Loading...
HomeMy WebLinkAboutContract 31538 AMENDMENT NO. 6 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. 362pi COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (CITY) and Carter & Burgess, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 25335, (the CONTRACT) which was authorized by the City Council by M&C C-17684 on the 12th day of October, 1999 and subsequently revised by Amendment No. 1 which was authorized by the City Council on the 14th day of May, 2002 (M&C C-19078) , Amendment No. 2 which was authorized by the City on the 26th day of November, 2002, Amendment No. 3 which was authorized by the City on the 3rd day of March, 2003; Amendment No. 4 which was authorized by the City Council on the 24th day of June, 2003 (M&C C-19646) , and Amendment #5 which was authorized by the City on the 30th day of November, 2004; WHEREAS, the Contract involves engineering services for the following project: North Tarrant Parkway from US 377 to IH-35W; WHEREAS, it has become necessary to execute Amendment No. 6 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in the proposal letter dated March 2, 2005, copies of which are attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $4, 584 .22 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services -1- 011 FFI. JAII IQ WON- 03-22-05P07 : 38 RCVD cirf l"-HRIM" aRIGINAL F7, W 5�THI TEK". performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $668, 127 .22 . 3 . All other provisions of the Contract, which are not expressly amended herein shall remain in full force and effect. nn EXECUTED on this the day of��� 200n Fort Worth, Tarrant County, Texas. ATTEST: APPROVED: Marty Hendlkx Marc Ott City Secretary Assistant City Manager APPROVAL RECOMMENDED: NO M&C REQUIRED Robert Goode, P.E. Director, Transportation/Public Works Department CARTER & BURGESS, INC. ENGINEER Darrell Thompson, P.E. APPROVED S TO FORM AND LEGALITY: Ste ' a ger Assistan City Attorney OR 10,141 ROD -2- Fy, "ITH, YEX, 777 Main Street P.O. Box 901058 Carter.-'Burgess Fort Worth,Texas 76101-2058 Phone: 817.735.6000 Fax: 817.735.6148 www.c-b.com March 02, 2005 Mr. Michael Weiss, P.E. Senior Professional Engineer City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Dear Mr. Weiss: Carter& Burgess is requesting an increase in our contract for North Tarrant Parkway to provide engineering required by development along the Parkway. The development occurred after the plans were developed and require changes to drainage, driveways and temporary work done prior to letting. This work includes a new street at each location showing the proposed changes and only includes problems identified to date. In accordance with the proposed fee schedule, enclosed Exhibit 1, we are requesting the amount of$4,584.22. We appreciate your help in this matter. Please call me at 817-735-6007 if you have any questions. Sincerely, Gregory M. Creamer, P.E. Associate GMC/mmo Enclosure cc: Correspondence Rodger Clements Carter&Burgess, Inc. Carter&Burgess Architects/Engineers,Inc. Carter&Burgess Consultants,Inc C&B ArchitecRK C&B Architects/Engineers,P.C. C&B Nevada,Inc. Nixon&Loird Architects/Engineers,P.C. k ■ # | ° „ & 7q EA � C6 �§ � § § k if , it 2 5 � 2 ) ) ! § § ( ) § \ ) b § § \ f k § ^ � ] G § \ . . § § Ek ] [ | § \ § e § Ix i /{ § e a ■ ■ xui f 7 } k§ 2 ! \ , § fL a § ! � ! a ! § - § ) } # # a ! $ - � E ■§ § § k # ) \ Jt � = » ` 10 e � @ � § 7 � ) ) � § 6 \ 7 \ k § ! \ OHICI 6w K � ON- � Of SKIMPY FT. WO N, TEN.