HomeMy WebLinkAboutContract 32352 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Hillwood Saratoga, L.P., hereinafter called "Developer", desires to make certain improvements to Saratoga Addition Phase 2, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. CFA 4% and Utilities 07 20 05.doc 1 Q 14-fir F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damazes are caused, in whole or in Part, by the alleged neWizence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. CFA 4% and Utilities 07 20 05.doc 2 L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain(B-1) Attached; Street Lights and Signs (C) Attached. M. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, BI, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $1,901,744.24. CFA 4% and Utilities 08 17 05.doc 3 SUMMARY OF COST Saratoga Addition Phase 2 Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $1,256,140.00 $1,256,140.00 2. Storm Drainage $570,441.00 $570,441.00 3. Street Lights (Tri-County $0 $0 4. Street Name Signs $2,100.00 $2,100.00 B. Engineering Design C. Construction Engineering and Management by DOE 4% $ 73,063.24 $ 73,063.24 TOTALS $ 1,901,744.24 $ - $ 1,901,744.24 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. CFA 4% and Utilities 08 17 05 (2).doc 4 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, at�d said Develo e has executed this instrument in triplicate,at Fort Worth,Texas this the e day of ,2005. Approval Recommended: Transportation and Public Works Department Robert Goode, P. E. Director ity f Fc Wo NO M&C REQUIRED Marc Ott Assistant City Manager ATTEST: /) Marty Hendrix City Secretary Approve s to Form: DEVELOPER: Hillwood Saratoga, L.P., a Texas limited partnership, By: HAR Saratoga,GP,LLC, a Texas limited liability company Assistant A yforne�' By: Hillwood Alliance Residential,L.P., a Texas limited partnership Its sole member By: Hillwood Operating,L.P., a Texas limited partnership, its general partner ATTEST: By: Hillwood Development Company,LLC, A Texas limited liability company, Its general partner B y: Corporate Secretary Br C Vlee-Presient Residential Division CEIVED CFA 4% and Utilities 07 20 05.doc 5 DESCRIPTION OF ITEMS SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT ITEM ITEM QUANTITY WORDS PRICE BID SECTION C-STORM DRAIN SYSTEM 440 1. 395 L.F. 21" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in Place for the Sum of Thirty-Two Dollars & No Cents per Linear Foot $32.00 $12,640.00 440 2. 1,080 L.F. 24" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in Place for the Sum of Thirty-Eijzht Dollars & No Cents per Linear Foot $38.00 $41,040.00 440 3. 162 L.F. 27" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in Place for the Sum of Fifty Dollars & No Cents per Linear Foot $50.00 $8,100.00 440 4. 77 L.F. 30" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in Place for the Sum of Fifty-Six Dollars& No Cents per Linear Foot $56.00 $4,312.00 440 5. 