HomeMy WebLinkAboutContract 31433 02-28-05P02 :31 RCVD AMENDMENT NO. 1 STATE OF TEXAS § CITY SECRETARY CONTRACT NO.3-11 �133 (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Baird, Hampton & Brown Inc. (Engineer) made and entered into City Secretary Contract No. 30001 (the Contract) which was authorized by the City Council by M&C C-20081 on the 18th day of May, 2004; and WHEREAS,the Contract involves engineering services for the following project: Birchman Street Reconstruction (Ashland to Camp Bowie) - Paving,Drainage, Water& Sanitary Sewer- WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services and provide additional contract time as specified in a proposal letter, dated February 8'h 2005, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $16,204.90. The additional contract time for these services is 30 working days. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of$139,319.90. 3. All other provisions of the contract, which are not expressly amended herein shall remain in full force and effect. ORIGINAL EXECUTED on this the day of , 20045 in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: A.Douglas Rademaker, P.E. Marc Director,Department of Assistant City Manager Engineering Baird,Hampton&Brown Engineering&Surve3ng ENGINEER ATTEST: Marty He x, City Secretary Name: Konstantine Bakintas, P.E. Vice-President APP ED AS TO AND LEGALITY: S*mb rger Ass7 istant City Attorney i0i U,1 lS 14�ty:'1 ,I n D � D I Baird, ton& Brown, Ina 0 En ineering & SurveV_ ng February 8,2005 Mr.Gopal Sahu, PE, Project Manager Department of Engineering City of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76102 Tel(817)392-7949,Fax 392-7854 RE: CONTRACT MODIFICATION BIRCHMAN STREET(ASHLAND TO CAMP BOWIE)RECONSTRUCTION Weber,Sanitary Sewer, Paving A Drainage DOE No 3913, Weber No P264 541200 60917 00063 80, Sewer No P274 541200 70917 00063 8o BHB No 03.115.00 Mr.Sahu: We are pleased to have been selected to assist the City of Fort Worth with the above referenced project; submitted herewith is a revised proposal to our previously submitted request for a contract modification dated January 18°i, 2005. This revised request provides for additional compensation to perform sewer service line re-route surveys. Our original contract was for the reconstruction of sanitary sewer lateral 2576,which Is in the right of way of Birchman Ave, and services between five and ten homes. Upon review of this lateral by the city, we were asked to review the feasibility of abandoning Lateral 2576 and rerouting the services to the sewer laterals within the alley behind the homes, L-2361 and L-991 which Is under design by IGmely Horn and associates. We were then supplied with videos of sanitary sewer lateral 2361 and 2576 for our review. Based on our review of sanitary sewer lateral 2576, we feel that abandoning this lateral and rerouting the services to lateral 2361 in,the alley behind the homes would be feasible. Based on our review of sanitary sewer lateral 2361 we have determined that the general condition of the line is poor. The existing pipe from Sta:13+00 to the end Sta:24+68 Is VCP with multiple cracks, significant surface wear and varying degrees of root growth at most joints. Also in this reach of the lateral the existing manholes are general old with brick tops that are cracked. Between Sta:9+00 and Sta:13+00 the pipe Is PVC that Is noticeably newer and in good condition. Also,the manholes at Sta:9+00 and Sta:15+00 are in noticeably newer with concrete tops and concrete pads. So our recommendation to the city is to reconstruct sanitary sewer lateral 2361 from Sta:13+00 to Sta:24+68,which is within the limits of our project. The estimated construction cost for this additional scope of work has been estimated at $151,800; we propose an engineering fee, which Includes basic and additional services, of $18,204.90. Additional services consist of topographic(design)surveys. 6300 Flidglea Place,Suite 700 • Fort Worth,Taxes 76116 • Tel:(817)338-1277 Fax:[817)338-9245 • www.bhbinc.com Mr.Gopal Sahu, P.E., Project Manager February 8,2005 Page 2 We propose to continue to utilize the services of an M/WBE surveying and reproduction firm to assist us with this project,and thus provide 38%M/WBE participation, on this contract modification. Sincerely, BHB Engineering dr Surveying BHB Engineering dr Surveying t L ' Austin Baird, EIT Icons 'ne , E. Vice President Enclosure: Fee&Schedule Summary Construction Cost Estimate e.12003.000.00012003.113.00d1documentslcontracNrevised proposal additlonel improvemeMs.doc • r BIRCHMAN STREET(ASHLAND TO CAMP BOWIE)RECONSTRUCTION Water,Sanitary Sewer,Paving&Drainage DOE No 3913 Water No P264 541200 60917 00063 80 Sewer No P274 541200 70917 00063 80 Fee Summary for Contract Modifications Basic Services: Water Department: (Construction Cost X ASCE Curve°A"X 85%) Water Improvements 36,300 X 7.300/6 X 85% _$ 2,252 Sanitary Sewer Improvements 115,500 X 7.30%X 85% -=$ 7.167 Water:Basic Services Total $ 9,419 Additional Services: Water Department: Topographic Surveying Services(by M/WBE) 'Survey for Service Line Re-route(Lots 1-11 Block 100) _$ 1,800.00 Topographic Survey 1,175LF X$3.25 =$ 3,819.00 Right-of-Entry Agreements 22 Ea X$25/Ea =$ 550.00 Administrative (10%) Fee on M/WBE Firms =$ 619.90 Water Department:Additional Services Total =$ 6,785.90 Water Department:Total Additional Compensation =$ 16,204.90 Project Schedule for Contract Modifications Topographic Surveying 20 Working Days Engineering 10 Working Days Total Additional Time 30 Working Days Note: Revised Proposal Provides for Additional Compensation for S.S. Service Line Re-Route Surveys