HomeMy WebLinkAboutContract 31438 03-02-05A00 : 02 RCVD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, D.R. Horton — Texas, Ltd., hereinafter called "Developer", desires to make certain improvements to Emerald Park Section 2, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through D.R. Horton, Inc., its duly authorized Authorized Agent, acting herein by and through Don E. Allen, its duly authorized Assistant Secretary, and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. CFA REVISED FORMAT WITH 4% 1 1 F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such initcries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: CFA REVISED FORMAT WITH 4% 2 Water (A) None; Sewer (A-1) None; Paving (B) attached; Storm Drain (13- 1) attached; Street Lights and Signs (C) attached. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to S Item Developer City Cost Total Cost Cost A. Construction 1. Streets $ 845,360.00 $ - $ 845,360.00 2. Storm Drainage $ 604,419.70 $ - $ 604,419.70 3. Street Lights $ 83,600.00 $ - $ 83,600.00 4. Street Name Signs $ t 1000.00 $ - $ 11000.00 B. Engineering Design C. Construction Engineering and Management by DOE 4% $ rJ-1 1 Y`C) $ TOTALS $ ��j� 11�, $ _ $ Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk and a separate financial guarantee is required in the form of a bond or check for the cost of the sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. CFA REVISED FORMAT WITH 4% 3 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth, Texas this the 2e day of 204.' Approval Recommended: Transportation and Public Works Department Contract Authorization 6 %_ Robert Goode, P. E. Date Director ATTEST: Ci f Fort Worth Marc Ott City Secretary Assistant City Manager Approved as to Form: Assistant City Attorney ATTEST: DEVELOPER: D.R. Horton —Texas, Ltd. By: D.R. o Inc. - Auth. Agent By: Corporate Secretary 715on E. Allen Assistant Secretary RECEIVED CFA REVISED FORMAT WITH 4% 4 _ r-- I I _-- FINAL PLA T - FP- 003-129 f _ .SINAL P-- T �.� 41ERALD PAn� 5 5 :- AN ADDITION TO THE CITY OF FORT WORTH, xVe � TARRANT COUNTY TEXAS BEING 60.376 ACRES OF LAND LOCATED IN THE HENRY ROBERTSON SURVEY, A- 1259 3-E!'GLEAT 233 RESIDENTIAL LOTS C&ITRT 2 COMMON LOTS fes`` LOTS 8-86, BLOCK 3; LOTS 12-36, BLOCK 4, LOTS 38-49, BLOCK 14; LOTS 1-45, BLOCK 15; LOTS 1-41, BLOCK 16, LOT 1 & LOTS 20-35, BLOCK 17, '53'00 ,�,E3 E LOT 1, BLOCK 19; LOTS 1-7 & LOTS 21 & 22, BLOCK 20; LOT 1, LOTS 51-53 AND LOTS 62 & 63, BLOCK 21 Ln i OWNER i DR HORTON TEXAS LTD. DFW WEST DIVISION .z 4500 MERCANTILE PLAZA DRIVE s, w ".1_ SUITE 104 _ FORT WORTH, TEXAS 76137 Phone (682) 647-3350 NOVEMBER, 2004 V I I 1 I m a V' k mycoskie4--mcinnis+associates —- - - - civil engineering surveying landscape architecture planning 2 0 0 e a s t a b r a m arlington , texas 7601 0 8 1 7 — 4 6 9 — 1 6 7 1 f a x : 8 1 7 — 2 7 4 — 8 7 5 7 SHEET 1 OF 2 THIS FLAT IS FILED IN CABINET , SLIDE , , P.R.T.C. Exhibit B Paving cost estimate for CFA ENGINEER: Mycoskie McInnis Associates OWNER: Emerald Park Section 2 D.R.Horton,Texas,Ltd PROJECT: PAVING, PROJECT NO: 1978-2-1 ITEM ITEM DESCRIPTION UNIT PLAN UNIT COST NO. QUANTITY PRICE 1 6"Lime stabilized subgrade preparation Sy 38700 $1.45 $56,115.00 2 Hydrated lime for subgrade(30#Sl) TON 581 $80.00 $46,480.00 3 6"Reinforced concrete pavement including 7"monolithic curb Sy 20600 $18.89 $389,134.00 4 7"Reinforced concrete pavement including 7"monolithic curb Sy 15900 $18.10 $287,790.00 5 Type III barricade LF 192 $30.00 $5,760.00 6 Concrete street header LF 186 $10.00 $1,860.00 7 HMAC for pavement transitions and temporary turnarounds Sy 500 $16.00 $8,000.00 8 Traffic control devices per std detail LS 1 $2,000.00 $2,000.00 9 Pavement markings buttons and striping per city std LF 3516 $0.50 $1,758.00 10 4'wide concrete sidewalk LF 1185 $10.001 $11,850.00 11 Barrier free ramp EA 30 $450.00 $13,500.00 12 Remove existing barricade and rock rip rap EA 2 $375.00 $750.00 13 Maintain erosion control devices during paving construction LS 1 $500.00 $500.00 14 Lime and Concrete Testing Sy 39726 $0.50 $19,863.00 SUBTOTAL $845,360.00 TOTAL AMOUNT OF PAVING: $845,360.00 TOTAL PROJECTED COST $845,360.00 EMERALD PARK 1"--400' FUTURE SEC71ONS / s EMERALD PARK FUTURE SEC71ONS EMERALD PARK SEC71ON eAt�xmiN '':� -+ L ONE -- WEYB'R%oLANE - \ FUTURE CHURCH SITE 1 `' r :y BANDS RANCH ROAD LEGEND 29' B-B PAVEMENT 6 INCH CONC. IN 50' ROW 41' B-B PAVEMENT 7 INCH CONC. 1N 60' ROW 4' WIDE SIDEWALK DATE: 11.04.04 PROJECT # 1978-2-2 EMERALD PARK DRAWN BY. J. URBANIAK SECTION TWO mycoskie mcinnis associ`aI(tes civilengineering"sunfeyirig landscapearcfutwure penning CHECKED BY. T. BELCHER EXHIBIT 'B' 2 o o a a,, or are 11 PAVING r l l a tea �-6 817-469- 1671 SHEET NO: 1 OF 1 fox: 817- 274-8757 Exhibit B-1 Storm Sewer cost estimate for CFA ENGINEER: MYCOSKIE MCINNIS ASSOCIATES,INC. OWNER: EMERALD PARK SECTION 2 D.R.Horton,Texas,Ltd PROJECT: SECTION C-STORM PROJECT NO: 1978-2-1 ITEM ITEM DESCRIPTION UNIT PLAN UNIT COST NO. QUANTITY PRICE 1 Install 5'x3'reinforced concrete box including bends LF 297 $155.00 $46,035.00 2 Install 5-8'x5'reinforced concrete box LF 60 $1,400.00 $84,000.00 3 Install 6-8'x5'reinforced concrete box LF 50 $1,600.00 $80,000.00 4 Install 48"Class III reinforced concrete pipe including bends... LF 630 $110.00 $69,300.00 5 Install 42"Class III reinforced concrete pipe including bends.. LF 669 $95.00 $63,555.00 6 Install 36"Class III reinforced concrete pipe including bends.. LF 303 $70.00 $21,210.00 7 install 30"Class III reinforced concrete pipe including bends- LF 591 $55.00 $32,505.00 8 Install 27"Class III reinforced concrete pipe including bends.. LF 300 $48.00 $14,400.00 9 Install 24"Class III reinforced concrete pipe including bends.. LF 32 $40.00 $1,280.00 10 Install 21"Class III reinforced concrete pipe including bends- LF 914 $35.00 $31,990.00 11 10'std curb inlet,per S-SD4 of the city std EA 26 $1,850.00 $48,100.00 12 4'square std.Drop inlet,per sht 25 and S-SD5 of the city std EA 1 $2,200,001 $2,200.00 13 4'square manhole,per S-SD7 ofthe city std EA 2 $1,800.00 $3,600.00 14 5'square manhole,per S-SD8 of the city