320 L.F. 33" Class III R.C. Pipe, Including Trench Excavation and Backfill, Complete in Place for the Sum of Sixty Two Dollars & No Cents per Linear Foot $62.00 $19,840.00 ReCE1VED N:\JOB\011765\specs\011765 040-utilities.doc Page 11 DESCRIPTION OF ITEMS SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT ITEM ITEM QUANTITY WORDS PRICE BID 440 6. 80 L.F. 4— 8' X 6' Reinforced Box Culvert, Including Trench Excavation and Backfill, Complete in Place for the Sum of One Thousand Two Hundred Twenty Five Dollars & No Cents per Linear Foot $1,225.00 $98,000.00 440 7. 80 L.F. 4 — 10' X 7' Reinforced Box Culvert, Including Trench Excavation and Backfill Complete in Place for the Sum of One Thousand Five Hundred Fifty Five Dollars & No Cents per Linear Foot $1,550.00 $124,000.00 525 8. 2,194 L.F. Trench Safety, Complete in Place for the Sum of One Dollars & No Cents per Linear Foot $1.00 $2,194.00 444 9. 12 Ea. 10' Standard Curb Inlet, Complete in Place for the Sum of One Thousand Nine Hundred Dollars & No Cents per Each $1,900.00 $22,800.00 444 10. 6 Ea. 15' Standard Curb Inlet, Complete in Place for the Sum of Two Thousand Four Hundred Dollars & No Cents per Each $2,400.00 $14,400.00 NAJOB\01 1765\specs\01 1765 040-utilities.doc Page 12 DESCRIPTION OF ITEMS SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT ITEM ITEM QUANTITY WORDS PRICE BI.D 11. 2 Ea. 20' Standard Curb Inlet, Complete in Place for the Sum of Three Thousand Eight Hundred Dollars& No Cents per Each $3,800.00 $7,600.00 444 12. 6 Ea. Standard 4' Square Manhole, Complete in Place for the Sum of One Thousand Eight Hundred Dollars & No Cents per Each $1,800.00 $10,800.00 w 410 13. 2 Ea. Type B Headwall for 24" R.C.P. (includes Grade to Drain Excavation), Complete in Place for the Sum of One Thousand Two Hundred Dollars & No Cents per Each $1,200.00 $2,400.00 444 14. 1 Ea. Type C Headwall for 24" R.C.P. (includes Grade to Drain Excavation), Complete in Place for the Sum of One Thousand Three Hundred Dollars & No Cents per Each $1,300.00 $1,300.00 444 15. 1 Ea. Type C Headwall for 27"R.C.P. (includes Grade to Drain Excavation), Complete in Place for the Sum of One Thousand Five Hundred Dollars& No Cents per Each I $1,500.00 $1,500.00 NAJOB\01 1765\specs\01 1765 040-utilities.doc Page 13 DESCRIPTION OF ITEMS SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT ITEM ITEM QUANTITY WORDS PRICE BID 444 16. 1 Ea. Type C Headwall for 27" R.C.P. (includes Grade to Drain Excavation), Complete in Place for the Sum of One Thousand Six Hundred Dollars & No Cents per Each $1,600.00 $1,600.00 444 17. 1 Ea. Type A Headwall for 33" R.C.P. (includes Grade to Drain Excavation), Complete in Place for the Sum of One Thousand Eight Hundred Dollars & No Cents per Each $1,800.00 $1,800.00 444 18. 2 Ea. Parallel Wingwalls for 4-8 'x 6' Box Culvert(includes Grade to Drain Excavation), Complete in Place for the Sum of Twenty Two Thousand Dollars & No Cents per Each $22,000.00 $44,000.00 444 19. 