Loading...
HomeMy WebLinkAboutContract 32351 X COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary f/�� r COUNTY OF TARRANT § Contract No. c�yb aD WHEREAS, ,�1T�.p hereinafter called "Developer", desires to make certain improvements to Sr,'M Lmjl phc&o. 1 , an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Spring Ranch Ph. 1-Newer CFA 4% and Utilities 08 25 05.doc F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. Spring Ranch Ph. 1-Newer CFA 4% and Utilities 08 25 05.doc -: L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1)Attached; Street Lights and Signs (C) Attached. M. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $545,654.92. Sprung Ranch Ph. 1-Newer CFA 4% and UtiPities 08 25 05.doc SUMMARY OF COST Spring Ranch Phase 1 Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $436,283.50 436,283.50 2. Storm Drainage $47,327.00 47,327.00 3. Street Lights $41,800.00 41,800.00 4. Street Name Signs $900.00 900.00 B. Engineering Design $ C. Construction Engineering and Management by DOE $ $ 4% 19,344.42 19,344.42 TOTALS 545,654.92 $ - 545,654.92 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk and a separate financial guarantee is required in the form of a bond or check for the cost of the sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. Spring Ranch Ph. 1-Newer CFA 4% and Uti4ties 08 25 05.doc IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth,Texas this the L 'hay of` 2005. Approval Recommended: Transportation and Public Works Department Robert Goode, P. E. Director it Fo V� Marc Ott NO M&C REQUIRED Assistant City Manager ATTEST: Marty Hendrix City Secretary Approve l,as to Form: AssistsWity ttorney ATTEST: DEVELOPER BD DEVELOP N , L.P . by 5409 A LLC, is r trier y: Corporate Secretary Kim ill, President RECEIVED Spring Ranch Ph. I-Newer CFA 4% and Utilities 08 25 05.doc `_"` D. STORM DRAINAGE IT EM $0.R' : :: :..::.::::. . QlJ1kN :::U IT:. :i c.Q.S ;:lJ-NIT. ::: T�?TkG�f3iST . ..... . .. ....... .. TITY.:.. ... .. TL.. ... 24" RCP 212 L.F. 51.00 10,812.00 27" RCP 150 L.F. 59.00 8,850.00 24"Single Sloped Hdwl 8 EA. 1,050.00 8,400.00 3 x 27""C" Hdwl 2 EA. 2,900.00 5,800.00 2 x 27""C" Hdwl 2 EA. 1,950.00 3,900.00 2 x 24""C" Hdwl 2 EA. 1,850.00 3,700.00 18"Std. Headwall Type "B" 6 EA. 850.00 51100.00 Grouted Rock Rip Rap 5 SY 100.00 500.00 Trench Safety 1 IL.S. 265.00 265.00 0.00 $47,327.00 SPRING RANCH, PHASE 1 August 1, 2005 WEI Engineers Estimate E. PAVING NIT:;:: ..:: ;:' .TOTAL::COST. 6" Reinf. Conc. Pavement (3,boo psi) 18,420 S.Y. 19.25 354,585.00 6" Lime Sub grade Pre paration 19,805 S.Y. 1.50 29,707.50 4T.lHydrated Lime for Subgrade ( 30#/SY) 297.8 TON 95.00 28,291.00 F Reinf. Conc. Pavement S.Y. 0,00 6" Lime Subgrade Preparation S.Y. 0.00 Hydrated Lime for Subgrade ( 36#/SY) TON 0.00 •Alley Paving S.Y 0.00 • Integral Curb L.F. 0.00 • Rolled Asphalt Curb L.F. 0.00 2"Asphalt Paving