std EA 2 $2,600.00 $5,200.00 15 5 sided Type 2 manhole,per S-SD10 of the city std EA 1 $4,000.00 $4,000.00 16 Install sloped end treatment Type Ii headwall,without pipe... EA 3 $1,200.00 $3,600.00 17 install concrete apron vertical headwall for 48"pipe per city.... EA 1 $2,000.00 $2,000.00 18 Install sloped end treatment Type II headwall without pipe EA 2 $1,500.00 $3,000.00 19 Insall concrete apron vertical headwall for 5'x3'RCB per city... EA 1 $3,000.00 $3,000.00 20 Install Flared wing walls for 5'x3'box,per TxDot std FW-O EA 1 $3,000.00 $3,000.00 21 Install modified parallel wing walls for 5-8'x5'box per sht 23... EA 2 $5,000.00 $10,000.00 22 Install modifed parellel wing walls for 6-8'x5'box per.... EA 2 $6,000.00 $12,000.00 23 Install Type R dry rip rap,per TxDot item 432 CY 805 $45.001 $36,225.00 24 Install Curlex blanket,seeding and fertilizer for channel... SY 21133 $0.90 $19,019.70 25 Rock Berm per erosion control plan EA 4 $800.00 $3,200.00 26 Maintain erosion control devices during all utility construction LS 1 $2,000.00 $2,000.00 SUBTOTAL $604,419.70 TOTAL AMOUNT OF STORM WATER SYSTEM: $604,419.70 TOTAL PROJECTED COST $604,419.70 I 10'CURB UBtT 1 .r EMERALD PARK 1"=400' FUTURE SECTIONS �v 10"CURB N1.EI �Lr tune n71ET ILY CURB MET EMERALD PARK 10•CURB WLET �y� FUTURE SECTIONS o EMERALD PARK 1 IO'CMB P&ET SECTION ONE SAVER rav-LANE -- 21.R ,B +r 10'CURB ALET 21-RCP . 0" N.E. i TV CURS ALET �. 10'CRm MET Cf•J 10'C.RB CJLEI B1LET - - - - -- — slw 3 FUTURE CHURCH S17E /, Rt\L� G� BANDS RANCH ROAD Rol DATE: 11.04.04 m m a PROJECT # 1978-2-2 .EMERALD PARK DRAWN BY.• J. URBANIAK SECTION TWO mycoskie ry cinnis associates civil engineering survey landscape archilecture planning EXHIBIT 'B-1' 2 D D a b r a nr CHECKED BY T. BELCHER STORM DRAINAGE arllnyl0 teas 76010 817, 469- 167t - SHEET NO. 1 OF 1 +a.: 8 7—az.,.e.1s.7 Exhibit C Lighting and Signage cost estimate for CFA ENGINEER: MYCOSKIE MCINNIS ASSOCIATES, INC. OWNER: EMERALD PARK SECTION 2 D.R. Horton,Texas Ltd PROJECT: Lighting and signage PROJECT NO: 1978-2-1 ITEM ITEM DESCRIPTION UNIT PLAN UNIT COST NO. QUANTITY PRICE 1 Street lights EA 38 $2,200.00 $83,600.00 2 Street signs EA 20 $100.00 $2,000.00 SUBTOTAL $85,600.00 TOTAL AMOUNT OF STREET LIGHTS AND SIGNAGE: $85,600.00 TOTAL PROJECTED COST $85,600.00 SUMMARY PAVING $845,360.00 STORM $604,419.70 SUB TOTAL $1,449,779.70 CONST& ENG PER DOE 4% $57,991.19 LIGHTING AND SIGNAGE $85,600.00 TOTAL $1,593,370.89 I PARK ��ECTIONS �, A 1"=400' y41IL- EMERALD PARK FUTURE SEC77ONS yam, o EMERALD PARK BAVER7tXV LANE � ~ SEC77ON ONE -- Nov 19 04 11 : 26a GRASON LAND INC 2142203910 p. 3 I'MIU �iN-_ULH rax=114- t-Sy40 Nov 19 '04 6:47 P.02 ®.MARIO S NACOLA & SONS t:AYATI1dG, INC. November 19, 2004 DR Horton-Texas, Ltd- 20D East Abram Street Adington,Texas 76010 ATTENTION: Mr.Harold Dixon GENTLEMEN: We propose to k mish ail labor, materials and equipment necessary to construct the following described work: PROJECT: Emerald Park 5 coon 2 LOCATION: Fort Worth,Te s PAVING Item Description Quantity Unit Unit aw Total Bid 1 6"Lime Stabilize i Subgrade 38,700.00 SY 1.45 $ 56,115.00 2 Hydrated Lime 30#I SY 581.00 TN BO.00 $ 46,480.00 3 6'3000 PSI Con.. Pvmt w/7"curbs 20.600.00 SY 18.89 $ 389,134.00 4 7"3000 PSI Cont. Pvmt.w/7'curbs 15,900.00 SY 18.10 $ 287,790:00 5 Temp.TY III Bay icade 192-00 LF 30.00 $ 5.760.00 6 Street Header 186.00 LF 10.00 $ 1,860.00 7 HMAC Transition (6' ) 500.00 SY 16.00 $ 8,000.00 8 Traffic Control during Constr. 