HomeMy WebLinkAboutContract 32352 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, Hillwood Saratoga, L.P., hereinafter called "Developer", desires to
make certain improvements to Saratoga Addition Phase 2, an addition to the City of
Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth, is hereby incorporated into this Community Facilities Contract
as if copy herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and
obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
CFA 4% and Utilities 07 20 05.doc 1
Q
14-fir
F. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damazes are caused, in whole or in Part, by the alleged neWizence of
the City of Fort Worth, its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
construct current and future improvements provided for in this
agreement.
CFA 4% and Utilities 07 20 05.doc 2
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain(B-1) Attached; Street Lights and Signs (C) Attached.
M. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, BI,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $1,901,744.24.
CFA 4% and Utilities 08 17 05.doc 3
SUMMARY OF
COST
Saratoga Addition Phase 2
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $1,256,140.00 $1,256,140.00
2. Storm Drainage $570,441.00 $570,441.00
3. Street Lights (Tri-County $0 $0
4. Street Name Signs $2,100.00 $2,100.00
B. Engineering Design
C. Construction Engineering
and Management by DOE
4% $ 73,063.24 $ 73,063.24
TOTALS $ 1,901,744.24 $ - $ 1,901,744.24
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
CFA 4% and Utilities 08 17 05 (2).doc 4
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, at�d said Develo e
has executed this instrument in triplicate,at Fort Worth,Texas this the e day of
,2005.
Approval Recommended:
Transportation and Public Works
Department
Robert Goode, P. E.
Director
ity f Fc Wo
NO M&C REQUIRED
Marc Ott
Assistant City Manager
ATTEST: /)
Marty Hendrix
City Secretary
Approve s to Form: DEVELOPER:
Hillwood Saratoga, L.P.,
a Texas limited partnership,
By: HAR Saratoga,GP,LLC,
a Texas limited liability company
Assistant A
yforne�' By: Hillwood Alliance Residential,L.P.,
a Texas limited partnership
Its sole member
By: Hillwood Operating,L.P.,
a Texas limited partnership,
its general partner
ATTEST: By: Hillwood Development Company,LLC,
A Texas limited liability company,
Its general partner
B y:
Corporate Secretary Br C
Vlee-Presient Residential Division
CEIVED
CFA 4% and Utilities 07 20 05.doc 5
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
SECTION C-STORM DRAIN SYSTEM
440 1. 395 L.F. 21" Class III R.C. Pipe, Including Trench
Excavation and Backfill, Complete in
Place for the Sum of
Thirty-Two Dollars &
No Cents per Linear Foot $32.00 $12,640.00
440 2. 1,080 L.F. 24" Class III R.C. Pipe, Including Trench
Excavation and Backfill, Complete in
Place for the Sum of
Thirty-Eijzht Dollars &
No Cents per Linear Foot $38.00 $41,040.00
440 3. 162 L.F. 27" Class III R.C. Pipe, Including Trench
Excavation and Backfill, Complete in
Place for the Sum of
Fifty Dollars &
No Cents per Linear Foot $50.00 $8,100.00
440 4. 77 L.F. 30" Class III R.C. Pipe, Including Trench
Excavation and Backfill, Complete in
Place for the Sum of
Fifty-Six Dollars&
No Cents per Linear Foot $56.00 $4,312.00
440 5. 320 L.F. 33" Class III R.C. Pipe, Including Trench
Excavation and Backfill, Complete in
Place for the Sum of
Sixty Two Dollars &
No Cents per Linear Foot $62.00 $19,840.00
ReCE1VED
N:\JOB\011765\specs\011765 040-utilities.doc Page 11
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
440 6. 80 L.F. 4— 8' X 6' Reinforced Box Culvert,
Including Trench Excavation and Backfill,
Complete in Place for the Sum of
One Thousand
Two Hundred Twenty Five Dollars &
No Cents per Linear Foot $1,225.00 $98,000.00
440 7. 80 L.F. 4 — 10' X 7' Reinforced Box Culvert,
Including Trench Excavation and Backfill
Complete in Place for the Sum of
One Thousand
Five Hundred Fifty Five Dollars &
No Cents per Linear Foot $1,550.00 $124,000.00
525 8. 2,194 L.F. Trench Safety, Complete in Place for the
Sum of
One Dollars &
No Cents per Linear Foot $1.00 $2,194.00
444 9. 12 Ea. 10' Standard Curb Inlet,
Complete in Place for the Sum of
One Thousand
