Loading...
HomeMy WebLinkAboutContract 33031 AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. .00-31 (M&C Needed) COUNTY OF TARRANT 8 WHEREAS, the City of Fort Worth (City) and TranSystems Corporation, (Engineer) made and entered into City Secretary Contract No. 31696, (the Contract) which was authorized by the City Council by M&C C-20631 on the 5th day of April, 2005 and; WHEREAS, the Contract involves engineering services for the following project: Water and Sanitary Replacement for SH 121T (Southwest Parkway) , Part 1 from Hulen Street to Summit Avenue. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I, of the Contract is amended to include the addition- al engineering services specified in M&C C-21176, adopted by the City Council on 6th day of December 2005, and further amplified in a proposal letter dated November 2, 2005, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $49,050.50. 2 . Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $707,455.00. RIGINAL 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the 9 day of A-C.ey bzr 2005, in Fort Worth, Tarrant County, Texas. ATTEST: C'� ;L11-? % ' ,gyp Contract Authorization Hendrix ._(o _ Cr City Secretary Date APPROV COMMENDED: P D: A. Douglas Rademaker, P.E . Marc A. Ott Director, Department of Assistant City Manager Engineering TRANSYSTEMS CORPORATION Engineer By: Name:Raul Pena, III , P.E . , Principal 500 W. 7t' St. , Suite 600 Fort Worth, TX 76102 APPROVE TO FORM--ASD LEGALITY: Assista City Attorne -2- , Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 12/6/2005 DATE: Tuesday, December 06, 2005 LOG NAME: 30AM1 TRANSYS REFERENCE NO.: **C-21176 SUBJECT: Authorize Execution of Amendment No. 1 to the City Secretary Contract No. 31696 with TranSystems Corporation for Water and Sanitary Sewer Replacement for SH121T (Southwest Parkway), Part 1 (City Project No. 00203) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 31696 with TranSystems Corporation in the amount of $49,050.00 to provide for additional design and survey services, thereby increasing the contract amount to $707,455.00. DISCUSSION: On April 5, 2005 (via M&C C-20631), the City Council authorized an engineering agreement with TranSystems Corporation, in the amount of $658,405.00 for the design of Water and Sanitary Sewer Relocations for SH 121 T (Southwest Parkway), Part 1. The project includes the realignment of the segment of sanitary sewer main M-133 that conflicts with the proposed SH121T (Southwest Parkway). During the design phase, the Water Department determined that the upstream segment of main M-133 is severely deteriorated and has requested that the main be replaced in conjunction with this project. TranSystems Corporation proposes to provide the necessary additional engineering services for a lump sum fee of$49,050.00. City staff considers this amount to be fair and reasonable. This project is located in COUNCIL DISTRICT 9, Mapsco 75, M, Q and R. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Project Fund, TO Fund/Account/Centers FROM Fund/Account/Centers P274 531200 709170020331 $10,356.00 http://www.cfwnet.org/council_packet/Reports/mc_pnnt.asp 12/7/2005 Page 2 of 2 P274 531200 709170020332 $20,712.00 P274 531200 709170020333 $3,452.00 P274 531200 709170020351 $14,530.00 Submitted for City Manager's Office by. Marc Ott (8476) Originating Department Head: A. Douglas Rademaker (6157) Additional Information Contact: A. Douglas Rademaker(6157) http://www.cfwnet.org/council_packet/Reports/mc_print.asp 12/7/2005 T�SysT AAs C O N S U L T A N T S November 2, 2005 revised Liam Conlon Department of Engineering City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102-6311 RE: Amendment 1 of SH 121T, Part 1 Water and Sewer Relocations City Project No. 00203 D.O. 4855 Dear Mr. Conlon, We have prepared this amendment request to cover additional sewer lines that the Water Department wishes to include in our SH 121T contract. In addition to the below description of the Scope of Work we have also attached a "Preliminary Opinion of Probable Construction Costs" and an itemized breakout of survey tasks and hours. 1. Surveys Lump Sum $14,530 • Surveys include approx. 36001f of topographic surveys for Vickery Blvd and Rutledge Street. 2. Final Engineering Design Lump Sum $31,020 Final engineering plans and specifications are proposed for the following Sewer Main replacement: M-133 from Station 26+62 to Station 62+35. Preliminary Opinion of Probable Costs $ 414,700 Engineering Design Fee: $414,700 x .088 x .85 = $31,020 Subtotal $45,550 Special Services: SWPPP $ 1,000 Printing $ 500 Record Drawings $ 1,000 10% for Sub-Consultant $ 1,000 subtotal $ 3,500 TOTAL Lump Sum Fee of $ 49,050 2 Summary of Contract Original Contract 658,405.00 .Amendment 1 49,050.00 Revised Contract Amount with Amendment 1 $ 707,455.00 This proposal does not include: 1. Excavating or uncovering City water and sewer mains. 2. Easement surveys and documents. 3. Construction administration. 4. Environmental Documentation. 5. SRF Funding. We will be using Stream Water Group for engineering and Arlington Blueline for reproductions to ensure the specified percentage goal of the contract will be performed by an approved MBE. If you have any questions or require additional information please give me a call. Sincerely, Tran yst' oration Consultants ul P , rincipa CITY tE0POR-a RF."w,.��"'Jy��71'l7��i ��i . •i40-i: al E J -