HomeMy WebLinkAboutContract 46237 CITV 0 E CR UA kt' L
CITY OF FORT WORTH, TEXAS
DEPARTMENT OF TRANSPORTATION
AND PUBLIC WORKS
GEOTECHNICAL SERVICES AGREEMENT
THIS AGREEMENT, is by and between the CITY OF FORT WORTH, a Texas
home-rule municipal corporation, acting herein by and through its duly authorized
Assistant City Manager, (the "City"), and Rone Engineering Services, Ltd. (the
"Engineer") for Services as defined herein for various developer-let projects.
WITNESSETH
That for and in consideration of mutual covenants and agreements herein contained, the
parties hereto mutually agree as follows:
ARTICLE I
SERVICES
Section 1. Engineer hereby agrees to perform as a per job independent contractor
such construction inspection, material testing, geotechnical investigation, and laboratory
services ("Services") as may be requested by the City during the term of this Agreement.
The Scope of Services is set forth in"Attachment A".
Section 2. In addition to the professional engineering services to be performed under
Section 1 above,Engineer shall render the following professional services:
1. Attend such conferences with City officials as may be determined
necessary to ensure the drilling, testing, and analysis will proceed in an
economical and orderly manner.
2. Advise the City on special aspects of each project as may be requested by
the City.
3. Furnish all necessary personnel, drilling equipment, laboratory testing
equipment, and materials necessary to perform all testing and other work required
and contemplated under this contract and at such time and in such manner so as
rrt not to delay the geotechnical investigation by the City. Engineer shall also furnish
all necessary barricades, signs and other warning devices and their appurtenances
so as to comply with all applicable local, state and federal laws, rules and
regulations.
bz ARTICLE II
CITY'S OBLIGATIONS AND COMPENSATION
OFFICIAL RW4CORS
D`iM V 3f_CRUiMC,RV
F7e wI nlv
Section 1. All testing or other work to be performed under this contract will be
specified in writing and performed according to "PROCEDURES FOR TESTING OF
DEVELOPER PROJECTS" as developed by the Department of Transportation and
Public Works. City shall not pay for any testing or other work performed by Engineer or
its subcontractors that has not been ordered in writing. It is specifically agreed that
Engineer shall not be compensated for any alleged or actual additional work resulting
from verbal orders of any person.
City shall make available to Engineer in the performance of the contract, all existing
plans, maps, field notes, statistics, computations, and other data in its possession relative
to the site(s) designated for investigation. City assumes no responsibility for the accuracy
of such data furnished to Engineer by the City, its agents, contractors, or subcontractors.
Section 2. City agrees to pay Engineer for testing services on a unit price per
authorized test basis. The unit price to be paid for each authorized service shall not
exceed the unit price amount set out in the schedule of Fees and Services, attached
hereto, marked "Attachment B", and incorporated herein for all purposes incident to this
contract. In no event shall the total amount to be paid by the City for all services
performed hereunder exceed the sum of Three Hundred Thousand Dollars ($300,000.00)
per contract term.
Engineer shall invoice City upon completion of the particular services. City shall pay
Engineer within 45 days of receipt and City's acceptance of responsibility for the
services. Acceptance by Engineer of said payment shall operate as a, and shall in fact,
release the City from all claims or liabilities under this contract for anything related to,
done, or furnished in connection with the services for which payment is made, including
any act or omission of the City in connection with such services.
Engineer understands and agrees that it is performing testing for developer-let projects to
ensure compliance with City standards. In the event a re-test (or a recall due to a
cancellation) is required, payment for those services rendered may be the responsibility
of the developer pursuant to its contract with the City. City shall review and determine
whether the invoice charges are City's or developer's responsibility. In the event
developer is responsible, City will forward Engineer's invoice to said developer for
payment directly to Engineer, and evidence of such payment shall be provided by
developer to City prior to the project's completion. Failure of developer to pay Engineer
will result in the City withholding final acceptance of the project from the developer until
Engineer is paid.
Acceptance by Engineer of developer's payment shall operate as a, and shall in fact,
release the City from all claims or liabilities under this contract for anything related to,
done, or furnished in connection with the services for which payment is made, including
any act or omission of the City in connection with such services.
