HomeMy WebLinkAboutContract 30533 AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO.�� (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and HNTB Corporation (Engineer) made and entered into City Secretary Contract No. 29323 (the Contract) which was authorized by the City Council by M&C C-19818 on the 21st day of October, 2003; and WHEREAS, the Contract involves engineering services for the following project: Engineering Service for Pavement Reconstruction and water and sanitary sewer reconstruction on Malcom Street (Craig Street to Lancaster Avenue) and Haynie Street (Craig Street to Lancaster Avenue) WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated August 20, 2004, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $12,684.00 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$127,547.77 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. ORIGINAL EXECUTED on this the QCyh day of , 2004, in Fort Worth, Tarrant County, Texas APPROVAL RECOMMENDED: APPROVED: A. Douglas Rademaker, P.E. Marc Ott Director, Department of Assistant City Manager Engineering HNTB Corporation, Inc. ENGINEER ATTEST: Marty Hendrix, ity Secretary By: kl,010L Name: Benjamin J B4ter, P.E. contract authorization Vice-President Date APPROVED AS TO FORM AND LEGALITY: ary Steinberger Assistant City Attorney ARCHITECTS ENGINEERS PLANNERS 0I Cournle""•S7ree! ,,,,<<.-00 Dallas,Texas 7520_' (219)-98-8900 Fax(214)-41-4681 August 20, 2004 Mr. Gopal Sahu, P.E. Project Manager Engineering Department City of Fort Worth 1000 Throckmorton Fort Worth, TX 76102 Reference: Malcolm Street and Haynie Street Improvement Contract Amendment No. 1 Dear Gopal I am pleased to submit to you our attached proposal for Contract Amendment No. 1, which will accommodate the following additional design services for the referenced project: 1. Extend the proposed 8" water line under Haynie Street from Church Street to Kerr Street, a distance of approximately 450 feet. Assessment taps are to be installed at each lot within the limits. The cost for this service is $4,512. 2. Prepare plans and bid documents so that the City can receive bids for three separate construction options. The options are described in the attached document emitted "Malcolm Street and Haynie Street Bid Options". The cost this service is $8, 172. Therefore, the total cost for Contract Amendment No. 1 is $12,684. The attached proposal shows the cost breakdown between Water Department and TPW. Since you had stated that you wanted to bid the project quickly, we ask that you expedite the approval of this contract amendment. If you need additional information or have questions, please let me know. Sincerely, Ctv�) F.I-:. Bo V. Cung, P.E. Senior Project Manager C: Jerry Holder, HNTB Anthony Kalinski, HNTB 1 �iui . . , . .. •..,i i i.�. il ... v ,.-i ,. i.�i, i ,. ., nua �m �� � rtpcy�"4/�4�\""ti`='Fk�IC('EVa.. • n i �, ,in. „ � i i,11�c.v"VL1'1 11 WC- u. AI .Il 1 .ill r ��I u,\i ,. ,ii M �4�tiVl���n'n r�:�tl?��kl��� '�Yo M1f Ill r� e i.,niai 1AH ic, tiiYria�F�rn'.i�'. .. 