HomeMy WebLinkAboutContract 32844 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary Q COUNTY OF TARRANT § Contract No ; DC WHEREAS, FW Vista West, L.P. — Fourth Decade Corporation, its General Partner, hereinafter called "Developer", desires to make certain improvements to Vista West, Phase IV, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section I1, of the Policy. Vista West Phase IV-Newer CFA 4% and Utilities 10 07 051.doc Uri M1r,1Kdl"ff F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or dama,-es are caused, in whole or in part, by the allezed nepli, ence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. Vista West Phase N-Newer CFA 4% and Uglities 10 07 05Ldoc L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached. M. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support seryices specified in this agreement, including design, construction and inspection is estimated to $352,405.94. Vista West Phase W-Newer CFA 4% and Uff lities 10 07 051.doc SUMMARY OF COST Vista West Phase IV item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $298,907.25 298,907.25 2. Storm Drainage $18,310.00 18,310.00 3. Street Lights $22,000.00 22,000.00 4. Street Name Signs $500.00 500.00 B. Engineering Design $ C. Construction Engineering and Management by DOE $ $ 4% 12,688.69 12,688.69 TOTALS 352,405.94 $ - T352,405.94 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk and a separate financial guarantee is required in the form of a bond or check for the cost of the sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Paid $49,568.75 for future paving improvements for Old Weatherford Road. Vista West Phase IV-Newer CFA 4% and Utilities 10 07 051.doc IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed apd said veloper has executed this instrument in triplicate, at Fort Worth,Texas this the day of 12005. Approval Recommended: Transportation and Public Works Department Robert Goode, P. E. Director City o , rt h NO M&C REQUIRED Marc Ott Assistant City Manager ATTEST: VIMIQ RECEIVED Marty Hendrix City Secretary Approvd �o Form: Assistant y A torney FW Vista West, L.P. — Fourth Decade Corporation, its General Partner ATTEST: DEVELOPER i By: Corpor e Secretary Lee AJ;co Vista West Phase W-Newer CFA 4% and Utilities 10 07 051.doc , (y 1���'.r''l ,� i n � �1t. VISTA WEST, PHASE IV CONCEPTUAL OPINION OF PROBABLE CONSTRUCTION COST FOR CFA ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL I WATER IMPROVEMENTS 1 8" Class 200 PVC Water Pipe 3,632 LF $17.50 $63,560.00 2 8"Gate Valve and Valve Box 5 EA $700.00 $3,500.00 3 6" Gate Valve and Valve Box 4 EA $600.00 $2,400.00 4 Fire H drant Assembly 4 EA $1,400.00 $5,600.00 5 Ductile Iron Fittings 0.7 TON $2,500.00 $1,750.00 6 1"Water Service and Meter Box 95 EA $375.00 $35,625.00 7 Testing 3,632 LF $0.10 $363.20 8 Compaction and