1.00 LS 2,000.00 $ 2,000.00 9 Pvmt Markings, Yjftons and striping 3,516.00 LF 0.50 $ 1,758.00 10 4'X 4"Sidewalk 1,185.00 LF 10.00 $. 11,850.00 11 Barrier Free Rarr ps 30.00 FA 450.00 $ 13,500.00 12 Rem. Barricade 6,rock rip rap 2.00 EA 375.00 $ . 750.00 13 Maintain Erosion Control Devices during paving 1.00 LS 500.00 $ 500.00 14 Lime&Concrete Testing 39,726.00 SY 0.50 $ 1'91863.00 PAVING TOTAL $ 845,36D.00 PMt5d.I III W2004 2004-261.111804,Contract Pay.Pmp.,Emenid P24 SEC 2-Prop Page.7 Of 2 UTILITIES • PAVING • EXCAVATING PO BOX 2329 - 10950 RESEARCH ROAD FRISCO,TEXAS 75034 (214)357-3 • ENGINEERING FAX(214)387-3940 • FINANCE FAX(214)387-3950 RECEIVED Nov 19 04 11 : 26a GRASON LAND INC 2142203910 P • 4 Nov 19 '04 8:48 P.03 MARIO S INACOLA & SONS cAVA-ri Mc,NC. QUALIFICATION'S: — Units are based 3n Mycoskie McInnis Associates, Inc.plans Dated:09104-Received: 10/12104. — All work on this p posal will be performed with one move-in at one time — Final quantitlas ill be determined using"Approved Plans' — Bonds included Testing is includ — No landscape. irr 3ation,electrical adjustments or repairs -- No installation or moval of erosion control devices -- No median pavin stones — No permanent tra fic markings or signage except for center line skips on 41'pavement —No permits, impaili t fees or fees of any kind No respreading of topsoil,sod,or seeding — No rock excavation — No undercutting — No sales tax on Incorporated materials -- No street lighting — No surveying — Manhole adjustor nts included — Colored concrete included in barrier free ramps — Reinforced sleel t be It 3's on 24'c-c both ways — Street subgrade be*!-0.20 feet by others — Proposal based won city approval of batch plant — Owner to provide sultable location with city water on-site or adjacent to the sits for a concrete batch plant(Approximately 2 Acres) We have quoted this project on a unit price basis, any work not specirrically quoted or qualified is excluded Should you have any questions, o reed clarification regarding this proposal, please feel free to contact this offtce. Sincerely, MARL Sita CO �oNs EXC VATING,INC. Michael Sinacol Vice President Ppni*d:1111WZ004 244.261;111804;Contract Pay.Prop.:Emwald Pah SEC 2-Prop Page:2 d? STORM SEWER PROPOSALSCHEDULE Item Quant Prices in Figures ity No. & Unit Description & Price In Words Total Unit TOTAL 1. 297 LF Install 5'x3' Pre-Cast Reinforced concrete box, including bends, complete and in place for the sum of: 1//7P $ /SS. DO $ yl, 035.60 dollars and no cents per linear foot 2. 60 LF Install 5-8'x5' Pre- Cast Reinforced concrete box, complete compllete and in place for the sum/of dollars and Arn $ 1, /-W- 00 $ 9`1000.06 cents per linear foot 3. 