HomeMy WebLinkAboutContract 31438 03-02-05A00 : 02 RCVD
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, D.R. Horton — Texas, Ltd., hereinafter called "Developer", desires
to make certain improvements to Emerald Park Section 2, an addition to the City of
Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through D.R. Horton, Inc., its duly
authorized Authorized Agent, acting herein by and through Don E. Allen, its duly
authorized Assistant Secretary, and the City, acting herein by and through Marc Ott, its
duly authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
CFA REVISED FORMAT WITH 4% 1
1
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such initcries, death or damages are caused,
in whole or in part, by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof:
CFA REVISED FORMAT WITH 4% 2
Water (A) None; Sewer (A-1) None; Paving (B) attached; Storm Drain (13-
1) attached; Street Lights and Signs (C) attached.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to S
Item Developer City Cost Total Cost
Cost
A. Construction
1. Streets $ 845,360.00 $ - $ 845,360.00
2. Storm Drainage $ 604,419.70 $ - $ 604,419.70
3. Street Lights $ 83,600.00 $ - $ 83,600.00
4. Street Name Signs $ t 1000.00 $ - $ 11000.00
B. Engineering Design
C. Construction Engineering
and Management by DOE 4% $ rJ-1 1 Y`C) $
TOTALS $ ��j� 11�, $ _ $
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
CFA REVISED FORMAT WITH 4% 3
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in triplicate, at Fort Worth, Texas this the 2e day of
204.'
Approval Recommended:
Transportation and Public Works
Department
Contract Authorization 6 %_
Robert Goode, P. E.
Date Director
ATTEST: Ci f Fort Worth
Marc Ott
City Secretary Assistant City Manager
Approved as to Form:
Assistant City Attorney
ATTEST: DEVELOPER:
D.R. Horton —Texas, Ltd.
By: D.R. o Inc. - Auth. Agent
By:
Corporate Secretary 715on E. Allen
Assistant Secretary
RECEIVED
CFA REVISED FORMAT WITH 4% 4 _
r-- I
I
_-- FINAL PLA T - FP- 003-129
f
_ .SINAL P-- T
�.�
41ERALD PAn�
5 5 :-
AN ADDITION TO THE CITY OF FORT WORTH,
xVe � TARRANT COUNTY TEXAS
BEING 60.376 ACRES OF LAND LOCATED IN
THE HENRY ROBERTSON SURVEY, A- 1259
3-E!'GLEAT 233 RESIDENTIAL LOTS
C&ITRT 2 COMMON LOTS
fes`` LOTS 8-86, BLOCK 3; LOTS 12-36, BLOCK 4,
LOTS 38-49, BLOCK 14; LOTS 1-45, BLOCK 15;
LOTS 1-41, BLOCK 16, LOT 1 & LOTS 20-35, BLOCK 17,
'53'00 ,�,E3 E LOT 1, BLOCK 19; LOTS 1-7 & LOTS 21 & 22, BLOCK 20;
LOT 1, LOTS 51-53 AND LOTS 62 & 63, BLOCK 21
Ln
i OWNER
i DR HORTON TEXAS LTD.
DFW WEST DIVISION
.z 4500 MERCANTILE PLAZA DRIVE
s,
w ".1_ SUITE 104
_ FORT WORTH, TEXAS 76137
Phone (682) 647-3350
NOVEMBER, 2004
V I I 1
I
m a
V'
k
mycoskie4--mcinnis+associates
—- - - - civil engineering surveying landscape architecture planning
2 0 0 e a s t a b r a m
arlington , texas 7601 0
8 1 7 — 4 6 9 — 1 6 7 1
f a x : 8 1 7 — 2 7 4 — 8 7 5 7
SHEET 1 OF 2
THIS FLAT IS FILED IN CABINET , SLIDE , , P.R.T.C.
