HomeMy WebLinkAboutContract 31941 j COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.� WHEREAS, Centex Homes, a Nevada General Partnership, hereinafter called "Developer", desires to make certain improvements to Timberland, Phase IA, D.O.E #4559 an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. N:�, 1 ,) _� Q Timberland Phase IA -Newer CFA 4% and Utilities 04 29 05.doc F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged ne"U ence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed(Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. Jf'f l"vf :,� a �vUti� Timberland Phase IA -Newer CFA 4% and Utilities 04 29 05.doc RV L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached. M. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $1,333,722.77. Timberland Phase IA -Newer CFA 4% and Utilities 04 29 05.doc SUMMARY OF COST Timberland Phase IA Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $459,339.79 459,339.79 2. Storm Drainage $788,278.26 788,278.26 3. Street Lights $35,200.00 35,200.00 4. Street Name Signs $1,000.00 1,000.00 B. Engineering Desi n $ C. Construction Engineering and Management by DOE $ $ 4% 49,904.72 49,904.72 TOTALS 1,333,722.77 $ - 1,333,722.77 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk and a separate financial guarantee is required in the form of a bond or check for the cost of the sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Paid $179,983.50 for future improvements for Keller-Haslet Road. Timberland Phase IA -Newer CFA 4% and Utilities 04 29 05.doc BE IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth, Texas this the ay of-Inc , 2005. Approval Recommended: Transportation and Public Works Department LS Robert Goode, P. E. Director City of Fort Worth NO M&C REQUIRED Marc Ott Assistant City Manager fv\ATTTEST: ` Centex Homes Marty HendA A Nevada General Partnership City Secretary DEVELOPER Approved as to Form: By: Centex Homes Real Estate Corp. A Nevada Corporation Its Managing General Partner By: Steve Magee G Its Senior Vice President—Real Estate Assistant y ttorney DFW M o By: Date: Z e ATTEST: Corporate Secretary Timberland Phase IA -Newer CFA 4% and Utilities 04 29 05.doc '' L i5 J. 11r3 UU, ART Bl,! GE . tu. ..t .. . .t�.�c ............................. .......r•..���...........��...Hf...•..� �?:..�R•'Isar#�.:.:.:.:�:.:.:.:.:.:.:.:...:.•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•:•: NO>. 8:`!T .'-:73 5-600 IVl�tra:.:8�1.7 .429.�1.7th.:.:.:.:.:.:.:.:.�.:.�.�.•.•........:.....:...:.:.....:.:.:.:.:.�.