50 LF Install 6-8'x5' Pre-Cast Reinforced concrete box, complete and in place for the sum of SII- l7Un1,jrrrl dollars and ,yo $ /, ( DO. $ .0D, do 00 cents per linear foot 4. 630 Install 48 inch Class III Reinforced concrete LF pipe, including bends and wyes, complete and in place for the sum of On P U f£" $ //u'- 00 $ dollars and /{/0 cents per linear foot 5. 669 LF Install 42 inch Class ill Reinforced concrete pipe, including bends, wyes and plug, complete and in place for the sum of Q Al it e 7L y- �,t/e $ /.S. 0o $ 3, .SS,S. D 0 dollars and �o cents per linear foot PROPOSALSCHEDULE Item Quant Prices in Figures its/ No. & Unit Description & Price In Words Total Unit TOTAL 6. 303 LF Install 36 inch Class III Reinforced concrete pipe, including bends and wyes, complete and in place for the sum of .Se vete �y $ 70. 00 $ .21, 2 io.oo dollars and ,vp cents per linear foot 7. 591 LF Install 30 inch Class III Reinforced concrete pipe, including bends and wyes, complete and in place for the sum of $ SS. o o $ 3 21 s os.o o dollars and ,vo cents per linear foot 8. 300 LF Install 27 inch Class III Reinforced concrete pipe, including bends and wyes, complete and in place for the sum of dollars and Np cents per linear foot 9. 32 LF Install 24 inch Class III Reinforced concrete pipe, including bends and wyes, complete and in place for the sum of LCzTl $ L/Q. 06 $ / .280. 00 dollars and ti19 cents per linear foot 10. 914 LF Install 21 inch Class III Reinforced concrete pipe, including bends and wyes, complete and in place for the sum of /fig-fv- Live $ 35. 00 $ J'/ 990.00 dollars and ,v, ' cents per linear foot y ;. . T-1.,.-,. X T PROPOSAL SCHEDULE (tem Quant Prices in Figures ity No. & Unit Description & Price In Words Total Unit TOTAL 11. 26 EA 10 foot std curb inlet, per S-SD4 of the city std., complete and in place for the sum of: One A7,I7unrlle �Ev dollars and 'o $ /, .050. 00 $ foo Do cents per each 12 1 EA 4 foot square std. drop inlet, per sht 25 and S-SD5 of the city std., complete and in place for the sum of: 77�tvo t/7Uusa,i1 4Rie $ .2, 200.00 $ ,2 00.00 dollars and ,,,n cents per each 13 2 EA 4 foot square manhole, per S-SD7 of the city std., complete and in place for the sum of: One e.�*Zfit /gun'l'-ell dollars and „D $ / JOp o. 00 $ 3, 6 0 0.G0 cents per each 14 2 EA 5 foot square manhole, per S-SD8 of the city std., complete and in place for the/ sum of: Twn Z�/]ot�Sani .5.,( nunr�re'd dollars and o $ � 6 00.00 $ S, 2 o o. o o cents per each 15 1 EA 5 sided Type 2 manhole, per S-SD10 of the city std., complete and in place for the sum of: four /lnuSun� $ yQOU. 00 $ y.dOO GU dollars and ,V,, cents per each PROPOSALSCHEDULE Item Quant Prices in Figures ity No. & Unit Description & Price In Words Tota[ Unit TOTAL 16. 3 EA Install sloped end treatment Type II headwall, without pipe runners for 21" pipe, per TxDOT std SETP-CD, complete and in place for the sum of: $ /, ,200.00 $ 3,w'60- 00 O/)P �/lo�Suncl�U �n�nd�P�/ dollars and cents per each 17. 