Loading...
HomeMy WebLinkAboutContract 45304-A2 CITY SECRE TA W AMENDMENT No.2 CONTRACT NO. � TO CITY SECRETARY CONTRACT No. 45304 WHEREAS, the City of Fort Worth (CITY) and Williams Scotsman Inc, (ENGINEER) made and entered into City Secretary Contract No. 45304, (the CONTRACT) which was administratively authorized on the 27th day of January, 2014 in the amount of $ 14, 500 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $34, 750 . 00 which was administratively authorized on June 11, 2014 ; and WHEREAS, the CONTRACT involves engineering services for the following project : Meacham Airport Modular Project; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated 9124114, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $28, 000. 00. 2 . Article II of the CONTRACT is amended to provide for an increase in ;o the fee to be paid to Engineer for all work and services performed under m the Contract, as amended, so that the total fee paid by the City for all c') m work and services shall be an amount of $77, 250. 00. rn ® 3 . ® All other provisions of the Contract, which are not expressly Cn amended herein, shall remain in full force and effect . City of Fort Worth �(���1�� Professional Services Agreement Amendment Template _ PMO Official Release 8/1/2012 P--VaV Page 1 of 2 ��o Uuh ll l{uy X14 EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Consultant Williams Scotsman, Inc �,. Fenando Costa Melanie E. Champniss Assistant City Manager Sr Contract Administrator DATE: I��w( � 7 DATE: AP VAL RECO ENDED: W' i am Wel s t ea d 4c(Ing on behalf of WRNam Weldad Director, Aviation Department APPROVED AS TO FORM AND LEGALITY: M&C: a-Z QV 1 Date : Grant JordKn Assistant City Attorney ATTEST: 0 Mary J. k4 ser � Q6va�a o° VVV City Secretary ` [ GFFICOAL RECORD 01TV SECRETARY G U. m0mq n City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 2 Williams Scotsman,Inc.Proposal Dated 9/24/2014 CITY OF FORT WORTH,TEXAS AMENDMENT No.2 To the PROFESSIONAL SERVICES AGREEMENT 1. Article 1,Scope of Services and Attachment"A",Scope of Services,are hereby amended to include additional Scope(s)of Services which are outlined in the following revised Exhibits. The revised Exhibits are made a part of and incorporated into this Proposal, this Amendment 2 and the Agreement: ➢ Attachment A-Scope Of Services To City Of Fort Worth,Texas Standard Agreement For Professional Services, as revised by the following Exhibits: • Pacheco Koch Letter of Additional Services dated 3/14/14(6)pages • Pacheco Koch Letter of Additional Services dated 7/16/14(2)pages • Pacheco Koch Letter of Additional Services dated 8/14/14(3)pages • Real Network Services,Inc. Quote Number 1028, dated 8/08/2014 (1)Page ➢ Attachment B—Schedule of Values revised 9/24/2014 ➢ Attachment C—Amendments to Standard Agreement For Professional Services remains unchanged. ➢ Attachment D-D-1 Meacham Project Schedule Feasibility Study and Design(Phase I)dated 11/14/2014 ➢ Attachment E- Site Map entitled Mayor and Council Communication Map; 55MTW Meach Temp Bldgs(01527) (1)Page remains unchanged 2. Article II,Compensation, and Attachment B is amended from: The total fee of: $49,250.00 By the amount of: $28,000.00 To the new total fee of: $77,250.00 The total fee may include time,travel and per diem costs incurred by Consultant related to the services provided herein. 3. Attachment D Project Schedule amend to reflect that: Attachment D-1 Meacham Exploratory Schedule Dated 6/3/2014 is replaced with revised Attachment D-1 Meacham Project Schedule Feasibility Study and Design(Phase I)dated 11/14/2014 Except as expressly set forth herein,the original terms and conditions of the Agreement dated January 27, 2014, as revised by Amendment I remain unmodified and in full force and effect Page i of 1 Amendment No.2 To The Professional Services Agreement Williams Scotsman Proposal Pacheco Koch March 14, 2014 PK No.: 3257-13.425 Mr. David E. Sanders Senior Account Manager WILLIAMS SCOTSMAN 4742 Blountstown Highway Tallahassee, Florida 32304 Re: Additional Services MEACHAM INTERNATIONAL AIRPORT Fort Worth, Tarrant County, Texas Dear Mr. Sanders: As you are aware, Pacheco Koch, LLC has been requested to provide services on the referenced site that we believe are