ARTICLE III
TERM
GEOTECHNICAL SERVICES-DEVELOPER-LET PROJECTS
ANNUAL CONTRACT
Page 2 of 9
Section 1. The term of this Agreement shall commence on the Effective Date and shall
be for a term of one (1) year or full expenditure of the contract amount, whichever occurs
first, unless terminated in accordance with the terms of this Agreement.
Section 2. City, in its sole discretion, shall have the right, but not the obligation, to renew
this Agreement two (2) additional terms provided that Engineer shall agree in writing to
continue such agreement pursuant to the same conditions as contained herein at unit
pricing satisfactory to City.
Section 3. The Engineer shall complete and charge all work on any project entered into
prior to the expiration of the Agreement to that particular agreement term.
ARTICLE IV
INDEPENDENT CONTRACTOR
Engineer shall operate hereunder as an independent contractor, and not as an officer,
agent, servant, or employee of the City. Engineer shall have exclusive control of and the
exclusive right to control the details of the work to be performed hereunder and all
persons performing same, and shall be solely responsible for the acts and omissions of its
officers, agents, employees, contractors and subcontractors. The doctrine of respondent
superior shall not apply as between City and Engineer, its officers, agents, employees,
contractors, and subcontractors, and nothing herein shall be construed as creating a
partnership or joint venture between City and Engineer.
ARTICLE V
PROFESSIONAL COMPETENCE AND INDEMNIFICATION
Section 1. To the best of its professional ability, all work performed by Engineer shall
comply in all aspects with all applicable local, state and federal laws and with all
applicable rules and regulations promulgated by the local, state and national boards,
bureaus and agencies. Approval by the City of any work shall not constitute or be deemed
to be a release of the responsibility and liability of Engineer or its officers, agents,
employees, contractors and subcontractors for the accuracy and competency of its
drilling, testing, and reporting, and other engineering services performed hereunder.
Section 2. ENGINEER SHALL INDEMNIFY, HOLD HARMLESS AND DEFEND
THE CITY AND ALL OF ITS OFFICERS, AGENTS, SERVANTS AND
EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS OR SUITS FOR
PROPERTY DAMAGE OR LOSS AND/OR PERSONAL INJURY, INCLUDING
DEATH, TO ANY AND ALL PERSONS OF WHATSOEVER KIND OR
CHARACTER, INCLUDING BUT NOT LIMITED TO EMPLOYEES OF
ENGINEER, EMPLOYEES OF SUBCONTRACTORS, AND ALL OTHER
PERSONS PERFORMING WORK INCIDENT TO THIS CONTRACT WHICH
MAY RISE OUT OF OR BE CONNECTED WITH DIRECTLY OR
INDIRECTLY:
GEOTECHNICAL SERVICES-DEVELOPER-LET PROJECTS
ANNUAL CONTRACT
Page 3 of 9
A. THE NEGLIGENT, DEFECTIVE OR DEFICIENT EXECUTION,
PERFORMANCE, ATTEMPTED PERFORMANCE OR NON-
PERFORMANCE OF THIS CONTRACT BY ENGINEER.
B. ANY ACT, OMISSION, DEFECT, DEFICIENCY OR
NEGLIGENCE OF ENGINEER IN DRILLING AND TESTING,
REPORTING, RECOMMENDATIONS OR ANY OTHER ENGINEERING
SERVICES;
C. ANY NEGLIGENCE IN THE SAFEGUARDING OF THE WORK
BY ENGINEER OR ITS SUBCONTRACTORS;
D. FAILURE BY ENGINEER OR ITS SUBCONTRACTORS TO
PROPERLY EXECUTE THE WORK;
E. DEFECTIVE WORK OR MATERIALS; AND/OR
F. STRIKING, CUTTING, IMPALING OR TEARING ANY CABLES,
UTILITY LINES, PIPES AND OTHER MATTER LOCATED BENEATH
THE SURFACE.
ENGINEER SHALL LIKEWISE INDEMNIFY, AND HOLD HARMLESS, CITY
FOR ANY AND ALL INJURY OR DAMAGE TO CITY PROPERTY ARISING
OUT OF, OR IN CONNECTION WITH, ANY AND ALL ACTS OR OMISSIONS
OF ENGINEER, ITS OFFICERS, AGENTS, EMPLOYEES OR
SUBCONTRACTORS.