Exhibit B Paving cost estimate for CFA
ENGINEER: Mycoskie McInnis Associates
OWNER: Emerald Park Section 2
D.R.Horton,Texas,Ltd
PROJECT: PAVING,
PROJECT NO: 1978-2-1
ITEM ITEM DESCRIPTION UNIT PLAN UNIT COST
NO. QUANTITY PRICE
1 6"Lime stabilized subgrade preparation Sy 38700 $1.45 $56,115.00
2 Hydrated lime for subgrade(30#Sl) TON 581 $80.00 $46,480.00
3 6"Reinforced concrete pavement including 7"monolithic curb Sy 20600 $18.89 $389,134.00
4 7"Reinforced concrete pavement including 7"monolithic curb Sy 15900 $18.10 $287,790.00
5 Type III barricade LF 192 $30.00 $5,760.00
6 Concrete street header LF 186 $10.00 $1,860.00
7 HMAC for pavement transitions and temporary turnarounds Sy 500 $16.00 $8,000.00
8 Traffic control devices per std detail LS 1 $2,000.00 $2,000.00
9 Pavement markings buttons and striping per city std LF 3516 $0.50 $1,758.00
10 4'wide concrete sidewalk LF 1185 $10.001 $11,850.00
11 Barrier free ramp EA 30 $450.00 $13,500.00
12 Remove existing barricade and rock rip rap EA 2 $375.00 $750.00
13 Maintain erosion control devices during paving construction LS 1 $500.00 $500.00
14 Lime and Concrete Testing Sy 39726 $0.50 $19,863.00
SUBTOTAL $845,360.00
TOTAL AMOUNT OF PAVING: $845,360.00
TOTAL PROJECTED COST $845,360.00
EMERALD PARK 1"--400'
FUTURE SEC71ONS
/ s
EMERALD PARK
FUTURE SEC71ONS
EMERALD PARK
SEC71ON eAt�xmiN '':� -+ L
ONE --
WEYB'R%oLANE
- \
FUTURE
CHURCH SITE 1 `' r
:y
BANDS RANCH ROAD
LEGEND
29' B-B PAVEMENT 6 INCH CONC. IN 50' ROW
41' B-B PAVEMENT 7 INCH CONC. 1N 60' ROW
4' WIDE SIDEWALK
DATE: 11.04.04
PROJECT # 1978-2-2 EMERALD PARK
DRAWN BY. J. URBANIAK SECTION TWO mycoskie mcinnis associ`aI(tes
civilengineering"sunfeyirig landscapearcfutwure penning
CHECKED BY. T. BELCHER EXHIBIT 'B' 2 o o a a,, or are 11
PAVING r l l a tea �-6
817-469- 1671
SHEET NO: 1 OF 1 fox: 817- 274-8757
Exhibit B-1 Storm Sewer cost estimate for CFA
ENGINEER: MYCOSKIE MCINNIS ASSOCIATES,INC.
OWNER: EMERALD PARK SECTION 2
D.R.Horton,Texas,Ltd
PROJECT: SECTION C-STORM
PROJECT NO: 1978-2-1
ITEM ITEM DESCRIPTION UNIT PLAN UNIT COST
NO. QUANTITY PRICE
1 Install 5'x3'reinforced concrete box including bends LF 297 $155.00 $46,035.00
2 Install 5-8'x5'reinforced concrete box LF 60 $1,400.00 $84,000.00
3 Install 6-8'x5'reinforced concrete box LF 50 $1,600.00 $80,000.00
4 Install 48"Class III reinforced concrete pipe including bends... LF 630 $110.00 $69,300.00
5 Install 42"Class III reinforced concrete pipe including bends.. LF 669 $95.00 $63,555.00
6 Install 36"Class III reinforced concrete pipe including bends.. LF 303 $70.00 $21,210.00
7 install 30"Class III reinforced concrete pipe including bends- LF 591 $55.00 $32,505.00
8 Install 27"Class III reinforced concrete pipe including bends.. LF 300 $48.00 $14,400.00
9 Install 24"Class III reinforced concrete pipe including bends.. LF 32 $40.00 $1,280.00
10 Install 21"Class III reinforced concrete pipe including bends- LF 914 $35.00 $31,990.00