2 Ea. Parallel Wingwalls for 4-10' x 7' Box Culvert(includes Grade to Drain Excavation), Complete in Place for the Sum of Twenty Six Thousand Dollars& No Cents per Each $26,000.00 $52,000.00 NAJOB\01 1765\specs\01 1765 040-utilities.doc Page 14 DESCRIPTION OF ITEMS SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT ITEM ITEM QUANTITY WORDS PRICE BID 20. 2 Ea. Form lining of wing walls for 4-8'X6' MBC, Form Lining of the outside face of Wing Walls facing the channel only (will not be seen from the street side), Form lining to be Greenstreak Architectural Concrete Form Liners "Fractured Rib" design (Greenstreak No. 366) or approved equal, Complete in Place for the Sum of One Thousand Eight Hundred Dollars & No Cents per Each $1,800.00 $3,600.00 21. 2 Ea. Form lining of wing walls for 4-10'X7' MBC, Form Lining of the outside face of Wing Walls facing the channel only(will not be seen from the street side), Form lining to be Greenstreak Architectural Concrete Form Liners "Fractured Rib" design(Greenstreak No. 366) or approved equal, Complete in Place for the Sum of Two Thousand Dollars& No Cents per Each $2,000.00 $4,000.00 S.P. 22. 432 L.F. Pedestrian Handrail on Box Culvert Wingwalls, Complete in Place for the Sum of Fifty Dollars& No Cents per Linear Foot $50.00 $21,600.00 S.P. 23. 672 S.Y. Grouted Rock Rubble Rip Rap (3' Deep, 18"-24"Minimal Size)(Utilize Existing Material Onsite), Complete in Place for the Sum of Eighty Five Dollars & No Cents per Square Yard $85.00 $57,120.00 N:\JOB\011765\specs\011765 040-utilities.doc Page 15 DESCRIPTION OF ITEMS SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT ITEM ITEM QUANTITY WORDS PRICE BID S.P. 24. 127 S.Y. Rock Rubble Rip Rap (3' Deep, 18"-24" Minimal Size))(Utilize Existing Material Onsite), Complete in Place for the Sum of Eighty Five Dollars & No Cents per Square Yard $85.00 $10,795.00 S.P. 25. 1 L.S. Storm Water Pollution Prevention Maintenance, Complete in Place for the Sum of Three Thousand Dollars & No Cents per Lump Sum $3,000.00 $3,000.00 SECTION C --- STORM DRAIN SYSTEM $570,441.00 Summary Section A—Water $460,068.00 Section B—Sanitary Sewer $505,968.50 Section C—Storm Drain $570,441.00 GRAND TOTAL $1,536,477.50 N:\JOB\011765\specs\011765 040-utilities.doc Page 16 PART B — PROPOSAL DEVELOPER AWARDED CONTRACTS This proposal must not be removed from this book of Contract Documents. TO: Hillwood Residential Services, L.P. PROPOSAL FOR PROJECT NAME: STREET IMPROVEMENTS FOR SARATOGA ADDITION PHASE 2 WATER PROJECT NO. P164-060164015378 SANITARY SEWER PROJECT NO.P174-070174013376 D.O.E. NO. 4992 FILE NO.W-1718 "X" NO. X-17353 Includes the furnishing of all materials, except materials specified to be furnished by the City, equipment and labor f&the installation of Street Improvements and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: Saratoga Addition Phase 2 Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, a44d the General Contract Documents and General Specifications for Water Department Projects, the General Contract Documents and General specifications for Transportation and Public works Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the