Nine Hundred Dollars &
No Cents per Each $1,900.00 $22,800.00
444 10. 6 Ea. 15' Standard Curb Inlet,
Complete in Place for the Sum of
Two Thousand
Four Hundred Dollars &
No Cents per Each $2,400.00 $14,400.00
NAJOB\01 1765\specs\01 1765 040-utilities.doc Page 12
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BI.D
11. 2 Ea. 20' Standard Curb Inlet,
Complete in Place for the Sum of
Three Thousand
Eight Hundred Dollars&
No Cents per Each $3,800.00 $7,600.00
444 12. 6 Ea. Standard 4' Square Manhole,
Complete in Place for the Sum of
One Thousand
Eight Hundred Dollars &
No Cents per Each $1,800.00 $10,800.00
w
410 13. 2 Ea. Type B Headwall for 24" R.C.P. (includes
Grade to Drain Excavation),
Complete in Place for the Sum of
One Thousand
Two Hundred Dollars &
No Cents per Each $1,200.00 $2,400.00
444 14. 1 Ea. Type C Headwall for 24" R.C.P. (includes
Grade to Drain Excavation),
Complete in Place for the Sum of
One Thousand
Three Hundred Dollars &
No Cents per Each $1,300.00 $1,300.00
444 15. 1 Ea. Type C Headwall for 27"R.C.P. (includes
Grade to Drain Excavation),
Complete in Place for the Sum of
One Thousand
Five Hundred Dollars&
No Cents per Each I $1,500.00 $1,500.00
NAJOB\01 1765\specs\01 1765 040-utilities.doc Page 13
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
444 16. 1 Ea. Type C Headwall for 27" R.C.P. (includes
Grade to Drain Excavation),
Complete in Place for the Sum of
One Thousand
Six Hundred Dollars &
No Cents per Each $1,600.00 $1,600.00
444 17. 1 Ea. Type A Headwall for 33" R.C.P. (includes
Grade to Drain Excavation),
Complete in Place for the Sum of
One Thousand
Eight Hundred Dollars &
No Cents per Each $1,800.00 $1,800.00
444 18. 2 Ea. Parallel Wingwalls for 4-8 'x 6' Box
Culvert(includes Grade to Drain
Excavation),
Complete in Place for the Sum of
Twenty Two Thousand Dollars &
No Cents per Each $22,000.00 $44,000.00
444 19. 2 Ea. Parallel Wingwalls for 4-10' x 7' Box
Culvert(includes Grade to Drain
Excavation),
Complete in Place for the Sum of
Twenty Six Thousand Dollars&
No Cents per Each $26,000.00 $52,000.00
NAJOB\01 1765\specs\01 1765 040-utilities.doc Page 14
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
20. 2 Ea. Form lining of wing walls for 4-8'X6'
MBC, Form Lining of the outside face of
Wing Walls facing the channel only (will
not be seen from the street side), Form
lining to be Greenstreak Architectural
Concrete Form Liners "Fractured Rib"
design (Greenstreak No. 366) or approved
equal, Complete in Place for the Sum of
One Thousand
Eight Hundred Dollars &
No Cents per Each $1,800.00 $3,600.00
21. 2 Ea. Form lining of wing walls for 4-10'X7'
MBC, Form Lining of the outside face of
Wing Walls facing the channel only(will
not be seen from the street side), Form
lining to be Greenstreak Architectural
Concrete Form Liners "Fractured Rib"
design(Greenstreak No. 366) or approved
equal, Complete in Place for the Sum of
Two Thousand Dollars&
No Cents per Each $2,000.00 $4,000.00
S.P. 22. 432 L.F. Pedestrian Handrail on Box Culvert
Wingwalls,
Complete in Place for the Sum of
Fifty Dollars&
No Cents per Linear Foot $50.00 $21,600.00
S.P. 23. 672 S.Y. Grouted Rock Rubble Rip Rap (3' Deep,
18"-24"Minimal Size)(Utilize Existing
Material Onsite),
Complete in Place for the Sum of
Eighty Five Dollars &
No Cents per Square Yard $85.00 $57,120.00
N:\JOB\011765\specs\011765 040-utilities.doc Page 15
DESCRIPTION OF ITEMS
SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT
ITEM ITEM QUANTITY WORDS PRICE BID
S.P. 24. 127 S.Y. Rock Rubble Rip Rap (3' Deep, 18"-24"
Minimal Size))(Utilize Existing Material
Onsite),
Complete in Place for the Sum of
Eighty Five Dollars &
No Cents per Square Yard $85.00 $10,795.00
S.P. 25. 1 L.S. Storm Water Pollution Prevention
Maintenance, Complete in Place for the
Sum of
Three Thousand Dollars &
No Cents per Lump Sum $3,000.00 $3,000.00
SECTION C --- STORM DRAIN SYSTEM $570,441.00
Summary
Section A—Water $460,068.00
Section B—Sanitary Sewer $505,968.50
Section C—Storm Drain $570,441.00
GRAND TOTAL $1,536,477.50
N:\JOB\011765\specs\011765 040-utilities.doc Page 16
PART B — PROPOSAL
DEVELOPER AWARDED CONTRACTS
This proposal must not be removed from this book of Contract Documents.
