HomeMy WebLinkAboutContract 32853 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, Ck2L>MPt! D l_o�T�lt'�J+.l-�D' hereinafter called
"Developer", desires to make certain improvements to
C0--now lE�dli -P4B UC-S�gnaddition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and tt-h�Jroelh hK=—hL 9. 41QbMkkA is
duly authorized V.P. oR��E QgeML f'R"; and the City, acting herein by and
through Marc Ott, its duly authorized Assistant City Manager, for and in consideration of
the covenants and conditions contained herein, do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy') dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
CFA REVISED FORMAT WITH 4% 1 12-06-05
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused,
in whole or in part, by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof:
CFA REVISED FORMAT WITH 4% 2
Water (A) None; Sewer (A-1)None; Paving (B) attached; Storm Drain (13-
1) attached; Street Lights and Signs (C)None.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, 131,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $162,796.40.
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent(4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
CFA REVISED FORMAT WITH 4%.doc 3
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed—and said Developer
has executed this instrument in triplicate, at Fort Worth,Texas this the day of n �
200_5
Approval Recommended:
Transportation and Public Works
Department
N4 M&C REQUIRED Robert node, P. E.
Director
ATTEST: City Of Fort Worth
BfMa
�(`(MLr+i.� J�-,'X c Ott
City Secretary Assistant City Manager
Approved as to Form:
9•G f' /
Assista Cit Attorney
ATTEST: DEV OPER y C.A� L&-m beVELoOMB� r
By: R�c�4ner
Corporate Secretaryi-r5 V.P. op �E (� GCr� MAW`°�
C �
CFA REVISED FORMAT WITH 4% 4
SUMMARY OF COST
Cotton Depot
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $11,337.50 $ 11,337.50
2. Storm Drainage $145,197.50 $ 145,197.50
3. Street Lights $ -
4. Street Name Signs $
B. Engineering Design $
C. Construction Engineering
and Management by DOE (4%) 1 $ 6,261.40 6,261.40
TOTALS $ 162,796.40 $ - $ 162,796.40
COTTON DEPOT
PUBLIC STREETS
Streets-Public
UNIT
DESCRIPTION UNIT QUANTITY PRICE TOTAL
6"Concrete Int. Curb LF 224 $2.50 $560.00
7"3500 PSI Concrete Pavement SY 390 $25.00 $9,750.00
Concrete Sidewalk SY 15 $8.00 $120.00
Free Barrier Ramp EA 1 $450.00 $450.00
Saw Cut LF 65 $4.50 $292.50
Dowel Into Existing Pavement LF 22 $7.50 $165.00
STREET-SUBTOTAL $11,337.50
PROJECT COST
Streets-Public $11,33
SUB-TOTAL $11,337.50
10% CONTINGENCY, FEES&TAXES $1,133.75
TOTAL $12,471.25
PAGE 1 OF 1 1/6/2004
COTTON DEPOT
PUBLIC STREETS
Streets & Storm Sewer-Public
UNIT
DESCRIPTION UNIT QUANTITY PRICE TOTAL
6"Concrete Int. Curb LF 224 $2.50 $560.00
6" 3500 PSI Reinf. Concrete Pavement SY 390 $24.00 $9,360.00
Concrete Sidewalk SY 15 $8.00 $120.00
Free Barrier Ramp EA 1 $450.00 $450.00
Saw Cut LF 65 $4.50 $292.50
Dowel Into Existing Pavement LF 22 $7.50 $165.00
Lime Stabilization Base Course SY 420 $2.00 $840.00
6% Hydrated Lime Ton 6 $110.00 $660.00
Concrete Junction Box EA 1 $90,000.00 $90,000.00
48"Cl. IV Concrete Pipe LF 225 $190.001 $42,750.00
STREET-STORM SEWER-SUBTOAL $145,197.50
PROJECT COST
Streets& Storm Sewer $145,197.50
SUB-TOTAL $145,197.50
10% CONTINGENCY, FEES &TAXES $14,519.75
TOTAL $159,717.25
PAGE 1 OF 1 2/17/2004
0
a
Q � �
O � z
S a�d\A �d
-0
/-35W
� ,I,�♦ ��`.��,. � a_ �..'1Ir�1���C iia � ' .•
�• '• s � r' .►�c �."_ '�= tip ., � � � -.;
I.. 0 ii ♦ IE
rr: ..�/ , / 1►
IN-•r .. •
Plan
,•rIR
te.`� / ♦,
r \
41
R� I Mn '�
_ 1
OWN
n + &Nor.Aff
•� a �, / •
._ 1
7
3-4
S< X BOUGH SURVEYABST. RM 100
i
ARST.BT N!70.SURr
T �C�'r
�9
\ p
ns �
yLo
\ \ Sys
ttIlttt; tlt. I! lltt :eR ;f \
Y <=Y
V.