11 10'std curb inlet,per S-SD4 of the city std EA 26 $1,850.00 $48,100.00
12 4'square std.Drop inlet,per sht 25 and S-SD5 of the city std EA 1 $2,200,001 $2,200.00
13 4'square manhole,per S-SD7 ofthe city std EA 2 $1,800.00 $3,600.00
14 5'square manhole,per S-SD8 of the city std EA 2 $2,600.00 $5,200.00
15 5 sided Type 2 manhole,per S-SD10 of the city std EA 1 $4,000.00 $4,000.00
16 Install sloped end treatment Type Ii headwall,without pipe... EA 3 $1,200.00 $3,600.00
17 install concrete apron vertical headwall for 48"pipe per city.... EA 1 $2,000.00 $2,000.00
18 Install sloped end treatment Type II headwall without pipe EA 2 $1,500.00 $3,000.00
19 Insall concrete apron vertical headwall for 5'x3'RCB per city... EA 1 $3,000.00 $3,000.00
20 Install Flared wing walls for 5'x3'box,per TxDot std FW-O EA 1 $3,000.00 $3,000.00
21 Install modified parallel wing walls for 5-8'x5'box per sht 23... EA 2 $5,000.00 $10,000.00
22 Install modifed parellel wing walls for 6-8'x5'box per.... EA 2 $6,000.00 $12,000.00
23 Install Type R dry rip rap,per TxDot item 432 CY 805 $45.001 $36,225.00
24 Install Curlex blanket,seeding and fertilizer for channel... SY 21133 $0.90 $19,019.70
25 Rock Berm per erosion control plan EA 4 $800.00 $3,200.00
26 Maintain erosion control devices during all utility construction LS 1 $2,000.00 $2,000.00
SUBTOTAL $604,419.70
TOTAL AMOUNT OF STORM WATER SYSTEM: $604,419.70
TOTAL PROJECTED COST $604,419.70
I
10'CURB UBtT
1 .r
EMERALD PARK 1"=400'
FUTURE SECTIONS
�v
10"CURB N1.EI
�Lr tune n71ET
ILY CURB MET
EMERALD PARK
10•CURB WLET �y� FUTURE SECTIONS
o
EMERALD PARK 1 IO'CMB P&ET
SECTION ONE SAVER rav-LANE --
21.R ,B
+r
10'CURB ALET 21-RCP .
0" N.E.
i
TV CURS ALET
�.
10'CRm MET Cf•J
10'C.RB CJLEI
B1LET
- - - - -- — slw 3
FUTURE
CHURCH S17E /, Rt\L�
G�
BANDS RANCH ROAD Rol
DATE: 11.04.04 m m a
PROJECT # 1978-2-2 .EMERALD PARK
DRAWN BY.• J. URBANIAK SECTION TWO mycoskie ry cinnis associates
civil engineering survey landscape archilecture planning
EXHIBIT 'B-1' 2 D D a b r a nr
CHECKED BY T. BELCHER STORM DRAINAGE
arllnyl0 teas 76010
817, 469- 167t -
SHEET NO. 1 OF 1 +a.: 8 7—az.,.e.1s.7
Exhibit C Lighting and Signage cost estimate for CFA
ENGINEER: MYCOSKIE MCINNIS ASSOCIATES, INC.
OWNER: EMERALD PARK SECTION 2
D.R. Horton,Texas Ltd
PROJECT: Lighting and signage
PROJECT NO: 1978-2-1
ITEM ITEM DESCRIPTION UNIT PLAN UNIT COST
NO. QUANTITY PRICE
1 Street lights EA 38 $2,200.00 $83,600.00
2 Street signs EA 20 $100.00 $2,000.00
SUBTOTAL $85,600.00
TOTAL AMOUNT OF STREET LIGHTS AND SIGNAGE: $85,600.00
TOTAL PROJECTED COST $85,600.00
SUMMARY
PAVING $845,360.00
STORM $604,419.70
SUB
TOTAL $1,449,779.70
CONST&
ENG PER
DOE 4% $57,991.19
LIGHTING
AND
SIGNAGE $85,600.00
TOTAL $1,593,370.89
I
PARK ��ECTIONS �, A 1"=400'
y41IL-
EMERALD PARK
FUTURE SEC77ONS
yam,
o
EMERALD PARK BAVER7tXV LANE � ~
SEC77ON ONE --
Nov 19 04 11 : 26a GRASON LAND INC 2142203910 p. 3
I'MIU �iN-_ULH rax=114- t-Sy40 Nov 19 '04 6:47 P.02
®.MARIO S NACOLA & SONS
t:AYATI1dG, INC.