ARTICLE VI
INSURANCE
Section 1. Engineer shall not commence work under this contract until it has
obtained all insurance required under this Article and the City has approved such
insurance, nor shall Engineer allow any subcontractor to commence work on its
subcontract until all similar insurance of the subcontractor has been so obtained and
approval given by the City; provided, however, Engineer may elect to add any
subconsultant as an additional insured under its liability policies.
Commercial General Liability
$5,000,000 each occurrence
$5,000,000 aggregate
Automobile Liability
$1,000,000 each accident (or reasonably equivalent limits of
coverage if written on a split limits basis). Coverage shall
be on any vehicle used in the course of the PROJECT.
GEOTECHNICAL SERVICES-DEVELOPER-LET PROJECTS
ANNUAL CONTRACT
Page 4 of 9
Worker's Compensation
Coverage A: statutory limits
Coverage B: $100,000 each accident
$500,000 disease-policy limit
$100,000 disease -each employee
Professional Liability
$1,000,000 each claim/annual aggregate. Professional Liability
coverage shall be maintained for the duration of the contractual
agreement and for a minimum of five (5)years following completion
of the service provided under the contractual agreement or for the
warranty period whichever is longer. An annual certificate of
insurance submitted to the City shall evidence coverage.
Section 2. Additional Insurance Requirements
a. Except for employer's liability insurance coverage under Engineer's worker's
compensation insurance policy and professional liability insurance, the City,
its officers, employees and servants shall be endorsed as an additional insured
on Engineer's insurance policies.
b. Certificates of insurance shall be delivered to the Department of Transportation
and Public Works' contract administrator, 1000 Throckmorton Street, Fort
Worth, TX 76102,prior to commencement of work.
c. Any failure on part of the City to request required insurance documentation
shall not constitute a waiver of the insurance requirements specified herein.
d. The Engineer shall be responsible for providing notice to the City, of
cancellation, non-renewal, and/or material change in policy terms or coverage.
A ten days notice shall be acceptable in the event of non-payment of premium.
e. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A: VII or equivalent measure of financial strength
and solvency.
f. Deductible limits, or self-funded retention limits, on each policy must not
exceed $10,000.00 per occurrence unless otherwise approved by the City.
g. Other than worker's compensation insurance, in lieu of traditional insurance,
City may consider alternative coverage or risk treatment measures through
insurance pools or risk retention groups. The City must approve in writing any
alternative coverage.
h. Workers' compensation insurance policy(s) covering employees employed on
the project shall be endorsed with a waiver of subrogation providing rights of
recovery in favor of the City.
GEOTECHNICAL SERVICES-DEVELOPER-LET PROJECTS
ANNUAL CONTRACT
Page 5 of 9
i. City shall not be responsible for the direct payment of insurance premium
costs for Engineer's insurance.
j. Engineer's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self-funded or commercial coverage
maintained by City shall not be called upon to contribute to loss recovery.
k. In the course of the contract, Engineer shall report, in a timely manner, to
City's officially designated contract administrator any known loss occurrence
which could give rise to a liability claim or lawsuit or which could result in a
property loss.
1. Engineer's liability shall not be limited to the specified amounts of insurance
required herein.
m. Upon the request of City, Engineer shall provide complete copies of all
insurance policies required by these contract documents.
n. If insurance policies are not written for specified coverage limits, Umbrella or
Excess Liability insurance for any difference is required. Excess Liability
shall follow form with the primary coverage.
ARTICLE VII
ASSIGNMENT AND AMENDMENT
Section 1. City and Engineer each bind themselves, and their respective legal successor
and assigns, to this Agreement. Engineer, its successors and assigns, shall not assign,
sublet or transfer any interest in this agreement without prior written consent of the City.
Section 2. No modification, addition, deletion, revision, alteration or other change to this
Agreement shall be effective unless and until such change is reduced to writing and
executed by the parties.
