Loading...
HomeMy WebLinkAboutContract 29442 CITY CONTRACT NO Y9q AMENDMENT NO. 2 STATE OF TEXAS 3 CITY SECRETARY CONTRACT (No M&C Needed) COUNTY OF TARRANT 3 WHEREAS, the City of Fort Worth (City) and Graham Associates, Inc. Consulting Engineers, (the "Engineer") made and entered into City Secretary Contract No. 24711 (the Contract) which was authorized by the City Council by M&C C-17288 on the 23 day of February, 1999; and WHEREAS, the Contract involves engineering services for the following project : Street reconstruction and water and sanitary sewer line replacement on Gambrell Street(Mccart to Frazier) and Wimberly Street (Merrimac to Wingate) WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; "Study of off-site sanitary sewer system for Wimberly Street" NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract : 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated December 11, 2003, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $24, 815 . 00 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $62, 716. 03 'Al �s X00 ��ti� S r;01\IV 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect . EXECUTED on this the _ t day of _ .� I , 2001, in Fort Worth, Tarrant County, Texas . APPROVAL RECOMMENDED: APPROVED: Ajb �19FAMAAW.1-- EJ6�� L �-74� A. Douglas Rademaker, P. E. Marc Ott Director, Department of Assistant City Manager Engineering Graham Associates, Inc. ENGINEER AT T: )9,0"f I I c Gloria Pe rson, City Secretary do BAal=LLI j Name: Chuck Stark, P. E. , Vice President Contract Authorization Summit Office Park 1300 Summit Ave. , Suite419 Data Fort Worth, Texas 76102 APPROVED AS TO FORM AND LEGALITY: 9 � //-"" Gary Steinberger Assistant City Attorney 914WEL"ill SON Jy Graham Associates, Inc. CONSULTING ENGINEERS & PLANNERS December 11,2003 Mr.Fred Ehia,P.E. City of Fort Worth Engineering Department 1000 Throckmorton Fort Worth,TX 76102 Re: D.O.E.#2217 Wimberly Street—Merrimac to Wingate City Secretary Contract#24711 Engineering Change Order No.2 Mr.Ehia: Based on our meeting last week with the Water Department and the consultant performing the White Settlement Road sewer replacement,it appears we have finally reached a viable solution for the siphon problem at the intersection of Wimberly Street and Wingate Drive. Over the past two years,Graham Associates has spent a considerable amount of time evaluating sewer options and I was glad to see the solution being implemented,as part of the White Settlement Road project, was our preferred alternative proposed in 2002. I believe we are now in a position to revise the Wimberly Street paving and utility plans one last time and proceed with construction. In accordance with your previous direction,I have tracked time devoted to evaluating sewer options and revising previously approved plans related to the siphon issue. These charges fall into five categories, itemized below. 1) Field survey of existing offsite sewer system downstream of the existing siphon: i)Currie Street from Wingate to White Settlement Road and ii)Wimberly Street from St. Juliet to White Settlement Road. Meet on-site with operations crews for vacuuming of manholes and field survey of siphon inverts. Senior Engineer 6 @ 110 660.00 Tech III 12 @ 65 780.00 Survey Crew 30 @ 100 3,000.00 Subtotal 4,440.00 2) Analysis of options for off-site sewer routes and siphon modifications. Present results in letter report format and meet with Water Department on three occasions to discuss options. Principle 12 @ 120 1,440.00 Senior Engineer 22 @ 110 2,420.00 Design Engineer 42 @ 75 3,150.00 Tech I11 27 @ 65 1,755.00 Clerical 8@ 35 280.00 Subtotal 9,045.00 ETexas r, ga,7 IR �Summit Office Park Centerpolnt Three k,13M Summit Ave.,Suite 419 600 Six Flags Drive,Suite 500 3200 .,Pulte 530 Ft.Worth,Texas 76102-4418 Arlington,Texas 76011-6356 Garland, 7504 - (817)332-5756 (817)649-8530 • Metro(817)640-8535 (972)640-6671 Fax(817)336-6909 FAX(817)633-5240 FAX(972)840-6671 3) Revise approved Wimberly Street paving, drainage and utility plans for shorter paving length. This was to allow bidding and construction of the street without including the area where the existing siphon is located. Revise contract documents and bid quantities accordingly. Senior Engineer 12 @ 110 1,320.00 Design Engineer 42 @ 75 3,150.00 Tech Ill 28 @ 65 1,820.00 Clerical 7 @ 35 245.00 Subtotal 6,535.00 4) Revise contract documents and bid quantities for new Special Conditions and MWBE requirements implemented during the time period the project was waiting to bid. Design Engineer 8 @ 75 600.00 Clerical 6 @ 35 210.00 Subtotal 810.00 5) Based on our meeting of last week,revise Wimberly plans once again to reflect installation of 21 inch dry line, leave existing 15 inch sewer line in place until White Settlement Road project is constructed, and extend pavement limits to include the siphon area. Revise contract documents and bid quantities accordingly. Estimate Cost: Senior Engineer 6 @ 110 660.00 Design Engineer 25 @ 75 1,875.00 Tech III 18 @ 65 1,170.00 Clerical 8@ 35 280.00 Subtotal 3,985.00 Since neither the work associated with sewer line replacement alternatives downstream of Wimberly Street, the revisions necessary to coordinate with the White Settlement Road project,nor the pavement revisions to approved plans were anticipated in the original design contract, I believe these services constitute legitimate "additional services". We respectfully request our contract be amended in the amount of $24,815.00 to reflect this additional work. Sincerely, GRAHAM ASSOI TES,INC. 7 -- Chuck Stark,P.E.,R.P.L.S. Vice President CS/br KV B FORTWORTH TO: A. Douglas Rademaker,P.E. FROM: Fred Ehia,P.E. DATE: January 6,2004 RE: PAVEMENT RECONSTRUCTION,WATER AND SANITARY SEWER LINE REPLACEMENT IN GAMBRELL STREET AND WLWBELY STREET, DOE#2217 AMENDMENT#2 As requested by the Water Department, Graham Associates,Inc. has submitted a proposal to study and analyze off-site sanitary sewer system in Wimberly Street. Graham Associates,Inc.requested to perform these additional services for a fee not to exceed $24,815.00 increasing the contract fee to $62,716.03 Staff considers this fee to be fair and reasonable for the scope of services proposed. Please authorize this additional design.by your signature on the attached Contract Amendment form. Xc: Rick Trice ENGINEERING DEPARTMENT ' 'n ' . THE CITY OF FORT WORTH * lOOO THROCKMORTON STREET * FORT WORTH, TEXAS 7fi10?-6311 (817) 871-7941 * FAx (817) 871-7854 1, Printed on recycled paper