TO: Hillwood Residential Services, L.P.
PROPOSAL FOR PROJECT NAME: STREET IMPROVEMENTS FOR
SARATOGA ADDITION PHASE 2
WATER PROJECT NO. P164-060164015378
SANITARY SEWER PROJECT NO.P174-070174013376
D.O.E. NO. 4992
FILE NO.W-1718
"X" NO. X-17353
Includes the furnishing of all materials, except materials specified to be furnished by the City,
equipment and labor f&the installation of Street Improvements and all necessary
appurtenances and incidental work to provide a complete and serviceable project designated
as:
Saratoga Addition Phase 2
Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly
examined the Contract Documents, including plans, special contract documents, a44d the
General Contract Documents and General Specifications for Water Department Projects, the
General Contract Documents and General specifications for Transportation and Public works
Projects, the site of the project and understanding the amount of work to be done, and the
prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and
material except as specified to be furnished by the City, which is necessary to fully complete the
work as provided in the Plans and Contract Documents and subject to the inspection and
approval of the Director of the Department of Engineering of the City of Fort Worth, Texas; and
binds himself upon acceptance of this Proposal to execute a contract and furnish an approved
Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may
be required by the Contract Documents for the performing and completing of the said work.
Contractor proposes to do the work within the time stated and for the following sums:
N:UO B\011765\specs\01176503.040C.doc
B-1
PAVING IMPROVEMENTS
Furnish and install, including all appurtenant work, complete and in place, the following items
APPROX
ITEM QTY & UNIT OF ITEM DESCRIPTION UNIT TOTAL
NO. MEASUREMENT "D" ITEM REFERENCE PRICE AMOUNT
1 52,390 S.Y. 6" Lime Stabilized Subgrade (Includes
Preparation of Subgrade), Complete in
Place for the Sum of
One Dollar &
Sixty Cents per Square Yard $1.60 $83,824.00
2 790 TON Lime for Subgrade (30#IS.Y.), Complete in
Place for the Sum of
Eighty Dollars &
No Cents per Ton $80.00 $63,200.00
3 41,870 S.Y. 6", 29' B-B Reinforced Concrete Pavement
` (Includes Joint Sealer and 7" STD Attached
Concrete Curb), Complete in Place for the
Sum of
Nineteen Dollars &
EightyEighly Three Cents per Square Yard $19.83 $830,282.10
4 8,850 S.Y. 6", 40' B-B Reinforced Concrete Pavement
(Includes Joint Sealer and 7" STD Attached
Concrete Curb), Complete in Place for the
Sum of
Seventeen Dollars &
Eighty Two Cents per Square Yard $17.82 $157,707.00
5 29 L.F. Standard Concrete Street Header,
Complete in Place for the Sum of
Ten Dollars &
No Cents per Linear Foot $10.00 $290.00
6 29 L.F. End-of-Road Barricades per Details,
Complete in Place for the Sum of
Forty Five Dollars &
No Cents per Linear Foot $45.00 $1,305.00
N AJO B\011765\specs\01176503.040 C.doc
B-2
APPROX
ITEM CITY & UNIT OF ITEM DESCRIPTION UNIT TOTAL
NO. MEASUREMENT "D" ITEM REFERENCE PRICE AMOUNT
7 35 S.Y. Rock Rubble Rip Rap 18" Deep, 12"-15"
Nominal Size, Complete in Place for the
Sum of
Fifty Dollars &
No Cents per Square Yard $50.00 $1,750.00
8 1,950 L.F. Pavement Markings for 4.1" B-B pavement,
Complete in Place for the Sum of
Two Dollars &
Fifty Cents per Linear Foot $2.50 $4,875.00