Density Test 1 LS $1,500.00 $1,500.00 SUBTOTAL $114,298.20 II SANITARY SEWER IMPROVEMENTS 1 8" SDR 35 PVC Sewer Pie 3,147 LF $24.00 $75,528.00 2 8"SDR 26 PVC Sewer Pie 68 LF $26.00 $1,768.00 3 Std. Sanitary Sewer Manhole 11 EA $1,400.00 $15,400.00 I 4 Extra Manhole Depth (> 6') 12.7 VF $130.00 $1,651.00 5 4" Sanitary Sewer Service (Two-Way C/O 95 EA $350.00 $33,250.00 6 Cement Stabilized Backfill 68 LF $20.00 $1,360.00 7 Clay Dam 1 EA $500.00 $500.00 f 8 Testing 3,215 LF $1.00 $3,215.00 9 Trench Safety 3,215 LF $1.00 $3,215.00 10 Compaction and Density Test 1 LS $1,500.00 $1,500.00 SUBTOTAL $137,387.00 III STORM DRAINAGE IMPROVEMENTS 1 24" Class III RCP 115 LF $45.00 $5,175.00 2 21" Class III RCP 20 LF $40.00 $800.00 3 15' Standard Curb Inlet 2 EA $3,200.00 $6,400.00 4 4'x 4'SDMH 1 EA $1,900.00 $1,900.0.0 5 Trench Safety 135 LF $1.00 $135.00 6 Erosion Control 1 LS $3,900.00 $3,900.00 SUBTOTAL $18,310.00 t i I I i i I I I I VISTA WEST, PHASE IV CONCEPTUAL OPINION OF PROBABLE CONSTRUCTION COST FOR CFA ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL IV PAVING IMPROVEMENTS 1 6" Lime Stabilized Sub rade 12,265 SY $1.80 $22,077.00 2 Lime for Stabilization 30#/SY) 184.0 TON $98.00 $18,032.00 3 6" Reinforced Concrete Pavement 11,559 SY $20.75 $239,849.25 4 6" HMAC Transition Pavement 315 SY $15.00 $4,725.00 5 Concrete Wheel Chair Rams 10 EA $500.00 $5,000.00 6 Adjust SSMH RimNalve Cover 12 EA $100.00 $1,200.00 7 Relocate Road Barricade 1 EA $300.00 $300.00 8 Remove Std. Road Barricade 2 EA $100.00 $200.00 9 Install Concrete Header 1 EA $500.00 $500.00 10 Rock Rip Rap 32 SY $40.00 $1,280.00 10 4" Utility Sleeve 93 LF $8.00 $744.00 11 Erosion Control 1 LS $3,000.00 $3,000.00 12 Traffic Control 1 LS $2,000.00 $2,000.00 SUBTOTAL $298,907.25 TOTAL CONSTRUCTION COST $568,902.45 V OLD WEATHERFORD PAVING PROPORTIONALITY 1 6" Lime Stabilized Sub rade 1,665 SY $2.25 $3,746.25 2 Lime for Stabilization (27#/SY) 22.5 TON $105.00 $2,362.50 3 6" Reinforced Concrete Pavement 1,635 SY $22.00 $35,970.00 4 4' Concrete Sidewalk 535 LF $14.00 $7,490.00 SUBTOTAL $49,568.75 VI CITY FEES 1 Street Lights 10 EA $2,500.00 $25,000.00 2 Old Weatherford Road Assessment 535 LF $92.65 $49,568.75 3 TP&W Construction Inspection (4%) $12,688.69 4 Water Construction Inspection (2%) $5,033.70 SUBTOTALI $92,291.14 I ZZ urr I I I 1 UNIT III: STORM DRAIN ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) 1. 115 LF 24" CL III RCP Storm Drain Forty-Five Dollars Zero Cents $ 45.00 $ 5,175.00 2. 20 LF 21" CL III RCP Storm Drain Forty Dollars Zero Cents $ 40.00 $ 800.00 3. 2 EA 15' Standard Curb Inlet Three-Thousand-Two- Hundred Dollars Zero Cents $ 320.00 $ 6,400.00 4. 1 EA 4' x 4' SDMH One-Thousand-Nine- Hundred Dollars Zero Cents $ 1,900.00 $ 1,900.00 5. 135 LF Trench Safety One Dollars Zero Cents $ 1.00 $ 135.00 6. 