ltittilZiEttitttitittttttit Ej _i�^ji IBS � \���,,jrr�� '�� '� ��. v��
ttilttIECcICt;RtittitttttIC {�
ittRt:t: :CiCCiR : itRtttCit :i z � I�� � � ��
� i� �$�$�����d���6 ��1�1 i ��i• � ,iFi ill � __�' ��
ayo>1nr"8 aw30 V HUOA1 1L1O3
S 3
dj
Y$�
e —
�E€
n y o� i
} 4
Q r
IA
i;�ry�lj � !' ~ �� 829 9, ,yj '\ '�` ■� e•
i;
Moore Thornton
& Co. Addition
Lot 2 I Lot 4 Z I Lot 2
C• ,
-Portion of Lo� 2, Blk. 26 , o I Zr
Moore Thornton & Co. Addition y
'
566.06
'
This portion of East Fourth Street g
Right-of-Way has been vacated bya
City Ordinance No. 12556 and LP
SS - - - - E- fourth-Store
retained as a 55' utility easement
Gonne,cr To Exist. Concrete
P'oremenL Intoll LongRuddnol
Bultf.hints
N 60'09'49" E ?i_ N 60.09'49" E
---------------------------------------- = '. - -- --,--—-- ---7
149.99' : 105.88'
20' Access Eoemenk
29"47'00" W
N 2947 00'" W '
,�. t- • i 30.88'
30.85'
THIS PORTION
S 06"36'49" W r.
3.69
N60"09'49"E -
r=+ -=
f
• , �: ' ' . • . . . :yam �
' Steel BoAwds
D E PCS
C"TY'!OF FORT NORTH
'-' L�^•-� �-- "GAIiAGREEMENT FOR
PAVEMENT CONSTRUCTION
O I 576..89 W,yO
� L=L
�IGN
i I SIGN
(Z; C>7T-FOIN EDE P C:>T
0'- TY OF FORT WORTH
.-C A!lAGREENIENT FOR
PAVEMENT CONSTRUCTION 6-2
IUH
I�
/ IN
PP �/ • I�
SM,N \ I ObFH
THIS PORTION -- 576.29
srGN I u ----------
/ POST POST 57f
SIGN ?9
�. I IF
i
OWN STREET
596.02E F
0
MH '� (60'RICHT-OF-WAY)
T Toy arPno/r ovenneni
s� - •cP
1�MVIBU Y
POST 1sPe .•: N6fl09'49'E — 136;64' N 60'0949' ----------
�. • • 25.00,
ti
ry is
PP / . ' .� •p C ��
• \/ � �'_ .7-777
er_.
/ q ' �_ hl= I(J;�. C,
Pool Deck
00
•0 c
lV60'11'23 E
11;-2
MH
599.61 .\.`_ - ./. � .1
O '
S29' 8 39 E
2' 7'
= Elk
�. - BJ �, -�. — - . - — I.—. BJ 7 ,—.