HomeMy WebLinkAboutContract 30852 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
a�e�
WHEREAS, Pulte Homes of Texas , L. P. , hereinafter called
"Developer", desires to make certain improvements to
Everman Park South Add. 'n an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Matt Robinson , its
duly authorized V. P. of Land Develop- , and the City, acting herein by and
men
through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of
the covenants and conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community.Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
CFA REVISED FORMAT WITH 4% 1 �'
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused,
in whole or in part, by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits a ma�YCefi�q.
CFA REVISED FORMAT WITH 4% 2 �, `'ti'v'r.� ,
Water (A) None; Sewer (A-1)None; Paving (B) attached; Storm Drain (B-
1) attached; Street Lights and Signs (C) attached.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $400, 638 . 80
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
CFA REVISED FORMAT WITH 4% 3 1` '_
SUMMARY OF COST
Everman Park South Phase I
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $227,401.46 $ 227,401.46
2. Storm Drainage $133,982.00 $ 133,982.00
3. Street Lights $24,200.00 $ 24,200.00
4. Street Name Signs $ 600.00 $ 600.00
B. Engineering Design $ -
C. Construction Engineering
and Management by DOE (4%) $ 14,455.34 14,455.34
TOTALS $ 400,638.80 $ - $ 400,638.80
CFA CODE: 4
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Develo er
has executed this instrument in triplicate, at Fort Worth,Texas this the U day of
) 2004.
Approval Recommended:
Transportation and Public Works
Department
65, AC
4�
Robert Goode, P. E.
Director
City of Fort Worth
Marc Ott
Assistant City Manager
ATTEST: LIU no - LLM[wt
ffi tu ' Contract Authorizdtioa
Marty Hendrix
City Secretary Date
Approved as to Form:
*�,ssistanity Attorney �6mts of
bpi iT5 LaE����L
ATTEST: DEVELOPER
By.
Corporate Secretary
dr 1 I II L7 ��:51:L'•
CFA REVISED FORMAT WITH 4% 4 it
SUMMARY OF COST
Everman Park South Phase I
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $227,401.46 $ 227,401.46
2. Storm Drainage $133,982.00 $ 133,982.00
3. Street Lights $24,200.00 $ 24,200.00
4. Street Name Signs $ 600.00 $ 600.00
B. Engineering Design $ -
C. Construction Engineering
and Management by DOE 4% $ 14,455.34 14,455.34
TOTALS $ 400,638.80 $ - $ 400,638.80
CFA CODE: 4
Ld
W
U
0
w w
J
J O
3 F a
m 0
J d'
N
JOHN BURGUESS >
x
CITY W
CITY
z
35W N AM EL
0
Y WORTH a
0 EVERMAN BARR0 Lo PROJECT w ANG VAUG N
LOCATION RUSSEL
EVERMAN MARLE E N NEI
CEDNA J a y EDNA 41
Z) >- �y U ~ ELLEY U
0 3 U CHRI TI
w
U
PALETTE a
FORUM WAY m
MAN
J r
z
Z J H
W
U x 7
_U
z m CITY
V)
w t
J
m J Q
F
W
N.T.S- O
LOCATION MAP
"EVERMAN PARK SOUTH, PHASE 1 " s , r.
WELCH ENGINEERINO,
CONSULTING ENGINEERS
" ENON AVENUE
-------------_�— _ (ULTIMATELY 60' RIGHT-OF-WAY) — 20.5 PAVING SECTION
--
SUNBURST DRIVE --_— ---
4 (50 RICHT-OF-WAY)
4 f I I I
4
I
4
w'a 29'B—B
m U
I � m a w ---- ---
l
I Q Q 3
k �v
1J I O
LJ JO
9io wr ---�.2 ---
--m., w
4 X2 Oo
LLJ
I \ 29'B-B
I \
4 \
---
0
I
I � \
I X40 \\
o�� \
(
cq \ m
c�
\ I
I o M v
I 4 �
\
I � 1
p--- ------ I 29'B-B
EVRRaLgRGP°RwWAY
100% DEVELOPER'S COST )
6" PAVEMENT W/ 6" CROWN
ON 6" LIME SUBGRADE \
DEVELOPER'S ESCROW
® 6" PAVEMENT ON
6" LIME SUBGRADE
EXHIBIT "B"
PAVING IMPROVEMENTS
"EVERMAN PARK SOUTH, PHASE 1 " SCALE: 1"=200'
WELCH EWORS EERIN0, INC.