•. TIMBERLAND PHASE 1A 26 JANUARY 2005 PAVING ITEM# DESCRIPTION QTY UNIT PRICE AMOUNT 1 6" LIME STABALIZED SUBGRADE 17,943 S.Y. 2.25 40,371.53 2 6" R.C. STREET PVMT WR" CURB 17,323 S.Y. 22.00 381,108.20 3 HYDRATED LIME 30#/SY) 269 TON 105.00 28,260.07 4 END OF ROAD BARRICADE 2 EA. 1,200.00 2,400.00 5 WHEELCHAIR RAMPS 161 EA. 1 450.00 7,200.00 TOTAL - PAVING $459,339.79 G:\J08\013670\EST\PH1A_CFA_2005_02_22.XLS �� c .!t...I. .. ..ST I .. NO .. 4# 7...W 171 ...TERAS....7�69f .........•.•.•.•.•.•...........................•..............:.:.. : N. PHS `. , .,��, ...�35 �Q...o�r.Metra..11t1.7 .42��1.TCI.......................................................... TIMBERLAND PHASE 1A ' 26 JANUARY 2005 STORM DRAINAGE ITEM# DESCRIPTION QTY UNIT PRICE AMOUNT 1 9'x5' SBC 261 L.F. 316.05 82,489.05 2 8'x5' SBC 499 L.F. 296.45 147,928.55 3 7'x5'SBC 94 L.F. 242.20 22,766.80 4 6'x5' SBC 605 L.F. 192.85 116,674.25 5 5'x4' SBC 653 L.F. 153.65 100,333.45 6 4'x4' SBC 137 L.F. 100.10 13,713.70 7 48" RCP 172 L.F. 110.00 18,920.00 8 42" RCP 89 L.F. 84.00 7,476.00 9 36" RCP 1,163 L.F. 64.00 74,432.00 10 33" RCP 188 L.F. 58.00 10,904.00 11 30" RCP 506 L.F. 52.00 26,312.00 12 27" RCP 279 L.F. 48.00 13,392.00 13 24" RCP 161 L.F. 44.00 7,084.00 14 24" RCP DRIVEWAY CULVERT 120 L.F. 47.00 5,640.00 15 21" RCP 42 L.F. 40.00 1,680.00 16 TRENCH SAFETY (STORM DRAIN) 4,969 L.F. 1 1.00 4,969.00 17 STD 10' CURB INLET 10 EA. 2,200.00 22,000.00 18 STD 9' DROP INLET 5 EA. 2,000.00 10,000.00 19 STD 4' DROP INLET 4 EA. 1,000.00 4,000.00 20 4' SQUARE MANHOLE 5 EA. 2,500.00 12,500.00 21 MANHOLE RISER 7 EA. 1,000.00 7,000.00 22 9'x5' SBC SLOPING HEADWALL 1 EA. 6,500.00 6,500.00 23 8'x5' SBC SLOPING HEADWALL 2 EA. 6,200.00 12,400.00 24 5'x4' SBC SLOPING HEADWALL 1 EA. 4,000.00 4,000.00 25 42" RCP SLOPING HEADWALL 1 EA. 2,900.00 2,900.00 26 36" RCP SLOPING HEADWALL 2 EA. 2,700.00 5,400.00 27 24" RCP SLOPING HEADWALL 5 EA. 2,300.00 11,500.00 28 24" SAFETY END TREATMENT 4 EA. 1,500.00 6,000.00 29 ROCK RUBBLE RIPRAP 607 SY. 35.00 21,245.00 30 10'WIDE CONCRETE FLUME &ACCESS DRIVE 103 L.F. 78.82 8,118.46 TOTAL -STORM DRAINAGE 788,278.26 GAJOB\01 3670\EST\PH 1ACFA 2005 02 22.XLS 2/22/2005 OBIRP .,.: �::. ONE.:N 8 3 OtI . or:; Me .&.T .42��€1.�0..... :.:.:.: ... ... .....�..............Q............................ ......... ....................................:. TIMBERLAND PHASE 1A 8 APRIL 2005 ESCROW FOR 1/2 KELLER HASLET RD ITEM# DESCRIPTION QTY UNIT PRICE AMOUNT 1 6" LIME STABILIZED SUBGRADE 3648 S.Y. 2.25 $8,208.00 2 6" R.C. STREET PVMT W/7" CURB 3559 S.Y. 22.00 $78,298.00 3 HYDRATED LIME 30#/SY 54.7 TON 105.00 $5,743.50 4 WHEELCHAIR RAMPS 41 EA. 450.00 $1,800.00 5 4' SIDEWALK 1464 L.F. 14.00 $20,496.00 6 STREET LIGHTS 3 EA. 2,200.00 $6,600.00 7 36" RCP 80 L.F. 64.00 5,120.00 8 33" RCP 437 L.F. 58.00 25,346.00 9 30" RCP 235 L.F. 52.00 12,220.00 10 24" RCP 140 L.F. 44.00 6,160.00 11 TRENCH SAFETY STORM DRAIN 892 L.F. 1.00 892.00 12 4' SQUARE MANHOLE 1 EA. 2,500.00 2,500.00 13 STD 10' CURB INLET 3 1 EA. 2,200.00 6,600.00 TOTAL - ESCROW $179,983.50 PIE' pill CITYtlRl�M pY G:\JOB\013670\ESRPH1A CFA 2005 04 01.XLS 4/8/2005 I. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 10 EA $ 2, 000 $20, 000 . 00 MID-BLOCK RESIDENTIAL 6 EA $ 2, 000 $12, 000 . 00 CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00 Subtotal $32 ,000 .00 City's Cost $00,000. 00 Developer's Subtotal $32,000 .00 10% Contingencies $3,200 .00 Project Total $35,200.00 Adjacent Developer' s Cost $00 ,000 .00 Developer's Cost $35,200 .00 2% Inspection Fee $00,000.00 CFA CODE #2005032 DEVELOPER' S COST: $35,200. 00 TIMBERLAND, PHASE IA March 16, 2005 Fort Worth, Texas March 16, 2005 PAGE I OF Exhibit C II. STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department . 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works . 3 . The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets. the developer agrees to pay the city the amount shown below prior to the City starting it' s design efforts. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors . 5 . The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER'S COST: $35,200.00 TIMBERLAND, PHASE IA March 16, 2005 FORT WORTH, TEXAS CFA CODE #2005032 Page II of Exhibit C 1,47 III. "STREETLIGHTS" INTERSECTIONS PRICKLYBRANCH DR & KELLER HASLET RD 1 PRICKLYBRANCH DR & LACEBARK LN 1 PRICKLYBRANCH DR & MARTINGALE LN 1 PRICKLYBRANCH DR & HOUNDSTAIL LN 1 PRICKLYBRANCH DR & WILLOWROCK RD 1 CEDAR HOLLOW DR & WILLOWROCK RD 1 CEDAR HOLLOW DR & HOUNDSTAIL LN 1 CEDAR HOLLOW DR & MARINGALE LN 1 CEDAR HOLLOW DR & LACEBARK LN 1 CEDAR HOLLOW DR & KELLER HASLET RD 1 MID - BLOCK WILLOWROCK RD 2 HOUNDSTAIL LN 1 MARTINGALE LN 1 LACEBARK LN 2 TIMBERLAND, PHASE I Page III of Exhibit C Iv STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following ten (10) intersections at a cost to the Developer of $1,000.00: Pricklybranch Dr & Keller Haslet Rd Pricklybranch Dr & Lacebark Lane Pricklybranch Dr & Willowrock Rd Pricklybranch Dr & Houndstail Lane Pricklybranch Dr & Martingale Lane Cedar Hollow Dr & Keller Haslet Rd Cedar Hollow Dr & Lacebark Lane Cedar Hollow Dr & Willowrock Rd Cedar Hollow Dr & Houndstail Lane Cedar Hollow Dr & Martingale Lane Timberland, Phase IA CFA code: 2005032 March 22, 2005 'VJU�� VS�:TP�LLLin<<,��rj� PROJ 