Loading...
HomeMy WebLinkAboutContract 32851 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.E�w I WHEREAS, Lumbermen's Investment Corporation, hereinafter called "Developer", desires to make certain improvements to Kingsridge Phase IV, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: That said Developer, acting herein by and through Gary McAtee, its duly authorized Vice President, and the City, acting herein by and through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of the covenants and conditions contained herein, do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section U,paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof- Water (A) None; Sewer (A-1)None; Paving (B) attached; Storm Drain (13- 1) attached; Street Lights and Signs (C) attached. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, 131, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $716,553.54. Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk and a separate financial guarantee is required in the form of a bond or check for the cost of the sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. CFA REVISED FORMAT WITH 4%.doc 3 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed,Aday d said eveloper has executed this instrument in triplicate, at Fort Worth,Texas this the of J3 2001. Approval Recommended: Transportation and Public Works Department LS 2(—�—,— Robert Goode, P. E. NO M&C REQUIRED Director ATTEST: C' Of rt Worth Marc A. Ott City Secretary 4SSistant Gty tanager Approved as to Form: Assist it Attorney ATTEST: DEVELOPER: Lumbermen's Investment Corporation By: Corporate Secretary Gary kcA ee, Vice President RECEIVED SUMMARY OF COST Kingsridge Phase IV Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $451,266.10 $ 451,266.10 2. Storm Drainage $211,670.00 $ 211,670.00 3. Street Lights $26,400.00 $ 26,400.00 4. Street Name Signs $700.00 $ 700.00 B. Engineering Design $ - C. Construction Engineering and Management by DOE 4%) $ 26,517.44 26,517.44 TOTALS $ 716,553.54 $ - $ 716,553.54 �FI Rl!"hik—t CIT 1�01;AES II KINGSRIDGE,PHASE IV,BLOCKS 2,9-14 OPINION OF PROBABLE COMMUNITY FACILITIES COST ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL I WATER IMPROVEMENTS 1 6"Class 200 Water Pipe 1,075 LF $17.75 $19,081.25 2 8"Class 200 Water Pie 3,342 LF $18.30 $61,158.60 3 Fire Hydrant 6 EA $1,450.00 $8,700.00 4 6"Gate Valve and Box 7 EA $625.00 $4,375.00 5 8"Gate Valve and Box 8 EA $725.00 $5,800.00 6 Ductile Iron Fittings 1.77 TON $3,000.00 $5,310.00 7 1"Water Service 77 EA $415.00 $31,955.00 8 Testing 1 LS $1,500.00 $1,500.00 SUBTOTAL $137,879.85 II SANITARY SEWER IMPROVEMENTS 1 8"SDR 35 PVC Sewer Pipe w/trench excay. 861 LF $24.00 $20,664.00 2 15"SDR 26 PVC Sewer Pipe w/trench excay. 20 LF $40.00 $800.00 3 8"SDR 26 PVC Sewer Pipe w/trench excay. 1,105 LF $26.25 $29,006.25 4 8"Ductile Iron Sewer Pipe w/trench excay. 565 LF $32.00 $18,080.00 5 4'Dia.Std.Sanitary Sewer Manhole 9 EA $1,300.00 $11,700.00 6 4'Dia.Shallow Sanitary Sewer Manhole 4 EA $1,850.00 $7,400.00 7 Extra Depth Manhole in excess of 6' 7 VF $130.00 $910.00 8 2000 PSI Concrete Encasement 130 LF $20.00 $2,600.00 9 4"SDR 26 SanitarySewer Service w/Cleanout 10 EA $425.00 $4,250.00 10 4"SDR 35 SanitarySewer Service w/Cleanout 29 EA $385.00 $11,165.00 11 Testing1 LS $3,500.00 $3,500.00 12 Trench Safe 2,551 LF $1.00 $2,551.00 SUBTOTAL $112,626.25 III STORM DRAINAGE IMPROVEMENTS 1 21"Class III RCP 48 LF $38.00 $1,824.00 2 24"Class III RCP 55 LF $42.00 $2,310.00 3 27"Class III RCP 295 LF $50.00 $14,750.00 4 33"Class III RCP 972 LF $69.00 $67,068.00 5 36"Class III RCP 376 LF $78.50 $29,516.00 6 48"Class III RCP 206 LF $120.00 $24,720.00 7 3'x5'Box Culvert 149 LF $175.00 $26,075.00 8 10'Standard Curb