outside the Scope of Work of our initial proposal dated December 4, 2013, and subsequent additional services proposals as applicable. These services are as follows: Surveying Services PARTIAL TOPOGRAPHIC SURVEY: Pacheco Koch will perform an on the ground survey of the property under the direct supervision of a Registered Professional Land Surveyor. The limits of survey will be at the discretion of Pacheco Koch and based on the information that will be necessary to design the proposed improvements. Included in this item: ■ Location of permanent improvements on, and immediately adjacent to, the site. ■ Spot elevations on a 50-foot grid. ■ Contours on one foot intervals. ■ Top of curb and gutter elevations for paving on, and immediately adjacent to, the site. ■ Location of visible utilities and appurtenances. ■ Location and sizes of underground utilities based on available record information. ■ Pacheco Koch will graphically plot, if any, the Special Flood Hazard Area from the Flood Insurance Rate Map (FIRM), published by Federal Emergency Management Agency (FEMA), for this area. Not included in this item: ■ Species names of trees. ■ Trees less than 6-inches in diameter. ■ Tree locations and identification in heavily wooded areas. ■ Boundary surveying. ■ Research or review of easements that may affect the subject tract. ■ Subsurface utility engineering services. ■ Parking spaces in parking garages. ■ Location of irrigation control valves. 6100 Western Place ■ Suite 1001 ■ Fort Worth,TX 76107-4654 ■ T:817.412.7155 ■ F:817.412.7156 pkce.com Mr. David E. Sanders March 14, 2014 Page 2 Engineering Services DEMOLITION PLAN: Pacheco Koch will prepare a Demolition Plan for the proposed project. The scope of work defined by this plan shall be limited to site work only. Plans and/or specifications for demolition of buildings and structures shall be by others if required. Included in this item: • Coordination of City review and approval of plans prepared as part of this item, if required. • One (1) revision to the plan to reflect site plan changes as a result of Owner comments. Additional changes will be made on an hourly rate basis. ■ Limits of demolition or removal as appropriate. ■ Identification of items to be protected and/or preserved during demolition. ■ General notes related to the demolition activities. DIMENSIONAL CONTROL PLAN: Based on an approved Site Plan provided by the Owner or Architect, Pacheco Koch will prepare a detailed site horizontal Dimensional Control Plan which will define drives, parking spaces and building location in relation to existing property improvements. This item is meant to be a tool for the Contractor to lay out the site during construction and is not meant to be a "Site Plan" for City review/approval purpose.It is our understanding that either Pacheco Koch will provide sufficient surveying services to define the existing improvements. Included in this item: • Coordination of City review and approval of plans prepared as part of this item, if required. • One (1) revision to the plan to reflect site plan changes as a result of Owner comments. Additional changes will be made on an hourly rate basis. Not included in this item: ■ Survey to define site boundaries. SITE PAVING PLAN: Pacheco Koch will prepare construction plans and details for site paving, sidewalks and drive approaches. Paving section designs are to be based on recommendations included in a current Geotechnical Report to be provided by the Owner. Included in this item: • Coordination of City review and approval of plans prepared as part of this item, if required. • One (1) revision to the plan to reflect site plan changes as a result of Owner comments. Additional changes will be made on an hourly rate basis. Not included in this item: ■ Design of any off-site paving improvements,street extensions or widening. ■ Design and detailing of other site improvements including, screening walls, light pole bases, transformer or generator pads, hardscape features, pavers, and site signage. ■ The detailed layout of walks and hardscape area, including scoring patterns are not included. It is our understanding the design of these items will be shown on the Landscape and /or Architectural plans. Mr. David E.Sanders