Department of Engineering of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: N:UO B\011765\specs\01176503.040C.doc B-1 PAVING IMPROVEMENTS Furnish and install, including all appurtenant work, complete and in place, the following items APPROX ITEM QTY & UNIT OF ITEM DESCRIPTION UNIT TOTAL NO. MEASUREMENT "D" ITEM REFERENCE PRICE AMOUNT 1 52,390 S.Y. 6" Lime Stabilized Subgrade (Includes Preparation of Subgrade), Complete in Place for the Sum of One Dollar & Sixty Cents per Square Yard $1.60 $83,824.00 2 790 TON Lime for Subgrade (30#IS.Y.), Complete in Place for the Sum of Eighty Dollars & No Cents per Ton $80.00 $63,200.00 3 41,870 S.Y. 6", 29' B-B Reinforced Concrete Pavement ` (Includes Joint Sealer and 7" STD Attached Concrete Curb), Complete in Place for the Sum of Nineteen Dollars & EightyEighly Three Cents per Square Yard $19.83 $830,282.10 4 8,850 S.Y. 6", 40' B-B Reinforced Concrete Pavement (Includes Joint Sealer and 7" STD Attached Concrete Curb), Complete in Place for the Sum of Seventeen Dollars & Eighty Two Cents per Square Yard $17.82 $157,707.00 5 29 L.F. Standard Concrete Street Header, Complete in Place for the Sum of Ten Dollars & No Cents per Linear Foot $10.00 $290.00 6 29 L.F. End-of-Road Barricades per Details, Complete in Place for the Sum of Forty Five Dollars & No Cents per Linear Foot $45.00 $1,305.00 N AJO B\011765\specs\01176503.040 C.doc B-2 APPROX ITEM CITY & UNIT OF ITEM DESCRIPTION UNIT TOTAL NO. MEASUREMENT "D" ITEM REFERENCE PRICE AMOUNT 7 35 S.Y. Rock Rubble Rip Rap 18" Deep, 12"-15" Nominal Size, Complete in Place for the Sum of Fifty Dollars & No Cents per Square Yard $50.00 $1,750.00 8 1,950 L.F. Pavement Markings for 4.1" B-B pavement, Complete in Place for the Sum of Two Dollars & Fifty Cents per Linear Foot $2.50 $4,875.00 9 80 L.F. Remove existing barricade and connect to existing pavement, Complete in Place for the Sum of Ten Dollars & No Cents per Linear Foot $10.00 $800.00 10 1,052 S.F. Remove & Dispose of 4'wide Concrete sidewalk, Complete in Place for the Sum of One Dollars & No Cents per Square Foot $1.00 $1,052.00 11 579 S.Y. Remove & Dispose of 6" Temporary Asphalt Pavement, Complete in Place for the Sum of Eight Dollars & No Cents per Square Yard $8.00 $4,632.00 12 8,534 S.F. Construct 4' wide Concrete Sidewalk, Complete in Place for the Sum of Four Dollars & Fifty Cents per Square Foot $4.50 $38,403.00 13 188 L.F. Construct 7" STD. Concrete Curb and Gutter, Complete in Place for the Sum of Fifteen Dollars & No Cents per Linear Foot $15.00 $2,820.00 N:\JOB\011765\specs\01176503.040C.doc B-3 APPROX ITEM QTY & UNIT OF ITEM DESCRIPTION UNIT TOTAL NO. MEASUREMENT "D" ITEM REFERENCE PRICE AMOUNT 14 44 EA. Barrier Free Ramps, Complete in Place for the Sum of Six Hundred Fifty Dollars & No Cents per Each $650.00 $28,600.00 15 1 L.S. Storm Water Pollution Prevention Maintenance, Complete in Place for the Sum of One Thousand Dollars & No Cents per Lump Sum $1,000.00 $1,000.00 16 1 L.S. Construction Material Testing per City