ARTICLE VIII
TERMINATION OF CONTRACT
Section 1. City may terminate this contract at any time, for any cause, by providing
written notice to Engineer. Upon receipt of such notice, Engineer shall immediately
discontinue all services and work hereunder and the placing of all orders or the entering
into contracts for supplies, assistance, facilities, and materials, in connection with the
performance of this contract and shall proceed to cancel promptly all existing contracts
insofar as they are chargeable to this contract.
Section 2. If City chooses to terminate this contract under Article VIII, Section 1, upon
receipt of notice of termination, Engineer shall, upon notification, cease to provide
materials testing services. Engineer shall submit fees for services rendered up to the date
GEOTECHNICAL SERVICES-DEVELOPER-LET PROJECTS
ANNUAL CONTRACT
Page 6 of 9
of such termination based upon calculations in Article II, Section 2 and the attached
incorporated Schedule of Fees and Services (Attachment"B").
Section 3. All reports, whether partial or complete, prepared under this contract,
including the original drawings, whether furnished by the City, its officers, agents,
employees, consultants, engineers, or contractors, or prepared by Engineer, shall be or
become the property of the City, and shall be furnished to the City prior to or at the time
such services are completed, or upon termination or expiration of this agreement.
ARTICLE IX
RIGHT TO AUDIT
Section 1. Engineer agrees that the City shall, until the expiration of three (3) years
after final payment under this contract, have access to and the right to examine any
directly pertinent books, documents, papers and records of Engineer involving
transactions relating to this contract. Engineer agrees that the City shall have access
during normal working hours to all necessary facilities and shall be provided adequate
and appropriate workspace in order to conduct audits in compliance with the provisions
of this section. City shall give Engineer reasonable advance notice of intended audits.
Section 2. Engineer further agrees to include in all its subcontracts hereunder, a
provision to the effect that the subcontracting consultant agrees that the City shall, until
the expiration of three (3) years after final payment under the subcontract, have access to
and the right to examine any directly pertinent books, documents, papers and records of
such subconsultant, involving transactions to the subcontract, and further, that City shall
have access during normal working hours to all subconsultant facilities, and shall be
provided adequate and appropriate work space in order to conduct audits in compliance
with the provisions of this article. City shall give Engineer and any subconsultant
reasonable advance notice of intended audit.
Section 3. Engineer and sub-consultants agree to photocopy such documents as may be
requested by the City. The City agrees to reimburse Engineer for the cost of copies at the
rate published in the Texas Administrative Code in effect as of the time copying is
performed.
ARTICLE X
M/WBE PARTICIPATION
In accordance with City Ordinance No. 20020-12-2011, as amended, the City has goals
for the participation of minority business enterprises and small business enterprises
("M/WBE") in City contracts. Engineer acknowledges the M/SWBE goal has been
waived for this contract.
ARTICLE XI
OBSERVE AND COMPLY
GEOTECHNICAL SERVICES-DEVELOPER-LET PROJECTS
ANNUAL CONTRACT
Page 7 of 9
Engineer shall at all times observe and comply with all federal and State laws and
regulations and with all City ordinances and regulations which in any way affect this
agreement and the work, hereunder, and shall observe and comply with all orders, laws
ordinances and regulations which may exist or may be enacted later by governing bodies
having jurisdiction or authority for such enactment. No plea of misunderstanding or
ignorance thereof shall be considered. Engineer agrees to defend, indemnify and hold
harmless City and all of its officers, agents and employees from and against all claims
or liability arising out of the violation of any such order, law, ordinance, or regulation,
whether it be by itself or its employees.
ARTICLE XII
VENUE
Should any action, whether real or asserted, at law or in equity, arise out of or under this
Contract, venue for said action shall be exclusively in Tarrant County, Texas or the
United States District Court for the Northern District of Texas, Fort Worth Division.
ARTICLE XIII
NO THIRD PARTY BENEFICIARIES
This Agreement shall inure only to the benefit of the parties hereto and third persons not
privy hereto shall not, in any form or manner, be considered a third party beneficiary of
this Agreement. Each party hereto shall be solely responsible for the fulfillment of its
own contracts or commitments.