9 80 L.F. Remove existing barricade and connect to
existing pavement, Complete in Place for
the Sum of
Ten Dollars &
No Cents per Linear Foot $10.00 $800.00
10 1,052 S.F. Remove & Dispose of 4'wide Concrete
sidewalk, Complete in Place for the Sum of
One Dollars &
No Cents per Square Foot $1.00 $1,052.00
11 579 S.Y. Remove & Dispose of 6" Temporary Asphalt
Pavement, Complete in Place for the Sum
of
Eight Dollars &
No Cents per Square Yard $8.00 $4,632.00
12 8,534 S.F. Construct 4' wide Concrete Sidewalk,
Complete in Place for the Sum of
Four Dollars &
Fifty Cents per Square Foot $4.50 $38,403.00
13 188 L.F. Construct 7" STD. Concrete Curb and
Gutter, Complete in Place for the Sum of
Fifteen Dollars &
No Cents per Linear Foot $15.00 $2,820.00
N:\JOB\011765\specs\01176503.040C.doc
B-3
APPROX
ITEM QTY & UNIT OF ITEM DESCRIPTION UNIT TOTAL
NO. MEASUREMENT "D" ITEM REFERENCE PRICE AMOUNT
14 44 EA. Barrier Free Ramps, Complete in Place for
the Sum of
Six Hundred Fifty Dollars &
No Cents per Each $650.00 $28,600.00
15 1 L.S. Storm Water Pollution Prevention
Maintenance, Complete in Place for the
Sum of
One Thousand Dollars &
No Cents per Lump Sum $1,000.00 $1,000.00
16 1 L.S. Construction Material Testing per City of
Fort Worth requirements, Complete in Place
for the Sum of
Twenty One Thousand
Six Hundred Dollars &
No Cents per Lump Sum $21,600.00 $21,600.00
17 128 L.S. City of Fort Worth Bonds, Complete in
Place for the Sum of
Fourteen Thousand Dollars
No Cents per Lump Sum $14,000.00 $14,000.00
TOTAL $1,256,140.10
City of Fort Worth requires a minimum of 30#/S.Y. The Paving Contractor will be responsible for a lime series test as directed by the City
of Fort Worth Construction Inspection Department.
Owner shall be responsible for installation of all silt barriers,sediment traps,check dams,and seeding. The Earthwork contractor shall be
responsible for the"Construction Entrance/Exit"installation.
N AJ O B\011765\specs\01176503.040 C.doc
B-4
This contract is issued by an organization which qualifies for exemption pursuant to the
provisions of Article 20.04(F) of the Texas Limited Sales, Excise and Use Tax Act.
Taxes: All equipment and materials not consumed by or incorporated into the project
construction, are subject to State sales taxes under House Bill 11, enacted August 15, 1991.
The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400
(Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in,
employment practices.
The undersigned agrees to complete all work covered by these Contract Documents within
30 working days from and after the date for commencing work, as set forth in the written Work
Order to be issued by the Owner, and to pay not less than the "Prevailing Wage Rates for
Streets, Drainage and Utility Construction," as established by the City of Fort Worth, Texas.
WithiR tGR (10) days ef FeGeipt of RetiGe ef aGGeptaRGe ef this bid, the LlRdeFsigRed will exeG61te
the fE)FFnal GGRtraGt, and will deliver an appi:eved SuFety BeRd foF the faithful perfei:MaRGe Gf this
Respectfully submitted,
Mario Sinacola and Sons Excavating, Inc.
By:
Address: PO Box 2329
Frisco, TX 75034
(S E A Q If Bidder is Corporation
Date
Receipt is acknowledged of the following addenda:
Addendum No. 1
Addendum No. 2
Addendum No. 3
N:UOB\011765\specs\01176503.040C.doc
B-5
>:
<, GA'. TER & BU'RGESS;'1N'C::::' : :::. .. .