of Fort Worth requirements, Complete in Place for the Sum of Twenty One Thousand Six Hundred Dollars & No Cents per Lump Sum $21,600.00 $21,600.00 17 128 L.S. City of Fort Worth Bonds, Complete in Place for the Sum of Fourteen Thousand Dollars No Cents per Lump Sum $14,000.00 $14,000.00 TOTAL $1,256,140.10 City of Fort Worth requires a minimum of 30#/S.Y. The Paving Contractor will be responsible for a lime series test as directed by the City of Fort Worth Construction Inspection Department. Owner shall be responsible for installation of all silt barriers,sediment traps,check dams,and seeding. The Earthwork contractor shall be responsible for the"Construction Entrance/Exit"installation. N AJ O B\011765\specs\01176503.040 C.doc B-4 This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.04(F) of the Texas Limited Sales, Excise and Use Tax Act. Taxes: All equipment and materials not consumed by or incorporated into the project construction, are subject to State sales taxes under House Bill 11, enacted August 15, 1991. The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in, employment practices. The undersigned agrees to complete all work covered by these Contract Documents within 30 working days from and after the date for commencing work, as set forth in the written Work Order to be issued by the Owner, and to pay not less than the "Prevailing Wage Rates for Streets, Drainage and Utility Construction," as established by the City of Fort Worth, Texas. WithiR tGR (10) days ef FeGeipt of RetiGe ef aGGeptaRGe ef this bid, the LlRdeFsigRed will exeG61te the fE)FFnal GGRtraGt, and will deliver an appi:eved SuFety BeRd foF the faithful perfei:MaRGe Gf this Respectfully submitted, Mario Sinacola and Sons Excavating, Inc. By: Address: PO Box 2329 Frisco, TX 75034 (S E A Q If Bidder is Corporation Date Receipt is acknowledged of the following addenda: Addendum No. 1 Addendum No. 2 Addendum No. 3 N:UOB\011765\specs\01176503.040C.doc B-5 >: <, GA'. TER & BU'RGESS;'1N'C::::' : :::. .. . 7` 7:MAIN STREETx 'FORT: W ?f2TH T 7�1t1 PHONE NO (8 ;7� 735 600f ter Metro (8'I'� 2 -#I'IQ SARATOGA ADDITION PHASE 2 Aug 1, 2005 PAVING ITEM# DESCRIPTION QTY UNITI PRICE AMOUNT 1 6" LIME STABILIZED SUBGRADE 52,390 S.Y. $1.60 $83,824.00 2 LIME 790 TON 80.00 63,200.00 3 6", 29' B-B CONCRETE PAVING 41,870 S.Y. 19.83 830,282.10 4 6", 41' B-B CONCRETE PAVING 8,850 S.Y. 17.82 157,707.00 5 STANDARD CONCRETE HEADER 29 L.F. 10.00 290.00 6 END OF ROAD BARRICADE 29 L.F. 45.00 1,305.00 7 PAVEMENT MARKINGS FOR 41' B-B 1,950 L.F. 2.50 4,875.00 REMOVE BARRICADES AND CONNECT TO 8 EXISTING PAVEMENT 80 L.F. 10.00 800.00 9 12"-15" DIAMETER ROCK RIP RAP 35 L.F. 50.00 1,750.00 10 BARRIER FREE RAMPS 44 EA 650.00 28,600.00 11 SWPPP MAINTENANCE 1 L.S. 1,000.00 1,000.00 12 CONSTRUCTION MATERIAL TESTING 1 L.S. 21,600.00 21,600.00 13 BONDS 1 L.S. 14,000.00 14,000.00 15 Remove & Dispose Of 4' Concrete Sidewalk 1,052 SF 1.00 1,052.00 16 Remove & Dispose Of 6" Temporary Asphalt 579 SY 8.00 4,632.00 17 4"- 4' Wide 3000 PSI Concrete