3 � ECT '' (\ CATION ' R � G s` ELLER H LET LINT DIL IAID OAK HAV —� o La 1 z in l ¢o KELLER HICKS ROAD z BEAR CggfK Fld 170L14 FE1 GOLDEN TRIANGLE m Q 4 1 n D .. N NOT TO SCALE LO CATi O N MAP . TIMBERLAND PHASE IA t,,��G°?Lic Carter Burgess C4RTER 8 BURGESS,INC, m MMN SIMM FORT=TX 76101 PROJECT NO. 011993.010.1.0630 N 1 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 2 0 1 lAaiBARK 3 SCALEi 1" = 200' 3 1 4 1 4 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 5 5 1 6 6 9 I 2 3 4 5 6 7 8 9 10 /1 12 13 /4 l5 7 ' 7ILC WROCK I RO kD s 1 s 9 1 9 " O 10 10 26 27 26 25 24 23 22 2l 20 /9 16 l7 /6 15 r� I 11 / 11 12 C1 l2 1 2 3 4 5 6 7 B 9 IO 11 12 /J /4 H ST /3 I 14 14 n i BLOCK 6 15 /5 LOr1X 26. 25 24 23 12 2/ 20 1g /8 /7 /6 15 /4 L� I 716 /6 l7 F l7 I 2 3 4 5 6 7 8 9 10 11 12 /3 ? ! 9 } 18 G /8 -. FUTURE STREET 20 10 i f a pJ 22 2/ 20 l9 18 /7 l6 /5 14 l3 21 22 TURF. O IMEE,L�B _..L..-:---•---�-.... ._..+. . ..-._ .� �. ., .- FLTURE STREET LEG-END .A STREETS PROP. 29' B/B ROADWAY/50' ROW EXHIBIT 'B' PROP. 41' B/B TIMBEPJ AND ROADWAY/60' ROW PHASE IA. PROP. 4' S I DEWALK ( BY HOMEBU I LDER) Cater mss PROP. 4' S I DEWALK ( BY DEVELOPER) CARTER & BURGESS,INC- m MNN sewer rover wom,ex 761m LIMITS OF PROJECT --— M717&S-6= PROJECT NO. 011993.010.1.0630 e.rc A nC 7 8 N 1 ' 1 2 3 4 5 6 7 8 9 to 11 12 l3 14 15 16 2 227„ M SCALE- 1" = 200' 1 1 3 LACEBARK LANE 1 4' 4' DROP _ I NL T 4 Q 30 29 28 27 Z6 Z5 24 23 22 2/ 20 /9 r 8 r 7 r 6 0 I .5 ' 5 CR 3 0" "' 0" M 6 1 _ I 2 3 4 5 6 7 8 9 IO 11 l2 l3 14 l5 7 Lu ' 8 4' M 36" 6,, LU WILLOWROCK ROAD — 9 I 9 "d 4 M 1 RISER IO �' 28 17 16 25 24 Z3 ZZ Z! ZO /9 /8 /7 /6 /5 em U vi 12 / 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 0 t ' 42"SLOPING HOWL /4 HOUNDSTAIL LANE 21" 2 4" 14 1 d ' 1 0 A v R,II�ER 36"SLOPING HOWL ; BLOCK 6 15 LOTIX 26 25 24 23 22 Z/ ZO r9 /8 !7 16 15 /4 j N 24 SLOPING HOWL 7 i'l 16 ., I6 24"SLOPING MH 4" RISE 17 i 30"'1 0" LO 17 1 36" I 2 3 4 5 6 7 8 9 10 11 1Z 13 I ! 18 1 0' ' X4' SBC — — „ 19 MARTINGALE LANE 24" 3 4'MH TURF STREET zo — — — 1 0' R 1111 20ER II t ? 23 27 11 20 19 l8 17 16 15 14 1q i 4 21 /2 U 21 l/7 — — --- 22 KE, r � X S •_ FUT NLOB , 5':X4' S6 s - PH sr....... _.. . 'URE 1 T # ' r_-� LOP I NG R,I SE7� "'"�" `"- ' " 5 X4' SLOP:I NG_ HOWL { e-X5__S. "� HDWL ;5'14' SBC' - 1 STORM DRAIN LEGEND EXHIBIT 'B-1' TIMBERLAND PROP. STORM DRA I N L I NE T PHASE IA PROP. INLET PROP. MANHOLE RR 1 PROP. HEADWALL ----� r��l,�G;!6 �:�+,t tern Burgess �v ' c �l EX I ST. STORM DRA I N L I NE ___�___ - , MtTER a BURGESS,INC. TREEr RR � Y� f•'•���� C.jai 7%76108 LIMITS OF PROJECT 1 i PA%JE N0. 