Inlet 4 EA $2,000.00 $8,000.00 9 20'Standard Curb Inlet 2 EA $3,850.001 $7,700.00 10 15'Curb Inlet on 48"Main Line 1 EA $4,000.00 $4,000.00 11 4'x4'Storm Drain Manhole 5 EA $1,800.00 $9,000.00 12 36"Headwall 1 EA $1,500.00 $1,500.00 13 48"Headwall 1 EA $2,000.00 $2,000.00 14 3'x5'Headwall 1 EA $2,600.00 $2,600.00 15 18"Dia.Grouted Rock Rip Rap 109 SY $75.00 $8,175.00 16 3'Reinforced Concrete Flume 48 SF $9.001 $432.00 17 Erosion Control per Plan 1 LS $2,000.00 $2,000.00 SUBTOTAL $211,670.00 IV PAVING IMPROVEMENTS-INTERIOR STREETS 1 6"Lime Stabilized Sub rade 17,521 SY $1.85 $32,413.85 2 Lime for Stabilization 30#/SY) 263 TON $96.00 $25,248.00 3 6"Reinforced Concrete Pavement 17,037 SY $21.85 $372,258.45 4 Concrete Wheel Chair Rams 12 EA $850.00 $10,200.00 5 Adjust SSMH RimNalve Cover 14 EA $100.00 $1,400.00 6 Remove/Dispose of Existing Barricades 2 EA $200.00 $400.00 7 Std.4'Conc.Sidewalk Adjacent to Park 2,772 1 SF $2.65 $7,345.80 8 Erosion Control per Plan 1 LS $2,000.00 $2,000.00 SUBTOTAL $451,266.10 SUBTOTAL CONSTRUCTION COST $913,442.20 Page 1 of 1 Section B — Paving and Storm Drainage Improvements UNIT III - Storm Drainage Improvements ITEM APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL NO. QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID 1. 48 LF 21" CL III RCP Storm Drain; Per Linear Foot Thirty-eight Dollars No Cents $38.00 $ 1824.0 2. 55 LF 24" CL III RCP Storm Drain; Per Linear Foot Forty-two Dollars No Cents $42.00 $2310.00 3. 295 LF 27" CL III RCP Storm Drain; Per Linear Foot Fifty Dollars No Cents $50.00 $14,750.00 4. 972 LF 33" CL III RCP Storm Drain; Per Linear Foot Sixty-nine Dollars No Cents $69.00 $67,068.00 5. 376 LF 36" CL III RCP Storm Drain; Per Linear Foot Seventy-eight Dollars Fifty Cents $78.50 $29,516.00 6. 206 LF 48" CL III RCP Storm Drain; Per Linear Foot One hundred Twenty Dollars No Cents $120.00 $24,720.00 7. 149 LF 5'x3' Reinforced Culvert Box; Per Linear Foot One Hundred Seventy-five Dollars No Cents $175.00 $26,075.00 MA Page 5 of 11 � � � ITEM APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL NO. QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID 8. 4 EA 10' Standard Curb Inlet; Per Each Two Thousand Dollars No Cents $2000.00 $8000.00 9. 2 EA 20' Standard Curb Inlet; Per Each Three Thousand Eight Hundred Fifty Dollars No Cents $3850.00 $7700.00 10. 1 EA 15' Standard Curb Inlet on 48" RCP; Per Each Four Thousand Dollars No Cents $4000.00 $4000.00 11. 5 EA 4'x4' Standard Storm Drain Manhole; Per Each One Thousand Eight Hundred Dollars No Cents $1800.00 $9000.00 12. 1 EA Standard 36"Type 'B' Headwall; Per Each One Thousand Five Hundred Dollars No Cents $1500.00 $1500.00 13. 1 EA Standard 48"Type `B' Headwall; Per Each Two Thousand Dollars No Cents $2000.00 $2000.00 14. 1 EA Standard 3'x5' Type 'B' Headwall; Per Each Two Thousand Six Hundred Dollars No Cents $2600.00 $2600.00 15. 109 SY 18" Dia. Grouted Rock Rip Rap; Per Square Yard Seventy-five Dollars No Cents $75.00 $8175.00 Page 6 of 11 ITEM APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL NO. QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID 16. 48 SF 3' Reinforced Concrete Flume; Per Square Feet Nine Dollars No Cents $9.00 $432.00 17. 1 LS Erosion Control Per Plan; Per Lump Sum Two Thousand Dollars No Cents $2000.00 $2000.00 TOTAL AMOUNT BID, UNIT III— STORM DRAINAGE IMPROVEMENTS $ 211,670.00 UNIT IV - Paving Improvements ITEM APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL NO. QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID 1. 17,521 SY 6" Lime Stabilized Subgrade; Per Square Yard One Dollars Eighty-five Cents $1.85 $32,413.85 2. 263 TON Lime for Stabilization (30#/SY); Per Ton Ninety-six Dollars No Cents $96.00 $25,248.00 3. 