w/6" Base S.Y. 0.00 •Asphalt Paving S.Y. 0.00 Material Testing 1 L.S. 6,500.00 6,500.00 ' Std. Curb Inlet (Second Stage) EA. 0.00 'Std. Curb Inlet (Second Stage) EA. 0.00 Barricades 120 L.F. 60.00 7,200.00 Temporary Asphalt Transition S.Y. 0.00 Const. Std. Street Header 120 L.F. 7.50 900.00 Saw, Cut& Remove Existing Conc. S.Y. 0.00 Saw, Cut& Remove Existing sidewalk S.Y. 0.00 Sawcut Breakout Groove 160 L.F. 5.00 800.00 PVC Conduit for Street Crossings L.F. 0.00 PVC Conduit for Irrigation Crossings L.F. 0.00" Turning Lane L.S. 0.00 Traffic Control on Willow Springs 1 L.S. 500.00 500.00 1 iSidewalk S.F. 0.00 Si nal Conduit L.F. 0.00 "Striping L.F. 0.00 " Traffic Buttons EA. 0.00 Barrier Free Ramps EA. 0.00 Wheelchair Ramps EA. 0.00 "Separate Curb &Gutter L.F. 0.00 Erosion Control Site Seeding (Parkways) AC. 0.00 Haybale/Silt Fence L.F. 0.00 Removal of Exist. Barricades L.F. 0.00 ,Adjust S.S. Manholes/Cleanouts EA. 0.00 Adjust Storm Manholes EA. 0.00 Adjust Water Valves EA. 0.00 Haybale/Silt Fence L.F. 0.00 Inlet protection devices EA. 0.00 Entrance/Exit stabilization pad L.S. 0.00 Hydromulch/seeding L.S. 0.00 Stormwater Management Maintenance 1 L.S. 300.00 300.00 P.P.M. Bond 2YR/100% 1 L.S. 7,500.00 7,500-00 1-0-0 $436,283.50 SPRING RANCH, PHASE 1 August 1, 2005 WEI Engineers Estimate Thursday,August 04, 2005 8:49 AM ssalsbury 817-268-2330 p.03 SEWER MAINS 1). 7401 LF 8" SDR-35 PVC PIPE $14.00 $103,614.00 2). 186 LF 8" SDR-26 PVC PIPE $25.00 $4,650.00 3). 3768 LF 6" FORCE MAIN $18.50 $69,708.00 4). 19 EA 4' M.H. $1,980.00 $37,620.00 5). 2 EA 4' DROP M.H. $3,300.00 $6,600.00 6). 40 EA 4" SDR-26 SERVICES $335.00 $13,400.00 7). 52 EA 4" SDR-35 SERVICES $325.00 $16,900.00 8). 1 EA AIR VACUME VALVE W/VAULT $5,950.00 $5,950.00 9). 1 EA GIFT STATION $123,500.00 $123,500.00 10). 3 EA R/R GRAVEL DRIVEWAYS 5300.00 $900.00 11). 1 EA R/R EX/DBL.24" RCP&HDWL. $3,300.00 $3,300.00 12). 40 LF BORE 6" FORCE MAIN $200.00 $8,000.00 13). 1 LS R/R EX.LANDSCAPING/SENDERA RANCH BLVD. $4,000.00 $4,000.00 14). 1 EA CONN.TO EX. 12" FORCE MAIN $800.00 $800.00 15). 7586 LF TEST&T.V. MAINS $1.00 $7,586.00 W. 21 EA VACUME TEST M.H. $75.00 $1,575.00 17). 1 LS TRENCH SAFETY $8,365.00 $8,365.00 18). 1 LS TRAFFIC CONTROL $2,000.00 $2,000.00 19). 5 CY BALLAST STONE $33.00 $165.00 20). 5 CY CRUSHED LIMESTONE $27.00 $135.00 21). 5 CY CLASS"E" 150(#CONC. $100.00 $500.00 22). 5 CY CLASS "B"2500#CONC. $105.00 $525.00 23). 1 LS STORM WATER MANAGEMENT $1.00 $1.00 24). 25 SY R/R EX.PVMT. $95.00 $2,375.00 25). 3 EA R/R EX. CULVERT ALONG BOAZ RD $150.00 $450.00 SEWER MAINS TOTAL: $422,619.00 STORM DRAINAGE 1). 150 LF 27"RCP CL. III PIPE $59.00 $8,850.00 2). 212 LF 24" RCP CL.III PIPE $51.00 $10,812.00 3). 8 EA 24"SINGLE SLOPED HDWL. $1,050.00 $8,400.00 4). 2 EA 3 X 27" "C" HDWL. $2,900.00 $5,800.00 5). S SY GROUTED ROCK RIP-RAP $100.00 $500.00 6). 2 EA 2 X 27" "C"HDWL. $1,950.00 $3,900.00 7). 