Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 43754-CO5
CITY SECRETAW COWRACT W. FORT'WORTH. City of Fort Worth Change Order Request Project Name I Village Creek WRF Deep Filters 1-20 Modifications(Scum Screen Addition) City Sec# 43754 Client Project#(s)l Fort Worth(01628); F&N(FTW11104A); Pepper-Laswon(21813) Project Rehabilitation of 20 filters at Village Creek WRF, Design M&C C-24703;Construction M&C C-25887 Description Contractor Pepper-Lawson Construction,LP Change Order# 0 Date 1 11/03/2014 City Project Mgr.1 Farida S Goderya,PhD,PE City Inspector FTobert Walker and Ted Gay(F&N) Dept. Water Totals Select Day Type Original Contract Amount $16,268,000.00 $16,268,000.00 730 Extras to Date $593,689.00 $593,689.00 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $16,861,689.00 $16,861,689.00 7300 Amount of Proposed Change Order $41,977.00 $41,977.00 Revised Contract Amount $16,903,666.00 $16,903,666.00 735 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $41,977.00 $41,977.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 391% MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+2591o) $20,335,000.00 JUSTIFICATION (REASONS)FOR CHANGE ORDER This Change Order#5 covers the following: PCM 008A and CMR 008 Note,Time Extension of five(5)days is also included in t i$ Order. The additional details may be found in the subse y er,eity Se It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Company Name Contractor Name Co tract Signature Date Pepper-Lawson Construction, LP Atul Raj,Vice President 11/04/2014 n'+ Inspector/Inspection Supervisor Affillmoft3 Date Project Mana er/Progra manager Date _m Robert Walker/Ted Gay,PE ,X --11K�:` Farida S.Goderya,PE m Assistant Director Dept. Date Director,Contracting Department(Dept) Date Andrew T Cronberg, P; // Assistant City Atto n l Dde Assistant City Manager Date Doug Black —� t(� � Q i Fernando Costa c Council Action if required ry M&C Number ,V M&C Date Approved N A=h E f1c 0� � i C) / \ / # / 2 # Q ƒ 0 / . g - _ Z;- e f k / / k 7 = % ƒ, 3 © $ / / §_ -2 e ° G \ & ® w 0 � ƒ / o © © k / � \ = n 9 n % 5 ƒ om / / � � n / C LL Cl 00 / / / £ $ . / U 2 ƒ / \ Q f 2 \ / M s § 2 w g u g CL cn / � k LF— @ 2 ) G ƒ \ / c . . . * _ \ § g ca c ƒ / g \ e m a _ 2 t \ / � - c / & \ / u \ 7 Ho- =ƒ Da) On, _ % ) » G G \ § \ co 2 • - / \ / D / a) / ' / a) / Page 1 of 1 Gay, Ted O� From: Goderya, Farida C� Sent: Thursday, July 03, 2014 1:21 PM To: Gay, Ted; Bailes, Norma Cc: chad.simmons @freese.com; Chad Simmons Subject: RE: VC Deep Filters PCM008A Filter Handrail Installatlon Approval" Attachments: RE: VC Deep Filter PCM007 Handrail Work Cost Estimate; internal' Hi Ted/Chad, I have reviewed the PCM 008A for furnishing and installing Filter handrails. The need for this additional handrail was realized during the construction and is detailed in the PCM paperwork. I understand, this proposal includes all costs associated with this handrail work and does not require contract time extension. I am in agreement with this PCM 008A and it will be included in the next change order(CO#5) paperwork. I have