HomeMy WebLinkAboutContract 45379-CO2 FORT WORTH City of Fort Worth CITY SE� f Z
Change Order Request CONTRA ..
NO. .,,
Project Name:1 Sanitary Sewer Rehabilitation, Contract 79 City Sec No.: 1 45379
Project No.(s):1 P258-708170149183 DOE No. 6948 City Proj.No.: 01491
Project Description: Sanitary Sewer Main replacement on Riverside Drive,Berry Street,Ellis Ranch Trail, Fairway Drive,Glen Garden Drive,
Stardust Lane and within Three Easements
Contractor:I William J Schultz, Inc.dba Circle C Const., Co. Change Order# Date: 1214/2014
City Project Mgr.J Roberto C.Sauceda City Inspector: I Edward Davila
Phone Number.1 817-392-2387 Phone Number: 817-994-0975
Dept. Sewer Totals Contract Time
(Calender days)
Original Contract Amount $2,977,235.00 $2,977,235.00 300
Extras to Date $96,000.00 $96,000.00 030
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $3,073,235.00 $3,073,235.00 330
Amount of Proposed Change Order 98,975.00 $98,975.00 030
Revised Contract Amount $3,172,210.00 $3,172,210.00 360
Original Funds Available for Change Orders $89,317.00 $89,317.00
Remaining Funds Available for this CO
Additional Funding(if necessary) $98,975.00 L$98,975.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 6.550/6
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25 9t.) $3,721,543.75
IWM EAMN FOR CHANGE ORDER -
The change order will provide compensation for the labor involved with reinstalling a segment of a project
6-inch sewer pipe in order to provide adequate vertical separation from a conflicting existing Chesapeake
as main whose existence was previously unknown. The change order will also allow for the installation of
two additional sanitary sewer manholes to accommodate the grade change.
Staff concurs with the contractor's request for 30 additional calendar days on the project.
F if 01?
/1 8900
070
W y OFFICIAL RECORD
0
Maly J. , City °u., oe�° CITY SECRETARY
AS
FT.WORTH, TX
It is understood and agreed that the acceptance of this Ch ange�N&rK contractor constitutes an accord and is payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
r alum
Circle C Construction, Co. Teri Skelly
M&C Number N/A M&C Date Approved
FORT WORTH City of Fort Worth
Change Order Additions
Project Name I Sanitary Sewer Rehabilitation,Contract 79 City Sec No.: 1 45379
Project No.(s): I P258-708170149183 DOE No. 6948 City Proj.No.: 1 01491
Project Sanitary Sewer Main replacement on Riverside Drive, Berry Street,Ellis Ranch Trail,Fairway Drive, Glen Garden Drive,
Description Stardust Lane and within Three Easements
Contractor William J Schultz, Inc.dba Circle C Const.,Co. Change Order:=2 Date: 12/4/2014
City Project Mgr. Roberto C.Sauceda City Inspector Edward Davila
ADDITIONS
DERRIPTION DEFT Qty Unit Unit Cast Total
13 84 inch Tunnel Liner Plate by OTOC Sewer 10.00 LF $800.00 $8,000.00
20 5'TYPE A MANHOLE Sewer 1.00 EA $15,000.00 $15,000.00
51 Remove and Replace 66 Inch Hobas Pipe Sewer 890.00 LF $75.00 $66,750.00
52 JRemove and Replace 5'TYPE A MANHOLE Sewer 1.00 EA $15,000.00 $15,000.00
Sewer $104,750.00
Page 2 of 4 Additions Sub Total
FORT w0axH City of Fort Worth
Change Order Deletions
Project Name Sanitary Sewer Rehabilitation, Contract 79 City Sec No.: 45379
Project No.(s): P258-708170149183 DOE No. 6948 City Proj. No.: 01491
Project Description Sanitary Sewer Main replacement on Riverside Drive, Berry Street,Ellis Ranch Trail, Fairway Drive, Glen Garden
Drive,Stardust Lane and within Three Easements
Contractor William J Schultz, Inc.dba Circle C Const.,Co. Change Order: 1E Date 12/4/2014
City Project Mgr, Roberto C.Sauceda City Inspector: F Edward Davila
DELETIONS
ITEM DESCMP'TION DEPT Qty Unit Unit Cost Tom
6 8 inch Sewer Pipe Sewer 50.00 LF $35.00 $1,750.00
19 5 foot Extra Depth Manhole Sewer 21.00 VF $175.00 $3,675.00
23 CONCRETE COLLAR Sewer 1.00 EA $350.00 $350.00
Sewer $5,775.00
Page 3 of 4 Deletions Sub Total $5,775.00
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Page 4 of 4
City of Fort Worth
Departmental Request for Waiver
Of MBE/SBE Subcontracting/Supplier Goal
r,
Water Department 98,975 11/17/14 �
DEPARTMENT NAME: ESTIMATED COST / PROPOSAL DAT '�
Sanitary Sewer Rehabllitation Contract 79 DOE 6948,CPN:01491
NAME OF PROJECT/BID: DOE/PROJECT 1 .
Gs7
Roberto C.Sauceda -=?W=--- --�---- 2387 11/17/14
SIGNATURE OF/PROJECT MANAGER EXTENSION DATE NIGP CODE
Prior to=advertisement the contracting/managing department.;shall 'determine whether the bid/proposal:;s one which:14IBE/S$E
requirements should not be applied. MBE/SBE requirements may be waived upon written.approval of the M/WBE Manager if o.,e
of the condihons;listedbalow exists,the contractng/managing department.shall notify the Manager via this form,sfattng tlae specific
reason.(s)£or requesting a waiver:
If the contracting/managing department and the Manager are in conflict over the granting of a waiver, either
may appeal to the City Manager, or designee, and his/her decision is final.
Please Check Applicable Reason:
A. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE
Ordinance, because the public or administrative emergency exists which requires the goods or
services to be provided with unusual immediacy; or
X B. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE
Ordinance, because the purchase of goods or services from source(s) where subcontracting or
supplier opportunities are negligible; or
_..____C. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE
Ordinance, because the application of the provisions of this ordinance will impose an economic
risk on the City or unduly delay acquisition of the goods or services; or
D. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE
Ordinance, because the MWBE Waiver is solicited based on the sole source information
provided to the MWBE Office by the managing department's project manager.
Justify Commodity or Service Waiver Request:
Extension of 84 Inch hand Tunnel under W.Berry Street
Please use additional sheets,if needed
M/W1E OFFICE USE ONLY;
080 V
Approved Sig ature f M BE Authorized Personnel Date
Not Approved Signature of M/WBE Authorized Personnel Date
Rev.2-20-13