2 EA 2 X 24" "C" HDWL. $1,850.00 $3,700.00 8). 6 EA 18" "B" HDWL. $850.00 $5,100.00 9). 1 LS TRENCH SAFETY $265.00 $265.00 STORM DRAINAGE TOTAL: $47,327.00 TOTAL BID: $712,538.80 NOTE:SEE PAGE 3 FOR INCLUSIONS&EXCLUSIONS Page 2 of 3 Thursday, August 04, 2005 8:49 AM ssalsbury 817-268-2330 p.04 Walker Utilities,Inc. Location: SPRING RANCH PH.I FORT WORTH,TEXAS UTILITIES PROVISIONS SOIL TESTING BY OTHERS ENGINEERING AND LAYOUT BY OTHERS METER AND FEE'S,INSP.FEE'S,CONN.FEE'S OR PERMITS BY OTHER NO BONDS INCLUDED EXCESS SPOILS DEPOSITED ON SITE BID ON UNAPPROVED PLANS ONE MOVE IN BARRICADES PROVIDED ONLY AT WORK LOCATION DURING CONSTRUCTION INSURANCE LIMITS$2,000,000.00 WORK TO INCLUDE ONLY THE ITEMS LISTED STAGING AREA PROVIDED BY OWNER $IS0.00 PER V.F.FOR EXTRA DEPTH ON INLETS AND M.H.NOT SHOWN ON PLANS NO MATERIAL TAX INCLUDED NATIVE BACKFILL OVER PIPE EMBEDMENT INCLUDED NO S.W.P.P.P.DESIGN OR SUBMITAL INCLUDED For your convenience,the above quantities have been estimated,however this proposal is on a unit price basis with payments to be made on the actual measured quantities of work completed. On the last day of each month partial estimates shall be prepared including all of the completed work plus all of the material on hand for the uncompleted portion and shall be paid in full not later than the 15th day of the following month.Final estimate shall be prepared immediately upon completion and shall be paid within 15 days.All estimates not received on due date shall bear interest from due date until date received at 12%per artnum. It is also agreed by both parties to this agreement that any and all costs of litigation to obtain monies due contractor shall be at the expense of the owner. This proposal is also based on all engineering,grades and alignments being furnished by the owner,together with all necessary permits from the City,County,State or other interested parties.Our prices include on-site disposal of excess materials.Off-site disposal will be the responsibility of the excavation contractor. Your acceptance of this proposal by signing and returning one copy to us within(10)days and the approval by us of credit arrangement will constitute a contract between us.This proposal or contract is subject to cancellation if a National Emergency should cause materials to become unavailable. ACCEPTED: Walker Utilities,Inc. (Owner) (Contractor) By ::�tP4 Salsbury ��. Estimator Title Title Bank Ref Date Attest Page 3 of 3 08/03/2005 14: 32 8177351613 CONSTRUCTION OFFICE PAGE 02 OFFICE PHONE GILCO CONTRACTING, INC . FAX NUMBER. (817) 735-1600 4200 S. HULEN ST., SUITE 513 (817) 735-1613 FORT WORTH, TEXAS 76109 PROPOSAL PROJECT: SPRING RANCH, PHASE 1 OWNER: BO DEVELOPMENT, L.P, 8 1 D DATE: Jury 27, 2005 ITEM NO I bESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL BID 1 6"STABILIZED LIME SUBGRADE SY 19,805 $1.50 $29,707.50 2 