1 LS Erosion Control Three-Th ousand-Nine- Hundred Dollars Zero Cents $ 3,900.00 $ 3,900.00 TOTAL AMOUNT BID STORM DRAIN $_18 310-00 B-6 Updated 05/16/2005 UNIT IV: PAVING IMPROVEMENTS ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) 1. 12,265 SY 6"Lime Stabilized Subgrade One Dollars Ei Cents $ 1.80 $ 22,077.00 2. 184.0 TON Lime Stabilization (30 lbs/SY) Ninety-Eight Dollars Zero Cents $ 98.00 $ 18,032.00 3. 11,559 SY 6"Reinforced Concrete Pavement Twenty Dollars Seventy-Five Cents $ 20.75 $239,849.25 4. 315 SY 6"HMAC Transition Pavement Fifteen Dollars Zero Cents $ 15.00 $ 4,725.00 5. 10 EA Concrete Wheel Chair Ramps Five-Hundred Dollars Zero Cents $ 500.00 $ 5,000.00 6. 12 EA Adjust SSMH Rim/Valve Cover One-Hundred Dollars Zero Cents $ 100.00 $ 1,200.00 7. 1 EA Relocate Road Barricades Three-Hundred Dollars Zero Cents $ 300.00 $ 300.00 Updated 05/1 /2 a^� 911�1 S4K1 T1q FT. ��;►:I r►' IbL 8. 2 EA Remove Road Barricades One-Hundred Dollars Zero Cents $ 100.00 $ 200.00 9. 1 EA Install Concrete Header Five-Hundred Dollars Zero Cents $_500.00 $ 500.00 10. 32 SY Rock Rip-Rap Forty Dollars Zero Cents $ 40.00 $ 1,280.00 11. 93 LF 4"Utility Sleeve Eight Dollars Zero Cents $ 8.00 $ 744.00 12. 1 LS Erosion Control Three-Thousand Dollars Zero Cents $ 3,000.00 $ 3,000.00 13. 1 LS Traffic Control Two-Thousand Dollars Zero Cents $ 2,000.00 $ 2,000.00 TOTAL AMOUNT BID PAVING $ 298,907.25 Updated 05/16104 TOTAL AMOUNT BID WATER $ 114 298.20 TOTAL AMOUNT BID SEWER $ 137 387.00 TOTAL AMOUNT BID STORM DRAIN $ 18 310.00 TOTAL AMOUNT BID PAVING $ 298 907.25 GRAND TOTAL AMOUNT BID $ 568,902.45 B-9 -- - Updated 05/16/200 PART B - PROPOSAL(Cont.) After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security, if required is to become the property of the Developer. The undersigned bidder certified that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department. 2. The Standard Specifications for Street and Storm Drain Construction which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within to calendar days after issue of the work order, and to complete the contract within 5/57 working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of , our principal B-10 -- Updated 05/16/20 5, tj / place of business, are not required to underbid resident bidders. ✓ B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. B-11 Updated 05/16/20 5,si I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) Respectfully submitted, �srrO�tr �NI��d� 7X, Li� Title /� Q Addre Telephone: (Seal) Date: Sl a��r B-12 Updated 05/16/2005 I . STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 5 EA $ 2, 200 $11, 000 . 00 MID-BLOCK RESIDENTIAL 4 EA $ 2, 200 $8, 800 .00 CHANGE OF DIRECTION RESIDENTIAL 1 EA $ 2, 200 $2, 200 .00 MID-BLOCK COLLECTOR 0 EA $ 2, 200 $0, 000 . 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00 Subtotal $22,000.00 City' s Cost $00,000 .00 Developer's Subtotal $22 ,000 . 