attached the another email chain,just in case if you want to include in the PCM paperwork. Call or email with questions. Regards. Farida ---------------------------------------------------- Farida S. Goderya, PhD, PE Sr. Prof Engineer I Facilities Project Manager Fort Worth Water Department Office: 817-392-8214 Cell: 817-851-4910 Farida.Godcrva(&fortworthtexas.gov City of Fort Worth— Working together to httild a strong community FORT WORTH From: Bailes, Norma Sent: Monday, June 09, 2014 11:48 AM To: Goderya, Farida Cc: chad.simmons @freese.com; Gay, Ted Subject: VC Deep Filters PCM008A Filter Handrail InstallatIon RECOMMEND Good Morning Farida, Attached is VC Deep Filters PCM008A Filter Handrail Installation recommendation letter. Thanks for your help. Norma 7/7/2014 ■ approaches • ; 4055 International Plaza,Suite 200 • Fort Worth,Texas 76109 • 817-735-7300 • fax 817-735-7491 www.freese.com June 9, 2014 C) City of Fort Worth Water Engineering Department 1000 Throckmorton Street Fort Worth, TX 76101 Attn: Ms. Farida Goderya, P.E. RE: Village Creek Deep Filters 1-20 Modifications Capital Project No. 01628 F&N No. FTW11104A PCM008A—Filter Handrail Installation Dear Ms. Goderya: Transmitted herewith please find a copy of Pepper-Lawson's June 4, 2014 price proposal for the referenced work.The cost for this work is$34,284.00. No additional Contract Time has been requested. The plant safety group has requested the handrail layout be modified to provide operator access to the air scour valves on nine sidewalks on the filters. The original design intent to keep access limited to competent personnel who would make entry over existing handrails to the valves and electrical panels utilizing personal protective equipment (fall protection). The Operations staff may need access to the air scour valve actuators during weekend and night time operations and requested the safety group to review the proposed handrail improvements and to determine if additional handrail systems were needed. We have reviewed this price proposal and are of the opinion that it is a fair and equitable price. We recommend the City accept this cost and issue a Change Order in the amount of $34,284.00. Please advise if the Water Department desires this PCM be incorporated in a Change Order. Sincerely, FREESE`AND NICHOLS, INC. �j� G. E. Gay, P.E. Xc: Chad Simmons-FNI Jason Ho-JQ file FTW11104A.4.41.008A L:\VC Deep Filters\CHANGES\PCM\OOBA Filter Handrail Installation 060914 RECMD (D ►� PROPOSED CONTRACT MODIFICATION 4 .41/008A PROJECT:Village Creek WRF Deep Filters 1-20 Modi.E_i__c_ation PROJECT NUMBER OWNER: City of Fort Worth 01.628 - CONTRACTOR: Pepper-Lawson _ 21813 CONSTRUCTION MANAGER: Freese and_Nichols, Inc. FTW11104 PCM DESCRIPTION: Filter Handrail Installation PCM NO. 008 NOTIFICATION TO CONTRACTOR: The Owner proposes to make the additions, modifications or deletions to the Work described in the Contract Documents as shown in Attachment "A". We request that you take the following action within 1.0 calendar days: Notify us that you concur that this change does not require a