ARTICLE XIV
SEVERABILITY
The provisions of this Agreement are severable, and if any word, phrase, clause,
sentence, paragraph, section or other part of this Agreement or the application thereof to
any person or circumstance shall ever be held by any court of competent jurisdiction to
be invalid or unconstitutional for any reason, the remainder of this Agreement and the
application of such word, phrase, clause, sentence, paragraph, section, or other part of
this Agreement to other persons or circumstances shall not be affected thereby and this
Agreement shall be construed as if such invalid or unconstitutional portion had never
been contained therein.
ARTICLE XV
NOTICES
All written notices called for or required by this Agreement shall be addressed to the
following, or such other party or address as either party designates in writing, by certified
mail, postage prepaid, or by hand delivery:
GEOTECHNICAL SERVICES-DEVELOPER-LET PROJECTS
ANNUAL CONTRACT
Page 8 1
1. CITY OF FORT WORTH: Douglas W. Wiersig, PE, Ph.D., Director
Department of Transportation and Public Works
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102
Copies to: Fernando Costa,Assistant City Manager
City Manager's Office
City of Fort Worth
Fort Worth, TX 76102
2 ENGINEER: Rone Engineering Services, Ltd.
8908 Ambassador Row
Dallas, TX 75247
ACCORDINGLY, the parties hereto have made and executed this agreement in multiple
originals effective as of the date subscribed by the City's City Manager of his/her
designee.
CITY OF FORT WORTH Rone ineering Services, Ltd.
By:75a �� By:
Fernando Costa Ma
Assistant City Manager ice President
ATTES ��aa� 0%
BY: GS n0
$ o
ary J. s °o
°
City Secr ary oa oo00
APPROVED AS TO FORM ROVAL RECOMMENDED:
AND LEGALITY
Douglas W. Black GI iersig, PE, Ph.D.,Director
Assistant City Attorney Tr ation/Public Works Dept.
M&C: C - Z 4-
Date: 0 - I3- ly
NN
GEOTECHNICAL SERVICES-DEVELOPER-LET PROJECTS
ANNUAL CONTRACT Page 9 of 9
ATTACHMENT A 1 of 1
SCOPE OF CONSTRUCTION MATERIAL TESTING
To perform, quality control and inspect a variety of public works projects
including the construction of streets, curbs, sidewalks, drainage facilities,
underground utilities and related structures; to ensure compliance with the
Standards Specification of the City of Fort Worth Transportation &
Public Works, to maintain records and prepare reports on projects inspected.
The scope of work contain but not limited to the following tests:
Moisture Density Relationship
Asphalt Density
Proctor
Unit Weight
Atterburg Limits Raw PI
Bar Lineal Shrinkage
PH Series
Texas Wet Ball Mill
Grain Size Analysis
-200 Sieve Analysis
Gradation:
Rock - Crushed Stone for Embedment LAA (Los Angeles Abrasion)
Sand - Backfill Water & Sewer
Lime Field Gradation
Cement Field Gradation
Core:
Test Hole Analysis
Concrete
Asphalt
Compression:
Cylinders
Cores
• Preview plans and specifications for assigned project prior to
testing and inspection.
• Prepare daily construction progress reports.
• Take samples of materials for examination or analysis to
laboratories; schedule routine materials and density field tests to
assure material and workmanship quality; coordinate results of tests.
• Observe work during progress and upon completion.
• Perform preliminary and final testing and inspections on routine
construction projects; provide input on acceptance of developments.
• Prepare various testing and inspection reports as required; maintain
files and reports regarding testing and inspection and plan check
activities and findings.
• Ability to respond promptly to the City's request for services.
