HomeMy WebLinkAboutContract 29533 AMENDMENT NO. 2
STATE OF TEXAS $ CITY SECRETARY CONTRACT NO.M3_
(M&C Needed)
COUNTY OF TARRANT $
WHEREAS, the City of Fort Worth (City) and Carter & Burgess,
Inc. , (Engineer) made and entered into City Secretary Contract No.
28226, (the Contract) which was authorized by the City Council by
M&C C-19345 on the 11th day of November 2002 and subsequently
revised by one previous amendment; and
WHEREAS, the Contract involves engineering services for the
following project:
Engineering Contract for Relocation of approximately 1,700
linear feet of 54" Sanitary Sewer Mains (M-272B) and (M-15R) in an
area bounded by Forest Park Boulevard, the Clear Fork of the
Trinity River, Henderson Street and Old Valley Street in the
Central Business District of Fort Worth, Texas.
WHEREAS, it has become necessary to execute Amendment No. 2 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Article I, of the Contract is amended to include the addition-
al engineering services specified in M&C C-19939, adopted by the
City Council on 20th day of January 2004, and further amplified in
a proposal letter dated September 15, 2003, copies of which are
both attached hereto and incorporated herein. The cost to City for
the additional services to be performed by Engineer total
$102,248.00.
2.
Article II, of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall- t
exceed the sum of $222,217.00 %
3.
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on this the ( day of , 2004, in
Fort Worth, Tarrant County, Texas.
ATTEST 1 �
� 1
Contract Authorization
Gloria Pearso City Secretary -
City Secretary Date
APPROVAL RECCMMENDED: P D•
A. Douglas Rademaker, P.E. Marc A. Ott
Director, Department of Assists t City Manager
Engineering
CARTER & BURGESS, INC.
Enginper
Name:Tha Brundrett, ASLA
Senior Vice President
777 Main Street
Fort Worth, TX 76101-2058
APPROVED AS TO FORM AND LEGALITY:
CAE��=L/
Gary Steinberger
Assistant City Attorney
rade i of �
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 1/20/2004
DATE: Tuesday, January 20, 2004
LOG NAME: 30RADIO PIER REFERENCE NO.: **C-19939
SUBJECT:
Amendment No. 2 to Engineering Agreement with Carter & Burgess, Inc. for Sanitary Sewer Mains
M-272B and M-15R Rehabilitation along Forest Park Boulevard, the Clear Fork Trinity River,
Henderson Street, and Old Valley Street in the Central Business District
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute Amendment No. 2 to City
Secretary Contract No. 28226 with Carter & Burgess, Inc. in an amount not to exceed $102,248, thereby
increasing the contract amount to $222,217.
DISCUSSION:
On November 11, 2002 (M&C C-19345), the City Council authorized the City Manager to execute an
engineering agreement with Carter & Burgess, Inc. in the amount of $111,069 to prepare plans and
specifications for sanitary sewer mains M-272B and M15R to serve the corporate headquarters projects of
Radio Shack and Pier 1.
This contract was previously revised by Amendment No. 1 on July 21, 2003, in the amount of$8,900 for the
design of 450 linear feet of 16-inch water line near the proposed Taylor Street turnaround by the Radio
Shack Riverfront Campus Project.
Amendment No. 2 will allow Carter & Burgess, Inc. to provide surveying, geotechnical investigation, and
engineering design for an additional 1,350 linear feet of 54-inch sanitary sewer line, and 414 linear feet of
16-inch water line as requested by the Water Department. The 54-inch sewer, located in the Radio Shack
development area in the downtown Central Business District, was constructed in 1962. A recent television
inspection of the sewer line revealed that sewer main M-282 has severe pipe deterioration due to corrosion.
This section of the pipe was not included in the original scope of services.
Carter & Burgess, Inc. proposes to provide these services for a lump sum fee of $102,248. City staff
considers this fee to be fair and reasonable for the scope of services proposed.