November 19, 2004
DR Horton-Texas, Ltd-
20D East Abram Street
Adington,Texas 76010
ATTENTION: Mr.Harold Dixon
GENTLEMEN: We propose to k mish ail labor, materials and equipment
necessary to construct the following described work:
PROJECT: Emerald Park 5 coon 2
LOCATION: Fort Worth,Te s
PAVING
Item Description Quantity Unit Unit aw Total Bid
1 6"Lime Stabilize i Subgrade 38,700.00 SY 1.45 $ 56,115.00
2 Hydrated Lime 30#I SY 581.00 TN BO.00 $ 46,480.00
3 6'3000 PSI Con.. Pvmt w/7"curbs 20.600.00 SY 18.89 $ 389,134.00
4 7"3000 PSI Cont. Pvmt.w/7'curbs 15,900.00 SY 18.10 $ 287,790:00
5 Temp.TY III Bay icade 192-00 LF 30.00 $ 5.760.00
6 Street Header 186.00 LF 10.00 $ 1,860.00
7 HMAC Transition (6' ) 500.00 SY 16.00 $ 8,000.00
8 Traffic Control during Constr. 1.00 LS 2,000.00 $ 2,000.00
9 Pvmt Markings, Yjftons and striping 3,516.00 LF 0.50 $ 1,758.00
10 4'X 4"Sidewalk 1,185.00 LF 10.00 $. 11,850.00
11 Barrier Free Rarr ps 30.00 FA 450.00 $ 13,500.00
12 Rem. Barricade 6,rock rip rap 2.00 EA 375.00 $ . 750.00
13 Maintain Erosion Control Devices during paving 1.00 LS 500.00 $ 500.00
14 Lime&Concrete Testing 39,726.00 SY 0.50 $ 1'91863.00
PAVING TOTAL $ 845,36D.00
PMt5d.I III W2004 2004-261.111804,Contract Pay.Pmp.,Emenid P24 SEC 2-Prop Page.7 Of 2
UTILITIES • PAVING • EXCAVATING
PO BOX 2329 - 10950 RESEARCH ROAD FRISCO,TEXAS 75034
(214)357-3 • ENGINEERING FAX(214)387-3940 • FINANCE FAX(214)387-3950
RECEIVED
Nov 19 04 11 : 26a GRASON LAND INC 2142203910 P • 4
Nov 19 '04 8:48 P.03
MARIO S INACOLA & SONS
cAVA-ri Mc,NC.
QUALIFICATION'S:
— Units are based 3n Mycoskie McInnis Associates, Inc.plans Dated:09104-Received: 10/12104.
— All work on this p posal will be performed with one move-in at one time
— Final quantitlas ill be determined using"Approved Plans'
— Bonds included
Testing is includ
— No landscape. irr 3ation,electrical adjustments or repairs
-- No installation or moval of erosion control devices
-- No median pavin stones
— No permanent tra fic markings or signage except for center line skips on 41'pavement
—No permits, impaili t fees or fees of any kind
No respreading of topsoil,sod,or seeding
— No rock excavation
— No undercutting
— No sales tax on Incorporated materials
-- No street lighting
— No surveying
— Manhole adjustor nts included
— Colored concrete included in barrier free ramps
— Reinforced sleel t be It 3's on 24'c-c both ways
— Street subgrade be*!-0.20 feet by others
— Proposal based won city approval of batch plant
— Owner to provide sultable location with city water on-site or adjacent to the sits for a concrete batch
plant(Approximately 2 Acres)
We have quoted this project on a unit price basis, any work not specirrically quoted or qualified is
excluded
Should you have any questions, o reed clarification regarding this proposal, please feel free to contact this offtce.
Sincerely,
MARL Sita CO �oNs EXC VATING,INC.
Michael Sinacol
Vice President
Ppni*d:1111WZ004 244.261;111804;Contract Pay.Prop.:Emwald Pah SEC 2-Prop Page:2 d?
