Loading...
HomeMy WebLinkAboutContract 43998-CO2 MY SECRErAW , CONTRACT NO. ORT WORTHa City of Fort Worth Change Order Request Breakdown ProjectNamej 2008 CIP Contract 2C City Sec# 43998 clientPmject#(s)j Cfty Project#01231 Change Order Submittal# r z-� Date 9!1812014 Dept TPW Contract Time Water Sewer Totals CD Original Contract Amount $811,521,95 $400,683.50 $144,086.50 $1,356,291.95 365 Extras to Date $36,004.20 $2,950.00 $30,000.00 $68,954.20 Credits to Date Pending Change Orders(In M&C.Process) Contract Cost to Date � j$8475F15 $4a33Sf1� $, 065Q N $1,425,246.15 365 Amount of Proposed Change Order q ; $44;4328 � ? ; $fr;9Q8Q0�,1 `'�„$F4G0 $37,509.38 Revised Contract Amount w489IMMA Mm8 74- r ' 176 i;pi $1,462,755.53 365 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO :r1tiw: ,6s oo. d aA0° " t)0;•." v Additional Funding(If necessary) ! s 4`4?132758R , �MIND� s$2 Bfk $44,457.38 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT F-ft' `rq n MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) „ '§? WN Measured quantities in the field differed from design quantities,some exceeded,while others were less.Some of the main increases were in temp transition type D pavement,additional sod,tree removal,additional 1°water service lines&6'sewer pipe.Increases&decreases were distributed among 28th St,Elm St,Mineola Ave&Norman St.all the streets in contract 2C. 0 O J. , i Secretary °�* FXAS _ OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX r RTWO z C4 of Fort Worth Change Order Additions Projed Name 1 2006 CIP Contract 2C City Sec# 43998 CdentProjed# I 5yPmjw#5i23T- Change Order Submittal# 0 Date 9/18/2014 ADDITIONS ITEM DESCRIPTION ry 1 Unit I Unit Cost total Salvage-3/4'Water Meter Water Ductile Iron Water Fillings Water 63 N $6,000.0 0 1 1"Water Service afar 23.00--7Y--7f7=20 20 Connection tD Exisdng 6" Water 1.00 1 Remove T Sewer Manhole Sewer 1.00 Ea $22D.uu — 'Post-CCTV Inspecdan Sewer 24.80 .00 6 8'Sewer Pipe Sewer 300. 0 LF 34 Trench Safety Sewer 30070 .0 9 $'HOPE Pipe Enlargement ewer 18.00 .0 11 Manhole Vacuum Test ewer 1.00 100.00 4 Remvoe Concrete Driveway TPW 4.00 1.0 11 -1 Tree Removal TFW 4.00 1,000.00 14 8 ock Sad Placement TPW 2,600.00 Y 3.35 17 Lime PW 15.00 fN 139.00 19 HMAC Transition Type D TPW 84.35 TN 50.00 20 8'Concrete Pvmt PW 309.00 SY 32 5 22 6"Concrete Driveway PW 2,869.74 SF 5.72 23 6'Concrete Driveway Exp Agg P 51.40 SF 6.50 .1 24 V Harrier Free amp Type A W 4.00 Ea 550.00 25 4'Barrier tee Ramp Type H TPW 4.00 Ea 00.00 TPW $68,000.76 Water $21,280.00 Sewer $12,194.60 ub otal Additions Change Order Additions Page 2 of 4 i ORT WOR H City Of Fort Worth Change Order Deletions Project Name L 1008 CIP Contrail 2C 1 City Sec# 43998 Client Project* I COPm1ed#011231 Change Order SubmMW# Date 9!18!2014 DELETIONS ITEM OESCRiP f ION DEPT City Unit unit cost i Total Remove Conc Curb&Gutter Water 3 Remvoe Gonc Valley Gutter Water Too---s7— 00 6 5'Wide Asphalt Pvmt Repair ater ____2T. 0 45.00 4'Wide Asphalt Pvmt Repair ater - 100 ___f4_2 T0 8 Temporary Asphalt Paving ate 2,899.00 LF 8,0 9 Trench S ety Water 1.0 LF ____T170_ 11 24"Water Frye Water 1.00 L F $134.00 12 8'PVC Water Pipe