HomeMy WebLinkAboutContract 31436 D3-02-05A03: 05 RCVD
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, Coca-Cola Enterprises Inc., hereinafter called "Developer," desires
to make certain improvements to Fossil Creek Addition Phase I — Median Cuts/Turn
Lane on Fossil Creek Boulevard, located in the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City," to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Matthew J. Fanoe, its duly
authorized Corporate Director, Real Estate & Facilities, and the City, acting herein by
and through Marc Ott, its duly authorized Assistant City Manager, for and in
consideration of the covenants and conditions contained herein, do hereby agree as
follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copied
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section 11, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section 11, of the Policy.
-9357037.DOC I
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
Developer, its contractors, subcontractors, officers, agents or employees,
whether or not such iniuries, death or damages are caused, in whole or
in part, by the alleged nerlizence of the City of Fort Worth, its officers,
servants or employees.. This indemnity shall terminate upon the
completion and acceptance by the City of the work contemplated herein.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
J. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
K. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof.
Water (A) None; Sewer (A-1) None; Paving (B) Attached; Storm Drain
(B-1) None; Street Lights and Signs (C) None.
-9357037.DOC 2
SUMMARY OF COST
Fossil Creek Blvd.
Coca Cola Left Turn Lane
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $35,317.77 $ 35,317.77
2. Storm Drainage $0.00 $ -
3. Street Lights $0.00 $ -
4. Street Name Signs $0.00 $ -
B. Engineering Design $ -
C. Construction Engineering
and Management by DOE (4%) $ 1,412.71 1,412.71
TOTALS $ 36,730.48 $ - $ 36,730.48
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street
and other community facilities improvements shown as "current
improvements"on the attached Exhibit B.
B. Developer shall fund its share of the "current improvements" and shall pay
to the City an inspection fee in the amount of One Thousand Four
Hundred Twelve and 71/100 Dollars ($1,412.71), which represents four
percent (4%) of the cost of the improvements contemplated herein. The
estimated total cost of such improvements and related support services,
including all design, construction and inspection costs, is estimated to be
Thirty-Five Thousand Three Hundred Seventeen and 77/100 Dollars
($35,317.77).
Notes:
1. The City will pay any inspection fees in excess of the amount stated in this
Agreement.
2. The City is not preparing any plans and specifications for the improvements
contemplated in this Agreement.
-935703TDOC 3
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to
be executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in triplicate, at Fort Worth, Texas this the '% day of
Pveembw, 200 . ar—
'n&11c.41 S�
Approval Recommended:
Transportation and Public Works
Department
r5
Robert 96ode, P. E.
Director
Cit f rt Wi h
Date
Marc Ott
Assistant City Manager
ATTEST:
f Y�aAt
Marty Hendrix
City Secretary
4Apprasto Fo
Attorney
DEVELO
ATTEST: or�K-Q—
Matthew
B � QFany 'orporater,
E.Liston Bishop III Real Estatilities
Name: Vice President and Secrehry
Title:
RECEIVED
-9357037.DOC 4
1
d
i
v �`�
k � x ._......��
q yr � .
tJ � �A
1 �
�\y
J
Alk Alk AMW m
) �
4 y �elR3��4 i r�td' 1 tt..
tri.Ver 1 t �. "r '(+ri tNkJf fl�!
i
1
� � 11
EXHIBIT B
PAVING IMPROVEMENTS
See attached.
-9357037.DOC 5
DEC-10-2004 FRI 02:05 PM TRANSPORTATION PUBLIC WK FAX NO. 817 871 8092 P. 02
8-
OCT-? i7 11!49 FROM:D18 COVSTRUCTORS 917 G26 9305 EXH131131T Pavinn CFA
Coca-Cola Enterprises lnr.. DOE No.4438
(refwwce wim E for a fuji so of combvc6on documents)
" r...� n.lu,�a• c• •. a. ti V�.o...-,».....� �•i� r•..a'�.��....4'; i 1 ..�� Jy + '
J,
to
z r.
L. J4
1 n a
T
d
Tf
X0
W
It
Ila
it/
at
It
14V It
N L
Ht If
wY kti Al
0
n-y-
a- u.
I a .r-I•- -; t t k f i d+�
411
K!,
Is.
JIi xx��i .- .'.—ter 1
,F
Mp
MPIR-06-aW14.02114M TM-3214 731. 9949 t-.'k,I URS PAGE;001 R=93n
OCT-26-2004 11:49 FROM:D/B CONSTRUCTORS 817 626 9305 TO: 121430EE:B69 F.008/010
EXHBIBIT B-2-Project Cost CFA
Coca-Cola Enterprises Inc. DOE No. 4438
419104
CCE Fossil Creek
Fort Worth,Texas
FOSSIL CREEK ADDITION-PHASE I VM13BIT B)
DESCRIPTION QUANTITY UNIT UNIT TOTAL
COST COST
1.0 (D/B)
Mobilization 1 LT. $0.00 M $0.00
-IRemove Eidsting Curb 560 LF. P,2.65 $1,484.00
02oncrete Curb(Monolithic) 500 LF. _ $4.24 $2,120,00
--f-xcavatiion 650 Cy. $10.00 $6,500.00
-1"Lime Stabilized Subgrade 975 Sy. _$1.65 $1,609.17
"Lime(30 lbsJSY) 15 TN. ;;84.80 $1,229.60
e-7"Reinforced Concrete Pavement 910 Sy. $22.50 $20,475.00
-pavement Btniams 80 EA '5.00 $400.00
Com ingency 0 LT_ $500 $0.00
—Landscaping&Irrigation Demo&Repair 1 LT. $1,500.00 $1.500.00
�s Engineering Package,for COFW Approval 1 LT. _ ?-500.00 — _V-500-00--i
-
Tutal .,817.77
7
�31 7
0