HomeMy WebLinkAboutContract 29728 4 AMENDMENT NO. 1 STATE OF TEXAS b CITY SECRETARY CONTRACT NO. LC ae (M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering Corporation, (Engineer) made and entered into City Secretary Contract No. 28006, (the Contract) which was authorized by the City Council by M&C C-19172 on the 30th day of July, 2002; and WHEREAS, the Contract involves engineering services for the following project: Sanitary Sewer Main 257 and 325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I, of the Contract is amended to include the addition- al engineering services specified in M&C C-19936, adopted by the City Council on 20th day of January, 2004 , and further amplified in a proposal letter dated October 24, 2003, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $111,800.52 . 2 . Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid. by the City for all work and services shall not exceed the sum of $833,700.28. IWO `04A+_13:45 RCVD �_, 1 M 13 aL 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the 4 � day of Ark, 2004, in Fort Worth, Tarrant County, Texas. / -f ATTEST: Contract Authorization 2 ity Secretary date A APPROVAL RECOMMENDED: PR q�I u IM _ A. Douglas Rademaker, P.E . Marc A. tt Director, Department of Assistan City Manager Engineering DANNENBAUM ENGINEERING CORPORATION Engineer � By: Name:Louis H. AfZnes, P.E . Principal 6421 C Bowie Suite 400 Fort Worth, TX 76116-5421 APPROVED Z 0 FORM AND LEGALITY: ��k Gary Steinberger Assistant City Attorney q Q R M&C Request Review Page I of 2 DepartmentsHome I Council Agenda I M&C I Employee Wrectary I Morning Report I Ads I PRS I Solution Zone I Print M&C COUNCIL ACTION: Approved on 1/20/2004 DATE: 1/20/2004 REFERENCE NO.: **C-19936 LOG NAME: 30DANNENBAUM1 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Amendment No. 1 to Engineering Agreement with Dannenbaum Engineering Corporation for Sanitary Sewer Main 257 and 325 (Middle and Upper Village Creek) Parallel Relief Alignment Study and Design RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 28006 with Dannenbaum Engineering Corporation in the amount of$111,800.52, thereby increasing the contract amount to $833,700.28. DISCUSSION: On July 30, 2002 (M&C C-19172), the City Council authorized the City Manager to execute an engineering agreement with Dannenbaum Engineering Corporation in the amount of$721,899.76 to prepare plans and specifications for Sanitary Sewer Main 257 and 325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design. This project is currently under design. This amendment will allow Dannenbaum Engineering Corporation to provide additional engineering services for approximately 3,000 linear foot extension of Sanitary Sewer Main 257 alignment study and design of Sanitary Sewer Laterals 2389, 2484, 3378 and 3694 and will provide for the extension of Sanitary Sewer Main 238 and Lateral 9920. These additional services were necessary as a result of several design issues encountered during the original project design phase. All of these services are within the original project area. Dannenbaum Engineering Corporation proposes to provide these additional services for a lump sum fee of $111,800.52. City staff considers this fee to be fair and reasonable for the scope of services proposed. Dannenbaum Engineering Corporation is in compliance with the City's M/WBE Ordinance by committing to an additional 28% M/WBE participation on this Amendment No. 1. The City's goal on this amendment is 24%. This project is located in COUNCIL DISTRICT 8, Mapsco 106V and Z; 107F, K, J, N, and S; and 120F, K, P, and T. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Project Fund. http://www.cfwnet.org/council_packet/mc_review.asp?ID=1634&councildate=1/20/2004 3/9/2004 M&C Request Rcview Page 2 o' 2 TO Fund/Account/Centers FROM Fund/Account/Centers P172 531200 070172141030 $111,800.52 Submitted for City Manager's Office by: Marc Ott (8476) Originating Department Head: A. Douglas Rademaker (6157) Additional Information Contact: A. Douglas Rademaker (6157) ATTACHMENTS http://www.cfwnet.org/council_packet/mc_review.asp?ID=1634&councildate=1/20/2004 3/9/2004 DANNENBAUm ENGINEERING CORPORATION ' • 6421 CAMP BOWIE BLVD.,SUITE app FORT WORTH,TEXAS 