change in Contract time or amount. A Field Order will be issued. X Submit a Price Proposal with detailed cost breakdown of labor, materials, equipment, and all other cost related to this change. Proceed with the change. Payment will be made at the unit price bid. Proceed with the change under the time and materials provisions of the Contract. Authorization to proceed with changes must be approved by Field Order or Change Order in accordance with the Contract Documents. By: Ted Gay, P. E. Date: April 29, 2014 CONTRACTOR'S RESPONSE: We respond to your request as follows: ❑ We concur that this is a no cost or time change. Issue Field Order. x❑ We submit the attached Price Proposal with detailed cost breakdown and revised schedule for performing the described change. ❑ We are proceeding with the change at the unit price bid. ❑ We are proceeding with the change under the time and materials provisions of the Contract. By: Aaron James Date: 5/6/14 6/4/14 ACTION TAKEN: ❑ Proposed Contract Modification rejected. Contractor is hereby notified NOT to proceed: By: Date: ❑ Field Order issued: No. Date: By: ❑ Change Order issued: No. Date: By: 1 riH 1()11;.A.d 1. .m PRUI'O:;r D CONTRACT MOD f F]CAT[ON PCM-008AAT`('ACHMi?Nl' A PROJECT:Village Creek WRF Deep ViILers 1-20 Mod ilic.ilion PROJECT NUMBER OWNER: City of Fort Worth_ 0162_8 CONTRACTOR: Pepper-Lawson ?.1813 CONSTRUCTION MANAGER: Freese and Nichols, Inc. 1-7011104 PCM DESCRIPTION: Filter Handrail InsLallaLion PCM NO. 008A The Owner proposes to make the following additions, modifications or deletions to the work described in the Contract Documents. Authorization to proceed with these changes must be approved by Field Order or Change Order in accordance with the Contract Documents. RE: Filter Handrail Installation 1. Install additional handrails on top of filters as shown on attached drawings Sheets F23, F24, & F25. 2. Revise your record drawings as appropriate. By: Ted Gay, P.E. Date: April 28, 2014 I 2 Title: v( ye.,, f..i Date: /17//r ��Y� t/G, 7/io ��/�t, /�/y, /r//l, /�P /V/LO N \ U ♦, � r r �r O � � 4"/ fi+�r�! 7- C.to,.-, �. .� tl,.�.�.<. ct�.n.,c� A � �'o,� �',,,•s rm Page Of PEPPER-LAWSON $ WATERWORKS June 4,2014 Mr.Ted Gay Freese and Nichols 4055 International Plaza Suite 200 Fort Worth,Texas 76109 Re: City of Fort Worth Village Creek Deep Filters 1-20 Modifications PCM 8A Filter Handrail Installation Dear Mr.Gay: Per the engineer's PCM008 dated April 29,2014 and as modified in the revised drawings dated May 27,2014,Pepper- Lawson Waterworks offers aproposal to furnish and install approximately 715 If.of three-line, 1-1/2"Schedule 40,standard riveted aluminum handrail with 24"solid reinforcing bar.Please note that the proposed handrail will have clear anodized finish with the base being mounted to the concrete.A copy of the proposed base mount is attached for clarification.It is noted that the proposed handrail will terminate 4"before the electrical disconnects as shown on the PCM.Please note that the proposed handrail manufacturer will be Peak To Peak.Rocky Mountain Railings is the handrail