17,037 SY 6" Reinforced Concrete Pavement; Per Square Yard Twenty-one Dollars Eighty-five Cents $21.85 $372,258.45 4. 2 EA Remove Street Barricade; Per Each Two Hundred Dollars No Cents $200.00 $400.00 Page 7 of 11 �1�tiyrs� ' a`,Ie v1: ) J. ITEM APPROX. DESCRIPTION OF ITEMS WITH BID UNIT TOTAL NO. QUANTITY PRICES WRITTEN IN WORDS PRICE AMOUNT BID 5. 14 EA Adjust Sanitary Sewer ManholeNalve Cover; Per Each One Hundred Dollars No Cents $100.00 $1400.00 6. 12 EA Concrete Wheel Chair Ramps; Per Each Eight Hundred Fifty Dollars No Cents $850.00 $10,200.00 7. 2772 SF Standard 4' Cone Sidewalk Adj. To Park; Per Square Feet Two Dollars Sixty-five Cents $2.65 $7345.80 8. 1 LS Erosion Control per Plan; Per Lump Sum Two Thousand Dollars No Cents $2000.00 $2000.00 TOTAL AMOUNT BID, UNIT IV— PAVING IMPROVEMENTS $451,266.10 TOTAL AMOUNT BID—SECTION B (UNIT III + UNIT IV) $662,936.10 Page 8 of 11 BID SUMMARY: SECTION A—WATER & SANITARY SEWER IMPROVEMENTS $250,506.10 SECTION B — PAVING & STORM DRAINAGE IMPROVEMENTS $ 662,936.10 TOTAL BID $ 1,039,642.20 Page 9 of 11 Off MClffiRy H. `NUH, YEN, "STATEMENT OF MATERIALS AND OTHER CHARGES" MATERIALS INCORPORATED INTO THE PROJECT $ ALL OTHER CHARGES $ **TOTAL $ * This form is included in these documents for reference only. It is to be completed by the low bidder at the time of execution of the contract. ** This total must agree with the total figure shown in the Proposal, TOTAL AMOUNT BID in the bound contract. For purposes of complying with the Texas Tax Code, the Contractor agrees that the charges for any material incorporated into the project in excess of the estimated quantity provided for herein will be no less than the invoice price for such material to the Contractor. Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The undersigned bidder certified that he has been furnished at least one set of-the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department. 2. The Standard Specifications for Street and Storm Drain Construction, which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within calendar days after issue of the work order, and to complete the contract within_calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. Page 10 of 11 (Complete A or B below, as applicable:) A. The principal place o business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non-resident bidders in the State of , our principal place of business, are not requited to underbid resident bidders. ✓ B. The principal place o business of our company or our parent company or majority owner is in the State of Texas. I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) Respectfully submitted, Conatser Construction TX, L P By: Conatser Management Group, Inc., its General Partner By: Jerry Conatser, President Address P.O. Box 15448 Fort Worth, TX 76119 Telephone: 817-534-1743 (Seal) Date: �co�e� /y2oos - END OF PROPOSAL - Page 11 of 11 I. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 5 EA $ 2, 000 $10, 000 . 00 MID-BLOCK RESIDENTIAL 2 EA $ 2, 000 $4, 000 . 00 CHANGE OF DIRECTION RESIDENTIAL 5 EA $ 2, 000 $10, 000 . 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00 Subtotal $24 ,000.00 City' s Cost $00, 000 . 00 Developer's Subtotal $24,000.00 10% Contingencies $2,400.00 Project Total $26,400 .00 Adjacent Developer's Cost $0,000.00 Developer's Cost $26,400 .00 2% Inspection Fee $0,00.00 CFA CODE #2004154 DEVELOPER' S COST: $26,400.00 KINGSRIDGE, PHASE IV November 2, 2004 Fort Worth, Texas November 2, 2004 PAGE I OF Exhibit C II. STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C", immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works . 