March 14,2014 Page 3 GRADING &DRAINAGE PLAN: Pacheco Koch will prepare a Grading & Drainage plan for the project. This plan will show existing grades, proposed contours and spot elevations as required, and existing and proposed finished floor elevations. It is anticipated that all storm water drainage will be conveyed over land and that storm sewer will not be required. Included in this item: • Coordination of City review and approval of plans prepared as part of this item, if required. • One (1) revision to the plan to reflect site plan changes as a result of Owner comments. Additional changes will be made on an hourly rate basis. • Preparation of a site Drainage Area Map that will define storm water discharges and proposed drainage patterns for the site. Not included in this item: ■ Profiles for public and private systems. ■ Design of storm water detention facilities. ■ Design of any off-site storm sewer or drainage improvements not described above. ■ Design of any underfloor drainage systems or grading, and the design of French drain systems around the building perimeters. ■ Design of on-site storm sewer. WATER & SANITARY SEWER PLAN: Pacheco Koch will prepare plans for connection to on- site water and sanitary sewer facilities, if required and improvements including manholes, cleanouts, fire hydrants, meters, and building services to serve the proposed development. These improvements will be designed from existing infrastructure located on site to a point 5-foot outside the proposed building. The connection points will be coordinated with the MEP consultant. Included in this item: • Coordination of City review and approval of plans prepared as part of this item, if required. • One (1) revision to the plan to reflect site plan changes as a result of Owner comments. Additional changes will be made on an hourly rate basis. Not included in this item: • Design of any off-site water or sanitary sewer improvements or extensions not described above. • Profiles for public and private systems. INTEGRATED STORM WATER MANAGEMENT VARIANCE REQUEST: Pacheco Koch will request an Integrated Storm Water Management (iSWM) variance for the proposed project. The request will include the completion of the City of Fort Worth form as well as the preparation of a supplemental memorandum outlining the project scope. The variance request will be prepared with the premise that the nature of the facility is temporary and the project site is a part of a larger iSWM that is being prepared by others and will be submitted at a later date. Pacheco Koch does not guarantee that the variance will be granted. Mr. David E.Sanders March 14, 2014 Page 4 FRANCHISE UTILITY COORDINATION: Pacheco Koch will coordinate on-site franchise utility improvements to serve the proposed development. Franchise utilities include gas, power, and phone. These improvements will be shown from existing public facilities located adjacent to the site to a point 5-feet outside the proposed building. The connection points will be coordinated with the MEP consultant or the Architect. Included in this item: ■ Coordination meetings with Franchise Utility Companies and Owner,if required. ■ One (1) revision to the plan to reflect site plan changes as a result of Franchise Utility Company or Owner comments. Additional changes will be made on an hourly rate basis. ■ Request will-serve letters from Franchise Utility Companies on behalf of the Owner, if required. Not included in this item: ■ Design of any off-site utility improvements or extensions not described above. ■ Determination of power, gas and phone demands for the proposed development. ■ Design and sizing of franchise utility improvements to serve the proposed development. ■ Profiles of public or private systems. ■ Duct bank design and profiles. PROJECT COORDINATION: Pacheco Koch will be available to attend up to three (3) project meetings (including conference calls) and to coordinate with the Owner, members of the Design Team, City Staff, the Contractor, etc. Bid/Construction Phase Services CONSTRUCTION ADMINISTRATION: Pacheco Koch will be available to attend up to two (2) project coordination meetings (including conference calls) during construction. Meetings could include: ■ Pre-Bid