200,640.00 37 Remaval I Replace of existing 5 foot wide sidewalk Water 300.00 LF $39.00 $11,700.00 Water $212,340.00 Page 2 of 4 Additions Sub Total $212,340.00 FORT WORTH City of Fort Worth —. �Ilw Change Order Deletions Project Name 5Water Relocation on State Highway 114,Part 2 City Sec No. 45302 Project No.(s) PW77-060770140610 DOE No. 6759 City Proj.No. 1515 Project Description Relocation of water on State Highway 114 from Championship Parkway to IH-35W to accommodate TxDOT road widening project of State Highway 114 from Blue Mound Road to IH-35W. Contractor S.J.Louis Construction of TX,Ltd. Change Order: Q1 Date 8/22/2014 City Project Mgr. I Roberto C.Sauceda City Inspector Carios Vasquez DELETIONS MEN R1110 DER"! %Y Water Page 3 of 4 Deletions Sub Total MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 Page 4 of 4 M&C Review Page 1 of 1 -0 Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA IWORTH DATE: 10/21/2014 REFERENCE NO.:""C-27050 LOG NAME: 60SH114P2CO1- SJLOUIS CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Change Order No. 1 to City Secretary Contract No. 45302 with S.J. Louis Construction of Texas Ltd., in the Amount of$212,340.00 for a Revised Total Contract Amount of$1,261,239.50 for Water Main Relocation on State Highway 114, Part 2, from Championship Parkway to FM 156 (COUNCIL DISTRICT 7) RECOMMENDATION: It is recommended that the City Council authorize execution of Change Order No. 1, to City Secretary Contract No. 45302 with S.J. Louis Construction of Texas, Ltd., in the amount of$212,340.00 for a revised contract amount of$1,261,239.50 for Water Main Relocation on State Highway 114, Part 2. DISCUSSION: On January 14, 2014, (M&C C-26645)the City Council authorized execution of a contract with S.J. Louis Construction of TX, Ltd., in the amount of$1,048,899.50 for Water Main Relocation on State Highway 114, Part 2, from Championship Parkway to FM 156. Change Order No. 1 will allow for other than open cut pipe installation across a storm water detention pond located on Doral Tesoro Golf Club. Subsequent to advertising the project for bid, the Texas Department of Transportation increased the size of the pond such that a 280 foot segment of the casing pipe could no longer be constructed by open trench installation as originally proposed. The change order will also allow for the replacement of sidewalk that is in direct conflict with the project main. M/WBE Office-S.J. Louis Construction of Texas, Ltd. is in compliance with the City's BDE Ordinance by committing to four percent MBE participation on this Change Order No. 1. The project is located in COUNCIL DISTRICT 7, Mapsco 642Q and 642R. FISCAL INFORMATIONXERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Commercial Paper Water Fund. TO Fund/Account/Centers FROM Fund/Account/Centers PW77 541200 060770140610 $212,340.00 Submitted for City Manager's Office by; Fernando Costa (6122) Originating Department Head: Andrew T. Cronberg (5020) Additional Information Contact: Roberto C Sauceda (2387) ATTACHMENTS 60SH114P2CO1-SJL0UIS MAP.Pdf http://apps.cfwnet.org/council_packet/mc review.asp?ID=20335&councildate=10/21/2014 10/22/2014