Loading...
HomeMy WebLinkAboutContract 32130 CIT Y SECRETARYI CONTRACT NO. �- AMENDMENT NO. 1 STATE OF TEXAS 3 CITY SECRETARY CONTRACT (No M&C Needed) COUNTY OF TARRANT 3 WHEREAS, the City of Fort Worth (City) and HDR Engineering, Inc. ; (Engineer) made and entered into City Secretary Contract No. 30607, (the Contract) which was authorized by the City Council by M&C C- 20259 on the 7th day of September, 2004 and WHEREAS, the Contract involves engineering services for the following project : Engineering Study For Pavement Reconstruction On Prewett Road (N. Beach Street to Silver Sage Drive). WHEREAS, it has become necessary to execute Amendment No . l to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract : 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated June 8,2005 a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $1,380.00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $48,191.00. 0 R N AL ®r,MCIA H 020 0']-21 -05A10 :41) RCVD 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect . EXECUTED on this the — day of J V't 2005, in Fort Worth, Tarrant County, Texas . APPROVAL RECOMMENDED: P7)r l A. Douglas Rademaker, P. E. arc A.O t Director, Department of Assistant City Manager Engineering HDR ENGINEERING, INC. ENGINEER ATTEST: f NVA . Marty Hendri , City Secretary By: -VA ontr t Authori ation Name: Glen gear�� . E . Vice President 512 Main Street, Suite 600 nate Fort Worth, Texas 76102 APPROVEP AS TO FO AND LEGALITY: ^" y S in erger Assistant City Attorney z OY����kW ��b®K� . � , YEN. ONE • Sohitions- June 8, 2005 City of Fort Worth Engineering Department 1000 Throckmorton Street- Fort Worth, Texas 76102-6311 Attention: Richard Argomaniz, P.E. Project Manager RE: Street Reconstruction on Prewett Road (North Beach to Silver Sage) Dear Mr. Argomaniz: HDR Engineering, Inc. (HDR) is pleased to submit to the City of Fort Worth, a request for fee adjustment ($1,380) for engineering services for Street Reconstruction on Prewett Road (North Beach to Silver Sage). The fee adjustment will allow the HDR Team to prepare the necessary right-of-way instruments necessary for the City of Fort Worth to acquire right-of-way needed to support the construction of the referenced project. Should you have any questions or require additional.information at this time, please do not hesitate to contact me at (817) 333-2801. Sincerely, HDR ENGINEERING, INC. Dennis W. Schulze, P. E. Project Manager DWS encls: Globe Engineering Fee Request QY MDR Engineering,Inc. 512 Main Streeto Suite 600 F 07 Fort Worth,TX 76102-3913 c.cofn NUC Request Review Pagel of 2 RTWORTH www. CFWNet.org Ft}� DepartmentsHome I Council Agenda I M&C I Employee Directory I Morning Report I Ads I PRS I IT Online I Print M&C COUNCIL ACTION: Approved on 9/7/2004 DATE: 9/7/2004 REFERENCE NO.: **C-20259 LOG NAME: 30CIPPREWETT CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Engineering Agreement with HDR, Inc. for Pavement Reconstruction of Prewett Road (North Beach Street to Silver Sage Drive) RECOMMENDATION: It is recommended that the City Council authorize the City Manager execute an engineering agreement with HDR, Inc. in the amount of$46,811 for pavement reconstruction of Prewett Road (North Beach Street to Silver Sage Drive). DISCUSSION: The 2004 Capital Improvement Program (CIP) includes funds for pavement reconstruction of Prewett Road (North Beach Street to Silver Sage Drive). The engineering agreement is for the preparation of plans and specifications for pavement reconstruction of the above-identified street. HDR, Inc. proposes to perform the necessary design work for a lump sum fee of$46,811. City staff considers this fee to be fair and reasonable for the scope of services proposed. In addition to the contract amount, $7,320 is required for project management by the Engineering Department. HDR, Inc., is in compliance with the City's M/WBE Ordinance by committing to 16% M/WBE participation. The City's goal on the project is 16%. This project is located in COUNCIL DISTRICT 4, Mapsco 36N and P. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Street Improvements Fund. TO Fund/Account/Centers FROM Fund/Account/Centers C200 531200 204400001831 $11,793.00 C200 531200 204400001832 $23.587.00 C200 531200 204400001833 $3,931.00 C200 531200 204400001851 $7,500.00 http://www.cfwnet.org/council_packet/mc review.asp?refnum=C-20259 7/8/2005 M&C Request Review Page 2 of 2 Submitted for City Managers Office by: Marc Ott (8476) Originating Department Head: A. Douglas Rademaker(6157) Additional Information Contact: A. Douglas Rademaker (6157) ATTACHMENTS http://www.cfwnet.org/council_packet/mc review.asp?refnurn=C-20259 7/8/2005