HomeMy WebLinkAboutContract 31437 03-02-05AO3 : 10 RCVD
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 31 43 7
WHEREAS, TexasBank , hereinafter called "Developer", desires to make
certain improvements to TexasBank Alliance , an addition to the City of Fort Worth,
Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Vernon Bryant , its duly
authorized President & C.E.O. , and the City, acting herein by and through Marc Ott, its
duly authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
1. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth, is hereby incorporated into this Community Facilities Contract
as if copy herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and
obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of
community facilities in accordance with Section Il, paragraph 7 of the
Policy.
G:\Production\2004\200423Morrespondence\CFA\CFA_TexasBank Alliance �r-
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
F. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
1. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
G:\Production\2004\2004238\Correspondence\CFA\CFA_TexasBank Alliance
construct current and future improvements provided for in this
agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain (B-1) None; Street Lights and Signs (C) None.
M. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibit B.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibit B. The
estimated total cost of current improvements and related support services
specified in this agreement, including design, construction and inspection
is estimated to $21,398.75.
GAProduc6on\2004\2004238\Corresponden ce\CFA\CFA_TexasBank Alliance _
SUMMARY
OF COST
Texas Alliance Bank
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $19,198.75 $ 19,198.75
2. Storm Drainage $0.00 $ -
3. Street Lights $2,200.00 $ 2,200.00
4. Street Name Signs $0.00 $ -
B. Engineering Design -
C. Construction Engineering
and Mana ement b DOE 4% $
TOTALS 21,398.75 $ - T $ 21,398.75
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
G:\Production\2004\2004238\Con•espondence\CFA\CFA_TexasBank Alliance f
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary,with the corporate seal of the City affixed, and said Developer
has executed this instrument in triplicate, at Fort Worth,Texas this the day of
200 '.
Approval Recommended:
Transportation and Public Works
Department
Robert Goode, P. E.
Director
Conr_racL AuthorizatioA
Cit of rt Wo h
Date '
Marc Ott
Assistant City Manager
ATTEST:
Marty Hendrix
City Secretary
Appro d s to Form:
Assistant ty ttomey
ATTEST: DEVELOPER
By: _ 2
Corporate Secretary Vernon Bryan
President and C
G:\Production\2004\2004238\Correspondence\CFA\CFA_TexasBank Alliance
CITY ;"K HRLU��'
0
z
w
� o
O Q 0
5
�N W h�
N J
N
U ►� PROJECT
oil " LOCATION
z
WESTPQR PKWY KEL
0
i Greek
3
f—
O
rL
3 W
d
I�
�Dunaway Planners Engineers ;FS-004=285
Viciriit . Map.far
Associates Inc. Surveyors
61
Landscape Architects TexasBank A11tanGe.
1501 Msrrhut CYtl.,31..100 Fat WOM.7X 7810]Ph:817.008.1121-:817.12B.B103 FVt 31].0J5.79J7 �
ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
ITEM DESCRIPTION I QUANTITY UNIT I UNIT PRICE I COST
1 Standard 4'concrete sidewalk 93 LF $14.00 $1,302.00
2 7"reinforced concrete pavement and monolithic curb(complete and in place) 679 SY $22.00 $14,938.00
3 6"lime stabilized subgrade 695 SY $2.25 $1,563.75
4 Hydrated lime @ 27#/SY 9 TN $105.00 $945.00
5 Wheelchair ramp 1 EA $450.00 $450.00
6 Street light 1 EA $2,200.00 $2,200.00
Subtotal $21,398.75
NOTE:The unit prices in this estimate are per the units prices established in The City of Fort Worth's "Policy for the installation
of Community Facilities"Dated March 2001
D
- ^A•.^.tT
I . STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK RESIDENTIAL 0 EA $ 2, 000 $0, 000 .00
CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK COLLECTOR 1 EA $ 2, 000 $2, 000 .00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 .00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00
Subtotal $2,000 . 00
City's Cost $00,000 . 00
Developer's Subtotal $2,000.00
10% Contingencies $200 .00
Project Total $2,200.00
Adjacent Developer's Cost $00,000 . 00
Developer's Cost $2,200 . 00
2% Inspection Fee $00,000 . 00
CFA CODE #2005006
DEVELOPER' S COST: $2,200.00
TEXAS BANK ALLIANCE
February 1, 2005
Fort Worth, Texas
February 3, 2005
PAGE I OF Exhibit C
II. STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C", immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department .
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works .
3 . The City will install all the streetlights that use overhead or
underground conductors on residential, and collector streets . the
developer agrees to pay the city the amount shown below prior to the
City starting it' s design efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors .
5 . The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for
the installation of any electrical transformers required for the
proper operation of the street lights
6. The estimated cost of this street light installation is detailed on
page 1 of exhibit C and is summarized below, the street lights will
remain the property of, and will be maintained by the City of Fort
Worth.
DEVELOPER' S COST: $2,200.00
TEXAS BANK ALLIANCE
February 1, 2005
FORT WORTH, TEXAS
CFA CODE #2005006
Page II of Exhibit C
-64�icJiilCAW
a
I AaJ1Hit ��JLe
III .
"STREETLIGHTS"
MID BLOCK
WESTPORT PKWY 1
TEXAS MANK ALLIANCE
Page III of Exhibit C