ATTACHMENT B
FEE SCHEDULE
For Developer Construction Material Testing and Geotechnical Borings
Concrete
Compression Test Cylinders(Min.4 per set), each $16.00
Air Content/Slump/Temperature/Next Day Cylinder Pick up,hour $41.50 (Min 3 hours)
Vehicle charge in case of usage $37.00
Flexural Beams, each $30.00
*** Coring(4"DIA to 6"depth 4/trip) ***$59.00 (Min 4 per trip)
per add inch$6.35
2"Coring for depth isolation to 6"each additional inch $42.00 (Min 4 per trip)
Thickness Measurement,each $9.00
Patching of Core Holes, each $6.00
Coring Technician Time,hour $41.50
Flexural Test of Beams, each $30.00
Compression Test, each
Sawing and/or Capping Cores&Cylinders,each $60.00
Compression Test of Cores, each
Compression Test Specimen Hold
Mix Design Review,each $105.00
Mix Design Formulation w/Aggregate Tests Include Specific Gravity/Sieve $580.00
Analysis/Unit WT-200,each
Additional Mix Design Utilizing Above Mix Analysis, each $210.00
Mix Design Formulation Revision,each $210.00
Engineering Tech(NICET)for Quality Assurance Monitoring of Onsite Work, $48.00
hour
Pre-pour Reinforcing Steel Placement Inspection,hour $41.50
Sampling for In lab Test,hour $42.00
Equipment Char e N/C
Minimum Vehicle Charge $37.00
Batching Mix Design in Preparation for Making Lab Confumation Cylinders $41.50
or Beams,hour
Batch Plant Observation Supporting Concrete Placement,hour $48.00
Concrete Flatness, Sq.Ft. per sq. ft. $0.02
min. $530.00
Certified Welding Inspector,hour $65.00
Field Gradation Equipment,test N/C
Slump Test,each Include in Technician
time
*** Includes Cost of Technician Time Coring and Patching Core Holes
Page 1 of 5
ATTACHMENT B
FEE SCHEDULE
For Developer Construction Material Testing and Geotechnical Borings
HMAC
++Density Nuclear Method,hour ++$49.00
Core In place Density, each $34.00
Coring HMAC Technician Time,hour
Core Depth Measurement, core
Patching Core Holes,each $59.50 (Min 4/trip)
Min Vehicle Charge
4"DIA./6"Depth, core $45.00
Each Additional Inch,Inch $6.50
***Rolling Pattern Nuclear Gauge,hour *** $49.00
Nuclear Moisture Density Gauge, day Included in rate
Extraction and Gradation,each $180.00
Lab Density,each $45.00
Stability Test,each $170.00
Maximum Specific Gravity,each $78.00
Disposal Fee N/C
Batch Plant Hot Bin Analysis, each $58.00
Material Sampling For In Lab Tests,hour $42.00
*** Includes Gauge Charge
++First hour and half$170.00 any additional time after that is$49.00 per
hour, (includes Technician Time, Mobilization, Vehicle,Trip and Gauge
Charge).
Page 2 of 5
ATTACHMENT B
FEE SCHEDULE
For Developer Construction Material Testing and Geotechnical Borings
Professional
Chief Engineer/Scientist,hour $150.00
Senior Technician,hour $50.00
Senior Project Engineer/Professional Engineer,hour $130.00
Project Engineer/Scientist/Geologist,hour $110.00
Graduate Engineer/Project Manager,hour $90.00
Staff Scientist/Geologist/Engineer,hour $90.00
Project Inspector,hour $40.00
Clerical,hour $34.00
Drafter,hour $40.00
Engineering Technician,hour $41.50
Engineering and Report Review,hour $105.00
Page 3 of 5
ATTACHMENT B
FEE SCHEDULE
For Developer Construction Material Testing and Geotechnical Borings
Geotechnical
Undisturbed Soil Sample,each $12.00 (per ft.)
