HomeMy WebLinkAboutContract 45616-CO2 CrrY SECRETAW FORT WORTH. City of Fort Worth CONTRACT NQ, YgfI if-(-n Z' Change Order Request Breakdown ProjectNamel WESTERN CENTER BLVD AT NORTH RIVERSIDE DR AND FARM TO----1 City Sec# 1 93682 Client Project#(s)l 02182 Contractorl Durable Specialties,Inc. PM Lissette Acevedo Inspectorl Thomas Miller Change Order Submittal# C� Date 10/20/2014 Dept. TIPW Contract Time Totals CD Original Contract Amount $748,000.00 $748,000.00 Extras to Date $3,245.00 $3,245.00 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $751,245.00 $751,245.00 Amount of Proposed Change Order $38329.50 "' $38,329.50 0 Revised Contract Amount $789,574.50 $789,574.50 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO Additional Funding(if necessary) -'$38,329.50 _ $38,329.50 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.56% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) _'$935,000.00 Oil Change order cost is for repair of storm drain pipe at FM 1187 and Hemphill per plans dated 10-9-14. Need to add 24 days for construction of storm drain and pouring back of the paving&wheel chair ramps. In addition to this,need to add 28 days for delays pending approval. We have estimated 52 calendar days including delays,procurement of materials and construction. Do ity 94 ZMary J. K mob°°°° ��X�� OFFICIAL R CITY SECRETARY FT.WORTH,TX FOR- T�TH City of Fort Worth Change Order Additions Project Name WESTERN CENTER BLVD AT NORTH RIVERSIDE DR AND FARM TO MARKET 1187 AT HEMPHILL I City Sec# 93682 Client Project# 02182 Contractor Durable Specialties,Inc. PM Usselte Acevedo Inspector Thomas Miller Change Order Submittal# L—J Date 10/20/2014 ITEM ADDITIONS ty Unit Unit Cost Total REMOVE 2 REMOVE 10'RECESSED INLET T/P 1.00 EA 1,650.00 3 PLUG 21"STORM DRAIN T/PW 2.00 EA 825. 0 4 SEEDING SOIL RETENTION BLANKET(CURLER) T/PW 315.00 SY 3.30 5 21"RCP CLASS III T/PW 130.0 LF $143.00 6 10'RECESSED INLET T/PW 1.0 9--7 $6,050.05 7 TRAFFIC CONTROL T/PW 1.001 MO 1,375.00 8 REMOVE TEMP DRAINAGE REPAIR&BACKFILL T/PW 1.001 LS 550.00 9 REPAIR EXISTING INLET T/PW 1.00 EA $2,475.00 10 DE-HOLE EXISTING UTILITIES T/P 1.00 LS $3,300.00 Change Order Additions Page 1 of 2 T/PW $38,329.50 Sub Total Additions 38,329.50 Change Order Additions Page 2 of 2 Fox�TH City of Fort Worth Change Order Deletions Project Name WESTERN CENTER BLVD AT NORTH RIVERSIDE DR AND FARM TO MARKET 1187 AT HEMPHILL City Sec# 93682 Client Project# 02182 Contractor Durable Specialties,Inc. PM Lissette Acevedo Inspectorl Thomas Miller Change Order Submittal# Date 10/20/2014 DELETIONS ITEM DESCRIPTION Qty I Unit I Unit Cost Total Change Order Deletions Page 1 0 2 T/PW $0.00 Sub Total Deletions Change Order Deletions Page 2 of 2 M/SBE Breakdown for this Change Order M/SBE,Sub Type of Service Amount f6-r this CO Klutz Construction Recessed Inlet supplier $5,000.00 Total $5;00000> s - _ Previous Change Orders .DATE AMOUNT `7 f' N/A Total $0:00 CFW Change Order Approval St-COApp03 Page 2 of 3 FORT WORTH. City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 2 Change Order No.: St-COApp03 Date Started: 2014-11-18 City Sec. No.: 45616 Date Due: 2015-01-07 Project Name: Western Center at N. Riverside 02182 DOE Numbers: Project Numbers: - DOE No. 7134 Project Storm drain lateral pipe repair Description: Project Manager: Lissette Acevedo City Inspector: Thomas Miller Contractor: Durable Specialties INc COUNCIL ACTION (If Required): M&C Log Name: M&C Number: M&C Date: COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 38,329.50 C295-204390218283 0 Total Cost: $ 38,329.50 Total Requested Days: 0 Approval Status: RECEIVED Nov 24 2014 https://projeetpoint.buzzsaw.com/_bz web/Forms/FormPrint.aspx?SiteId=51500&Proces... 11/24/2014 CP W Change Order Approval St-COApp03 Page 3 of 3 Approved: Yes Comments: User: Keith Fox Date: 2014-11-19 10:19 AM Approved: Yes Comments: User: Lissette Acevedo Date: 2014-11-19 12:08 PM Approved: Yes Comments: User: Todd Estes Date: 2014-11-19 4:51 PM Approved: Yes Comments: Days discussion is for future consideration. Will not be awarded unless necessary. User: Andy Anderson Date: 2014-11-20 8:07 AM Approved: Yes Comments: User: Doug Wiersig Date: 2014-11-20 10:59 AM Approved: Yes Comments: User: Doug Black Date: 2014-11-20 2:29 PM Approved: Yes Comments: User: Fernando Costa Date: 2014-11-20 9:24 PM Action Required: https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&Proces... 11/24/2014 ,-,r w unange Order Approval St-COApp03 Page I of 3 Routinq Assigned To: Due Date: Assigned By: Due Time: Links(1) fortworthgov/lnfrastructure Proiects/02182 - Western Center at N. Riverside/Contractor/Change Orders/Change Order 2 Breakdown.xIs Attachments f0) 7 No Attachments have been added to this form. https://projectpoint.buzzsaw.com/—bz—web/Forms/ForniPrint.aspx?Siteld=5150O&Proces... 11/24/2014