Loading...
HomeMy WebLinkAboutContract 44299-CO2 dATY SECRETAW FORT WORTH. City of Fort Worth '1Or4TRACr luo. Change Order Request Project Name 1 2008 CIP Arterial Street Robertson Road City Sec# r44299 Client Project#(s) CPN#01299 DOE#6227 FAC C204 541200 207230129983 Project Description Robertson Road from Boat Club Rd to west of Lake Country Dr Contractorl Ed Bell Construction Change Order# Date 7/23/2014 City Project Mgr.I Mike Bennett City Inspector Thomas Miller Dept. TPW Water Sewer Contract Time Totals (CD) Original Contract Amount $5,037,373.40 $737,717.75 $194,604.48 $5,969,695.63 330 Extras to Date $36,013.13 $36,013.13 14 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $5,073,386.53 $737,717.75 $194,604.48 $6,005,708.76 344 Amount of Proposed Change Order $47,377.50 .00 $0.00 $47,377.50 38 Revised Contract Amount $5,120,764.03 $737,717.75 $194,604.48 $6,053,086.26 382 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 $0.00 $0.00 Additional Funding(if necessary) $47,377.50 $47,377.50 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.40% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25'x) $7,462,119.54 Her FOR CHANGE WER Driveway at lift station was widened for an improved design which will be better suited for the type of truckes servicing the lift station. A temporary signal was added to expedite traffic switch and improve project schedule. Fencing types were changed to match the type of fence existing on the properties at the start of construction. FoRr�► Q O 1.8 by. �� v$$ X OFFICIAL RECORD A °-%0000.,00 CITY SECRETARY }C SecratY X p►5 FT.WORTH,TX Macy J. K It is understood and agreed that the acceptance of this Change Order by the contractor constitutes a and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Chang r r it Ed Bell Construction 11—a— U 4K 4 D Oita tit �k M&C Number M&C Date Approved RECEIVED DEC 0 1,A.M. `t rn 0 rn N r N CC=) c 0 0 0 CV CV O O r N Vy �# ti r U C � m U m ° C J J J W W _m N O LO CD O L ~ � ~ m L � N O O m U � � m C 'U a O Ln C = z g L. co 0 C m L � CD w p CV3 m o O N ti N � O t9 V C t N C} $ a N U � Q U cr W p ti N N N � o g 9 W �p ° B of CL (� C N 9a _ U — m -e ayi CD Cod m cmi N U d' W r2 (T6 N 3 N N (6 c a f6 Fm �t c o c m ai U-in _ O cc a m m � 3 3 U C �j C a1 m O F m a �' U o o f a GL U o U a PT lr*- LU W) ILO Frr V6 M � M C") 0 0 0 0 0 0 0 0 co O O co C4 V�l 09, ct cli co t c 0 'v 0 N 0 N (0 a c 0 =o a� -a O OD c �o s U rn o N d N O LO �# C U � C UJ N � y E 0 O T # L F-- N .d O N O = to U tio C U a 0 �+ O 0 z 30 c w o Go 0 w LL. L C0 N m O t tt C m V $ U t CO c � N It Q � LL �N N C'D� g m 0 U o c ai o d N c U c U - m co Z m $ � ac w U C F" E '.0� 0 rn N d Q a m n m w 3 o m a a ° U ° a` a v a co m 0 0 0 0 U�looLn ao 0 0 0o c 0 0 co N O N N OD m a c 0 v v 0 v v O v on c m s u MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00