7` 7:MAIN STREETx 'FORT: W ?f2TH T 7�1t1
PHONE NO (8 ;7� 735 600f ter Metro (8'I'� 2 -#I'IQ
SARATOGA ADDITION
PHASE 2
Aug 1, 2005
PAVING
ITEM# DESCRIPTION QTY UNITI PRICE AMOUNT
1 6" LIME STABILIZED SUBGRADE 52,390 S.Y. $1.60 $83,824.00
2 LIME 790 TON 80.00 63,200.00
3 6", 29' B-B CONCRETE PAVING 41,870 S.Y. 19.83 830,282.10
4 6", 41' B-B CONCRETE PAVING 8,850 S.Y. 17.82 157,707.00
5 STANDARD CONCRETE HEADER 29 L.F. 10.00 290.00
6 END OF ROAD BARRICADE 29 L.F. 45.00 1,305.00
7 PAVEMENT MARKINGS FOR 41' B-B 1,950 L.F. 2.50 4,875.00
REMOVE BARRICADES AND CONNECT TO
8 EXISTING PAVEMENT 80 L.F. 10.00 800.00
9 12"-15" DIAMETER ROCK RIP RAP 35 L.F. 50.00 1,750.00
10 BARRIER FREE RAMPS 44 EA 650.00 28,600.00
11 SWPPP MAINTENANCE 1 L.S. 1,000.00 1,000.00
12 CONSTRUCTION MATERIAL TESTING 1 L.S. 21,600.00 21,600.00
13 BONDS 1 L.S. 14,000.00 14,000.00
15 Remove & Dispose Of 4' Concrete Sidewalk 1,052 SF 1.00 1,052.00
16 Remove & Dispose Of 6" Temporary Asphalt 579 SY 8.00 4,632.00
17 4"- 4' Wide 3000 PSI Concrete Sidewalk 8,534 SF 4.50 38,403.00
18 Construct 7" Concrete Curb & Gutter 188 LF 15.00 2,820.00
TOTAL PAVING $1,256,140.101
RECEIVED
GAt ER&BlFiOES , 1N
77171411A1N 7RE1 '1", F�?R"1' V1fQRTH, TEXAS 7'6'1 2
PHOFE HO8"[7� ?35 �i0f0 or IVletre� 81I7) -017Q
SARATOGA ADDITION
PHASE 2
Aug 1, 2005
STORM DRAIN SYSTEM
ITEM# DESCRIPTION QTY UNIT PRICE AMOUNT
1 21" RCP 395 L.F. $32.00 $12,640.00
2 24" RCP 1,080 L.F. 38.00 41,040.00
3 27" RCP 162 L.F. 50.00 8,100.00
4 30" RCP 77 L.F. 56.00 4,312.00
5 33" RCP 320 L.F. 62.00 19,840.00
6 4-8' x 6' MBC 80 L.F. 1,225.00 98,000.00
7 4-10' x 7' MBC 80 L.F. 1,550.00 124,000.00
8 TRENCH SAFETY 2,194 L.F. 1.00 2,194.00
9 STD 10' CURB INLET 12 EA. 1,900.00 22,800.00
10 ISTD 15' CURB INLET 6 EA. 2,400.00 14,400.00
11 STD 20' CURB INLET 2 EA. 3,800.00 7,600.00
12 4' SQUARE MANHOLE 6 EA. 1,800.00 10,800.00
13 24" TYPE 'B' HEADWALL 2 EA. 1,200.00 2,400.00
14 24" TYPE 'C' HEADWALL 1 EA. 1,300.00 1,300.00
15 27" TYPE 'B' HEADWALL 1 EA. 1,500.00 1,500.00
16 27" TYPE 'C' HEADWALL 1 EA. 1,600.00 11600.00
17 33" TYPE 'CH-PW-O' HEADWALL 1 EA. 1,800.00 1,800.00
18 PARALLEL WINGWALLS FOR 4-8' x 6' MBC 2 EA. 22,000.00 44,000.00
19 PARALLEL WINGWALLS FOR 4-10' x T MBC 2 EA. 26,000.00 52,000.00
20 FORM LINING FOR 4-8'X6' MBC WINGWALLS 2 EA. 1,800.00 3,600.00
21 FORM LINING FOR 4-10'X7' MBC WINGWALLS 2 EA. 2,000.00 4,000.00
