Loading...
HomeMy WebLinkAboutContract 31144-A4 Amendment No. 4 STATE OF TEXAS § CITY SECRETARY NO. COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Turner Collie & Braden, Inc., (Engineer) made and entered into City Secretary Contract No. 31144 (the Contract) which was authorized by M&C C-20450 on the 21st of December, 2004; WHEREAS, Turner Collie & Braden, Inc. has merged into AECOM USA Group, Inc.; WHEREAS, the Contract involves engineering services for the following project: Morningside Neighborhood Drainage Improvements Project No. 00088 WHEREAS, it has become necessary to execute Amendment No. 4 to said Contract to change the Engineer from Turner Collie & Braden, Inc. to AECOM USA Group, Inc. and include an increased scope of work and revised maximum fee. NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. All references to Turner Collie & Braden, Inc. shall be replaced with AECOM USA Group, Inc. and Engineer shall be and mean AECOM USA Group, Inc. 2. Article I of the Contract is amended to include the revised scope in engineering services specified in a proposal letter dated May 29, 2009, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $10,011.00. OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX Contract Amendment No. 4 Page 1 of 2 3. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $133,369.00. 4. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. t Executed on this the day of 2009, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: v William A. erke , P.E. Fernando Costa Director Assistant City Manager Transportation and Public Works AECOM, USA Group, Inc. ATTEST: ENGINEER Marty Hendrix By: City Secretary NAME: Donald D'Adam, P.E. TITLE: Vice President NO M&C REQUIRED APPROVED AS TO FORM AND LEGALITY: (Jkr� z Amy Ramse Assistant City At rney OFFICIAL RECORD CIN SECRETARY WORTH, TX Contract Amendment No. 4 Page 2 of 2 AECOM AECOM 1200 Summit Ave.,Suite 600,Fort Worth,TX 76102 T 817.698.6700 F 817.698.6701 www.aeoom.com May 29, 2009 Mr. Richard Argomaniz, PE City of Fort Worth Transportation and Public Works Department 1000 Throckmorton Fort Worth, Texas 76102 Subject: Morningside Neighborhood Drainage Improvements Amendment Request No.4 City of Fort Worth Project No. 00088, Contract No. 3114, DOE No.4737 Dear Mr. Argomaniz: As requested in the February 5, 2009 meeting, AECOM provided Amendment No. 4, which was necessary to amend the contract to include modifications of the previous signed/sealed construction plans to include a 7'X6' box in lieu of a 48-in pipe at the outfall of the Baker Street system. The Amendment Number 4 upsized the downstream Baker Street system to a 100-year Qplpe capacity, so that any future upstream modifications of the Baker Street system can connect directly into the 7'X6' box, without reconstructing the downstream box or headwall. The modifications to the plans that were included In the previously provided Supplemental Amendment#4 are shown below: Amendment#4 Item A 1. Revise the proposed headwall to facilitate 2-72" pipes and the 7'X6' box. 2. Upsize inlets at the Baker/Mississippi intersection. 3. Provide P&P sheets (2) to show the upsizing of an existing 42" pipe to a 7'X6' box and the upsizing of an existing 24" lateral to a 36" lateral. Sheets will include limits of pavement replacement. 4. Revise the riprap shown around the redesigned headwall. 5. Provide quantities so that the contractor can provide an estimate on the change order. The cost to do this additional work was $4,290. A breakdown of this fee is provided as Attachment 1 in Item A. AECOM prepared the Amendment Number 4 and submitted it to the City of Fort Worth on February 9, 2009. After the amendment was submitted,AECOM submitted plans to revise the outfall as described above. The City reviewed the plans and then asked AECOM to revise the plans to include gabions at the outfall and to realign the channel so that It will direct flow to a future detention pond. Both the gabions and the realignment of the channel were additional Items not included in the previously submitted Amendment Number 4, Item A. Since Amendment Number 4 has not been finalized, the City asked that AECOM resubmit Amendment Number 4 to include the design tasks for the gabions and the realignment of the channel. The modifications are shown in Item B. AECOM Water Amendment#4 Item B The modifications necessary to complete the work are shown below: 1. Add gabion mattress downstream of outfall. 