CONSUL TING ENGINEERS
------ ------ -------------- - ------------- -------
ENON AVENUE
t I
I I SUNBURST DRIVE
I I
I I
w
I 1 �
I I w
Y w 0
I ? z of
Of
\\\ 0 m ---- 00 ---
J �
ol
I 01 \\ � 10'
willI o 1 \\\� R� -RCP --- ---
! �I �\
Z,-RCP
01 \
I � 1
EVERMAN PARKWAY zo \�
I
i
48'-4:1 SLOPING-
10'
LOPING \
� 100 DEVELOPER'S COST HEADWALL�
10' OR 20' INLET
STORM SEWER AND INLET
AND ASSOCIATED APPURTENANCES
EXHIBIT 99B- 199
STORM DRAIN IMPROVEMENTS
"EVERMAN PARK SOUTH, PHASE 1 " SCALE: 1"=200'
WELCH ENGINEER Nq, NC
CONSULTING ENGINEERS - -�
ENON AVENUE-- – `�--
I i SLINBURST DRIVE —
I � w
\\ J mof
U
I \\ ?w >
\\ - W.
O \�
I of \\
I
01or I
\\
ol
I i
I h �
� r 1
4
-----------___ t
f �
I EVERMAN PARKWAY \�
I
* -- PROPOSED STREET LIGHT (100% DEVELOPER'S COST)
# -- EXISTING STREET LIGHT
p -- PROPOSED STREET SIGN (100% DEVELOPER'S COST)
EXHIBIT "C"
STREET LIGHTS SCALE: 1"=200'
"EVERMAN PARK SOUTH, PHASE 1 "
WELCH ENGINEERIN0, INC!
CONSULTING ENG/NEE-RS
I
i
B-1. STORM DRAIN (TOTAL COST)
l7EMESCRIp; If3N QUANTITY ORM CdST/UNIT, 407AL COST
21" RCP 133 L.F. 35.00 4,655.00
27" RCP 59 L.F. 38.00 2,242.00
30" RCP 32 L.F. 42.00 1,344.00
33" RCP 320 L.F. 50.00 16,000.00
42" RCP 419 L.F. 85.00 35,615.00
48" RCP 129 L.F. ✓` 140.00 18,060.00
20' Curb Inlet 2 EA. ✓ 3,400.00 6,800.00
10' Curb Inlet 4 EA. 2,300.00 9,200.00
4' x 4' T pe"Y" Inlet 1 EA. 2,100.00 2,100.00
5' x 5'Storm Manhole 2 EA. ;' 3,200.00 6,400.00
14'x 4' Storm Manhole 1 EA. ✓ 3,900.00 3,900.00
Remove/Replace exist. Pavement 40 S.Y. V 50.00 2,000.00
48"Type "B" Hdwl. 1 EA. 3,500.00 3,500.00
27"Type"B" Hdwl. 1 EA. ,/ 2,500.00 2,500.00
Inlet Protection Devices 6 EA. 220.00 1,320.00
Trench Safety 1,092 L.F. 0.50 546.00
-Dry rock rip-rap 295 S.Y. 40.00 11,800.00
Gabion matress 50 S.Y. 100.00 5,000.00
Stormwater Management Maintenance 1 L.S. 1,000.00 1,000.00
0.00
$133,982.00
Inspection Fee (4%) 1 L.S. 5,359.28 5,359.28
EVERMAN PARK SOUTH ADDITION, PHASE 1
B. PAVING (TOTAL COST)
.. .
.. . ...:........ ... ............
.:. . , utlT...kTEV : PI N: QUAkI'I. :. ....,.:CO. T JVkT ':":'::T TAL::C3.ST.:..
