WHEREAS, the City of Fort Worth (City) and Carter & Burgess, Inc., (Engineer)
made and entered into City Secretary Contract No. 28673 (the Contract) which was
authorized by the City Council by M&C C-19564 on the 29th day of April, 2003; and
WHEREAS, the Contract involves engineering services for the following project:
Engineering Contract for East 7th Street Deep Tunnel Sewer, which includes
replacement of approximately 4,000 linear feet of Sanitary Sewer Main M-34 with
approximately 5,500 linear feet of 24-inch deep tunnel sewer to meet current
demand and future growth in the uptown area of the Central Business District of
Fort Worth, Texas. The project area is located from Sanitary Sewer Main DS-100
at the intersection of 7th Street and Commerce Street to Sanitary Sewer Main M-
545, somewhere in the vicinity of the Burlington Northern Santa Fe Railroad.
WHEREAS, it has become necessary to execute Amendment No. 1 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends the
Contract:
1.
Article I of the Contract is amended to include the additional engineering services
specified in a proposal letter dated July 31, 2003, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional services to be performed by
Engineer total $1- 14j670-0
2.
Article II of the Contract is amended to provide for an increase in the maximum
fee to be paid to Engineer for all work and services performed under the Contract, as
amended, so that the total fee paid by the City for all work and services shall not exceed
the sum of$"`moo- 354, 543 .5o f-
3.
All other provisions of the contract, which are not expressly amended herein, shall
remain in full force and effect.
EXECUTED on this the day of 2003 , in
Fort Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED: APPROVED:
A.Douglas Rademaker, .T3.p "Mar Ott
I E
Director, Department of Assistant City Manager
Engineering
ENGINEER
ATTEST:
GI Pearson, City Secretary
Name: Steven C. Veal, P.E.
Principal/Vice-President contract Authorization
Carter&Burgess, Inc.
Date
APPROVED AS TO FORM AND LEGALITY:
I
Gary SteiAerger
Assistant City Attorney
777 Main Street
P.O. Box 901058
Carter.---Burgess Fort Worth,Texas 76101-2058
Phone: 817,735.6000
Fax: 817.735.61 d8
July 31, 2003 www'C-6,corn
Gopal Sahu, P.E.
Project Manager
City of Fort Worth
Department of Engineering
1000 Throckmorton Street
Fort Worth, Texas 76102
Reference: Amendment No. 1 to the Engineering Services Agreement
East 7th Street Deep Tunnel Sewer
Project No. P172-070172141110
D.O.E. No. 4009, City Sec. No 28673
C&B Proj. No. 011913.010.5.0102
Dear Mr. Sahu;
At your request I am pleased to submit Contract Amendment No. 1 to our Agreement for
Engineering Services for additional funding. This will cover the necessary expenditures for
additional general liability insurance coverage and bond coverage for our geotechnical sub
consultant, Mas-Tek Engineering & Associates, Inc. This will also cover the extra administrative
effort for Carter& Burgess, Inc. The additional funding request is made due to the increased
insurance coverage as deemed necessary by the Transportation Public Works Department and
different from our original signed contract stipulations. The increased insurance coverage and
bond requirement was communicated to Carter& Burgess by an email from Chris Harder dated
June 26, 2003.
The following is a summary of the additional cost to provide the insurance and bonding as
requested by the city:
• A $25,000 bond will cost $1,410.00
• A $1 million General Liability Insurance with a $10 million umbrella will cost an
additional $10,200.00.
• Time and effort spent on meetings to obtain change of insurance coverage is
$4,250.00
This amendment for a revised design fee provides an increase in the total not to exceed fee of
$15,860.00. The following table summarizes the Amendment No 1 request.
I
Project Summary Original Design Fee Amendment#1 Total Revised Fee
Design Services $339,873.50 $15,860.00 $355,733.50
M/WBE $32,000.00 $11,610.00 $43,610.
Mas-Tek 9.4% 73.2% 12.
Carter&Burgess,Inc- Carter&Burgess Arch itects/Engineers,Inc. Carter&Burgess Consultants,Inc. C&B Architects/Engineers,Inc.
C&B Architects/Engineers,P.C. C&8 Nevada,Inc. Nixon&Laird Architects/Engineers,P.C.
Gopal Sahu, P.E.
July 31, 2003
Page 2
The contract's total M/\NBE commitment will be increased from $87,000.00 or 26% to
$99,410.00 or 27.9% participation.