2. Modify detail sheet to Include gabion details, and redesign riprap. 3. Modify alignment of channel. 4. Revise quantities for change order. 5. Provide QA/QC. The additional costs to include the changes are estimated at$5,720. A breakdown of this fee is provided as Attachment 1 In Item B. SUMMARY The total cost of Supplemental Amendment Number 4 Is$10,011. A detailed breakdown of all the tasks is provided in Attachment 1. Original Contract Amount $108,538.00 Amendment Request No. 1 (Engineering Study) 5,280.00 Amendment Request No. 2 (GAI Boundary Survey) 4,070.00 Amendment Request No. 3 (Hydraulic Modeling) 5,470.00 Amendment Request No.4 (Revise Baker Street) 10,011.00 REVISED CONTRACT AMOUNT $133,369.00 If you have any questions, please don't hesitate to contact me at 817.698.6722 or e-mail at matthew.abbe@aecom.com. Sincerely, Matt Abbe, PE Project Manager Attachments AECOM Water AECOM ; r N LO m G m o co p R � k i 64 ~ t } 44 69 ■ � b N m m c 2 o m ■ � } m 2 'q # a w # w q § # C14W « m C Ia a _ a (N04 0 04 04 to ® § - _ C14 '0 § § / k CD � 2 k rL � ] ] f � « e o e E CN k o a / 2 a o q % 2 = � & 2 ;1 0 2 j 2 § \ ■ 2 & } la § f TO 7 ` m U 2 CeL LCL ) 3 i 4) L) ) O � k a c 2 » e - E § $ 2 k ) k § § k k \ ° J $ 2 q # . ¢ 2 $ I m m ■ § k \ \ > > k a a 2 j m z J ± $ 2 20 m / a. $ 2 / — � n e EXHIBIT B-313 MORNINGSIDE DRAINAGE IMPROVEMENTS BAKERIMISSISSIPPI STORM DRAIN OUTFALL ANALYSIS Transportation and Public Works Additional Services: TPW Dralnane SA#4. Wsize Baker Street Outfall A. Upsize Baker Street Outfall a1 Revise the proposed headwall to facilitate 2-72'pipes and the 7'X6'box a2 Upsize inlets at the Baker/Mississippi intersection a3 Provide P&P sheets(2)to show the upsizing of the Baker Storm Drain a4 Revise the riprap shown around the redesigned headwall a5 Provide quantities so that the contractor can provide an estimate on the change order B. Revise Baker Street Outfall from Item A. b1 Add gablon mattress downstream of outfall. b2 Modify detail sheet to include gabion details and redesign drap b3 Modify alignment of channel_ b4 Revise quantities for change order. b5 Provide QA/QC Total A $4,290 Total B $5,720 TOTAL AMENDMENT NO.4 ANALYSIS FEE $10,011 M&C Review Page 1 of 2 Official site of the City of Fort Mich, Texas _ CITY COUNCIL AGENDA FORT WORT" COUNCIL ACTION: Approved on 12/21/2004 DATE: 12/21/2004 REFERENCE NO.: **C-20450 LOG NAME: 30CIPMORNINGSID CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Engineering Agreement with Turner Collie & Braden, Inc, for Morningside Neighborhood Drainage Improvements RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute an engineering agreement with Turner Collie & Braden, Inc. in the amount of $108,538 for the Morningside Neighborhood Drainage Improvements Project. DISCUSSION: The 2004 Capital Improvement Program (CIP) includes funds for the Morningside Neighborhood Drainage Improvements Project. The scope of the project consists of the preparation of plans and specifications to install a storm drain system on New York Avenue from Judd Street to Cantey Street; on Cantey Street from New York Avenue to Mississippi Avenue; and on Mississippi Avenue from Cantey Street to Baker Street. Turner Collie & Braden, Inc. proposes to perform the necessary design work for a lump sum fee of $108,538. City staff considers this fee to be fair and reasonable for the scope of services proposed. In addition to the contract amount, $21,120 is required for project management by the Engineering Department. Turner Collie & Braden, Inc. is in compliance with the City's M/WBE Ordinance by committing to 19% M/WBE participation. The City's goal on the project is 19%. This project is located in COUNCIL DISTRICT 8, Mapsco 77U and V. http://apps.cfwnet.org/council�acket/mc_review.asp?II�3146&councildate=12/21/2004 4/16/2009 M&C Review Page 2 of 2 FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budgets, as appropriated, of the Street Improvements Fund. TO Fund/Account/Centers FROM Fund/Account/Centers C200 531200 208280008831 28 754.00 C200 531200 208280008832 $57,507.00 C200 531200 208280008833 $9,585.Q0 200 531200 208280008851 12 692.00 Submitted for City Managees Office by: Marc Ott(8476) Originating-Department Head: A. Douglas Rademaker(6157) Additional I_nformat on Contact: A. Douglas Rademaker(6157) ATTACHMENTS http://apps.cfwnet.org/council_packet/mc_review.asp?ID=3146&councildate=12/21/2004 4/16/2009