1 EA Install concrete apron vertical headwall for 48" pipe, per city std S-SD12, complete and in place for the sum of: n fhni-said $ 2, 000.60 $ ?, 000.00 dollars and Nn cents per each 18. 2 EA Install sloped end treatment Type II headwall, without pipe runners for 48" pipe, per TOOT std SETP-CD, complete and in place for the sum of: // $ /, Soo.06 $ 3, Ooo.00 �i[.�ndrer, dollars and do cents per each 19. 1 EA Install concrete apron vertical headwall for 5'x 3' RCB, per city std S-SD12, complete and in place for the sum of: -7-A/ ,-e ZXDL,-fonrA $ j 600. 00 $ 3 00 0. 00 dollars and ti- cents per each PROPOSALSCHEDULE Item Quant Prices in Figures ity No. & Unit Description & Price In Words Total Unit TOTAL 20. 1 EA Install Flared wing walls for 5'x 3' box, per TxDOT std FW-O, complete and in place for the sum of / ��7/PP Z�l�lGr SanGf $ �Ooo.00 $ 3, eoo. Do dollars and AID cents per each 21. 2 EA Install modified parallel wing walls for 5-8'x 5' box, per sht 23 and TxDOT std PW, complete and in place for the sum of /V� t/�nv.Sanr� $ S 000.00 /0, Uov.vo dollars and cents per each 22. 2 EA Install modified parallel wing walls for 6-8'x 5' box, per sht 26 and TxDOT std PW, complete and in place for the sum of dollars and ,,,,, cents per each 23. 805 Install Type R dry rip rap, per TxDOT item CY 432, complete and in place for the sum of v- ✓C dollars and '.o $ yS. D o $ cents per cubic yard 24. 21,133 Install Curlex Blanket, seeding and fertilizer SY for channel, per sht 27abc, complete and in place for the sum of X/C $ 90 $ �9, Dig. .7o dollars and ,v,;vErr- cents per square yard PROPOSALSCHEDULE Item Quant Prices in Figures i ty No. & Unit Description & Price In Words Total Unit TOTAL 25. 4 EA Rock Berm per ersosion control plan, complete and in place for the sum of Z,46 t /i1664-I'd dollars and ,la $ 900. 00 $ 3, z oo. oo cents per each 26. 1 LS Maintain Erosion Control devices during all utility construction, complete and in place for the sum of 7bUp 2�-Ao&(Sa.,2 $ Z 000. 00 $ � '000. 00 dollars and ,vn cents per lurrip sum TOTAL AMOUNT BID $ 'i/9. 70 ofa l �itJafer � 338 Cfl37•oo Toto SGn1fG.ry Sewcr Ll 3(n, z7 I• DO Tot- I .S-& orm Sewe,' Hl 70 7—o6o.1 U6,•1,*�-Jes S,J - 1, 3 79, 3.22. 70 F ' e PART B — PROPOSAL (cont.) Within ten (10) days after acceptance of the Proposal, the undersigned will execute the formal contract and will' deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The undersigned bidder certifies that he has been furnished at least one set of the General Contract Documents and General Specifications for water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and these specific Contract Documents and appurtenant plans. The undersigned assureds that its employees and applicants for employment and those of any labor organization, subcontractors or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. Contractor is to provide the number of projected working days to complete the project. The Bidder agrees to begin construction within 5 working days after issue of the work order by the Owner, and to complete