As soon as Amendment No. 1 is approved, Mas-Tek will be issued a sub consultant agreement
change order from Carter & Burgess, then they will begin the process to obtain the additional
General Liability Insurance and a $25,000 Bond. This Amendment No. 1 also requests that an
additional three (3) weeks be added to our contract schedule to account for lost time during the
change in scope and time to acquire the necessary insurance. A revised schedule is attached
for your reference. Please review this request and contact Terry Foyt or myself should you have
any questions regarding this request.
Sincerely,
JWm. Ba Hines, P.E.
Senior Project Manager
WBH/tg
T:WobQl 1913%WRCORR\01 19130111 I.doc
cc: Correspondence
Public Works-RDS
Terry Foyt
Peter Fu
Chris Harder
Carter&Burgess Architects/E n9i neers, Inc. Carter &Burgess Consultants, Inc. C&B Architects/Engineers, Inc,
C&B Architects/Engineers, P.C. C&B Nevada, Inc, Nixon & Laird Architects/Engineers, P.C.
Hines, Bart
From: Mark Farrow[markfarrow@aggengr.com]
Sent: Monday, July 28, 2003 3:36 PM
To: FoA Terry
Cc: Hines, Bart
Subject: Bond Cost- $5 mil & $10 mil
Terry,
Regarding the $25, 000 bond, the cost is 3% of bond plus 2 hours principal
time plus 2 hours administrative time. The typical time frame is 2 to 3
weeks for submittal and review of corporate information including financial
statements . If we walk this through personally, the time frame can be
shortened to about 2 to 3 days. This will require an additional 2 hours
principal time and 2 hours admin time. The total cost will be $1,410 .00.
Regarding the cost of increased General Liability Insurance, for a $1 mil.
policy with a $5 mil umbrella, the additional cost will be $6, 000.00. For a
$1 mil policy with a $10 mil Umbrella, the additional cost will be
$10,200.00
Mark
OCT. 15. 2003 3:02PM Mail CARTER & BURGESS 10/15/za NO- 6373 P. 1/1
TO terry fort
MAS-TEK Engineering
Associates, Inc.
COMEJUTNG rNCTIMMINC
ENCINMAING
CONST UCTION MA7g111j1tS Er4CiNUxjiqc;mu Timisa
FAX TRANSMITTAL
To: Fo 14 PROJECT No.:
COMPANY: t PROPOSAL No.:
FAx No- &I Y0 PHN No:
FROM-..- MARK J. FARROW, P.E.
COMPANY: MAS.-TEK ENGINEERING & ASSOCIATES, INC.
FAx No: (972) 444-8893 PHN NO-* (972) 444-8889
DATE: /v — Ir— o3
No. OF PAGES'. (INCLUDING COVER PAGE)
�41 o, oo
c 0 C-1-
/0, 00
The Information contained In this facsimile must be treated as CONFIDENTIAL
INFORMATION Intended for the use of the individual or entity named above, if you
have received this communication in error, please notify us immediately by phone.
2550 Beckleymeade,Suite 105 - Dallas,Texas 75237
Phn: (972)444-8889 FAX: (972)444-5893
DATE SENT.. TIMIS SENT, SENT ISY-
East 7th Street Deep Tunnel Amendment No.I Page I of 1
Sahu, Gopal .
From: Hines, Bart [HinesWB@c-b.com]
Sent: Tuesday, November 11, 2003 9:23 AM
To: Sahu, Gopal
Cc: Foyt, Terry; Stanley, Robert D.; Harder, Christopher
Subject: RE: East 7th Street Deep Tunnel Amendment No.1
Gopal,
We accept the counter offer. 5,0
Thanks for your assistance with this matter.
Bart
-----Original Message-----
From: Sahu, Gopal [mailto:Gopal.Sahu@fortworthgov.org]
Sent: Tuesday, November 11, 2003 8:59 AM
To: Hines, Bart
Cc: Foyt, Terry; Stanley, Robert D.; Harder, Christopher
Subject: RE: East 7th Street Deep Tunnel Amendment No.1
The City will like to cosider upto 30%max for the efforts in obtaining insurance($3,060.00max.)
Please revise ans resubmit ASAP.
THX
.....Original Message-----
From: Hines, Bart [mailto:HinesWB@c-b.com]
Sent: Friday, November 07, 2003 8:05 AM
To: Sahu, Gopal
Cc: Foyt,Terry; Stanley, Robert D.
Subject: East 7th Street Deep Tunnel Amendment No.1
Gopal,
Just checking with you to see if the information (Amendment No. 1 timesheets and letter) I dropped
off in your chair yesterday was sufficient? Please email or call me today to let me know.
Thanks,
Bart
11/11/2003