Conference ■ Pre-Construction Conference ■ Substantial Completion Walk-Through ■ Final Completion Walk-Through. ■ Visits to the construction-site to monitor progress of the construction and to check for general compliance with the construction documents. This shall not be construed as performing continuous construction inspection. Pacheco Koch will also be available to review submittals from the Contractor that are required for this project and related to the civil site improvements. Those submittals could include Contractor's Application for Partial Payment and Final Payment,shop drawings, product data, mix design, etc. Submittals not required by the contract documents or not related to civil site improvements will not be reviewed. Please note the following: • Pacheco Koch shall not at any time supervise or have authority over any Contractor work or jobsite management procedures, nor shall Pacheco Koch have authority over or be responsible for the means and methods, or procedures of construction selected or used by the Contractor. • Pacheco Koch neither guarantees the performance of the Contractor nor assumes responsibility for the Contractor's failure to furnish and perform the Work in accordance with the Contract Documents. Mr. David E. Sanders March 14, 2014 Page 5 (Continued from previous page) • Pacheco Koch shall not provide or have any responsibility for surety bonding or insurance-related advice, recommendations, counseling, or research, or enforcement of construction insurance or surety bonding requirements. • Pacheco Koch shall not be responsible for the acts or omissions of the Contractor or for any decision or interpretation of the Contract Documents made by the Contractor. • While at the Site, Pacheco Koch's employees and representatives shall comply with the specific applicable requirements of the Contractor's and Owner's safety programs of which Pacheco Koch has been informed in writing. Engineering Special Services(If Requested) INTEGRATED STORM WATER MANAGEMENT SITE PLAN: Pacheco Koch will prepare an Integrated Storm Water Management (iSWM) Site Plan for the proposed project. The iSWM Site Plan will be a comprehensive report that contains the technical information and analysis to meet the storm water regulatory requirements. The plan will include existing condition and post development hydrologic and hydraulic analysis and a storm water management system design. Included in this item: ■ Coordination of City review and approval of plans prepared as part of this item. ■ One (1) revision to the plan to reflect site plan changes as a result of Owner or Architect comments. Additional changes will be made on an hourly rate basis. We propose that the fee for our current contract be increased to cover personnel expenses involved in these changes as follows: Surveying Services PARTIAL TOPOGRAPHIC SURVEY $ 6,000.00 TOTAL $ 6,000.00 Engineering Services FINAL DESIGN $ 18,500.00 TOTAL $ 18,500.00 Bid/Construction Phase Services CONSTRUCTION ADMINISTRATION $ 2,500.00 TOTAL $ 2,500.00 Engineering Special Services(If Requested) INTEGRATED STORM WATER MANAGEMENT SITE PLAN $ 5,000.00 Terms and conditions shall be the same as per our original agreement. Mr. David E. Sanders March 14, 2014 Page 6 If this request is acceptable to you as presented, please sign where indicated below and return to our office for our mutual agreement. If you have any questions or need any additional information, please call me at your earliest convenience. Sincerely, Brian D. O'Neill, P.E., CFM ACCEPTED BY. Williams Scotsman SIGNATURE DATE PRINTED NAME AND TITLE CAA/dmc 3257-13.425 Add Serve Pacheco Koch July 16,2014 PK No.: 3257-13.425 Mr.Javier Hendricks Project Manager WILLIAMS SCOTSMAN 10855 John Ralston Road Houston,Texas 77044 Re: Additional Services MEACHAM INTERNATIONAL AIRPORT Fort Worth, Tarrant County, Texas Dear Mr. Hendricks: As you are aware, Pacheco Koch, LLC has been requested to provide services on the referenced site that we believe are outside the Scope of Work of our initial proposal dated December 4,2013, and subsequent additional services proposals as applicable.These services are as follows: MAJOR SITE PLAN CHANGE: The original scope referenced above includes one site plan change after