011993.010.1.0630 _�� PAGE 5 OF N 5' X5' DROP INLET 4' MH RISER SCALE, 1" = 200' 4' X4' SBC 1 5' X5' DROP 48" I NILE T 6' X5' SBC W _Z J 5' X5' DROP 48" 7- 1 NLET INLET U 8' X5' SBC 4' MH 9' X5' SBC RISER 9' X5' LOPING HDWL 36" 1 ] 4' 4' DROP I I tET Q I 36"SLOPING HDWL vFi 5 _ I"MH a. ' 1 24" j --. 4' X4' DROP �"- INLET j 4' X4' DROP INLET I 1 STORM BRAIN LEGEND EXHIBIT 'B-1' TIMBERLAND PROP. STORM DRAIN LINE r PHASE IA PROP. INLET PROP. MANHOLE PROP. HEADWALL Carter,-Burgess __ _ _= CARTER & BURGESS,INC. EXIST. STORM DRAIN LINE 777 AWN ST FOKT WORTH,,TX TX 76104 LIMITS OF PROJECT del o PR(817) N0. 01 1993.010.1.0630 PAGE 6 OF N ' 2 / 2 3 4 5 6 7 8 9 /0 1 12 /3 /4 /5 /6 2 3 SCALEl1" = 200' 1 3 LACEBARK LANE — 1 4 29 28 27 26 25 24F2-3 22 2l 20 /9 IB /7 /6 5 30 `— y �5 t 1 6 6 9 1 7 / 2 3 4 5 6 7 B 9 /0 /I /2 /3 /4 /S 78 Q 5A 1 8 WILLOWROCK ROAD q 9 CD 9 3 to � /0 ��•�, 28 27 267 25 24 23 222l 20 19 18 17 16 15 r• � O > Ll 12 l2 / 2 3 4 5 6 7 8 9 10 !l l2 l3 /4 q >a I /3 — — U /3 t C HOUNDSTAIL LANE /4 14 t� n — I BLOCK 6 /5 /5 p. LOTIX 26 25 24 23 22 2/ 20 19 /8 /7[16 /5 /4 7 /6 /6 � 4 /7 17 l 2 3 4 5 6 7 8 9 /0 II /2 13 1 /8 /8 i r '• ,. 19 MARTINGALE LANE 19 FUTURE STREET — — — _. ..., 20 zo 23 22 21 20 l9 IB l7 16 I5 f4 /3 F RL00 fPHpSE IIB FUILRE o ....__ STREET LIGHTS LEGEND EXHIBIT 'C' PROP. SINGLE STREET LIGHT • TIMBERLAND EXIST. SINGLE STREET LIGHT Q - PHASE IA ( ON STEEL POLE WITH STREET AND STOP SIGNS ATTACHED) �•, �, ,'� ��rs� - PROP. STREET SIGN " Carter Burgess EXIST. STREET SIGN 0 Yui J,y'.� � ��✓` CARTER STREET REGESS,INC. FORT WORTH,Tx 76M LIMITS OF PROJECT jai 7)'35.6°°° PROJECT NO. 011993.010. 1.0630 PACE 7 OF 7 I KELLER — HASLET ROAD �UN2 8 I 2 3 4 5 6 7 8 9 10 /I l2 !3 l4 l5l6 2 SCALES V = 200' 1 r — J J IACEBARK LANE 4 4 1 30 29 28 27 26 25 24 23 22 ?! 20 19 18 17 16 5 5 1 6 6 9 1 7 1 2 3 4 5 6 7 8 9 !0 11 /? 13 14 IS 7 8 8 WILLOWROCK ROAD 9 Q .d 9 � � — a I /0 10 28 27 26 25 24 23 22 21 20 19 18 17 16 15 d 1 l2I 12 2 3 4 5 6 7 8 9 10 1 1 12 /J 14 (��] k� t` 14 HOUNDSTAEL LANE /a O ,BLOCK 6 /5 15 LOT iX 26 25 24 23 22 2! ?0 19 18 IT 16 IS l4 7 16 I /6 17 17 1 1 2 3 4 5 6 7 8 9 /0 11 12 13 ( 111 l 9 MARTINGALE LANE /9 P[Tl URE 8T pff — — zp I R 23 22 21 20 12 18 17 16 15 14 13 21 21 20 22 �� � t_ _t_ L_ It - Q FU rCl}u; SrRIR _u �� - 17 LEGEND STREET ESCROW EXHIBIT V 1/Z PROP. 41' 8/B TIldBEFJ AND ROADWAY/60' ROW PHASE IA PROP. 4' S I DEWALK Carter n Burgess LIMITS OF PROJECT 7CARTTEER& BURGESS,INC. FORT WORM,7R 76107 {817)7344000 PROJECT NO. 011993.010.1.0630 PAGE I OF 1 DGN=q-\Job\ 011993\c Iv\ phase la\ 9931cta.dan