Loading...
HomeMy WebLinkAboutContract 30538 AMENDMENT NO. 3 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Lockwood, Andrews & Newnam, Inc. , (Engineer) made and entered, into City Secretary Contract No. 28790, (the Contract) which was authorized by the City Council by M&C C-19585; on the 13th day of May 2003; and subsequently revised by two previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract LXVII (67) WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE , City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated August 13, 2004 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $14 ,900.00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $318,368.00. ORIGINAL fq_ 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the r1 day of 2004 , in Fort Worth, Tarrant County, Texas. ATTEST: Contract Authoriaatioa Marty Hendri -----�-'r-- - �- -- - City Secretary APPROVAL RECOMMENDED: 7APD A. Douglas Rademaker, P.E. Marc A.�Ott Director, Department of Assistant City Manager Engineering LOCKWOOD ANDREWS & NEWNAM, INC. ENGINEER BY: Name: Patric E Joll P.E . Business Group Director Sinclair Building, 512 Main St. , Suite 1001 Lockwood, Andrews & Newnam, Inc. Fort Worth, TX 76120 APPROVED AS TO FORM AND LEGALITY: �2k 4—� Gary Steinberger Assistant City Attorney Lockwood, Andrews & Newnam, Inc. A LLC, A DALY COMPANY August 16, 2004 Mr. Liam Conlon City of Fort Worth Water Department—Engineering Services 900 Monroe Street, Suite 201 Fort Worth,Texas 76102 Re: Amendment No.3 Alignment Study for White Settlement Sewer Main Sanitary Sewer Rehabilitation Contract LXVII(67) DOE#4144 Dear Mr. Conlon: Following our meeting with you and Mr. Peter Fu, P.E. on July 29, 2004, we have developed this Amendment No. 3 with respect to the above referenced project. The amendment corresponds to the performance of an alternative alignment study for the proposed Write Settlement Road sewer main that is being design to serve the north portion of the Montgomery Ward property and areas to the west including the Linwood Addition. An alternative alignment for the sewer main is needed in order to avoid conflict with the Trinity River Vision project. Performance of the alternative alignment study will entail the preparation of a Preliminary Engineering Report (PER), similar to that originally produced during the initial phases of this project. The PER will I nclude a written narrative describing the alternative alignments under consideration with a recommendation for selection. An alignment exhibit will be prepared and photographs of existing conditions along the routes under consideration will be provided. Opinions of probable construction costs associated with each alternative will also be given. Exhibit D, enclosed, depicts the alignment alternatives that will initially be considered. It is noted that other alignments may also be considered during the course of the study in order to determine the best route selection. Based upon the work to be performed as described above, a lump sum fee addition of$14,900 is hereby requested. This increase will adjust the contract fee from$303,466 to $318,366. Thank you for your consideration. Please contact me should you require any additional information. We look forward to continuing our work with you on this project. Sincerely, LOCKWOOD, ANDREWS, & NEWNAM, INC. - aig P. Schellbach,P.E. Civil Team Manager Enclosure 307 West 7th Street,Suite 1250 • Fort Worth,Texas 76102 817.820.0420 Fax:817.820.0441 www.lan-inc.com