76116-5421 (817)763-8883 k r� o£ �, Gr:i'isnss October 24, 2003 Mr. Gopal Sahu, P.E. Department of Engineering City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102-6311 RE: Supplemental Agreement No. 1 -REVISED Sanitary Sewer Mains 257 and 325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design Water Project No. P170-070170140030 D.O.E. No. 3650 Dear Mr. Sahu: This letter is to provide information regarding the change in scope on the Water Department work on the above referenced project. The City has requested that Dannenbaum Engineering add a 3,000 linear foot extension of the Main 257 alignment study to Part 1 of the original contract, add the design of Lateral 2389 and Lateral 2484, the extension of the designs of Laterals 5133:and 3636 and the reroute and design of Main 188, Lateral 3378 and Lateral 3694 to Part 3 of the original contract and add the extension of the design of Main 238 and Lateral L-9920 to Part 4 of the original contract. Approval of Supplemental Agreement No. 1 will increase the design fee from $721,899.76 to $833,700.28. Please inform us of the City's approval of the contract changes. If you have any questions in the meantime, please do not hesitate to call. Sincerely, Brian D. O'Neill, P.E. Project Manager cc: Peter Fu, P.E., FW Water Department Louis H. Jones, Jr., P.E. Gary W. Fisher, P.E. i ,l _ L File 3642-32 G:\1210\3642-32Wdmin\Agreement\Supplemental#]\Letter Sahu 2003-10-23.doc EXHIBIT B-3 (SUPPLEMENT TO ATTACHMENT B) DESIGN FEE COST SUMMARY—SUPPLEMENTAL AGREEMENT No. 1 SANITARY SEWER MAINS 257 AND 325 MIDDLE AND UPPER VILLAGE CREEK PARALLEL RELIEF ALIGNMENT STUDY AND DESIGN Sanitary Sewer System Rehabilitation and Improvements Water Project No.-P170-070170140030 DOE No. 3650 Phase Scope of Services Fee MIWBE % I- Design Services Part 1 —Alignment Study $ 4,577.71 $ 1,650.00 36.04% (Exhibit A-1) Part 3 —San. Sew. Rehab. $ 82,926.73 $ 24,774.00 29.87% Design (Exhibit A-3, Parts A&B) Part 4 —San. Sew. Rehab. $ 22,696.08 $ 248.00 1.09% Design (Exhibit A-4, Parts A&B) Il-Construction Phase Part 3 —Village Creek Basin $ 500.00 Construction Assistance (Exhibit A-3, Part C) Part 3 —Village Creek Basin $ 450.00 As-Built Drawings, Part 4—Main 238 Drainage Area $ 300.00 Construction Assistance (Exhibit A-4, Part C) Part 4 —Main 238 Drainage Area $ 350-00 As-Built Drawings TOTAL $ 111,800.52 "r CIM Mob CIFf SECURE a YEN. G:\1210\3642-32\Admin\Agreement\Supplemental#1LSupplemental#I.doc Proposed NVINBE Subconsultants Services Fees % Blanton & Associates Environmental Assessment $ 1,650.00 1.48% ANA Consultants Field Survey (Part 3) $ 23,340.00 20.88%. ANA Consultants Easement Preparation (Part 3) $ 1,000.00 0.89% Trevino & Associates Reproduction (Part 3) $ 434.00 0.39% Trevino & Associates Reproduction (Part 4) $ 248.00 0.22% TOTALS $ 26,672.00 23.86% G:\1210\3642-32\Admin\A-,reement\Supplemental#11.Supplemental#l.doc EXHIBIT B-3A - (SUPPLEMENT TO ATTACHMENT B) SUMMARY OF DESIGN FEE— SUPPLEMENTAL AGREEMENT No. 1 SANITARY SEWER MAINS 257 AND 325 MIDDLE AND UPPER VILLAGE CREEK PARALLEL RELIEF ALIGNMENT STUDY AND DESIGN Sanitary Sewer System Rehabilitation and Improvements Water Project No. P170-070170140030 DOE No. 3650 The proj ect has been divided into four(4) distinct parts. This Supplemental Agreement proposes to add the 3,000 linear foot extension of the Main 257 alignment study to Part 1 of the original contract, add design of Lateral 2389 and Lateral 2484,the rerouting of Main 188,Main 182,Lateral 3378 and Lateral 3694, and the extension of the designs of Lateral 5133 & Lateral 3636 to Part 3 of the original contract and add the extension of the design of Main 238 to Part 4 of the original contract. • Part 1 —Alignment Study See Special Services • Part 3 —.Village Creek Drainage Basin Sanitary Sewer Rehab. Design Construction Cost $ 797,700.00 85% of TSPE Curve A (7.4% * 0.85) 6.29% Basic Design Fee $ 50,175.33 t- ";} • Part 4—Main 238 Drainage Area Sanitary Sewer Rehab. Design. Construction Cost $ 213,600.00 85% of TSPE Curve A (8,5% * 0.85) 7.23% Basic Design Fee S 15,443.28 Special Services (Part 1 —Main 257 Alignment Study) Design Engineering $ 2,762.71 Environmental Assessment (Blanton) $ 1,650.00 10% for M/WBE Subcontractor (0.1 * $ 