Carter & Burgess, Inc. is in compliance with the City's M/WBE Ordinance by committing to an additional
16% M/WBE participation on this Amendment No. 2. The City's goal on this amendment is 15%.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the
Sewer Capital Projects Fund.
http://www.cfwnet.org/council_packet/Reports/mq_print.asp 3 _ 1/21/2004
TO Fund/Account/Centers FROM Fund/Account/Centers
P172 531200 070172141040 $102,248.00
Submitted for City Manager's Office by: Marc Ott (8476)
Originating Department Head: A. Douglas Rademaker(6157)
Additional Information Contact: A. Douglas Rademaker(6157)
http://www.cfwnet.org/council_packet/Reports/mc_print.asp - 1/21/2004
777 Main Street,Floor 29
Fort Worth,Texas 76102
Carter.-.-Burgess P.O. Box 901082
Fort Worth,Texas 76101-2082
Phone: 817.222.8500
Fax: 817.222.8550
www.c-b.com
September 15, 2003
Mr. Gopal Sahu, P.E.
City of Fort Worth — Engineering
1000 Throckmorton
Fort Worth, TX 76102
Re: M-272-B Sanitary Sewer Improvements
COFW DOE No. 3755 — Contract Amendment No. 2
C&B Project No.: 011579.010
Dear Mr. Sahu:
Per Doo Kim's request, we have prepared this letter to summarize the changes to the
scope of work for the above referenced project. We have also included a man-hour
estimate for the recent addition of work, and a revised cost estimate for the entire
project. Also attached please is the back-up documentation for the M/WBE
subconsultants working with us on this project
Since our contract was approved last December, the following changes have occurred:
1) The 54" relocation was extended approximately 850 linear feet, 2) the 16" waterline
near Taylor and old Franklin Streets was added, and 3) approximately 500 linear feet of
54" sanitary sewer rehab located on the RadioShack Riverfront Campus site was added.
Item 1 requires additional topographic design survey and geotechnical investigations.
In order to keep this project on schedule, we need to send the geotech back out to the
site as soon as possible. Bore hole locations will need to be re-staked by the surveyor.
In the interest of time, we will initiate the additional survey and geotechnical
investigations with a verbal agreement from you.
Item 2 has already been approved. Contract Amendment number one addressed the
additional scope of work related to this item.
Item 3 addresses the City's recent request to add approximately 500 linear feet of 54"
sanitary sewer rehab. This portion of the work also includes the design of three new
junction boxes and the abandonment of three junction box structures. This item also
includes the structural design for the extensions of sanitary sewer junction structures
WF-2E and WF-2F. The actual man-hour effort for this design is attached to this letter.
Surveying —Approved contract amount = $19,500. The additional topographic
design survey, bore hole staking and easement preparation for amendment number two
totals $6,280.00. Total surveyor budget = $25,780.
Carter&Burgess,Inc Carter&Burgess Architects/Engineers,Inc. Carter&Burgess Consultants,Inc. C&B At Chit�Ei�j!dq$,i;c. I �i
7 Uo .�1.:.:1
C&B Architects/Engineers,P.C. C&B Nevada,Inc. Nixon&laird Architects/Engineers,P.
Mr. Gopal Sahu, P.E.
September 15, 2003
Page 2 of 2
Geotechnical —Approved contract amount= $6,290.00. The additional 850 linear feet of
54" sanitary sewer relocation added $9,400 to the geotechnical engineer's fees. $3,450 of this
amount is to perform a deep boring near the drainage crossing and provide recommendations
for a pier-supported structure. Total geotechnical budget = $15,690.00.
As we discussed, it is imperative that we hear back from you as soon as possible to meet our
schedule. Pending your approval, we will contact the surveyor and geotechnical engineer so
that they can complete their work and provide us with the necessary information to complete the
design. Please contact me if you have any questions regarding this letter or any of the attached
documents.
Sincerely,
David W an ord, P.E. Thad B. Brundrett, ASLA
Associate Senior Vice President
DWS/ds
01157901L04.doc
cc: Correspondence
Doo Kim, Peter Fu—COFW Water Dept.
Civil—DWS,TBB
2
Carter &Burgess, Inc. Carter & Burgess Architects/Engineers, Inc. Carter & Burgess Consultants, Inc. C&B Architects/Engineers, Inc.