00 10% Contingencies $00,000 . 00 Project Total $22,000 .00 Adjacent Developer's Cost $00 ,000 . 00 Developer's Cost $22 ,000 .00 2% Inspection Fee $00,000. 00 CFA CODE #2005043 DEVELOPER' S COST: $22,000.00 VISTA WEST, PHASE IV April 7 , 2005 Fort Worth, Texas April 7 , 2005 PAGE I OF Exhibit C II. STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works . 3. The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets. the developer agrees to pay the city the amount shown below prior to the City starting it' s design efforts. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors . 5. The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER'S COST: $22,000.00 VISTA WEST, PHASE IV April 7, 2005 FORT WORTH, TEXAS CFA CODE #2005043 Page II of Exhibit C �l �•fy��41L� Y�i�i III . "STREETLIGHTS" INTERSECTIONS OLD WEATHERFORD RD & BETHANY ST 1 NIGHTHAWK RD & BRADSHAW DR 1 NIGHTHAWK RD & HICKORY BENDLN 1 NIGHTHAWK RD & STREET A 1 BRADSHAW DR & BETHANY ST 1 MID BLOCK NIGHTHAWK RD 2 BETHANY ST 2 CHANGE OF DIRECTIONS HICKORY BEND LN 1 VISTA WEST, PHASE IV Page III of Exhibit C IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of$100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following five (5) intersection at a cost to the Developer of$500.00: Hickory Bend Lane & Nighthawk Rd Hickory Bend Lane & Bethany St Bradshaw Dr & Nighthawk Rd Bradshaw Dr & Bethany St Old Weatherford Rd & Bethany St Vista West, Phase IV CFA code: 2005043 April 5, 2005 A IVES �O��v MFfPR QRS RA CH Formers tis9�I� qp Branch l✓ ���P <�M�ti q�,�O�q SIF EST p01NT �- Q VW PH. 1 EST POINT VW PH. 2 - w FST � 3 n POINT ~ u VwN 3 PH. 3 ULD WEATHERF RD r Z rri r*t < t7 ULD WEATHERFORD EASA UND PROD CT LOC,ATI Z � OLD WEATH FORD C PIN a VICINITY MAP.- SCALE. 1" = 2000' VISTA WEST PHASE IV DOE # 4835 FILE # W-1645 WA TER PROD. # P164-060164015302 SEWER PROD. # P174-07017401J298 5 Jo 12 I � I � /I q I � 27 13 , 29 I 29 26 I I 14 I 128 III 28 I l I I 7 I 15 I I 1127 I .5 I I I I 8 I I I 127 I 26 �I I � I 16 I ` I 24 I I I I 1 "=100' I I 9 i t I ( 26 17 I I 120 25 I J I L l i 25 18 I I 124 I 10 � ' I I I 22 I 1 J 11 I IIS 24 19 23 II I I � 1I 1 123 2120 I I 122 I 2/ III LLj � I 12 1 1co I 121 1 20 20 22 121 - WT — -DR — — 22 14 I- 1 2 3 4 5 6 7 15 1 1 1 1 8 1 j 9 10 1 i I 1 I 16 I F TURF V SIDE WALK 9 _ FUTU E 27' OF PAVING 19 LD WEA THER ORD ROAD CO. RD. 1022 - 80 R.0. W. — CO. - - - - - - - - - FORT W Cl TY LlMI TS � A VING /Mpf? VE_M_ — — —VISTA (WEST IWASErtV— 1 1 D6E # 48J5 24 23 J 22 7 4 2 / --- 27 II sTA E � ' 3/ \ 73 E # 835 , 4 4 Fl Ey W 1645 _ JSHEEr ) 7 12 C� 70 77 77 72 ' ' =100' 13 70 NO r A L PROP SED P V/NG I 77 S �" BA 7 8 i H16KORY-BEN99- LAiII - 1/740 79 � � � � 40 l/l 20 39 2 / / �� 39 20 � l � 38 3 / l 11 27 i 38 1 C26 7 4 22 / / / � 3 3 / 5 7 36 � � l 35 / 05 7 l 34 l 8 / //34 31 22 2 / I / I/ 33 3 / l l 32 1152 30 70 / / I / 1 29 r 1 4 r l 28 I 1 1 3 72 1 27 29 29 ' ► I � 1 �`� I t ' ► 6 t l l � 1 1 � � I 26 I I i 14 1 I I 128 � I 7 I t � 28 I t l t I 75 I 1 127 ► 5 � ! t 1 I 8 t l l � I 27 1 � I 76 26 I � I I i 1 '.