1,650.00) $ 165.00 Special Services (Part 3 —Village Creek Drainage Basin Sanitary Sewer Rehab. Design) Design Surveys (ANA) $ 23,340.00 Easement Preparation (2 at $500.00/Ea) (ANA) $ 1,000.00 Traffic Control Plans $ 2,100.00 Temporary Right of Entries $ 2,900.00 TxDOT Coordination (Permit) $ 500.00 Reproduction* 16 Sets of preliminary plans (util. clear) (Trevino) $ 112.00 40 Sets of Construction Plans (Trevino) $ 280.00 Miscellaneous Printing (6 sets and Misc.) (Trevino) $ 42.00 10% for MIWBE Subcontractor (0.1 * $24,774.00) $ 2 4 *Estimated using 7 sheets per plan G:\1210\3642-32�Admin\Agreement\Supplemental#t\Supplemental#l.doc Special Services (Part 4—Main 238 Drainage Area Sanitary Sewer Rehab. Design) Design Surveys $ 4,880.00 Traffic Control Plans $ 2,100.00 Reproduction* 16 Sets of preliminary plans (util. clear) (Trevino) $ 64.00 40 Sets of Construction Plans (Trevino) $ 160.00 Miscellaneous Printing (6 sets and Misc.) (Trevino) $ 24.00 10% for M/WBE Subcontractor (0.1 * $ 248.00) $ 24.80 *Estimated using 4 sheets per plan Construction Services(Part 3 —Village Creek Sanitary Sewer Rehab.) $ 500.00 As-Built Drawings (Part 3 —Village Creek Sanitary Sewer Rehab.) $ 450.00 Construction Services (Part 4—Main 238 Area Sanitary Sewer Rehab.) $ 300.00 As-Built Drawings (Part 4—Main 238 Area Sanitary Sewer Rehab.) $ 350.00 TOTAL NOT-TO-EXCEED $ 111,800.52 h-i order to ensure M/WBE participation in this project, we will be using ANA Consultants for surveying,Blanton and Associates for environmental investigation and Trevino and Associates for reprographics. This will result in a 23.86% portion of the services included in this supplemental agreement and a 27.55% portion of the overall contract that will be performed by approved M/WBE firms, which will exceed the target goal of 24%. G:\1210\3642-32\Admin\Agreement\SupplementaI#1\Supplemental#l.doc City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 1/20/2004 DATE: Tuesday, January 20, 2004 LOG NAME: 30DANNENBAUM1 REFERENCE NO.: **C-19936 SUBJECT: Amendment No. 1 to Engineering Agreement with Dannenbaum Engineering Corporation for Sanitary Sewer Main 257 and 325 (Middle and Upper Village Creek) Parallel Relief Alignment Study and Design RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 28006 with Dannenbaum Engineering Corporation in the amount of $111,800.52, thereby increasing the contract amount to $833,700.28. DISCUSSION: On July 30, 2002 (M&C C-19172), the City Council authorized the City Manager to execute an engineering agreement with Dannenbaum Engineering Corporation in the amount of $721,899.76 to prepare plans and specifications for Sanitary Sewer Main 257 and 325 Middle and Upper Village Creek Parallel Relief Alignment Study and Design. This project is currently under design. This amendment will allow Dannenbaum Engineering Corporation to provide additional engineering services for approximately 3,000 linear foot extension of Sanitary Sewer Main 257 alignment study and design of Sanitary Sewer Laterals 2389, 2484, 3378 and 3694 and will provide for the extension of Sanitary Sewer Main 238 and Lateral 9920. These additional services were necessary as a result of several design issues encountered during the original project design phase. All of these services are within the original project area. Dannenbaum Engineering Corporation proposes to provide these additional services for a lump sum fee of $111,800.52. City staff considers this fee to be fair and reasonable for the scope of services proposed. Dannenbaum Engineering Corporation is in compliance with the City's M/WBE Ordinance by committing to an additional 28% M/WBE participation on this Amendment No. 1. The City's goal on this amendment is 24%. This project is located in COUNCIL DISTRICT 8, Mapsco 106V and Z; 107F, K, J, N, and S; and 120F, K, P, and T. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Project Fund. Loename: 30DANNENBAUMI Paye 1 of 2 _ l R TO Fund/Account/Centers FROM Fund/Account/Centers P172 531200 070172141030 $111,800.52 Submitted for City Manager's Office by; Marc Ott (8476) Originating Department Head: A. Douglas Rademaker (6157) Additional Information Contact: A. Douglas Radernaker (6157) Logname: 30DANNENBAUMI Pate 2 of 2