preparation of the civil drawings.Due to multiple site plan changes including additional buildings and revised parking areas, it is necessary to adjust the civil plans, including Dimensional Control, Paving, Grading and Drainage, Water and Sanitary Sewer and Erosion Control Plans as appropriate to reflect the major site plan changes as discussed via phone conversation on July 9,2014. Included in this item: ■ Update civil drawings listed above to reflect site plan changes. ■ Traffic signage plan • Horizontally locate site signage based on direction from Client/Owner • Traffic signage plan will refer to standard signs according to the Texas Manual on Uniform Traffic Control Devices (TMUTCD) Not included in this item: ■ Design of specialty signs or any structural design related to sign installation ■ Integrated Storm Water Management Report (iSWM) • The iSWM report was included in the original agreement as "Engineering Special Services (If Requested)" We propose that the fee for our current contract be increased $6,000.00 to cover personnel expenses involved in these changes. Terms and conditions shall be the same as per our original agreement. 6100 Western Place Suite 1001 Fort Worth,TX 76107-4654 T:817.412.7155 F:817.412.7156 pkce.com Mr. David E.Sanders July 16,2014 Page 2 If this request is acceptable to you as presented, please sign where indicated below and return to our office for our mutual agreement. If you have any questions or need any additional information, please call me at your earliest convenience. Sinicerel , 7 Carlo A.Andreani,P.E., LEED®AP BD+C ACCEPTED BY., Williams Scotsman SIGNATURE DATE PRINTED NAME AND TITLE WJB/dmc 3257-13.425 Add Serve Pacheco Koch August 14,2014 PK No.: 3257-13.425 Mr. Javier Hendricks Project Manager WILLIAMS SCOTSMAN 10855 John Ralston Road Houston,Texas 77044 Re: Additional Services No.5 MEACHAM INTERNATIONAL AIRPORT Fort Worth, Tarrant County, Texas Dear Mr. Hendricks: As you are aware, Pacheco Koch, LLC has been requested to provide services on the referenced site that we believe are outside the Scope of Work of our initial proposal dated December 4,2013, and subsequent additional services proposals as applicable.These services are as follows: I CONSTRUCTION STAKING: Pacheco Koch will provide construction staking as requested for the referenced project. Prior to staking, Pacheco Koch will be provided signed and sealed foundation and/or civil site structural plans and utility plans as needed. It is our understanding this scope is for two (2) days of staking total. Client shall contact the offices of Pacheco Koch a minimum of four(4) days prior to the day work is to be performed to allow for proper scheduling. Pacheco Koch will charge a minimum daily field crew rate of j four(4) hours for each requested visit. I EASEMENT DOCUMENTS: Based on a boundary survey of the site prepared by our office, Pacheco Koch will prepare separate instrument dedication documents for water,sanitary sewer,storm sewer, drainage and/or utility easements required as a part of development of the site. Included in this item: I ■ Dedication statements, survey exhibits and metes and bounds descriptions for each easement. Not included in this item: ■ Coordination with City staff for review and approval of each easement. ■ Coordination with property owners. ■ Monumentation of easement corners. We propose that the fee for our current contract be increased to cover personnel expenses involved in these changes as follows: CONSTRUCTION STAKING (Hourly not to exceed $3,500.00 without written authorization) $ HOURLY EASEMENT DOCUMENTS $ 2,500.00 ea. Terms and conditions shall be the same as per our original agreement. 6100 Western Place ® Suite 1001 ® Fort Worth,TX 76107-4654 , T:817.41 2.7155 ® F:817.412.7156 pkce.com I i „ Pacheco Koch SCHEDULE OF STANDARD HOURLY BILLING RATES (Our hourly rates are subject to change at any time.) ENGINEERING SURVEYING Principal..............................................$225.00/Hr. Principal..............................................$225.00/Hr. Associate Principal...........................$190.00/Hr. Associate Principal...........................$190.00/Hr. Senior Project Manager..................$140.00/Hr. Senior Project Manager..................