Loading...
HomeMy WebLinkAboutContract 30532 AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO.,-�053D— (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Huitt-Zollars, Inc (Engineer) made and entered into City Secretary Contract No. 29546 (the Contract) which was authorized by the City Council by M&C C-19958 on the 2nd day of February, 2004; and WHEREAS, the Contract involves engineering services for the following project: Engineering Service for Reconstruction of Pavement on Donnelly Avenue (Alamo Street to Ashland Street) WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated May 20, 2004, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $2,000.00 2. Article H of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$43,637.00 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. ORIGINAL EXECUTED on this the day of , 2004_, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: A.Dglas R ouademaker, P.E. %Marc.Director, Department of Assistat City Manager Engineering Contract Authorization Huitt-Zollars, Inc. ENGINEER Dat® ATTEST: Marty Hend_' , City Secretary BY: i Charles T. Aldredge, P.E. Vice President APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney s HUITL OLLRS HUITT-ZOLLARS,INC. - 3131 MCKinney Ave. , Suite 600 , Dallas,TX 75204-2489 214.871.3311 phone 214.871.0757 fax huitt-zollars.com May 20, 2004 Gopal Sahu, P.E. Project Manager City of Fort Worth Engineering Department Consultant Services 1000 Throckmorton Street Fort Worth,TX 76102 RE: Donnelly Avenue Paving Reconstruction (from Ashland to Alamo) HZI Project No. 03-0955.01 DOE #3914 Additional Services for Coordination of Utilities Dear Mr. Sahu: Huitt-Zollars, Inc. (HZI) has prepared the paving plans for the above-referenced project. The water and sewer replacement plans have been prepared by Teague, Nall and Perkins, Inc. At your request, HZI will combine the paving, utility plans and specifications into a single set of construction documents. Outlined below is the additional cost incurred by HZI to combine the plans and specifications and create a single cover sheet that will have professional engineer seals from both companies. SUMMARY OF ADDITIONAL REQUIREMENTS • Create Single Cover for Plans • Revise Specifications to include Proposal for Utilities and Pertinent Specification Section, as well as a Bid Summary. • Clerical for Specifications • Additional Project Coordination COMPENSATION • HZI will complete the additional work required for the additional fee of$2,000. Should you have any questions, we would be pleased to meet with you at your earliest convenience. Sincerely, Vnne HUI INC. P.E. Vice President Walter Norwood, P.E. l ; L ra"vt1 ' Project Manager k , Ilei �:. HAproj\03095501\admin\Gopa1 Sahu_051804.doc