HYDRATED LIME (30 LBS/SY) TON 297.8 $95.00 $28,291.00 3 6" REINF CONCRETE PAVMENT(3000 PSI) SY 18,420 $19.25 $354,585.00 W/03 BARS @ 24' (NO CURB) 4 TRAFFIC BARRICADES LF 120 $60.00 $7,200.00 5 STREET HEADER LF 120 $7.50 $900.00 6 SAWCUT, BREAKOUT GROOVE LF 160 $5.00 $800.00 INCLUDING HMAC TIE-IN) 7 TRAFFIC CONTROL PLANS ONTO WILLOW LS 1 $500.00 $500.00 SPRINGS ROAD 8 MATERIALS TESTING LS 1 $6,500.00 $6,500.00 9 STORM WATER MANAGEMENT LS 1 $300.00 $300.00 MAINTENANCE ONLY) 10 PERFORMANCE, PAYMENT AND 2 YEAR LS 1 $7,500.00 $7,500.00 100% MAINTENANCE BOND TOTAL AMOUNT BID $436,283.50 QUALIFICATIONS AND/OR EXCLUSIONS: 1. GILCO'S BID 1S BASED ON ONE MOVE-IN FOR ALL WORK QUOTED IN THIS PROPOSAL. 2. GILCO DOES NOT INCLUDE BONDS, STAKING/LAYOUT, TESTING, AGC DUES, PERMIT FEES, INSPECTION FEES, SEEDING, SODDING, HYDROMULCHING, EROSION CONTROL DEVICES, PAVEMENT MARKINGS, ELECTRICAL OR IRRIGATION CONDUITS, OR SIGNS, 3. GILCO DOES NOT INCLUDE SALES TAXES ON MATERIALS INCORPORATED INTO THIS PROJECT. 4_ GILCO WILL ACCEPT SUBGRADE AT PLUS OR MINUS ONE TENTH OF A FOOT WITH RESPECT TO PLAN GRADES. 5. GILCO DOES NOT INCLUDE CLEAN UP OF PARKWAYS, ETC. AFTER FRANCHISE UTILITY COMPANIES, 6. THIS PROPOSAL SHALL REMAIN GOOD FOR 15 DAYS. THESE PRICES ARE BASED UPON THIS WORK BEING PERFORMED WITHIN 6 MONTHS OF THE BID DATE. SHOULD THE PROJECT BE DELAYED LONGER THAN 6 MONTHS FOR ANY REASON, THEN GILCO RESERVES THE RIGHT TO RE-NEGOTIATE THE UNIT PRICES DUE TO LARGE FLUCTUATIONS IN MATERIAL PRICES CAUSE BY THE CURRENT VOLATILE PRICES OF FUEL. 7. GILCO WILL SUBMIT MONTHLY PAY APPLICATIONS FOR WORK COMPLETE THROUGH THE END OF THE MONTH. PAYMENT SHALL BE DUE ON THE 10TH OF THE FOLLOWING MONTH, 8. GILCO RESERVES THE RIGHT TO APPROVE OWNER CREDIT PRIOR TO EXECUTING AN AGREEMENT. 9. 1T IS THE INTENT OF THIS AGREEMENT THAT ALL MONIES DUE GILCO, INCLUDING FINAL RETAINAGE WILL BE PAID WITHIN 30 BAYS OF CITY ACCEPTANCE OF THE PROJECT. ANY STOPPAGE OF WORK MORE THAN 30 DAYS NOT DIRECTLY ATTRIBUTABLE TO GILCO WILL BE CAUSE FOR IMMEDIATE PAYMENT OF ALL RETAINAGE AND ANY OTHER AMOUNTS WHICH ARE OWED AT THAT TIME. _ Page 1 of 2 � . __ 08/03/2005 14: 32 8177351613 CONSTRUCTION OFFICE PAGE 03 OFFICE PHONE GILCO CONTRACTING, INC . FAX NUMBER: (817)735-1600 8200 S. HULEN ST., SUITE 513 (817) 735-1613 FORT WORTH, TEXAS 76109 PROPOSAL. PROJECT: SPRING RANCH, PHASE I OWNER: BD DEVELOPMENT, L.P. BID DATE: July 27, 2005 ITEM NO I DESCRIPTION I UNITI QUANTITY UNIT PRIC21 TOTAL BID 0UALIFIe,lATj0NS ANDIOR EXCLUSIONS: (CONTINUED) % GILCO INCLUDES THE'TEMPORARY BARRICADING NECESSARY TO COMPLETE ITS WQRK. ANY ADDITIONAL BARRICADING COST NOT DIRECTLY RELATED TO GILCO WILL BE PAID BY OWNER. 11. OWNER TO PROVIDE A SUITABLE LOCATION ON-SITE FOR GILCO TO ERECT AND OPERATE A PORTABLE CONCRETE BATCH PLANT. 12. OWNER TO PROVIDE ADEQUATE CLEARING TO PROPERLY CONSTRUCT STREETS FULL�WIDTH UTILIZING A SLIP FORM PAVER, CONCRETE BELT PLACER AND CONCRETE HAUL TRUCKS. 