$140.00/Hr. Senior Project Coordinator.............$140.00/Hr. Senior Project Coordinator.............$140.00/Hr. Project Manager..............................$120.00/Hr. Project Manager..............................$120.00/Hr. Project Coordinator.........................$120.00/Hr. Project Coordinator.........................$120.00/Hr. Project Engineer.................................$95.00/Hr. Project Surveyor..................................$95.00/Hr. Senior Technician.............................$1 10.00/Hr. Survey Intern........................................$90.00/Hr. Design Technician..............................$80.00/Hr. Senior Technician...............................$90.00/Hr. Technician...........................................$75.00/Hr. Technician...........................................$75.00/Hr. Research Manager............................$70.00/Hr. Research Manager............................$70.00/Hr. Technical Assistant.............................$50.00/Hr. Technical Assistant.............................$50.00/Hr. Senior Administrative Assistant.........$80.00/Hr. Senior Administrative Assistant.........$80.00/Hr. Administrative Assistant.....................$70.00/Hr. Administrative Assistant.....................$70.00/Hr. Expert Witness Testimony.................$350.00/Hr. Expert Witness Testimony................$350.00/Hr. LANDSCAPE ARCHITECTURE Survey Field Crew (1-person) ...........$95.00/Hr. Associate Principal...........................$190.00/Hr. Survey Field Crew (2-person) .........$135.00/Hr. Senior Project Manager..................$140.00/Hr. Survey Field Crew (3-person) .........$195.00/Hr. Project Manager..............................$120.00/Hr. Survey Field Crew (4-person) .........$250.00/Hr. Project Landscape Architect...........$95.00/Hr. Landscape Designer.........................$75.00/Hr. Senior Administrative Assistant.........$80.00/Hr. Administrative Assistant.....................$70.00/Hr. Expert Witness Testimony.................$350.00/Hr. rev.07/2014 6100 Western Place ■ Suite 1001 - Fort Worth,TX 76107-4654 ■ T:817.412.7155 ■ F:817.412.7156 • pkce.com Real network services. Inc Electrical Services Division 14209 Proton Rd, Dallas,TX 75244 Phone:214 624-7604 FAX: 972 284-7221 service @aboutreal.com August 8,2014 Quote Number: 1028 Javier Hendrick 281-865-2447 Cell 713-466-4353 ext.46105 Office Willaims Scottsman javier.henddcks @as.willscot.com Subject: Temporary Trailer Facility-Design&Engineering Services Service Contract Number- Dear Javier, I would like to thank you for the opportunity to provide you with pricing for the'Temporary Trailer Facility'project. We feel that our experience and product knowledge offers a superior solution when looking at the current demands and system requirements. As requested,pricing has been provided for the above mentioned project as follows: Furnish&Install Design&Engineering Services for a total price of$4,500.00 (Four Thousand Five Hundred Dollars and No Cents) Installation Price Includes: 1.General Description of Scope—DFW Terminal Concessions Cabling OPTION 1: 1. Supply all designs,calculations to feed each building. 2. Riser diagrams. 3. Minimum specifications on the drawings. 4. Determine the proper size from utility transformer to the buildings and secondary feeds to the modular panels. 5. Specify site lighting and all associated electrical gear. 6. Coordinate with the local utility Co. 7. Signed and sealed drawings. OPTION 1 COST. $5,400.00 OPTION 2: 1. Supply all designs,calculations to feed each building. 2. Riser diagrams. 3. Minimum specifications on the drawings. 4. Determine the proper size from utility transformer to the buildings and secondary feeds to the modular panels. 5. Specify site lighting and all associated electrical gear. 6. Coordinate with the local utility Co. 7. Signed and sealed drawings. 