6" Reinf. Concrete pavement 8,825 S.Y. 18.75 165,468.75
Lime 30#/S.Y. 141 TN 95.00 13,395.00
6" Lime Stabilized Subgrade 9,354 S.Y. 1.35 12,627.90
Material Testing 1 EA. 5,500.00 5,500.00
Street barricades 60 L.F. 35.00 2,100.00
J� 10 EA. 850.00 ,
Street Header 58 L.F. 45.00 2,610.00
Sawcut, Breakout Groove 170 L.F. 20.00 3,400.00
400 L.F. 4.20 1,680.00
4" -4' foot sidewalk adjacent Everman 1,200 S.F. 2.75 3,300.00
500 L.F, 3.75
Barrrier Free ramps 10 EA. 575.00 5,750.00
Erosion Control 3 AC 185.00 555.00
Inlet Protection Device 6 EA. 175.00 1,050.00
SWPPP 1 L.S. 2,000.00 2,000.00
Performance/Payment/Maintenance Bond 1 L.S. $226,206.65 3,393.10
Inspection Fee (4%) 1 IL.S. 1 9,328.19 9,328.19
� 222�z9.7s
Z.
l
I . STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 5 EA $ 2, 000 $10, 000 . 00
MID-BLOCK RESIDENTIAL 5 EA $ 2, 000 $10, 000 . 00
CHANGE OF DIRECTION RESIDENTIAL 1 EA $ 2, 000 $2, 000 . 00
MID-BLOCK COLLECTOR 0 EA $ 2 , 000 $0, 000 . 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00
Subtotal $22,000 . 00
City' s Cost $00, 000 . 00
Developer' s Subtotal $22 ,000 . 00
10% Contingencies $2 ,200 . 00
Project Total $24,200 . 00
Adjacent Developer's Cost $0,000 .00
Developer's Cost $24,200 . 00
2% Inspection Fee $0,00 .00
CFA CODE #2004071
DEVELOPER' S COST: $24,200. 00
EVERMAN PARK SOUTH, PHASE I
June 17 , 2004
Fort Worth, Texas
October 11 , 2004
PAGE I OF Exhibit C
nJ�U�y Z' C� �r
II. STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights at
the approximate locations shown in Exhibit "C" , immediately after
final acceptance of the street construction, in accordance with
engineering plans and specifications approved by the Transportation
and Public Works Department.
2 . Streetlights on residential and /or collector streets can be
installed using overhead or underground conductors with the approval
of the Director of Transportation and Public Works .
3 . The City will install all the streetlights that use overhead or
underground conductors on residential , and collector streets . the
developer agrees to pay the city the amount shown below prior to the
City starting it' s design efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors .
5 . The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for
the installation of any electrical transformers required for the
proper operation of the street lights
6. The estimated cost of this street light installation is detailed on
page 1 of exhibit C and is summarized below, the street lights will
remain the property of, and will be maintained by the City of Fort
Worth.
DEVELOPER' S COST: $24,200.00
EVERMAN PARK SOUTH, PHASE I
June 17 , 2004
FORT WORTH, TEXAS
CFA CODE #2004071
Page II of Exhibit C
III .
"STREETLIGHTS"
INTERSECTIONS
YELLOW BUCKEYE DR & CHERRY BARK LN 1
YELLOW BUCKEYE DR & SUNBURST DR 1
YELLOW BUCKEYE DR & ENON AVE 1
CHERRY BARK LN & SILVERBELL LN 1
EVERMAN PKWY & SILVERBELL LN 1
MID - BLOCK
YELLOW BUCKEYE DR 2
SILVERBELL LN 3
CHANGE OF DIRECTIONS
SUNBURST DR 1
EVERMAN PARK SOUTH, PHASE I
Page III of Exhibit C
IV
STREET NAME SIGNS
1 . The City of Fort Worth will install the street name signs upon
final approval of the street construction. The street name signs
will remain the property of, and will be maintained by, the City
of Fort Worth.
2 . The Developer will pay for the street name sign installations
required for this development to the extent of $100 .00 per
intersection. This unit cost will be revised annually by the
Department of Transportation and Public Works to reflect
prevailing costs of materials and labor.
3. This development creates the following six (6) intersections at a
cost to the Developer of $600.00 :
Yellow Buckeye Dr & Enon Dr
Yellow Buckeye Dr & Sunburst Dr
Yellow Buckeye Dr & Cherry Bark Lane
Silverbell Lane & Sunburst Dr
Silverbell Lane & Cherry Bark Lane
Silverbell Lane & Everman Pkwy
Everman Park South, Phase 1
CFA code : 2004071 Date : June 18 , 2004