13. OILOO DOES NOT INCLUDE THE COST OF EXPOSING OR RELOCATING FRANCHISE UTILITIES. 14. GILCO DOES NOT INCLUDE DESIGN, IMPLEMENTATION, OR OPERATING A STORM WATER POLLUTION PREVENTION PLAN. 15. GILCO DOES NOT INCLUDE RELOCATING OR INSTALLING A CONSTRUCTION ENTRANCE. IF GILCO IS REQUIRED TO RELOCATE OR INSTALL A CONSTRUCTION ENTRANCE THEN A CHARGE OF $1,540.00 PER EACH SHALL. BE APPLIED. 16, GILCO'S BID IS BASED ON OWNER PROVIDING SUBGRADE THAT IS SUITABLE FOR LIME STABILIZATION. ANY ROCK SHALL BE UNDERCUT AND REPLACED WITH SUITABLE MATERIAL. THIS APPLIES TO STREET SUBGRADE AND PARKWAY AREAS. IF REQUIRED, GILCO CAN PERFORM THIS WORK ON AN HOURLY DASIS. 17. GILCO DOES NOT INCLUDE SULFATE TREATMENT_ IF SULFATE'S ARE ENCOUNTERED THEN GILCO WILL PRICE ACCORDING TO CITY REQUIREMENTS FOR TREATMENT. 18. GILCO'S CONSTRUCTION SCHEDULE IS SUBJECT TO THE AVAILABILITY OF LOCAL RAW MATERIALS AT THE TIME OF CONSTRUCTION. DUE TO CEMENT SHORTAGES AND SHORTAGES OF OTHER RAW MATERIALS AND TRUCKS, GILCO CAN NOT MAKE ANY COMMITMENTS ON OUR SCHEDULE FOR CONSTRUCTION_ 19. GILCO WILL COMPLETE THIS PROJECT WITHIN 40 WORKING DAYS, SINCERELY, GILCO CONTRACTING, INC. JAMEY C. BURCHETT CONTRACT MANAGER Page 2 of 2 I. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 9 EA $ 2, 000 $18, 000 . 00 MID-BLOCK RESIDENTIAL 9 EA $ 2, 000 $18, 000 . 00 CHANGE OF DIRECTION RESIDENTIAL 1 EA $ 2, 000 $2, 000 . 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00 Subtotal $38,000 .00 City' s Cost $00,000 .00 Developer' s Subtotal $38,000.00 10% Contingency $3,800 . 00 Project Total $41 ,800 .00 Adjacent Developer' s Cost $00,000 .00 Developer' s Cost $41 ,800.00 2% Inspection Fee $00,000. 00 CFA CODE #2005106 DEVELOPER' S COST: $41,800.00 SPRING RANCH, PHASE I Fort Worth, Texas August 25, 2005 PAGE I OF Exhibit C •lYL II. STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2. Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works. 3. The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets. The developer agrees to pay the city the amount shown below prior to the City starting its design efforts. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors. 5. The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER' S COST: $41 ,800.00 SPRING RANCH, PHASE I August 25, 2005 FORT WORTH, TEXAS CFA CODE #2005106 Page II of Exhibit C III "STREETLIGHTS" INTERSECTIONS WILLOW SPRINGS RD & BLUFF SPRINGS DR 1 WILLOW SPRINGS RD & WHISPER WILLOW DR 1 WHISPER WILLOW DR & SPRING WATER DR 1 WHISPER WILLOW DR & DURANGO SPRINGS DR 1 WHISPER WILLOW DR & SMOKEY RANCH DR 1 WHISPER WILLOW DR & BRIDLE SPRINGS DR 1 CHISOLM RANCH DR & DURANGO SPRINGS DR 1 SMOKEY RANCH DR & BLUFF SPRINGS DR 1 BRIDLE SPRINGS DR & DURANGO SPRINGS DR 1 MID BLOCK DURANGO SPRINGS DR 4 WHISPER WILLOW DR 3 SMOKEY RANCH DR 1 BRIDLE SPRINGS DR 1 CHANGE OF