Loading...
HomeMy WebLinkAboutOrdinance 18537-04-2009Ordinance No 18537-04-2009 AN ORDINANCE INCREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE CULTURE AND TOURISM FUND IN THE AMOUNT OF $48 902.00 FROM AVAILABLE FUNDS FOR THE PURPOSE OF INSTALLING HANDRAILS IN THE COWTOWN COLISEUM PROVIDING FOR A SEVERABILITY CLAUSE, MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES 1N CONFLICT HEREWITH AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS SECTION 1 That in addition to those amounts allocated to the various City departments for Fiscal Year 2008- 2009 in the Budget of the City Manager there shall also be increased estimated receipts and appropriations in Culture and Tourism Fund in the amount of $48,902 00 from available funds, for the purpose of the installation of handrails in the Cowtown Coliseum SECTION 2. That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision opinion or judgment shalt in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect. SECTION 3 That this ordinance shall be cumulative of Ordinance No 18283 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed SECTION 4 ADOPTED AND EFFECTIVE April 7, 2009 This ordinance shall take effect upon adoption a~ _ t_YJ`_ '~ ~: } ..~. I ^. >, _. ? ' ~- ., Q ~ ~ ~ , `° ~ _ A~ c r ~~~ "~'! 4~ ,, STOCKYARDS- O ,; fi. O .....- Mi 26TH... _ O ~ p :;;~,_ t'>:~,^+..', .~ ,.<< - c f i '1R F ~ '. 1 1 I ~F _ t' _ W .. i C `t30 _° F - ,~ ,,., ,~ ~ ~I ' ro :.. Q ~r, a. ~ `K' EXCHANGE -w _„ ~t~~r ~~ ~ ~~~ ~ - ~~~ 7y.t _ 24T~~~ .,'a. ~ ~ ~ ±!Iith~~4~..w ~ ~ _ ~ _ .'~ ~ ~'. s, ~~-~-hc~ '~ti...~.~ l ..' w ~. aa~~.~.....;>.1 yea ,~ ~ u 5 __ ~ ... ..~.. t~~` ~~ ~ kl~~ ,',:'i~` ~~. ~._:, ORDINANCE NO 18537-04-2009 JOB ORDER CONTRACT COST PROPOSAL CONTRACT # 35188 CITY OF FORT WORTH OWNER: CITY OF FORT WORTH CONTRACTOR: ALPHA BUILDING CORPORATION 319 West 10th Street DFW AREA OFFICE Fort Worth, Texas 11266 Camp Bowie Bivd. West 76102-4616 Suite 118 Fort Worth TX 76008 JOC #: Pending Location: CFW, Cowtown Coliseum DATE: 211612009 TITLE: Coliseum Handrails COST PROPOSAL SUMMARY FROM: AI ha Suildin Cor oration TO: CFW Facilities Management Requested by Mike Milam This proposal is to provide all labor materials nd construction management for providing complete project in accordance with the statement of work and drawings provided. SCOPE OF WORK: 1 Limited to the supplying and staliation of handrails to yeas eferenced attached Exhibit A hightllghted in yellow on said xhibit. 2. Ratlings nd intermediate post wiil be 1 1/2" outside diameter single non-galvanized steel pipe. 3. Rails to be primed, receive two finish coats of paint olors designated by owner 4. Rails to be ed by wall brackets nd stabiilzed at nd of uns ay base ured post, needed. S. Post base will be attached to existing concrete by fasteners. 6. All to be walked with CFW Facilities to verify installation areas prior to fabrication. 7 CFW to inspect all fabrication prior to receiving approval to proceed with paint. 8. Proposal based CFW drawings, by Elements of Architecture, sheets A0.0, A0.2, A2.1 A2.2, A2.3, A2.4, dated: September 14, 2007 Project Duration: 60 Days Bond ncluded In project st TOTAL $38,901.21 Exclusions: Engineering, permits, electrical, mechanical, plumbing,carpentry blocking, ng of any type, spray painting, h[nged it sections, rete work, changes by any governing uthorities, TDLR requirements, relocation of sting attached structures, nd asbestos abatement. Est: Miles W' son Reviewed by Gary Raymond ~~ Ga a mond AI a u din or oration Date: REMARKS FROM: TO: Ci of Fort Worth Re resentatlve Date City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on, 4/7/2009" -Ord. No: 18537-04-2009 _ __ , . ;~ ~ , ~ , .~~ ~ _ .. ~~ ~,~_ ~ __~, Y DATE Tuesday April 07 2009 LOG NAME 25HANDRAILS_COWTOWN COLISEUM REFERENCE NO "C-23424 SUBJECT Authorize a Work Order in the Amount of $38 901.21 with Job Order Contractor Alpha Building Corporation to Install Handrails in Cowtown Coliseum and Adopt Appropriation Ordinance RECOMMENDATION It is recommended that the City Council 1 Adopt the attached supplemental appropriation ordinance increasing appropriations in the Culture and Tourism Fund by $48 902 00 and decreasing the Unaudited Unreserved Undesignated Fund balance by the same amount; and 2. Authorize the City Manager to execute a Work Order in the amount of $38 901 21 with Job Order Contractor Alpha Building Corporation to install handrails in the Cowtown Coliseum DISCUSSION On June 19 2007 M&C C-22191 authorized the execution of a job order contract with Alpha Building Corporation for construction services for minor construction and renovation projects. The project wiH install handrails to certain areas of the Cowtown Coliseum a City-owned facility located in the historic Stockyards Funds are available in the Unaudited Unreserved Undesignated Fund balance of the Culture and Tourism Fund The overall project cost is estimated to be Construction Contingency Other Contractual Staff Total $38 901 21 $10,000.79 $48 902 00 Alpha Building Corporation is in compliance with the City's M/WBE Ordinance by committing to 25 percent M/WBE participation The City's goal is 25 percent M/WBE participation on this Job Order Contract. This project is physically located in COUNCIL DISTRICT 2 but will serve Fort Worth residents in ALL COUNCIL DISTRICTS FISCAL INFORMATION /CERTIFICATION The Financial Management Services Director certifies that upon approval the Unaudited Unreserved Logname. 25HANDRAILS_COWTOWN COLISEUM Page l of 2 Undesignated Fund balance of the Culture and Tourism Fund will exceed the minimum reserve as outlined in the Financial Management Policy Statements FUND CENTERS TO Fund/Account/Centers GG04 539120 0246000 $48 902.00 FROM Fund/Account/Centers CERTIFICATIONS Submitted for City Manager's Office bv. Ori inatin De artment Head. Additional Information Contact: Logname 25HANDRAILS_COWTOWN COLISEUM Tom Higgins (6191) Kirk Slaughter (2501) Betty Tanner (2502) Page 2 of 2