3. The City will install all the streetlights that use overhead or underground conductors on residential, and collector streets. the developer agrees to pay the city the amount shown below prior to the City starting it' s design efforts. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors. 5. The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. The estimated cost of this street light installation is detailed on page 1 of exhibit C and is summarized below, the street lights will remain the property of, and will be maintained by the City of Fort Worth. DEVELOPER'S COST: $26,400.00 KINGSRIDGE, PHASE IV November 2, 2004 FORT WORTH, TEXAS CFA CODE #2004154 Page II of Exhibit C III. "STREETLIGHTS" INTERSECCTIONS CROWNE POINTE LN & SCARBOROUGH DR 1 CROWNE POINTE LN & CAMROSE ST 1 ST. ANDREWS ST & STAGECOACH ST 1 SCARBOROUGH DR & NOTTING HILL ST 1 CAMROSE ST & CAMROSE CT 1 MID BLOCK SCARBOROUGH DR 2 CHANGE OF DIRECTIONS CROWNE POINTE LN 1 ST. ANDREWS ST 1 SCARBOROUGH DR 1 CAMROSE ST 1 CAMROSE CT 1 KINGSRIDGE PHASE IV Page III of Exhibit C IV STREET NAME SIGNS 1. The City of Fort Worth will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City of Fort Worth. 2. The Developer will pay for the street name sign installations required for this development to the extent of $100.00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3. This development creates the following seven (7) intersections at a cost to the Developer of $700.00: Scarborough Dr & Crowne Pointe Lane Scarborough Dr & Notting Hill Scarborough Dr & St Andrews St Camrose St & Crowne Pointe Lane Camrose St & Camrose Ct Camrose St & Notting Hill Stagecoach & St Andrews St Kingsridge, Phase IV CFA code: 2004154 November 2, 2004 KELLER HI S ROAD W,. HAcsw An M i a TC J GOLD N TRIAN L B ET..« o� u ➢EA (REEK T r a RAY WHITEcn Awn c- � Ve00LAM0 4 � WAL = a W! TAf�[RR � z Z r o O VICIN/TY MAP. I" = 2000' 26 S yhy�po 8 121 R 30 7TH GPMp 2 30 SEDAL 80 28 NTS 16� oke ngt 820 GAF Q- 496 20 28 0 5 S w O U y�- PROJECT LOCATION PROJECT LOCATION MAP FOR... KINGSRIDGE PHASE IV BLOCKS 2 & 9-13 TEAGUE NAL1 L AND PERKINS ENGINEERS SURVEYOAS•CONSULTANTS PA SING - EXHIBIT "B" KINGSRIDGE PHASE IV LEGEND BLOCKS 2 & 9-13 STREET BY DEVELOPER SIDEWALKS l 1 2 J 4 5 6 7 8 9 10 11 12 II 13 14 I CROWNE POINT LANE - - 7 F o- - - __1 F - - - - 1 I I 1 2 1 18 17 16 15 I u 1 19 20 21 a I CAMROSE CT. o I 1 v 1 1 a 2,3 22 c*l 1 NOTTING HILL - 1 z 1 I I � a I I I � I a cor 4 (CITY PARK) GRAPHIC SCALE I 100 0 50 100 200 1 1 C 1 I 2 J 1* = 200' I o � 1 BRUNS TON RD. ENGINEERSESURVEYO S#CONSULTANTS 1 \ l O 6 52 5J 54 1, - - — - - I I STORM - EXHIBIT "B-l" K I N G S R I D G E PHASE IV LEGEND STORM DRAIN BLOCKS 2 & 9-13 PROP. INLETS >-- -- EXIST STORM DRAIN I .. I 1 273 4 5 6 7 8 9 10 11 12 13 14 1 f 011 1 J_ 33 RCP SD LINEF O I 3 RCP SD UNE E 48'RCP SD UNF E 1 I a 1 18 17 16 15 1 1 ti I I e ti 1 - � 1 I I I1 amv�b I IIII aO- III 19 20 _ �21 CAMROSE CT 23 22 3 CONREE RM£ Z NOT77NG HILL 5x3'RCB SD UNE'C' 2 . C O 1I I 1 II 1 I 1 1 1f j I � a 1 I l a 1 I U yI O r m LOT 4 nn 1 r (CITY PARK) �l I GRAPHIC SCALE 1 a O 1 0 5 0 i0o 200 1 b I I I 1 2 3 1' = 200' O I O TEAGUE NALL NO PPRKINS- I- 1 7'RCP 57J UN£ 8 I c�j 1 6 5 ENGINEERS SURVEY }?S'a CONSIi!TAM'S 1 52 53 54 t a I --�� 6 RCP SO LINE - - - - - STREET LIGHT - EXHIBIT "C" KINGSRIDGE PHASE IV LEGEND BLOCKS 2 & 9-13 (D PROP. STREET LIGHT EXIST. STREET LIGHT 1 2 J 4 5 6 7 8 9 10 11 12 iJ 14 1 \ 1 CROME POINTE LANE i 18 17 16 15 I Lo Lo I I 19 20 21 I _ I CAMROSE CT. Lo 01 a 2J 21 I I 00 ti I I -- 1O I I b I I b I o O 1 NO rnNG HILL r 1 a I I ti I 1 / U a f _ 1 1 I Ia I I U r` o LOT 4 nn r (CITY PARK) lJ r I _ GRAPHIC SCALE 1 100 0 50 100 200 I b I I I I 1 2 J 1' = 200' � b o I I y BRUNSTON RD. - \ I � TEAOUE NALL AND PERKINS 1 I n { g 5 ENGINEERS SURVEYOF?S•CONSULTANTS I 52 51 54