supplier per contract.Rocky Mountain Railings is no longer in business.The miscellaneous metals supplier has quoted handrail to match the handrail that will be provide per the contract documents. This change will result in a add to the Contract of $34,284 and an increase in contract duration of 0 calendar days from the date of approval to deliver the materials to the site and perform the work. Upon receipt of approval from the City of Fort Worth and Freese and Nichols as to the acceptability of our proposal, Pepper-Lawson will proceed with procuring the materials to be installed.Should you or the owner have any questions you are welcome to contact me at any time. Thank You. Sincerely, PEPPER-LAWSON WATERWORKS,LLC Aaron James Project Manager PO Box 120338 ® Arlington,TX 76012 P.(214)505-4010 F.(866)265-6220 www.t)lwaterworks.com PEPPER-LAWSON r WATERWORKS City of Fort Worth-Village Creek Deep Filter 1-20 Modifications 6/4/2014 Pepper Lawson Job#21813 PCM 8A I iltcr I landruil Installation NON-TAXED TAXED LABOR MATERIAL MATERIAL EQUIPMENT SUBCONTRACTOR ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO DESCRIPTION QTY UNIT COST COST COST COST COST COST COST COST COST COST 0.00 0.00 0.00 0,00 0.00 1 Filter Handrail Installation 260 MH 18 4680.00 0.00 0.00 0.00 0.00 2 Seguin Fabricators 1 LS 0.00 21165 21165.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 mol 0.001 0.001 0.001 000 SUMMARY 1 2 3 4 5 DIRECT COST SUBTOTAL 4680 21165 0 0 0 A LABOR BURDEN 2433.60 N/A N/A N/A N/A B TAX @ 8.25% N/A N/A 0 0 N/A C SUBTOTAL 2(A+B+C) 7113.6 21165 0 0 0 D SMALL TOOLS 1067.04 N/A N/A N/A N/A E SUBTOTAL(D+E) 8180.64 21165 0 0 0 F EQUIPMENT BURDEN N/A N/A N/A 0.00 N/A G SUBTOTAL(F+G) 8180.64 21165 0 0.00 0 H OH&P SUBS @ 5%(0.1xH) N/A N/A N/A N/A 0.00 I SUBTOTAL 3(H+I) 8180.64 21165.00 0.00 0.00 0 J OH&P SELF PERFORMED @ 15%(0.15xJ) 1227.10 3174.75 0.00 0.00 N/A K SUBTOTAL 4(J+K) 9407.74 24339.75 0.00 0.00 0.00 L BONDS&INSURANCE @ 1.59%(0.0159xL) 149.58 387.00 0.00 0.00 0.00 M SUBTOTAL(L+M) 9557.32 24726.75 0.00 0.00 0.00 N ITOTAL BASE BID(J1+J2+J3+J4+J5) 34284.07 TOTAL BASE BID(J1+J2+J3+J4+J5) 34284.07 OTHER N/A TOTAL COST R734,284] Project Change Order - Detail Job #12-307 Village Creek WRF Deep Filters Page # 1 Property of Seguin Fabricators, Ltd 06/04114 15:12:25 (Variation Ref.Equals 3) Change Order ref. kwo'H/Mhdrail Estimated value $21,165.00 Description @ Filters Agreed value $0.00 Date created Date received 05/01/14 Q� Internal/External External J Status RFQ Created by JENN Customer PO number Customer ref Engineer ref Architect ref Invoice number Invoice date Payment date Notes 614/14 Revision 2: Revised drawings received 5/29/14. Total handrail required =7151f Includes chains at east end of filter where handrail ends. Revised Cost= $21,165.00 5/6/14 Revision 1: Field measurements have been taken and the filter walkways are 64'-10"long.Total handrail required = 1,167 If Revised Cost= $33,945.00 5/1/14 Seguin Fabricators is quoting 1,080 If of 3-line, 1-1/2"sch 40, standard riveted handrail with 24"solid reinforcing bar. Finish will be