STORM SEWER
PROPOSALSCHEDULE
Item Quant Prices in Figures
ity
No. & Unit Description & Price In Words Total Unit TOTAL
1. 297 LF Install 5'x3' Pre-Cast Reinforced concrete
box, including bends, complete and in place
for the sum of:
1//7P $ /SS. DO $ yl, 035.60
dollars and no
cents per linear foot
2. 60 LF Install 5-8'x5' Pre- Cast Reinforced concrete
box, complete compllete and in place for the sum/of
dollars and Arn $ 1, /-W- 00 $ 9`1000.06
cents per linear foot
3. 50 LF Install 6-8'x5' Pre-Cast Reinforced concrete
box, complete and in place for the sum of
SII- l7Un1,jrrrl
dollars and ,yo $ /, ( DO. $ .0D, do 00
cents per linear foot
4. 630 Install 48 inch Class III Reinforced concrete
LF pipe, including bends and wyes, complete
and in place for the sum of
On P U f£" $ //u'- 00 $
dollars and /{/0
cents per linear foot
5. 669 LF Install 42 inch Class ill Reinforced concrete
pipe, including bends, wyes and plug,
complete and in place for the sum of Q
Al it e 7L y- �,t/e $ /.S. 0o $ 3, .SS,S. D 0
dollars and �o
cents per linear foot
PROPOSALSCHEDULE
Item Quant Prices in Figures
its/
No. & Unit Description & Price In Words Total Unit TOTAL
6. 303 LF Install 36 inch Class III Reinforced concrete
pipe, including bends and wyes, complete
and in place for the sum of
.Se vete �y $ 70. 00 $ .21, 2 io.oo
dollars and ,vp
cents per linear foot
7. 591 LF Install 30 inch Class III Reinforced concrete
pipe, including bends and wyes, complete
and in place for the sum of
$ SS. o o $ 3 21 s os.o o
dollars and ,vo
cents per linear foot
8. 300 LF Install 27 inch Class III Reinforced concrete
pipe, including bends and wyes, complete
and in place for the sum of
dollars and Np
cents per linear foot
9. 32 LF Install 24 inch Class III Reinforced concrete
pipe, including bends and wyes, complete
and in place for the sum of
LCzTl $ L/Q. 06 $ / .280. 00
dollars and ti19
cents per linear foot
10. 914 LF Install 21 inch Class III Reinforced concrete
pipe, including bends and wyes, complete
and in place for the sum of
/fig-fv- Live $ 35. 00 $ J'/ 990.00
dollars and ,v, '
cents per linear foot
y ;.
. T-1.,.-,. X T
PROPOSAL SCHEDULE
(tem Quant Prices in Figures
ity
No. & Unit Description & Price In Words Total Unit TOTAL
11. 26 EA 10 foot std curb inlet, per S-SD4 of the city
std., complete and in place for the sum of:
One A7,I7unrlle �Ev
dollars and 'o $ /, .050. 00 $ foo Do
cents per each
12 1 EA 4 foot square std. drop inlet, per sht 25 and
S-SD5 of the city std., complete and in place
for the sum of:
77�tvo t/7Uusa,i1 4Rie $ .2, 200.00 $ ,2 00.00
dollars and ,,,n
cents per each
13 2 EA 4 foot square manhole, per S-SD7 of the city
std., complete and in place for the sum of:
One e.�*Zfit /gun'l'-ell
dollars and „D $ / JOp o. 00 $ 3, 6 0 0.G0
cents per each
14 2 EA 5 foot square manhole, per S-SD8 of the city
std., complete and in place for the/ sum of:
Twn Z�/]ot�Sani .5.,( nunr�re'd
dollars and o $ � 6 00.00 $ S, 2 o o. o o
cents per each
15 1 EA 5 sided Type 2 manhole, per S-SD10 of the
city std., complete and in place for the sum
of:
four /lnuSun� $ yQOU. 00 $ y.dOO GU
dollars and ,V,,
cents per each
PROPOSALSCHEDULE
Item Quant Prices in Figures
ity
No. & Unit Description & Price In Words Tota[ Unit TOTAL
16. 3 EA Install sloped end treatment Type II
headwall, without pipe runners for 21" pipe,
per TxDOT std SETP-CD, complete and in
place for the sum of:
$ /, ,200.00 $ 3,w'60- 00
O/)P �/lo�Suncl�U �n�nd�P�/
dollars and
cents per each
17. 1 EA Install concrete apron vertical headwall for