the contract within 8o working days after beginning construction as set forth in the written work order to be furnished by the Owner. The undersigned acknowledges receipt of the following addendum: Addendum No. 1 Addendum No. 2 Addendum No. 3 BIDDER 1 Oflo I,SF� ��nC�rinC�inrl l (� �.1� Compa By liTp ele! ase Print) Jerry CC>'AO-k-L I�rPsnndFnt o� Mav,aaerY e,t- (� =n( �S G l Title Ro. R.x i sq{ g Address Fork Wortk 7—X 7l.HI City State Zip (Seal if corporation) D- _ „ I. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 14 EA $ 2, 000 $28, 000 . 00 MID-BLOCK RESIDENTIAL 18 EA $ 2, 000 $36, 000 . 00 CHANGE OF DIRECTION RESIDENTIAL 6 EA $ 2, 000 $12, 000 . 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00 Subtotal $76,000 .00 City' s Cost $00, 000 . 00 Developer' s Subtotal $76,000. 00 10% Contingencies $7, 600 . 00 Project Total $83, 600 . 00 Adjacent Developer's Cost $0,000 . 00 Developer's Cost $83, 600 .00 2% Inspection Fee $0,00 . 00 CFA CODE #2004164 DEVELOPER' S COST: $83, 600.00 EMERALD PARK, PHASE II December 6, 2004 Fort Worth, Texas January 22, 2005 PAGE I OF Exhibit C II. STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works . 3. The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets. the developer agrees to pay the city the amount shown below prior to the City starting it' s design efforts. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors . 5. The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER' S COST: $83,600.00 EMERALD PARK, PHASE II December 6, 2004 FORT WORTH, TEXAS CFA CODE #2004164 Page II of Exhibit C III . "STREETLIGHTS" INTERSECTIONS HAWKS LANDING RD & EMERALD PARK DR 1 HAWKS LANDING RD & CHATAMBRIDGE CT 1 HAWKS LANDING RD & EIRMOOR TRAIL 1 HAWKS LANDING RD & BAVERTON LANE 1 HAWKS LANDING RD & RYEBURY CT 1 HAWKS LANDING RD & ABBEYGLEN CT 1 CALDEROOD LANE & BAVERTON LANE 1 THORNGROVE COURT & BAVERTON LANE 1 WEYBRIDGE LANE & BAVERTON LANE 1 BAVERTON LANE & MYRICK COURT 1 BAVERTON LANE & AXTON CT 1 CALDEROOD LANE & EMERALD PARK DR 1 KITTERING TRAIL & WEYBRIDGE LANE 1 KITTERING TRAIL & DONOGAN COURT 1 MID-BLOCK HAWKS LANDING RD 7 EMRRALD PARK DR 2 CALDERWOOD LANE 1 THORNGROVE COURT 1 WEYBRIDGE LANE 2 KITTERING TRAIL 2 BAVERTON LANE 3 CHANGE OF DIRECTIONS THORNGROVE COURT 1 WEYBRIDGE LANE 1 DONAGON COURT 1 BAVERTON LANE 1 MYRICK COURT 1 AXTON COURT 1 EMERALD PARK, PHASE II Page III of Exhibit C Iv STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following sixteen (16) intersection at a cost to the Developer of$1,600.00: Bonds Ranch Rd & Hawks Landing Rd Bonds Ranch Rd & Kittering Tr Hawks Landing Rd & Abbeylen Ct Hawks Landing Rd & Baverton Lane Hawks Landing Rd & Chatamridge Ct Hawks Landing Rd & Eiremoor Tr Hawks Landing Rd & Ryebury Ct Hawks Landing Rd & Emerald Park Dr Calderwood Lane & Emerald Park Dr Calderwood Lane & Baverton Lane Thorngrove Ct & Baverton Lane Myrick Ct & Baverton Lane Axton Ct & Baverton Lane Weybridge Lane & Baverton Lane Weybridge Lane & Kittering Tr Donagon Ct & Kittering Tr Emerald Park, Phase II CFA code: 2004164 December 6, 2004