clear anodized finish. Base mount to concrete. See attached sketch of proposed base mount for handrail. Handrail between filters 1/2, 3/4, 5/6, 9/10, 11/12, 13/14, 15/16, 17/18, 19/20 per drawings F-23, F-24, F-25. Cost= $31,880.00 Please sign below and return if you accept this change order. This report was generated by FabTrol MRP software. For product information,call(541)485-4719 or visit www.fabtroLcom Project Change Order - Detail Job #12-307 Village Creek WRF Deep Filters Page # 2 Property of Seguin Fabricators, Ltd 06/04/14 15:12:25 U4,'R� Pepper Lawson Date Rue- From: Aaron James[mailto:AJames @pepperlawson.com] Sent: Monday, April 28, 2014 3:12 PM To: 'Jennifer Warren' Cc: Nicolas Monsanto Subject: FW: VC Deep Filters PcM008 Filter Handrail Installation RESEND Jennifer, Please take a look at the attached PCM. Please provide pricing for additional handrail for the subject project. The previously submitted detail that showed the stainless steel plate will not be used on this revised drawing. The Owner would like aluminum handrail with the base anchored directly to the concrete deck. Please provide pricing by May 5th. Thanks. Aaron James Project Manager Pepper-Lawson Waterworks, LLC This report was generated by Fab Trol MRP software. For product information,call(541)485-4719 or visit www.fabtrol.com C reeK 5" 3/4" 3/4" (4) 9/16"0 HOLES 3/4" FOR 1/2"0 S.S. ADHESIVE ANCHORS 2 1/2" X 5" LG. 0 0 2 1/2" 3/4" 2 1/2" 2 1/2" POST STIFFENER (2) 3/8"0 TAPPED HOLES LENGTH WILL VARY FOR 3/8"0 S.S. SET SCREWS X 1/2" LG. ALUM, PIPE CAST ALUM. BASE PLATE "B55" (SHIP LOOSE & FIELD ATTACH) a a a a a LEVEL CONC. LINE POST B55 _ Nt/ld NOUVOId100W 8—l S831113 aim SN° o I.° I °I•°,°{3—MS—MYIA S231113 b IV aw ZI YI 6 dN NOIIOntllSN00 NO!03ns51 17 s»� wynlOntlls Yr a 1I YI. Hr BOONOd tl3d IIVtlONVH OOV N 3s3ai�� SOOW OZ-I, S8311IJ d33O AM N3383 3JbrI11 WWI/S 01/9419 Hf VBOONOd tl3d 1M10NVH 35N1tl L, SVX31 '"ISOM 1tl03 30 Al1O '011M1-' a� � om.nc 3°llY015VMMDf .0-,59 , Inu� £ pNw rc __. - rcN ¢v1 �II�3YSN - ry co om - - - I 1 1 1 I 1m I Yl -o - oa ui I'. 1 - uzi� S ¢` as O°S2 , <a ?moo : a7 0 °w°�sio zaW 0� 'si III I OI m oL o�Y1ffi elriwi'i °o� L J a �w2 oou�iz 3 O j I I :O Y. 2aa�m �i � O o dAL �13F I'I 0 O IIdAI I II'; Iln��ll I1 r.=iz o«� y.31`•'"+z°s`��01�°<�w 7�3 aaYirciniiF� �irczrc j c°a�Onn LL ,_ IIICCC 6® lz o �m i a Z o �W� II II 1; I I I I; 11 11 p I, I I- - I'1O z_ O_:._IMF` -_-_i__ � ' '._I_I- ?z _ ._ •r' 7.1 rc� I li; II °Ilo w —lI 11 II 11 I I I,1, II 11 ————— is1 v „ s Fol -- ja I , I N4°w I I I I l I I 4111' i t ZO z I I 11 �oYa 11 I I 110 ^ 'Yjpa4 I i I I I I I I I II II I I ry , ------------ --� = - - - ' -- - rvll II 11 ml I 4111 ' I Fo F O I I I I c z + ; VZ-A 133NS 33S 3NIT3 AVn' _ - 1 E ® 3¢3 .0-.09 .0-.01 .9-. wJ Y3 8 o raise sn vassal-noz•ez v° Il.W°l,morn vrz-e-v<«\°•.\Yaocut\lanai a�a.o.