22 HANDRAILS 432 L.F. 50.00 21,600.00
23 3' DEEP, 18"-24" GROUTED ROCK RIP RAP 672 S.Y. 85.00 57,120.00
24 3' DEEP, 18"-24" ROCK RUBBLE RIP RAP 127 S.Y. 85.00 10,795.00
25 ISWPPP MAINTENANCE 1 L.S. 3,000.00 3,000.00
TOTAL STORM DRAIN SYSTEM $570,441.00
Iv
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following twenty-one (21) intersections
at a cost to the Developer of$2,100.00:
Saratoga Springs Cir & Connemara Lane
Saratoga Springs Cir & Campolina Way
Saratoga Springs Cir & Outlook Av
Saratoga Springs Cir & Creamello Av
Creamello Av & Outlook Av
Connemara Lane & Campolina Way
Nordic Way & Campolina Way
Nordic Way & Outlook Av
Saratoga Springs Cir & Tori Tr
Saratoga Springs Cir & Nordland Lane
Saratoga Springs Cir & Outlook Av
Gidran Dr & Outlook Av
Gidran Dr & Falabella Way
Gidran Dr & Morab St
Count Dr & Tori Tr
Count Dr & Nordland Lane
Tori Tr & Woods Edge Tr
Tori Tr & Nordland Lane
Outlook Av & Falabella Way
Outlook Av & Morab St
Outlook Ct & Outlook Av
Saratoga Addition, Phase II
CFA code: 2005078 June 30, 2005
WESTPO T ---KELLE - S D,- ^�_-____
o � -
ZPK J
S KELLER SLET RD.
o�
Lo
J�
2 _ CAYLOR RD. WI
-t__
_ x
' PR JECT 6,
LOC kF10N m
p z
W
1 � �
l KELLERHICKS ��
1 � 1
GOLDEN
E >;FM 1709 TRIANGLE BLV '1
JI
_
ON
NOT TO SCALE
RECEIVED
LOCATION MAP
SARATOGA
PHASE 2 Carteir Burgess
CARTER & BURGESS,INC.
777 MAIN STREET
FORT WORTH,TX 76102
(817(735-6000
PROJECT NO. 011765.040. 1.0630
I /
I -
I -
N
SCALEE 1" = 300'
I -
I '
/
/
- I -
/
I
/
aJ /
/ I
I NG caAY't.
I m
~ 4cot I
i
I , ;
o S
I m A�-,rOOq Q�
I •� � Sp Y�Qs .,�
• GS t„'LRCLv- �cd��►s' T.
� • •�• SA�TOGA S4KSN Gi . Pcn•._.
MATCHLINE
LEGEND
PROP. 29' B/B STREETS
ROADWAY/50' Row EXHIBIT 'B'
PROP. 41' B/B SARATOGA
ROADWAY/60' ROW PHASE 2
PROP. 4' S I DEWALK
( BY HOMEBUILDER)
PROP. 4' S I DEWALK '�� Burgess
( BY DEVELOPER) CARTER & BURGESS,INC.
777 AWN STREET
LIMITS OF PROJECT FORT(817)7735-600&600 T%7610]
0
PROJECT NO. 011765.040. 1.0630
N
SCALEI 1" = 300'
MATCHLINE
-MLI CO T
I �y
I y ,
I o��
I r�P
o 1
I ..3, � gy�py• 1 ,
COU D
• F Ppa�
I 0• •K A o � � •
BUTPON;BUSH DRIVE; PINE HOLLOW bRWE
I �
!4 .5
.. .� _
� DOGWOOD SPRINGS DR1VS
LEGEND
PROP. 29' B/B STREETS
ROADWAY/50' ROW EXHIBIT 'B'
PROP. 41' B/B SARATOGA
ROADWAY/60' ROW PHASE 2
PROP. 4' SIDEWALK ••••••............••
( BY NOMEBUILDER)
PROP. 4' S I DEWALK Carter Burgess
( BY DEVELOPER) CARTER & BURGESS,INC.