48" pipe, per city std S-SD12, complete and
in place for the sum of:
n fhni-said $ 2, 000.60 $ ?, 000.00
dollars and Nn
cents per each
18. 2 EA Install sloped end treatment Type II
headwall, without pipe runners for 48" pipe,
per TOOT std SETP-CD, complete and in
place for the sum of:
// $ /, Soo.06 $ 3, Ooo.00
�i[.�ndrer,
dollars and do
cents per each
19. 1 EA Install concrete apron vertical headwall for
5'x 3' RCB, per city std S-SD12, complete
and in place for the sum of:
-7-A/ ,-e ZXDL,-fonrA $ j 600. 00 $ 3 00 0. 00
dollars and ti-
cents per each
PROPOSALSCHEDULE
Item Quant Prices in Figures
ity
No. & Unit Description & Price In Words Total Unit TOTAL
20. 1 EA Install Flared wing walls for 5'x 3' box, per
TxDOT std FW-O, complete and in place for
the sum of /
��7/PP Z�l�lGr SanGf $ �Ooo.00 $ 3, eoo. Do
dollars and AID
cents per each
21. 2 EA Install modified parallel wing walls for 5-8'x
5' box, per sht 23 and TxDOT std PW,
complete and in place for the sum of
/V� t/�nv.Sanr� $ S 000.00
/0, Uov.vo
dollars and
cents per each
22. 2 EA Install modified parallel wing walls for 6-8'x
5' box, per sht 26 and TxDOT std PW,
complete and in place for the sum of
dollars and ,,,,,
cents per each
23. 805 Install Type R dry rip rap, per TxDOT item
CY 432, complete and in place for the sum of
v- ✓C
dollars and '.o $ yS. D o $
cents per cubic yard
24. 21,133 Install Curlex Blanket, seeding and fertilizer
SY for channel, per sht 27abc, complete and in
place for the sum of
X/C $ 90 $ �9, Dig. .7o
dollars and ,v,;vErr-
cents per square yard
PROPOSALSCHEDULE
Item Quant Prices in Figures
i ty
No. & Unit Description & Price In Words Total Unit TOTAL
25. 4 EA Rock Berm per ersosion control plan,
complete and in place for the sum of
Z,46 t /i1664-I'd
dollars and ,la $ 900. 00 $ 3, z oo. oo
cents per each
26. 1 LS Maintain Erosion Control devices during all
utility construction, complete and in place for
the sum of
7bUp 2�-Ao&(Sa.,2 $ Z 000. 00 $ � '000. 00
dollars and ,vn
cents per lurrip sum
TOTAL AMOUNT BID $ 'i/9. 70
ofa l �itJafer � 338 Cfl37•oo
Toto SGn1fG.ry Sewcr Ll 3(n, z7 I• DO
Tot- I .S-& orm Sewe,' Hl 70
7—o6o.1 U6,•1,*�-Jes S,J - 1, 3 79, 3.22. 70
F '
e
PART B — PROPOSAL (cont.)
Within ten (10) days after acceptance of the Proposal, the undersigned will execute the
formal contract and will' deliver an approved Surety Bond and such other bonds as
required by the Contract Documents, for the faithful performance of the Contract.
The undersigned bidder certifies that he has been furnished at least one set of the
General Contract Documents and General Specifications for water Department Projects
dated January 1, 1978, and that he has read and thoroughly understands all the
requirements and conditions of those General Documents and these specific Contract
Documents and appurtenant plans.
The undersigned assureds that its employees and applicants for employment and those
of any labor organization, subcontractors or employment agency in either furnishing or
referring employee applicants to the undersigned are not discriminated against as
prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No.
7400.
Contractor is to provide the number of projected working days to complete the project.
The Bidder agrees to begin construction within 5 working days after issue of the work
order by the Owner, and to complete the contract within 8o working days after
beginning construction as set forth in the written work order to be furnished by the
Owner.