�o A•n (vwi sm)ro�°I wn am NVId NOUVO13100W V l-6 S811113 Y•r,z-3-a/oc aY,.n,;o� luv,•Iw �� '6u1•oop I SNJ s IOa,x0 as�i„1W,I 9 31 9 A M S213111 zr ,a„,ZI 9I a dN N0110nmtsN00 90f j3ss v iyuntonsis oI {z f "r 'A*ON 83890 fV q S�ON�INI" •SOOW OZ-L 5831113 d330 38M N3380 39VIIIA �iaic�-'9i s` Hf VBOOBNdON3I1 WHO°Nn 3533tld SVX31 'H18oM 1803 J o Ally ,a"IMII v nu9a9nxn o 1 rc m� W ;s3TI tt wo H F aFi 4, o °� �J n Z rc 'io i h� 3 n uFF watt 2GGp a2 O O Fj 8Nr <FO{Ol Z;°O Zx�� ——— — _ KttOF wy=O -06< ri. -10 m 116 0 P.�rci FO i � I I I I I 1 1 1 Ill I I I I 1 1 .o Nw$ 2 w 335 p O—o =ul z'�G ,3• �aOtt z 3NIlHI 3NIIH 33S 0. i 1, p p wg= III I I l l l l i; �LLII IoawmQ IIII II II 11 rc ��ew I I 'Iv9 1 3��II w I�-V33wWry 111,' 11 N I I �.x{.I lb p LL z°�z rc �_ "x�oa--. I i. �Frrc2wn a fi I ng ti 'I 11 �rc-z - -- �]�F" "�°� ar=zia--�i �w ° i�°Hpa ���-ri o. m ` I vo- dAL Z Q II w ��� I -- -- m 10. Z l o� L.J'- ,o- o ® - _--- -- N Wz (IHSZ_i a I Iwl I ¢z I 1 I Ill it I I I I 133"5 335 ''I 1 — ——— - - 10 AA � n JJ-_ I,IJ_ .LII A. I-I_ !l .II I = I1 111 �_i - 0 T.00-.01 .0l dl .0-.59 7 OL 2x3 rc3O +� m ®4 ti wi az a3� :l4Ml 0 S115d 6:Sll ASS'-0I-1tOL'6L x.11 n^�m anwn gc-,z-e-vcoc\Y•o\a(ocuMlacMn .,,.n (v»i srtl)w�sl ra orov NVId NOUVO131(I0W OZ-91 52131113 6•ose-rotor „^1':a^rW '%y, I„x".m S2131113 n' sr,Zl it B aH I NOUndlstlo0 a01 03ns91 In ivanionais off aaaao 01311 N S70HMMIM SOOW OZ-1 SN311IJ d330 321M H3380 30dlllA Hr Hr I YB0000113d lIVa011YH 3SA9a lI + as3aai svx31 'WHOM iaoJ Jo ul3 .ol„xu ""'" mlmtmxn i ' 6 LL i ¢n � �?y°sW °. z X830 <V ♦ ¢ Z w e C Lf _ 3HfIHJ11M F� I3p i i' oj�ci ww0mo� I 1In wlI I II n l I II II ; � �FZ� ° m�H I I �1 I 1 1 'I S°3 wry III 11 11 ;1 j ° O�Z �ZW ON im$ I II. Z I ¢ s rZ3 ?gI I 1 1 I w l I I I 1 1 I I •21 I - ° ° ZZQ F IL ( I 1=�I I=—�; I- —�� I I _L J I I► a Wo o w= wm w U �� 1► I���i Liu I ii�� II 1i ii �U d.0 1 II I d.0 O °w v w i�I LU i W � i 11 irl° IHi�II 11 I I I wl 11 l Iln'N I I I' - o W nl I� I i I II j,a 1 41 1 I i ,qRM W° Jlw wly' u jU Wla° nN �4z 1`49 1 I 1 �i3� SI° woo II 1 �.. U :H 11� II II II I 11 11 II 11'- IT I 0 _ � JI 11 _L�1 I - rcz ~Z = W. ° m4 ¢o koW E .0-,01 Z-,901 8 yy6 511 VKSdI-aIOZ•6i t^tl H^atal:111MY1 bap'SL-f-Pt(K�bap\Bt°r44[�IQIJI�:1 aalW[awo tea[° (V»l STl)[0'6t Htl WJ/ Bailes, Norma ' `� 01� From: Goderya, Farida Sent: Friday, September 12, 2014 4:33 PM To: Bailes, Norma; Gay, Ted;Aaron James (AJames @pepperlawson.com) Cc: 'Chad Simmons' Subject: RE:VC Deep Filters CMR008 F15-20 Mechanical PIping Painting & Corrosion Protection, Approved Hi Ted/Aaron, Consider this email as an approval for this CMR 08, which is for the corrosion protection and painting of F15-20 piping and valves,within the filter gallery. The filters F15 through F20 are relatively newer filters and the piping coating damage is not severe, however to have the consistent repairs for all the filters (F1-20), it was decided to proceed with this CMR 08 in the amount of$7693.00. Please proceed with the work and this CMR 08 will be processed into the next Change Order No 05. Call or email with questions. Regards. Farida ---------------------------------------------------- Farida S. Goderya, PhD, PE Sr. Prof Engineer I Facilities Project Manager Fort Worth Water Department Office: 817-392-8214 Cell: 817-851-4910 Farida.Godetya@fortworthtexas.gov City of