8. Design and specify the pole mounted transformers to serve each building if the owner owns the primary. OPTION 2 COST: $7,800.00 Exclusions: Any other work not listed on this proposal" We look forward to working with you on this project and hope you will look favorably upon our response. Should you have any questions or require clarification of the attached,please feel free to contact me directly at 214 475-3065. Kindest Regards, Joe Reyes,PM jreyes @aboutreal.com Phone: 214 475-3065 Real Network Services, Inc. SPACIE BY SCOTSMAN Attachment B Schedule of Values Standard Agreement for Professional Services Revision 9/24/2014 1. Original Agreement $14,500.00 2. Amendment 1 $34,750.00 3. Amendment 2 Items as follows: $28,000.00 a. Pacheco Koch Proposal for Additional Services (staking, traffic control and signage) $9,500.00 b. Real Network Services Proposal for Services (electrical design) $7,800.00 c. Labor Rates for Meetings and Additional Services i. Williams Scotsman Acct. Man. - $100 11-Ir @ (20 hrs) $2,000.00 ii. Williams Scotsman Proj. Man. - $60/Hr @ (43.5 hrs) $2,610.00 d. Per Diem and Reimbursables $1,250.00 Williams Scotsman Per Diem - $125/Day @ (10 days) e. Williams Scotsman Profit (12.5% of Cost) On Amendment 2 $2,895.00 Subtotal $26,055.00 *Remaining balance of Amendment 2 in the amount of$1,945.00 to be credited against Amendment 3. Page 1 of 1 City of Fort Worth Schedule of Values Professional Service Agreement 45304 Amendment 2—1017/14 o�a ; p W 3 +m a N lY p d x A�3 Z 2 �0 03 a 3 TTa o0 o � g°c D l — m ^m' Do DTa STD°—' f CE - p c � O C �c a wU2 y m = m 3 O = o 3 3 �3�3 �0 0 c T -I 0+0 3 0 .0 . T o 3 c m N .`+, x H m P A A A A A A A.A A — O +O b O` 'NN 1A1�� N A m A N N A m 0 N m N +W iO q=E W A A A A A A A A A A A A A A A A A A A W P A N m N 3 O1 T ° W� i [ N D 3 3 3 3 IN 2 2 N i N A O T m m ♦ p� C N O m3 3 N N Uf T Mayor and Council Communication Map 55FTW MEACH ADMIN BLDG AMD 10 (01527) VIE OR . - �� y rte, wach-'a Intl Foci f4e,3 - . w ' 1111 nst FIT7 N wi -ia- AA BR - � 783 - Meacham i 5 FI 'sA►dministratior�=.: #� . ' �� • P. Building ti �► a � Tacvy" DS j !- '� �St M&C Review Pagel of 2 Official site of the City of Fort Worth,Texas CITY LWOUNCILAGENDA Fora% 7H COUNCIL ACTION: Approved on 9/23/2014 REFERENCE 55FTW MODULAR DATE: 9/23/2014 NO.: **C-27001 LOG NAME: COMPLEX ENGINEERING AMD 2 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 2 to City Secretary Contract No. 45304, a Professional Services Agreement with Williams Scotsman, Inc., in an Amount Up to $28,946.00 for Additional Engineering Services for the Modular Complex Site at Fort Worth Meacham International Airport (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 2 to City Secretary Contract No. 45304, a Professional Services Agreement with Williams Scotsman, Inc., in an amount up to $28,946.00 for additional engineering services for the Modular Complex Site at Fort Worth Meacham International Airport. DISCUSSION: On January 27, 2014, City Secretary Contract (CSC) No. 45304 was administratively authorized in the amount of$14,500.00 with Williams Scotsman, Inc., for exploratory services for the development of a Modular Complex. This complex is needed for the relocation of tenants of the Administration Building at Fort Worth Meacham International Airport (Meacham) during the renovation of the building. The contract was subsequently revised by Amendment No. 1 in the amount of$34,750.00 for a total contract amount of$49,250.00 to develop engineering plans. This Amendment No. 2 is for additional engineering design, including an Integrated Stormwater Management Plan, which is now required due to an increase in the project size, site revisions and related utility work. Amendment No. 2 in the amount of$28,946.00 will increase the total contract amount to $78,196.00. M/WBE Office -A waiver of the goal for MBE/SBE subcontracting requirements was requested by the Aviation Department and approved by the M/WBE Office, in accordance with the BIDE Ordinance, because the purchase of goods or services is from sources where subcontracting or supplier opportunities are negligible. Meacham International Airport is located in COUNCIL DISTRICT 2, Mapsco 48T. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Airports Gas Lease Project Fund. TO Fund/Account/Centers FROM Fund/Account/Centers 3) P240 539120 552070152780 $28.946.00 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: Bill Welstead (5402) 11/14/2014 M&C Review Page 2 of 2 Additional Information Contact: Ruseena Johnson (5407) ATTACHMENTS 55FTW Modular Complex Design A2 Exhibit[11.pdf 11/14/2014 i' r