Loading...
HomeMy WebLinkAboutContract 29526 AMENDMENT NO. 1 STATE OF TEXAS CITY SECRETARY CONTRACT NO. (M&C Needed) COUNTY OF TARRANT WHEREAS, the City of Fort Worth (City) and Dunaway Associates, Inc. , (Engineer) made and entered into City Secretary Contract No. 29019, (the Contract) which was authorized by the City Council by M&C C-19701 on the 12th day of August, 2003; and WHEREAS, the Contract involves engineering services for the following project: Water Main Extensions to Serve Walsh Ranch, Phase I. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article 1, of the Contract is amended to include the addition- al engineering services specified in M&C C-11940, adopted by the City Council on 20':h day of January, 2004, and further amplified in a proposal letter dated November 21, 2003, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $42,605.00. 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $1,008,011.95. 1�7 3. All other provisions of the Contract which are not expressly amended herein shall remain in f 11 force andr ffect. Q-r� EXECUTED on this the - day of /2 -, 2004, in Fort Worth, Tarrant County, Texas. ATj C L±h-111L� contract Authorization G1 ria Pear n, City Secretary Date City Secretary APPROVAL RECCbNENDED: AP D: A f Ott A. Douglas tad"ker, P.E. Marc Director, Department of Assis�nt City Manager Engineering DUNANAY ASSOCIATES, INC. Engine( By:_ Name:Brian S. Darby, P.E. , Associate 1501__-Merrimac Circle, Suite 100 Fort Worth-, TX 76107-6572 APPROVED AS TO FORM AND LEGALITY: Gary Ste nberger Assistant City Attorney Rl -2 i Doh: - DUNAWAY ASSOCIATES, INC. ENGINEERS* PLANNERS* SURVEYORS DAI No. 2002113 November 21, 2003 Mr. Rakesh Chaubey, P.E. Project Manager City of Fort Worth Department of Engineering Fort Worth,Texas 76102 Reference: Amendment No. 1 - REVISED Water Main Extension to serve Walsh Ranch, Phase I D.O.E. No. 4158 Water Project No. PW77-060770140580 Dear Mr. Chaubey: Dunaway Associates, Inc. is pleased to present this Amendment No. 1 for the following additional services that are beyond our original scope of services. • 3,450 LF of additional water line due to revision of the City of Fort Worth Master Thoroughfare Plan: • additional design • additional survey • additional geotechnical • additional archeological study • additional reproduction A summary of the proposed budget for this revised amendment is as follows: Basic Fee Design of 3,450 LF $ 27,600.00 UVRE Survey $ 8,000.00 Sub-consultant administation (10%) $ 800.00 Geotechnical $ 3,800.00 Sub-consultant administation(1011/6) $ 380.00 Archeological Survey $ 750.00 Sub-consultant administation(10%) $ 75. Reproduction $ 1200. ITOTAL PROPOSED AMENDMENT $ 42 605.600 6. 1501 MERRIMAC CIRCLE 0 SUITE 100 0 FORT WORTH,TEXAS 76107.6572 • (817)335-1121 • METRO(817)429-2135 • FAX(817)335-7437 • Amendment No. 1 November 21, 2003 Page 2 A summary of the total project is as follows: Contract Description Fee Original Contract Design of 31,000 LF of Water $965,406-95 Improvements Amendment No. 1 Design of 3,450 LF of Water $42,605.00 Improvements ITOTAL PROJECT $ 1,008,011.95 Please review the enclosed information and do not hesitate to call me N you have any questions or require additional information regarding this proposal. Sincerely, DUNAWAYOCIATES, INC. Brian S. Darby, P. Associate 2002113 Amendment#1_RChaubey_03-1121_BSD.doc C", 'L City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 1/20/2004 DATE: Tuesday, January 20, 2004 LOG NAME: 30WALSH AMD1 REFERENCE NO.: **C-19940 SUBJECT: Amendment No. 1 to the Engineering Agreement with Dunaway Associates, Inc. for Water Main Extension to Serve Walsh Ranch, Phase 1 RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 29019 with Dunaway Associates, Inc. in the amount of $42,605.00 to provide for additional design and survey services, thereby increasing the contract amount to $1,008,011.95. DISCUSSION: On August 12, 2003 (M&C C-19701), the City Council authorized the City Manager to execute an engineering agreement with Dunaway Associates, Inc. in the amount of$965,406.95 for the design of a 30- inch water main extension to serve the Walsh Ranch Addition, Phase 1. Due to a recent revision of the City's Master Thoroughfare Plan, the future alignments of Walsh Ranch Parkway and West Port Boulevard were changed. Consequently, the proposed 30-inch water line, which would have been designed within the previous future right-of-way of both roadways, must be revised. The new alignment will increase the length of the proposed water main by approximately 3,500 linear feet. Dunaway Associates, Inc. proposes to provide the necessary additional design and survey services for the additional pipe length for a lump sum fee of$42,605.00. Staff considers this amount to be fair and reason- able. The project will be located in COUNCIL DISTRICTS 3 and 7, pending the completed annexation for the project, Mapsco 57W and X; 71Z; and 76D, H, J, M, N, 0, P, Q, and R. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Commercial Paper-Water Fund. TO Fund/AccountICenters FROM Fund/Account/Centers PW77 531200 060770140580 $42,605.00 Submitted for City Manager's Office by: Marc Off (8476) Originating Department Head: A. Douglas Rademaker (6157) Additional Information Contact: A. Douglas Rademaker(6157) Logname: 30WALSH AMD1 Pate 1 of 1