Visual Classification,each $12.00
Classification ASTM D-2487,each $105.00
Sample Extrusion,each N/A
Sample Preparation,each $10.00
Atterburg Limits RAW PI,each $52.00
Soil w/Additive, each $55.00
Bar Lineal Shrinkage, each $20.00
Moisture Density Relationship(Proctor) $150.00
Standard(ASTM D-698),each
Moisture Density Relationship(Proctor) $179.00
Modified(ASTM D-1517),each
THD 113E, each $190.00
Unit Weight,each $30.00
Unit Weight(Dry Rodded), each $30.00
-200 Sieve Analysis,each $34.00
Laboratory Moisture Content,each $8.50
Sieve Analysis(Fine Aggregate), each $62.00
Sieve Analysis(Large Aggregate),each $62.00
Sieve Analysis(Finer than 200 Sieve),each $35.00
Lime or Cement Series Determination(5 points),each $275.00
Optimum Lime Content,each $215.00
H Series(6 points),each $215.00
Specific Gravity, each $45.00
Absorption, each $25.00
Los Angeles Abrasion(Large Aggregate),each $235.00
Los Angeles Abrasion(Small Aggregate),each $215.00
Texas Wet Ball Mill, each $175.00
Gradation(Lime or Cement Stabilized),each ++$49.00/Hr
Limed Soil Depth Measurement, each
++In Place Moisture Density(Nuclear Method Technician),hour ++$49.00
Grain Size Analysis(Mechanical and Hydrometer),each $155.00
Unconfined Compression Test Including Moisture,each $35.00
Unconfined Compression Test Soil, each $38.00
Unconfined Compression Test Rock,each $48.00
Confined Compression Test(UU),each $104.00
Triaxial Test Unconsolidated Undrained,speci $85.00
Triaxial Test Multiple Stage,stage $335.00
Triaxial Consolidated Undrained w/Pore Pressure Measurement, speci $675.00
Triaxial Consolidated Drained Multiple Stage, stage $675.00
Triaxial Consolidated Drained Single Stage, stage $335.00
Triaxial Consolidated Drained Three Stage,stage $800.00
Consolidated Test,each $375.00
Direct Shear Consolidated Drained Sand&Gravel,point $225.00
Direct Shear Consolidated Drained Silt&Clay,point $375.00
Direct Shear Consolidated Undrained Sand&Gravel,point $200.00
Direct Shear Consolidated Undrained Silt&Clay,point $225.00
California Bearing Ratio,each $275.00
Page 4 of 5
ATTACHMENT B
FEE SCHEDULE
For Developer Construction Material Testing and Geotechnical Borings
THD Triaxial, each $840.00
Percent Swell,each $90.00
Permeability Test Falling Head,each $225.00
Permeability Test Triaxial, each $325.00
Permeability Test Flex Wall, each $325.00
Permeability Test Fixed Wall,each $225.00
Permeability Test Clay Soils, each $310.00
Permeability Test Granular Soils, each $275.00
Permeability Test Pressure Head wBeck Pressure Saturation, each $375.00
Electrical Resistivity,THD Method, each $105.00
Truck Mounted Mobilization,mile and trip Mile-$4.00
Trip-$350.00
Buggy/Ave Mounted,mile and trip Mile-$6.00
Trip-$475.00
Per Diem Per Man, day $100.00
Intermittent Soil Sampling w/Truck @ 5' Intervals 0-25' Depth,foot $12.00
Intermittent Soil Sampling w/Truck @ 5' Intervals 25-50' Depth,foot $13.50
Intermittent Soil Sampling w/Truck @ 5' Intervals 50-100' Depth,foot $16.00
Continuous Soil Sampling w/Truck 0-10' Depth,foot $16.00
Intermittent Soil Sampling w/ATV @ 5' Intervals 0-25' Depth,foot $13.00
Intermittent Soil Sampling w/ATV @ 5' Intervals 25-50' Depth,foot $14.50
Intermittent Soil Sampling w/ATV @ 5'Intervals 50-100'Depth, foot $17.00
Continuous Soil Sampling w/ATV 0-10' Depth, foot $15.00
Continuous Soil Sampling w/ATV 10-50'Depth,foot $19.00
Auger Drilling Without Sample,foot $10.00
Rock Coring w/NX Size,Core Barrel 0-25'Depth Carbide Bit,foot $25.00
Rock Coring w/NX Size,Core Barrel 25-50'Depth Carbide Bit,foot $27.00
Rock Coring w/NX Size,Core Barrel 50-75'Depth Carbide Bit,foot $29.00
Rock Coring w/NX Size,Core Barrel 75-100' Depth Carbide Bit,foot $31.00
Rock Coring w/NX Size,Core Barrel 50-75'Depth Diamond Bit,foot $33.00
CME 5' Continuous Sampler 0-50' Depth,run $16.00 Per FT
Stand By or Access Time,hour $200.00
Drilling w/Auger Rig,hour $150.00
Minimum Drill Fee $700.00
Post Injection Sub-grade Evaluation Per Boring Including Moisture and Free $575.00
Swell Determination
Minimum Post Injection Charge $1100.00
Field Time Engineer,hour $105.00
*** Includes Gauge Charge
++First hour and half$170.00 any additional time after that is$49.00 per
hour, (includes Technician Tune,Mobilization,Vehicle,Trip and Gauge
Charge).