DIRECTIONS DURANGO SPRINGS DR 1 SPRING RANCH, PHASE I Page III of Exhibit C � � Iv STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following nine (9) intersections at a cost to the Developer of$900.00: Bluff Springs Dr & Willow Springs Rd Bluff Springs Dr & Smokey Ranch Dr Whisper Willows Dr & Willow Springs Rd Whisper Willows Dr & Smokey Ranch Dr Whisper Willows Dr & Durango Springs Dr Whisper Willows Dr & Spring Water Dr Whisper Willows Dr & Bridle Springs Dr Durango Springs Dr & Chislom Ranch Dr Durango Springs Dr & Bridle Springs Dr Spring Ranch, Phase I CFA code: 2005106 August 15, 2005 �G 2 y �o O 0 y z � O O N Q �O 2 Q m I Z J z CD = Willow Springs Golf Course AVONDALE — HASLET BOAZ RD PROJECT LOCATION 1: 0 U) CD n Z cli U) LS N 8�c O & 28) 3 BLUE MOUND N.T.S. - JV7-0 LOCATION MAP WATER N0: P164-060164015340 SANITARY SEWER NO:"SPRING RANCH, PHASE 1 STREET/STORM DRAIN P17NO:4W-1678 013337 WELCH ENGINEERIlVG, I NC. CONSUL TING ENG/NEE-RS 1 � I W I I //T a BLUFF SPRINGS DRIVE I I I I I I CHISHOLM RANCH DRIVE �y (60' RIGHT-OF-WAY) I I I I (60' RIGHT-OF-WAY) i i / ------'-------------- ----'--------- O¢I W I 1 ���//� I ----- V, z � 1 1 ! 1 ! 1 1 1 1 l 1 1 1 1 1 1 1 L) (/1 i 24'E�E w o r Cc DURANGO SPRINGS ­1 VE a i _J Y.S (60' RIGHT-OF-WAY} N _J V) 24'E-E I � I I 4, W I I w � Qp F� (WHISPER WILLOWS DRIVE i ofza'E IE I (60' RIGHT-OF-WAY) I N m 24'E-E �\ a \ Zp� \ �\ d \ V 100% DEVELOPER'S COST 6" PAVEMENT ON 6" LIME SUBGRADE EXHIBIT "B» D.O.E. NO: 4927 SCALE: 1"=400' PAVING IMPROVEMENTS WATER NO: P164-060164015340 SANITARY SEWER NO: 013337 "SPRING RANCH, PHASE 1 " STREET/STORM DRAIN NO:4W01678--- WELCH ENGINEERING, INC. CONSUL TING ENG/NEE-RS 1 I BLUFF SPRINGS DRIVEk ! i CHISHOLM RANCH' DRIVE__---------- __----_--_____ r PROP 24'RCP I I —— —— — v�� LJ Lo � --ZOf z I I I --}-- CL V) a i l DURANG0 SPRINGS DRIVEI I PROP 24' CP I O -- ----- ROP 2T P V)l N aR� Z Of�*R CL> Lp Qo aR Lo ---- Rca I o WHISPER WILLOWS DRIVE m L 1 h \ / PROP 24-RCP' of JI W 1I ~ Q I > Z O V) 100% DEVELOPER'S COST STORM SEWER AND HEADWALL EXHIBIT YYB—1 D.O.E. NO: 4927 SCALE: 1"=400' STORM DRAIN IMPROVEMENTS WATER NO: P164-060164015340 „ SANITARY SEWER NO: P174-070174013337 SPRING RANCH, PHASE 1 STREET/STORM DRAIN NO: W-1678 WELCH ENCINEERJNC,, INC. CONSUL 7/NG ENG/NEE-RS 11'1 1 I \ __-�- --t - - --�--� -� - --' --I--------' --� ---- � I I ! ! BLUFF SPRINGS DRIVE I I ; CHISHOLM RANCH DRIVE Q . j 01 > i l f l l l l l l l l I 0 a 1 I I I I I I I I � Y DURANGO SPRINGS DRIVE I I � I �- � I I z I I 0 l 'WHISPER WILLOWS DRIVE m 4I4� W Lij I� Q Q — — — — \\ (n * -- PROPOSED STREET LIGHT (100% DEVELOPER'S COST) p -- PROPOSED STREET SIGN (100% DEVELOPER'S COST) EXHIBIT "C" SCALE: 1"=400' D.O.E. NO: 4927 STREET LIGHTS WATER NO: P164-060164015340 SANITARY SEWER NO:"SPRING RANCH, PHASE 1 STREET/STORM DRAIN NO:4W016i013337 WELCH ENGINEERING, I NC. CONSUL TING ENGINE-ERS