=1 0' 11 , 9 ► l i 26 77 t 1120 25 I 25 I II 1 I ' X25 18 1 1124 70 1 1 � 1 1 22 , ' i 1123 f 77 ► 1124 19 II i fI23 2120 1 I X122LLj I 2� I I � I 12 IICQ I I 1 20 20 1 21 I I 127 22 �R LU — — 22 14 - 1 2 3 4 5 6 7 15 I I 1 I I I I 8 I � ° ?0 11 16j FSlBACK--r-B ALLED P VING N10 CK 0 WEA THERFOR H MINE Ill 1 l� F1�1l-fHl H1 1HiFIHH1 11 - - - If-1HlH- m FORT WOR Cl T Y LWl TS EXHIBIT ST PHASE IV I I I 1 I L DO # 4835 1 FILE W-1645 (SHEET 2OF2) \ ` I \ \� ,o. 24 / 23 22 l 14 ►— 21 ► 2 5 u�S��W� V-- 21 Dot 44 \ \ \ \ 13 4 F�E W61 ,\ \ \ I 12 C� 2j 8 � i 9 10 /1 11 12 ' =100' 13 10 - I ,_ � 17 16 9 I 1 15 14 13 I 80 18 j HlEKOR-)-- - LAN — 40 1 j� � I� 40 i 3939 2 ! ! 20 l � 38 21 � � !� �! 38 1 C2O i/ 57 1214 /l � 37 22 �i/ i i 5 36 36 � � l 35 1 i35 i ! 7 1 32 1 1 34 i 8 /i34 rr 22 !r ll/ 33 2 ! ! 3 9 3 , 30 32 r i 32 � 29 ! ! 28 ; � I I 1129 27 r 29 13 1 1 1 26 28 1 � I 14 I f I--��-__ � I ► I I � ► I /5 � 1 127 1 5 28 i ► I � I , � ► 27 1 i 1 8 i► ll 16 11 ► 26 24 ► ► 1 "=100, 11 9 1 III 26 17 ► 1120 25 f ► 23 11124 10 ► I ► 25 18 ► ► 1124 /0 � f ► ► i 22 , ► I I ► 24 19 i ' ► 12,3 f // ► Iil II II I I ► I @2 1 I I 1 22 I 27 123 20 /2 I I 20 20 I 21 I I. 1 2/ I 122 � — - 24 22 14 - 11 2 3 4 5 6 7 /5 1 ► I 1 8 1 9 10 ;1 1 1 � I a 16 1 I L1—WEA THERFOR H 1 H H H 1H-1 I fl-H-H I�fl i 1 HIM 11-.11—'011111B- 11 Hill FORT WOR Cl T Y L lMl TS E ff fs I I ► I ' HIBIT I _ _ _ �X � 1 �- WEST PHASE IIS I I �— OE j 4835 ' ' - - - - FILE # W-1645 (SHEET 2 OF 2) I I 1 I I I _ \ / 24 23 1 22 14 \ 2/ 2 3 VISTA 13 OE # 835 \ lLE51 -1645 1 ` 12 C� I(SHEE11 D 2) 7 \ � 8 _ 10 11 11 12 ' =100' 13 10 I 9 17 16 15 14 13 I 18 —ftKa?-Y�LANE- - -- 1 40 1 TYPIC L R1E 0GHTT 19 11 r 1 1 � 1 l 1/11 ,39 ? 1 � 1 � 1 20 20 / 1 1 1 39 l l 38 3 1 1 1 1 21 / 11 1138 / 2 37 4 /l 22 // / l /l 5 / 37 36 6 / 3 135 1 7 / 32 1 1 1 34 i 8 /l34 Ji r � 2 1 /1 133 1 1 32 32 10 i 3 1 / 10 1 1 �- l 29 � 4 1 1 28 1 1, 5 ► ► � 3 72 I � t'► I ► � ► � I� 27 , 29 � 6 � I ► � �� 29 13 26 7 � ► I 128 28 14 I � I � �I ► I ► ( I I 5 8 I i 15 TYPIC�4 I I T 1 I I 1 i i , i 27 16 ► 26 24 � I 9 f I I 26 17 I 10 25 1 23 — — I ► I I I I ► 25 18 � I � 124 10 I I ► I 22 1 1 II124 19 � I I I 123 I I 17 27 III 232120 I I i 22 I 12 I I I I 20 20 I I 21 1 I 121 122 � Of T/1 �Rl?"If lyLH - 22 14 - 11 2 3 4 5 6 7 1 8 � 15 I I I I ' 9 70 � i I � Qs 16 � I � 19 N7g rf4- C/ H H�-UMFEI 111H I�f!f111 H Hi�H 1 FF�f Ft F1 H 1 11 - FF1�if muFORT WOR T Y L lMl TS I I i I I EXHIBIT WEST PHASE 7'T�OE # 4835Li I r - - - - - 1 - - - - -� I- - - - - -1 FILE # W--1645 I I I I L ET 2 OF 2 I (SHE )� I I 1 I I I