Fort Worth — Working together to build a strong community FORTWORTH. From: Bailes, Norma Sent: Thursday, September 11, 2014 1:27 PM To: Goderya, Farida Subject: VC Deep Filters CMR008 Filters 15-20 Mechanical PIping Painting &Corrosion Protection RECOMMEND Please find attached VC Deep Filters CMR008 Mechanical Piping Paint&Corrosion Protection RECOMMEND. This has also been posted to Buzzsaw. Thanks. Norma 1 approaches Innovative Z Outstanding service 4055 International Plaza,Suite 200 • Fort Worth,Texas 76109 • 817-735-7300 • fax 817-735-7491 www.freese.com September 11, 2014 O City of Fort Worth Water Engineering Department 1000 Throckmorton Street Fort Worth,TX 76101 Attn: Ms. Farida Goderya, P.E. RE: Village Creek Deep Filters 1-20 Modifications Capital Project No.01628 F&N No. FTW11104A CMR-008 Filter 15-20 Mechanical Piping Painting& Corrosion Protection Dear Ms. Goderya: Transmitted herewith please find a copy of Pepper-Lawson's September 10, 2014 price proposal for the referenced work. The cost for this work is $7,693.00. Five calendar days Contract Time has been requested. Inspection of Filters 15-20 identified several areas of coating damage. While the areas of damage were not deemed severe enough to recommend correction during the design phase of the project, subsequent inspections during construction identified several hidden areas of damage and in particular providing new paint and a grout cant water barrier where the filtered water effluent pipe penetrates the concrete slab will eliminate an ongoing pipe corrosion problem. We have reviewed this price proposal and are of the opinion that it is a fair and equitable price and contract time adjustment. We recommend the City accept this price proposal and issue a Change Order in the amount of$7,693.00 and five days time extension. Please advise if the Water Department desires this CMR be incorporated in a Change Order. Sincerely, FREESE AND NICHOLS, INC. �� � G. E. Gay/, P.E. cc: Chad Simons-FNI file FTW11104A.4.42.008 L:\VC Deep Filters\CHANGES\CMR\CMR008 Filters 15—20 Mechanical Piping Paint&Corrosion Protection RCMD 0091114 PEPPER-LAWSON WATERWORKS September 10,2014 Mr.Ted Gay Freese and Nichols 4055 International Plaza Suite 200 Fort Worth,Texas 76109 Re: City of Fort Worth Village Creek Deep Filters 1-20 Modifications CMR 8 FW Mechanical Pioine Painting and Corrosion Protection-Filter 15-20 r.Gay: Per the Engineer's request,Pepper-Lawson Waterworks offers a proposal to recondition the existing 36-inch effluent piping and side outlet tee for Filter 15-20.Pepper-Lawson also proposes to provide additional corrosion protection for the 24-inch effluent piping at the slab by bushing a 4-inch wide by 1-inch deep strip on the perimeter of the pipe prior to reconditioning the pipe and install non-shrink grout tapered to one inch above slab at the pipe wall.Proposal also includes coating the 6-inch drain line for each filter.Proposal does not include any lead testing,abatement,or removal. This change will result in a add to the Contract of $7,693 and an increase in contract duration of 