Page 5 of 5
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 11/18/2014
DATE: Tuesday, November 18, 2014 REFERENCE NO.: C-27087
LOG NAME: 202014 DEVELOPER GEOTECHNICAL CONTRACT
SUBJECT:
Authorize Execution of One-Year Annual Contracts with Renewal Options for Geotechnical and
Construction Materials Testing for Various Developer Construction Projects with Alliance Geotechnical
Group, Inc., CMJ Engineering and Testing, Inc., Ellerbee Walczak, Inc., Fugro Consultants, Inc., Globe
Engineers, Inc., Kleinfelder Central, Inc., Landtec Engineers, LLC, Mas-Tek Engineering &Associates,
Inc., Rone Engineering Services, Ltd., Terracon Consultants, Inc. and T. Smith Inspection and Testing,
LLC, with a Fee Not to Exceed $300,000.00 Annually Per Firm (ALL COUNCIL DISTRICTS)
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute individual contracts
with Alliance Geotechnical Group, Inc., CMJ Engineering and Testing, Inc., Ellerbee Walczak, Inc., Fugro
Consultants, Inc., Globe Engineers, Inc., Kleinfelder Central, Inc., Landtec Engineers, LLC, Mas-Tek
Engineering & Associates, Inc., Rone Engineering Services, Ltd., Terracon Consultants, Inc. and T. Smith
Inspection and Testing, LLC, for geotechnical and construction materials testing for various developer
projects. The term of each Agreement is one-year with two one-year renewal options. The annual amount
of each contract is up to $300,000.00.
DISCUSSION:
A Request for Qualifications (RFQ) was published for these services in the Fort Worth Star-Telegram on
July 31, 2014 and August 7, 2014. The Transportation and Public Works Department received written
Statements of Qualifications (SOQ) on August 29, 2014 from 20 firms. Each firm's SOQ was evaluated
based upon pre-established selection criteria including qualification of personnel, experience, performance
on previous City contracts, and availability of testing equipment. An inter-departmental committee selected
the most qualified, and now recommends the following firms for contract approval: Alliance Geotechnical
Group, Inc.,CMJ Engineering and Testing, Inc., Ellerbee Walczak, Inc., Fugro Consultants, Inc., Globe
Engineers, Inc., Kleinfelder Central, Inc., Landtec Engineers, LLC, Mas-Tek Engineering &Associates,
Inc., Rone Engineering Services, Ltd., Terracon Consultants, Inc. and T. Smith Inspection and Testing,
LLC.
Funding for the geotechnical and construction materials testing services will be provided through
established fees collected at the time of execution of each respective Community Facilities Agreement.
These fees are paid by the developers who initiate the construction projects.
MIWBE Office - Has waived the goal for these contracts and the SBE component of the City's Ordinance
was implemented as part of the solicitation. In addition, six of the recommended firms (Alliance
Geotechnical Group, Inc., CMJ Engineering and Testing, Inc., Ellerbee Walczak, Inc., Globe Engineers,
Inc., Mas-Tek Engineering &Associates, Inc. and T. Smith Inspection and Testing, LLC) are certified as
SBE.
FISCAL INFORMATION I CERTIFICATION:
Logname: 202014 DEVELOPER GEOTECHNICAL CONTRACT Page I of 2
The Financial Management Services Director certifies that funds are available in the current capital
budgets, an appropriated, on m project by project basis of the VVobsr Capital Fund. the Sewer {}aphe|
Projects Funds and the TPW CFA Fund.
FUND CENTERS:
TO Fund/Account/Centers FROM Fund/Account/Centers
"
CERTIFICATIONS:Submitted for Cily Manager's Office by:
Fernando Costa 0122)
Originating Department Head: Douglas VKVWanaig (7801)
Additional Information Contact: Roy Teal (7958)
ATTACHMENTS
No attachments found.
lLognonze: 2A20l4 DEVELOPER GEOTECHNICAL CONTRACT Page 2of2 »