777 AWN STREET
FORT WORTH,TX 76*2
LIMITS OF PROJECT - -- - (8M7JS-°00°
PROJECT NO. 011 T65.040.1.0630
I '
i
I -
N
SCALES t" = 300'
I
-
27"HOWL -
-27"
IJ 2T" 27"HDW`
I 20'
20'
I
I140 C W AY f
24"HOWL` '
ro 24"
I
ZY �
21„ 21° FST
10'
I I � 10'
"HOWL -+y �
24" 4" 1
m 4
15 15'
21L
90
4-101 X7 10' SA."RA \
\
i
I � � ����� � 'WCC •' � ,/�
TpGA SP1iB1G5 ` 'CiF pvF
MATCHLINE
STORM DRAIN
LEGEND EXHIBIT 'B-l'
PROP. STORM DRAIN LINE SARATOGA
PROP. INLET PHASE 2
PROP. MANHOLE
PROP. HEADWALL Carter - Burgess
0
EXIST. STORM DRAIN LINE CARTER & BURGESS,INC.
777 MAIN STREET
LIMITS OF PROJECT FORT WORTH,TX 76102
(8171735-6000
PROJECT NO. 011765.040.1.0630
N
SCALES 1" = 300'
MATCHLINE
w
24"HOWL ?f. 1177
O O CO T E� � -� -..
10' ,COW o
1 4�
� 5
Oe
24"HOWL I ARA SPRINGS C7RC1.B 4-B'X6' 2JI10'
C1 RAL 15, 2 211.1
24" 4' 0 21" 10`
21" 21' 21" Sz 15' 30"
10' 10' 10' 1 1 y q. 1
1 21' 15'
��C.
1 ' g
T RI F�PPR� 1
O OK A
L L
m L �
BUTTON;BUSH D1UVE; __ PINE HOLL W,.DRIVE,
LEAFLL
: : _ _.. - . ' ►.gyp�
_.. . r_DT{1VE; - -. I . P�' bDCiP/00D SPRINGS'DRIVE
STORM DRAIN
LEGEND EXHIBIT 'B-1'
PROP. STORM DRAIN LINE SARATOGA
PROP. INLET r PHASE 2
PROP. MANHOLE
PROP. HEADWALL -C Carter Burgess
0
EXIST. STORM DRAIN LINE CARTER & BURGESS,INC.
777 MNN STREET
LIMITS OF PROJECT �" Ienl7Jw-6000 6102
PROJECT NO. 011765.040. 1.0630
i
I '
I N
I ���� �' SCALES 1" = 300'
I '
I -
11
aJ
� I
I
I t'O IC
wr+Y
I I
I
I
fff
I
I i I O `�
b I O
P O
O
SAR.4PpCq �l`r
spm
GA SPRIN _ cct;
00
MATCHLINE
STREET LIGHTS
LEGEND EXHIBIT 'C'
PROP. SINGLE STREET LIGHT • SARATOGA
EXIST. SINGLE STREET LIGHT O PHASE 2
( ON STEEL POLE WITH STREET
AND STOP SIGNS ATTACHED)
PROP. STREET SIGN A Carter Burgess
EXIST. STREET SIGN 0 CARTER & BURGESS,INC.
LIMITS OF PROJECT 777 WO STREET
roar RTH,rx 7e102
(817(705-6000
PROJECT NO. 011765.040. 1.0630
N
SCALE1 1" = 300'
MATCHUNE
I
O
Oy
I 5
I P
O _ '`—dr..UVTOOA OS U&g&,
I
a 1 0
O K A Q
iL L!
m
BU'1,TON;BUSH D1UVE; PINE HOLLOW DANE
ti \tea yes�s ,
y J\4ti
i4 Abp
Z f ti a\
�LEAFET;..DRIVE DOGWOOD §PRINOSDAIVB
STREET LIGHTS
LEGEND EXHIBIT 'C'
PROP. SINGLE STREET LIGHT SARATOGA
EXIST. SINGLE STREET LIGHT 0 PHASE 2
, ON STEEL POLE WITH STREET
AND STOP SIGNS ATTACHED)
PROP. STREET SIGN Carter Burgess
EXIST. STREET SIGN 0 CARTER & BURGESS,INC,
777 MAN STREET
_IMITS OF PROJECT --- -- � FORT WORTH.T%7610'1
(817(73S-6000
PROJECT NO. 011765.040.1.0630