The undersigned acknowledges receipt of the following addendum:
Addendum No. 1
Addendum No. 2
Addendum No. 3
BIDDER
1 Oflo I,SF� ��nC�rinC�inrl l (� �.1�
Compa
By
liTp ele! ase Print)
Jerry CC>'AO-k-L I�rPsnndFnt o�
Mav,aaerY e,t- (� =n( �S G l
Title
Ro. R.x i sq{ g
Address
Fork Wortk 7—X 7l.HI
City State Zip
(Seal if corporation)
D- _ „
I. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 14 EA $ 2, 000 $28, 000 . 00
MID-BLOCK RESIDENTIAL 18 EA $ 2, 000 $36, 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 6 EA $ 2, 000 $12, 000 . 00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00
Subtotal $76,000 .00
City' s Cost $00, 000 . 00
Developer' s Subtotal $76,000. 00
10% Contingencies $7, 600 . 00
Project Total $83, 600 . 00
Adjacent Developer's Cost $0,000 . 00
Developer's Cost $83, 600 .00
2% Inspection Fee $0,00 . 00
CFA CODE #2004164
DEVELOPER' S COST: $83, 600.00
EMERALD PARK, PHASE II
December 6, 2004
Fort Worth, Texas
January 22, 2005
PAGE I OF Exhibit C
II. STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C", immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department.
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works .
3. The City will install all the streetlights that use overhead or
underground conductors on residential, and collector streets. the
developer agrees to pay the city the amount shown below prior to the
City starting it' s design efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors .
5. The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for
the installation of any electrical transformers required for the
proper operation of the street lights
6. The estimated cost of this street light installation is detailed on
page 1 of exhibit C and is summarized below, the street lights will
remain the property of, and will be maintained by the City of Fort
Worth.
DEVELOPER' S COST: $83,600.00
EMERALD PARK, PHASE II
December 6, 2004
FORT WORTH, TEXAS
CFA CODE #2004164
Page II of Exhibit C
III .
"STREETLIGHTS"
INTERSECTIONS
HAWKS LANDING RD & EMERALD PARK DR 1
HAWKS LANDING RD & CHATAMBRIDGE CT 1
HAWKS LANDING RD & EIRMOOR TRAIL 1
HAWKS LANDING RD & BAVERTON LANE 1
HAWKS LANDING RD & RYEBURY CT 1
HAWKS LANDING RD & ABBEYGLEN CT 1
CALDEROOD LANE & BAVERTON LANE 1
THORNGROVE COURT & BAVERTON LANE 1
WEYBRIDGE LANE & BAVERTON LANE 1
BAVERTON LANE & MYRICK COURT 1
BAVERTON LANE & AXTON CT 1
CALDEROOD LANE & EMERALD PARK DR 1
KITTERING TRAIL & WEYBRIDGE LANE 1
KITTERING TRAIL & DONOGAN COURT 1
MID-BLOCK
HAWKS LANDING RD 7
EMRRALD PARK DR 2
CALDERWOOD LANE 1
THORNGROVE COURT 1
WEYBRIDGE LANE 2
KITTERING TRAIL 2
BAVERTON LANE 3
CHANGE OF DIRECTIONS
THORNGROVE COURT 1
WEYBRIDGE LANE 1
DONAGON COURT 1
BAVERTON LANE 1
MYRICK COURT 1
AXTON COURT 1
EMERALD PARK, PHASE II
Page III of Exhibit C
Iv
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following sixteen (16) intersection at a
cost to the Developer of$1,600.00:
Bonds Ranch Rd & Hawks Landing Rd
Bonds Ranch Rd & Kittering Tr
Hawks Landing Rd & Abbeylen Ct
Hawks Landing Rd & Baverton Lane
Hawks Landing Rd & Chatamridge Ct
Hawks Landing Rd & Eiremoor Tr
Hawks Landing Rd & Ryebury Ct
Hawks Landing Rd & Emerald Park Dr
Calderwood Lane & Emerald Park Dr
Calderwood Lane & Baverton Lane
Thorngrove Ct & Baverton Lane
Myrick Ct & Baverton Lane
Axton Ct & Baverton Lane
Weybridge Lane & Baverton Lane
Weybridge Lane & Kittering Tr
Donagon Ct & Kittering Tr
Emerald Park, Phase II
CFA code: 2004164 December 6, 2004