Sidewalk 8,534 SF 4.50 38,403.00 18 Construct 7" Concrete Curb & Gutter 188 LF 15.00 2,820.00 TOTAL PAVING $1,256,140.101 RECEIVED GAt ER&BlFiOES , 1N 77171411A1N 7RE1 '1", F�?R"1' V1fQRTH, TEXAS 7'6'1 2 PHOFE HO8"[7� ?35 �i0f0 or IVletre� 81I7) -017Q SARATOGA ADDITION PHASE 2 Aug 1, 2005 STORM DRAIN SYSTEM ITEM# DESCRIPTION QTY UNIT PRICE AMOUNT 1 21" RCP 395 L.F. $32.00 $12,640.00 2 24" RCP 1,080 L.F. 38.00 41,040.00 3 27" RCP 162 L.F. 50.00 8,100.00 4 30" RCP 77 L.F. 56.00 4,312.00 5 33" RCP 320 L.F. 62.00 19,840.00 6 4-8' x 6' MBC 80 L.F. 1,225.00 98,000.00 7 4-10' x 7' MBC 80 L.F. 1,550.00 124,000.00 8 TRENCH SAFETY 2,194 L.F. 1.00 2,194.00 9 STD 10' CURB INLET 12 EA. 1,900.00 22,800.00 10 ISTD 15' CURB INLET 6 EA. 2,400.00 14,400.00 11 STD 20' CURB INLET 2 EA. 3,800.00 7,600.00 12 4' SQUARE MANHOLE 6 EA. 1,800.00 10,800.00 13 24" TYPE 'B' HEADWALL 2 EA. 1,200.00 2,400.00 14 24" TYPE 'C' HEADWALL 1 EA. 1,300.00 1,300.00 15 27" TYPE 'B' HEADWALL 1 EA. 1,500.00 1,500.00 16 27" TYPE 'C' HEADWALL 1 EA. 1,600.00 11600.00 17 33" TYPE 'CH-PW-O' HEADWALL 1 EA. 1,800.00 1,800.00 18 PARALLEL WINGWALLS FOR 4-8' x 6' MBC 2 EA. 22,000.00 44,000.00 19 PARALLEL WINGWALLS FOR 4-10' x T MBC 2 EA. 26,000.00 52,000.00 20 FORM LINING FOR 4-8'X6' MBC WINGWALLS 2 EA. 1,800.00 3,600.00 21 FORM LINING FOR 4-10'X7' MBC WINGWALLS 2 EA. 2,000.00 4,000.00 22 HANDRAILS 432 L.F. 50.00 21,600.00 23 3' DEEP, 18"-24" GROUTED ROCK RIP RAP 672 S.Y. 85.00 57,120.00 24 3' DEEP, 18"-24" ROCK RUBBLE RIP RAP 127 S.Y. 85.00 10,795.00 25 ISWPPP MAINTENANCE 1 L.S. 3,000.00 3,000.00 TOTAL STORM DRAIN SYSTEM $570,441.00 Iv STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following twenty-one (21) intersections at a cost to the Developer of$2,100.00: Saratoga Springs Cir & Connemara Lane Saratoga Springs Cir & Campolina Way Saratoga Springs Cir & Outlook Av Saratoga Springs Cir & Creamello Av Creamello Av & Outlook Av Connemara Lane & Campolina Way Nordic Way & Campolina Way Nordic Way & Outlook Av Saratoga Springs Cir & Tori Tr Saratoga Springs Cir & Nordland Lane Saratoga Springs Cir & Outlook Av Gidran Dr & Outlook Av Gidran Dr & Falabella Way Gidran Dr & Morab St Count Dr & Tori Tr Count Dr & Nordland Lane Tori Tr & Woods Edge Tr Tori Tr & Nordland Lane Outlook Av & Falabella Way Outlook Av & Morab St Outlook Ct & Outlook Av Saratoga Addition, Phase II CFA code: 2005078 June 30, 2005 WESTPO T ---KELLE - S D,- ^�_-____ o � - ZPK J S KELLER SLET RD. o� Lo J� 2 _ CAYLOR RD. WI -t__ _ x ' PR JECT 6, LOC kF10N m p z W 1 � � l KELLERHICKS �� 1 � 1 GOLDEN E >;FM 1709 TRIANGLE BLV '1 JI _ ON NOT TO SCALE RECEIVED LOCATION MAP SARATOGA PHASE 2 Carteir Burgess CARTER & BURGESS,INC. 777 MAIN STREET FORT WORTH,TX 76102 (817(735-6000 PROJECT NO. 011765.040. 1.0630 I / I - I - N SCALEE 1" = 300' I - I ' / / - I - / I / aJ / / I I NG caAY't. I m ~ 4cot I i I , ; o S I m A�-,rOOq Q� I •� � Sp Y�Qs .,� • GS t„'LRCLv- �cd��►s' T. � • •�• SA�TOGA S4KSN Gi . Pcn•._. MATCHLINE LEGEND PROP. 29' B/B STREETS ROADWAY/50' Row EXHIBIT 'B' PROP. 41' B/B SARATOGA ROADWAY/60' ROW PHASE 2 PROP. 4' S I DEWALK ( BY HOMEBUILDER) PROP. 4' S I DEWALK '�� Burgess ( BY DEVELOPER) CARTER & BURGESS,INC. 777 AWN STREET LIMITS OF PROJECT FORT(817)7735-600&600 T%7610] 0 PROJECT NO. 011765.040. 