Loading...
HomeMy WebLinkAboutContract 29351 FORTWORTH MEMORANDUM TO: A. Douglas Rademaker, Director DOE and Marc A. Ott, Assistant City Manager FROM: Miguel A. Domenech,P.E. t% DATE: November 12, 2003 RE: DESIGN FEE AMENDMENT NO. 1 TO SANITARY SEWER REHABILI- TATION CONTRACT LXVIII (68), DOE NO. 3766, WATER PROJECT NO. PS58-070580175800 The proposed amendment will reimburse Carter & Burgess, Inc. (C&B) for the additional engineering services that were provided on the project as requested by the City. During construction it was determined that a 250 LF portion of lateral L-2781 (which is lo- cated at the immediate downstream end of a project sewer main) is in a dilapidated condition and in need of replacement. This amendment will allow C&B to provide the necessary sur- vey and design to replace the lateral. The amendment will also reimburse C&B for the sur- veying services that were provided to allow for the rerouting of all private services from a lateral located in the rear lots of Eastwood Avenue to the new lateral to be installed in public right-of-way of Eastwood Avenue. Carter & Burgess, Inc., has requested a fee of$7,149.00 for the additional services thereby increasing the contract fee from $207,093.00 to $214,242.00. I believe this fee is fair and rea- sonable for the additional services that were provided. Please authorize this additional design fee by your signatures on the attached contract amendment form. cc: Tony Sholola, P.E., Program Manager Berdena Hamilton, Water Department Dan Pepon, Water Department MEMO 7642 i� ENGINEERING DEPARTMENT THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311 (817) 871-7941 * Fnx (817) 871-7854 1'., Printed on recycled paper AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO.� �{ (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and Carter & Burgess, Inc . , (Engineer) made and entered into City Secretary Contract No. 28236, (the Contract) which was authorized by the City Council by M&C C-19346 on the 12th day of November 2002; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Sanitary Sewer Rehabilitation Contract LXVIII (68) . WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated October 31, 2003, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $7, 149 . 00 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $214, 242 . 00. C!Tf SEC2Ehw'�' FT. STH, TEXT 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. r4 �.�` EXECUTED on this the � day of � 1 � 2003, in Fort Worth, Tarrant County, Texas. ATTEST Contract Authorization Gloria Pearson, -City Secretary Date APPROVAL RECOMMENDED: APPROVED: r A. Douglas Rademaker, P.E. Marc A. Ott Director, Department of Assistant City Manager Engineering Carter & Burgess, Inc . ENGINEE By: Name: Steven C. Veal, P.E. _ Principal/Vice-President 777 Main Street Fort Worth, TX 76101-2058 APPROVED AS TO FORM AND LEGALITY: CA� Gary Ste 'nberger Assistant City Attorney 22266-6 -2- '� � � � FT. 1v01fH, 0. 777 Nioin Streel P.O. Box 901058 Cartery-Burgess `cri Worth,Texas 76101-2058 ?Hone: 817.735.6000 5'7.735.61-".n ww W, O.ccm October 31, 2003 Mike Domenech, P.E. Project Manager City of Fort Worth Engineering Department Engineering Services 900 Monroe Street, Suite 200 Fort Worth, Texas 76102 Project: Sanitary Sewer Rehabilitation Contract L.XVIIi (68) Contract. Water Project No. PS58-070580175800 DOE No. 3766 Carter & Burgess No. 011625.010 FZefererlce: Amendment No, 1 to Engineering Services Agreement Mr. Domenech: At your request I ani pleased to submit an Amendment No. 1 of our Agreement for Engineering Services for additional services performed by Carter & Burgess, Inc. (C&B) and our Subconsuitant, ANA Consultants LLC. As discussed in previous project meetings,the additional services; as presented herein, is outside of the original scope of the Project's Engineering Agreement. Accordingly, C&B is requesting approval of this Amendment to the initial Engineering Service Agreement for reimbursement for all direct and indirect costs incurred to complete thye additional scope of work. The additional scope of work tasks and/or project requirements are summarized as the following Amendment Items: Amendment Item No. 1: Replacement of the L-2781 Eastwood Avenue Outfall Sanitary Severer. All site surveys and related engineering office work to prepare a complete set of construction drawings and specifications to replace (via pipe bursting technology) the existing L,- 2781 ,2781 Sanitary Sewer OUtfail at Eastwood Avenue. Said Outfall is estimate at 250 linea! ft. and shall be reconstructed (relined) ufilizing the "on-site" contractor who is currently completing the construction of'rhe remainder of Sanitary Sewer L-2781 from a previous C&B design. The additional scope of services for this Amendment Item includes: 1) the completion of all site surveys to determine existing topography, pertinent design elevations, existing surface obstructions and/or features impacting the final design and construction of the project, and existing monUmentation to establish or confirm sewer line right-of-way and/or easement requirements; and, 2) the preparation i of detailed construction drawings and specifications. Amendment Item No. c: Replacement: of Sanitary Sewer L-2781. The additional scope of work associated with this amendment item primarily includes the completion of all site surveys to prepare detailed designs and sGecif ications to reconstruct Sanitary Sewer L-2781 (with the exception of the Eastwood Outfall :fewer section, or portion, described in Amendment item No. 1 ,)hc,ve). Said reconstruction includes the abandonment of the existing sanitary sewer generally located within the back-lots of existing residlential homes to within the frontage street commonly known as Eastwood Avenue. The additicnai scope of services for this ndment C",Mf. NOUN, TES. Mike Domenech, P.E. City of Fort Worth, Engineering Department, Engineering Services October 31, 2003 Page 2 of 2 Item does not include office engineering to prepare project designs and specifications. The length of Sanitary Sewer L-2781 surveyed under the additional scope of work for this amendment item is estimated at 2,241.0 ft. Increase in Contract Fee. The requested increase in the overall contract fee is summarized as follows: $207,093.00 Initial Contract Engineering/Professional Services Fee $3,649.00 Amendment Item No. 1 $3,500.00 Amendment Item No. 2 $214,242.00 Revised Total Fee for Engineering/Professional Services $66,740.00 Initial Contract MBE/WBE Fee Amount/Participation $1,150.00 MBE/WBE (ANA Consultants) Fee Increase Amendment Item No. 1 $3,500.00 MBE/WBE(ANA Consultants)Fee Increase Amendment Item No. 2 . $71,390.00 Revised MBE/WBE Fee Amount/Participation As itemized, the increase in MBE/WBE fee/participation now accounts for 33.3 percent of the total contract engineering/professional services fee. Attached please find all pertinent documentation in support of our request for an increase in the contract fee as follows: • ANA Cost Proposal for all site survey tasks given in Amendment Item No. 1. • C&B Project Fee Estimate for all engineering tasks given in Amendment No. 1. • ANA invoice for all site survey tasks given in Amendment No. 2. We appreciate the opportunity to complete this important project for the City of Fort Worth in a timely and responsive manner. If you have immediate questions regarding the stated engineering effort associated with this amendment or stated fee increase, please call me at my 817-347-5933 direct office phone number. Your prompt approval of this amendment is appreciated. Respectful tted, stensen, P.E. cc: Bart Hines, P.E., Manager, Public Works Group, Fort Worth,w/attachments. Jonathan Shirk, E.I.T., Project Engineer, Public Works Group, Forth Worth, w/attachments