5 calendar days from the date of approval to deliver the materials to the site and per the work. Upon receipt of approval from the City of Fort Worth and Freese and Nichols as to the acceptability of our proposal, Pepper-Lawson will proceed with procuring the materials to be installed.Should you or the owner have any questions you are welcome to contact me at any time. Thank You. Sincerely, PEPPER-LAWSON WATERWORKS,LLC Aaron James Project Manager PO Box 120338 0 Arlington,TX 76012 P.(214)505-4010 N F.(866)265-6220 www.olwatrworks.com b PEPPER-LAWSON �� i WATERWORKS �� City of Fort Worth-Village Creek Deep Filter 1-20 Modifications 9/10/2014 Pepper Lawson Job#21813 CMR 8 FW Mechanical Pining Painting and Corrosion Protcclion-Filter[5-20 NON-TAXED TAXED LABOR MATERIAL MATERIAL EQUIPMENT SUBCONTRACTOR ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QTY UNIT COST COST COST COST COST COST COST COST COST COST 0.00 0.00 0.00 0.00 0.00 1 Provide Grout Cant at Floor 36 HR 18 648.00 0.00 0.00 0.00 0.00 2 Grout I LS 0.00 100 100.00 0.00 0.00 0.00 3 Dobbs Coating Systems 1 LS 0.00 0.00 0.00 0.00 5862.00 5862.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SUMMARY 1 2 3 4 5 DIRECT COST SUBTOTAL 648 100 0 0 5862 A LABOR BURDEN 336.96 N/A N/A N/A N/A B TAX @ 8.25% N/A N/A 0 0 N/A C SUBTOTAL 2(A+B+C) 984.96 100 0 0 5862 D SMALL TOOLS 147.74 N/A N/A N/A N/A E SUBTOTAL(D+E) 1132.70 100 0 0 5862 F EQUIPMENT BURDEN N/A N/A N/A 0.00 N/A G SUBTOTAL(F+G) 1132.704 100 0 0.00 5862 H OH&P SUBS @ 5%(0.1xH) N/A N/A N/A WA 293.10 1 SUBTOTAL 3(H+I) 1132.70 100.00 0.00 0.00 6155.1 J OH&P SELF PERFORMED @ 15%(0.15xJ) 169.91 15.00 0.00 0.00 N/A K SUBTOTAL 4(J+K) 1302.61 115.00 0.00 0.00 6155.10 L BONDS&INSURANCE @ 1.59%(0.0159xL) 20.71 1.83 0.00 0.00 97.87 M SUBTOTAL(L+M) 1323.32 116.83 0.00 0.00 6252.97 N ITOTAL BASE BID(J1+J2+J3+J4+J5) 7693.12 TOTAL BASE BID(J1+J2+J3+J4+J5) 7693.12 OTHER N/A TOTAL COST $ 7,693 a �-DOBBS • I <tvry Tr: uetl l hl�rlirr � Fax: (8 17) , 1197 slmuing:(817)819-4308 COATING • Scrnt7 Bli.rtrrrg 1888 Mineral Wells ttwy. SYSTEMS Weatbed'ord, Tx 76088 Aaron James, Project Manager September 8, 2014 Pepper Lawson Waterworks, LLC Cell: 214-505-4010 Email: AJames @pepperlawson.com Project: Village Creek WRF Deep Filters Subcontract Number: Re: Request for Change Order Price—Clean and repaint existing 36", 24" &6" diameter piping below the 36"butterfly valves in the Filter Pipe Gallery at Filters 15 -20 Aaron, Per your request, our change order pricing to prepare and repaint the existing 36", 24"& 6"diameter piping below the 36"butterfly valves in the Filter Pipe Gallery at Filters 15 - 20 ADD: $ 5,862.00 Note: All lead paint testing, abatement,and removal is excluded from our scope of work. Please issue a Work Order for this work if accepted. We will require the completed paperwork in our office prior to commencement of work. Please notify our office in writing when scheduling work to be performed and allow 2 weeks lead time for us to be able to coordinate material, equipment and labor. Thank you, Don Fillenworth Dobbs Coating Systems, Inc.