Water 19.0 34.00 16 1"Private Service Water 1 .00 15.0 24 8x6 Tapping Sleeve Water ,0 a 2,50.00 5 4'Sewer ervie -way Cleanout ewer .00 a 0 0 Block Sod Placement ewer 9 AO SY .00 1 WnholeAdjustmentMajor Sewer 1.00 a $1,100.00 15 7emparary Pavement =Sewer885.00 LF $10.00 1 emove idewalk 100 RemvoeAsphalt mt SY 3.00 5 Remvve Asphalt Drive SF emove Bnck Driveway SF 2.00 emvae Fence TP 370.00 $2.001 ;740.00 4'Chain Link Fence TPW .00---LT-- $34.00 $68.00 9 Reinstall 4'Chain Link Fence TPW , 230.00 L 20.00 4, 1 5'Wrought ron ence T 40.00 LT__ 45,00 13 Topsoil TFV9 132.00 CY $100 $1,963.60 21 4'Concrete Sidewalk TPW 13.40 42 26 Misc Utility Adl TPW 0.62 LS 0,000.00 $6,20U.Uo 29 Remove Concrete Curb&Gutter T W 1,545.3 L $1.50 TPW $23,567.98 Water $28,228.00 Sewer $12,170.00 Sub Total Deletions $63,965.98 Change Order Deletlons Page 3 of 4 MJSBE Breakdown for this Change Order ` FS€tb Wa � Y �} Igocr�tfvrfh« € { w N/A Total a Previous Change Orders 18%,141, OX-1,8114 .,_: I ws . Total 14 CFW Change Order Approval 2 Page 1 of 3 r Routing Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthgov/Infrastructure Proiects/01231 - 28th St. NW, Elm St, N Mineola Ave. Norman St, Contract 2008 CIP 2CIContractor/Change Orders/Final Ouantity Reconsiliation CO.xis Attachments(0) No Attachments have been added to this form. RECEIVED NOV 24 2014 https://projectpoint.buzzsaw.com/_bz_web/Forms/FormPrint.aspx?Site1d=51500&Proces... 11/24/2014 CFW Change Order Approval 2 Page 2 of 3 FORT WORTH® City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 2 Change Order No.: 2 Date Started: 2014-10-29 City Sec. No.: 43998 Date Due: 2014-12-18 Project Name: 28th St. NW, Elm St, N Mineola Ave, Norman St, Contract 2008 CIP 2C 01231 DOE Numbers: Project Numbers: 6139 Project Water, Sewer, Storm sewer & Pavement replacement for segments Description: of 28th street, N Elm street, Mineola ave & Norman street. Project Manager: Khal Jaafari City Inspector: Carlos Vasquez Contractor: McClendon Construction COUNCIL ACTION (If Required): M&C Log Name: 202008 CIP Contract 2C Dist 2 M&C Number: C-26280 M&C Date: 2012-12-04 COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 44,432.78 C204 541200 202400123183 0 Water $ -6,948.00 P253 541200 602170123183 0 Sewer $ 24.60 P258 541200 702170123183 0 Total Cost: $ 37,509.38 Total Requested Days: 0 Approval Status: https://proj ectpoint.buzzsaw.com/_bz_web/Forms/FormPrint.aspx?Siteld=51500&Proces... 11/24/2014 CFW Change Order Approval 2 Page 3 of 3 Approved: Yes Comments: User: Tara Fishback Date: 2014-10-31 10:57 AM Approved: Yes Comments: User: Justin Blair Date: 2014-10-31 3:38 PM Approved: Yes Comments: User: Khal Jaafari Date: 2014-11-03 10:19 AM Approved: Yes Comments: User: Najib Fares Date: 2014-11-03 11:05 AM Approved: Yes Comments: User: Andy Anderson Date: 2014-11-03 11:23 AM Approved: Yes Comments: User: Doug Wiersig Date: 2014-11-03 12:03 PM Approved: Yes Comments: User: Doug Black Date: 2014-11-20 1:10 PM Approved: Yes Comments: User: Fernando Costa Date: 2014-11-20 7:29 PM Action Required: Review & forward https:Hprojectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Proces... 11/24/2014