1.0630 N SCALEI 1" = 300' MATCHLINE -MLI CO T I �y I y , I o�� I r�P o 1 I ..3, � gy�py• 1 , COU D • F Ppa� I 0• •K A o � � • BUTPON;BUSH DRIVE; PINE HOLLOW bRWE I � !4 .5 .. .� _ � DOGWOOD SPRINGS DR1VS LEGEND PROP. 29' B/B STREETS ROADWAY/50' ROW EXHIBIT 'B' PROP. 41' B/B SARATOGA ROADWAY/60' ROW PHASE 2 PROP. 4' SIDEWALK ••••••............•• ( BY NOMEBUILDER) PROP. 4' S I DEWALK Carter Burgess ( BY DEVELOPER) CARTER & BURGESS,INC. 777 AWN STREET FORT WORTH,TX 76*2 LIMITS OF PROJECT - -- - (8M7JS-°00° PROJECT NO. 011 T65.040.1.0630 I ' i I - N SCALES t" = 300' I - 27"HOWL - -27" IJ 2T" 27"HDW` I 20' 20' I I140 C W AY f 24"HOWL` ' ro 24" I ZY � 21„ 21° FST 10' I I � 10' "HOWL -+y � 24" 4" 1 m 4 15 15' 21L 90 4-101 X7 10' SA."RA \ \ i I � � ����� � 'WCC •' � ,/� TpGA SP1iB1G5 ` 'CiF pvF MATCHLINE STORM DRAIN LEGEND EXHIBIT 'B-l' PROP. STORM DRAIN LINE SARATOGA PROP. INLET PHASE 2 PROP. MANHOLE PROP. HEADWALL Carter - Burgess 0 EXIST. STORM DRAIN LINE CARTER & BURGESS,INC. 777 MAIN STREET LIMITS OF PROJECT FORT WORTH,TX 76102 (8171735-6000 PROJECT NO. 011765.040.1.0630 N SCALES 1" = 300' MATCHLINE w 24"HOWL ?f. 1177 O O CO T E� � -� -.. 10' ,COW o 1 4� � 5 Oe 24"HOWL I ARA SPRINGS C7RC1.B 4-B'X6' 2JI10' C1 RAL 15, 2 211.1 24" 4' 0 21" 10` 21" 21' 21" Sz 15' 30" 10' 10' 10' 1 1 y q. 1 1 21' 15' ��C. 1 ' g T RI F�PPR� 1 O OK A L L m L � BUTTON;BUSH D1UVE; __ PINE HOLL W,.DRIVE, LEAFLL : : _ _.. - . ' ►.gyp� _.. . r_DT{1VE; - -. I . P�' bDCiP/00D SPRINGS'DRIVE STORM DRAIN LEGEND EXHIBIT 'B-1' PROP. STORM DRAIN LINE SARATOGA PROP. INLET r PHASE 2 PROP. MANHOLE PROP. HEADWALL -C Carter Burgess 0 EXIST. STORM DRAIN LINE CARTER & BURGESS,INC. 777 MNN STREET LIMITS OF PROJECT �" Ienl7Jw-6000 6102 PROJECT NO. 011765.040. 1.0630 i I ' I N I ���� �' SCALES 1" = 300' I ' I - 11 aJ � I I I t'O IC wr+Y I I I I fff I I i I O `� b I O P O O SAR.4PpCq �l`r spm GA SPRIN _ cct; 00 MATCHLINE STREET LIGHTS LEGEND EXHIBIT 'C' PROP. SINGLE STREET LIGHT • SARATOGA EXIST. SINGLE STREET LIGHT O PHASE 2 ( ON STEEL POLE WITH STREET AND STOP SIGNS ATTACHED) PROP. STREET SIGN A Carter Burgess EXIST. STREET SIGN 0 CARTER & BURGESS,INC. LIMITS OF PROJECT 777 WO STREET roar RTH,rx 7e102 (817(705-6000 PROJECT NO. 011765.040. 1.0630 N SCALE1 1" = 300' MATCHUNE I O Oy I 5 I P O _ '`—dr..UVTOOA OS U&g&, I a 1 0 O K A Q iL L! m BU'1,TON;BUSH D1UVE; PINE HOLLOW DANE ti \tea yes�s , y J\4ti i4 Abp Z f ti a\ �LEAFET;..DRIVE DOGWOOD §PRINOSDAIVB STREET LIGHTS LEGEND EXHIBIT 'C' PROP. SINGLE STREET LIGHT SARATOGA EXIST. SINGLE STREET LIGHT 0 PHASE 2 , ON STEEL POLE WITH STREET AND STOP SIGNS ATTACHED) PROP. STREET SIGN Carter Burgess EXIST. STREET SIGN 0 CARTER & BURGESS,INC, 777 MAN STREET _IMITS OF PROJECT --- -- � FORT WORTH.T%7610'1 (817(73S-6000 PROJECT NO. 011765.040.1.0630