1• 1 1 W, ... .i ., _ _ IIS . [. ! i. ', " .I O11•1PV�1•,,. UC Malcolm Street and Haynie Street Bidding Options 1. Option 1: • Unit 1: o Water Line Replacement on Haynie o Sewer Line Replacement on Malcolm and Haynie o Temporary pavement repair on Malcolm and Haynie. • Unit 2: Paving on Malcolm and Haynie 2. Option 2: • Unit 1: o Water Line Replacement on Haynie o Sewer Line Replacement on Malcolm and Haynie o Temporary pavement repair on Malcolm o Permanent pavement repair on Haynie. • Unit 2: Paving on Malcolm only 3. Option 3: • Unit 1: o Water Line Replacement on Haynie o Sewer Line Replacement on Malcolm and Haynie o Temporary pavement repair on Malcolm and Haynie. • Unit 2: Paving on Malcolm only • Unit 3: o Replace curb and gutter, driveways, sidewalks on Haynie o Pavement pulverization on Haynie (3" asphalt overlay over 8" lime pulverization.) HNTB Proposal Malcolm & Haynie From Craig Street to Lancaster Avenue Contract Amendment# 1 Prepared for:The Citv of Fort Worth DATE:08-19-2004 Contract Summary Original Supplemental Agreement No.1 Amount New Contract Amount Prepare Extend Water Line Documents for 3 on Haynie Bid Options Subtotal Contract Amount 1 Depart ment of Engineering 21 Pavement Design Services $75,636.83 $4,086.00fl$4,086.00 $79,722.133 3 4 Subtotal Department of Engineering $75,636.83 $4,086.00 $79 722.83 5 6 Water Utilities 7 Water Desi n Services $21,433.70 $4,512.00 $2,043.00 $27,988.70 8 S ecial Services $17,793.24 $2,043.00 $19,836.24 910 Subtotal Water Utilities $39 226.94 $4,512.00 $4,086.00 $47,824.94 11 12 Total Contract $114,863.771 $4,512.00, $8,172.00 $12,684.001 $127,547J7 Consultant Participation Summary Original Orig%of New New%of Contract Amount Contract Contract Amount Contract 1 HNTB Corporation $87,301.68 76.0°% $99,985.68 78.4% 2 3 Gorrondona&Associates MBE Sub $24,782.09 21.6% $24,782.09 19.4% 4 5 Hu o C.Trevino&Associates BE Sub $2,780.00 2.4%1 $2,780.00 2.2% 6 7 Total Contract $114,863.771 100.0%1 $127,547.771 100.0% Page 1 row HNTB Design Fee r�r� Malcolm & Haynie From Craig Street to Lancaster Avenue Contract Amendment# 1 Prepared for:The Citv of Fort Worth DATE:08-19-2004 Scope Revision:Extend Water Line on Haynie to Kerr Street.Approx.Construction Cost:$33,125 Prepare plans,specifications and estimates to extend the proposed water Principal Manager Engrf Arch Cadd Tech Clerk TOTAL line on Haynie from Church Street to Kerr Street. Hours Hours Hours Hours Hours IF 1 Final Design 100°!° 2 Collect data 0 2 2 12 0 16 3 Developtans bid quantities sheets andspecial specifications 2 4 8 10 0 24 4 Finalize Opinion of Probable Cost. 2 4 4 0 10 5 Qualityassurance/control review 0 2 0 0 0 2 6 Submit plans to Cit 0 0 0 0 0 0 7 Sub-total 2 8 12 14 0 36 8 9 Total Man-hours 2 8 12 14 0 36 10 Contract HourlyRates $195 $164 $135 $60 $37 11 Labor Cost $390 $1,312 $1,620 $840 $0 $4,162 12 13 Expenses $350 14 15 Total Cost for Department of Enaineerinq $4,512 Page 2 (Z--� HNTB Design Fee Malcolm & Haynie From Craig Street to Lancaster Avenue Contract Amendment# 1 Prepared for:The City of Fort Worth DATE:08-19-2004 F1 Scope Revision:Develop Three(3)Bid Options Prepare plans,specifications and estimates for three separate bidding Principal Manager EngiTarch Cadd Tech Clerk TOTAL options for the Project Hours Hours Hours I Hours I Hours Final Design(100%) 2 DeveloD Dians,bid quantities sheets ands ecial specifications 2 8 16 24 0 so 3 Finalize Opinion of Probable Cost. 2 2 4 4 0 12 4 Quality assurance/control review 2 4 4 0 10 5 Submit plans to City 0 2 2 0 0 4 6 Sub-total 6 8 26 28 0 76 7 8 Total Man-hours 6 8 26 28 0 76 9 Contract Hourly Rates $195 $164 $135 $60 $37 10 Labor Cost $1,170 $1,312 $3,510 $1,680 $0 $7,672 11 12 Expenses $500 13 14 Total Cost for Department of Engineering $8,172 Page 3