HomeMy WebLinkAboutContract 30846 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.as�4 0
WHEREAS, Cooks Children's Hospital, hereinafter called "Developer", desires
to make certain improvements to Cooks Children's Medical Center Addition, Lot 1-R,
Block 1 (Inpatient Expansion), an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Russel K. Toman, its duly
authorized President, and the City, acting herein by and through Marc Ott, its duly
authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows:
1. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy
herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of this
Community Facilities Agreement and the Policy shall be resolved in favor
of this Agreement.
C. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II,paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
CFA COOKS CHILDRENS HOSPITAL USP"
e
F. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub-contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused,
in whole or in part, by the alleged negligence of the City of Fort Worth,
its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees that
no street construction or storm drainage will begin prior to City Council
approval of this Community Facilities Agreement. (Article 104.100,
Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed
(Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications and
cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part hereof:
CFA COOKS CNILDRENS HOSPITAL 2 �R, •+ty, �G�ylw i KN17
Water(A) None; Sewer(A-1)None; Paving (B) attached; Storm Drain(13-
1) none; Street Lights and Signs (C) none.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B. The
estimated total cost of current improvements and related support services
specified in this agreement, including design, construction and inspection
is estimated to $14;;56.00.
Item Developer City Cost Total Cost
Cost
A. Construction
1. Streets $ 13,976.00 $ - $ 13,976.00
2. Storm Drainage $ - $ - $ -
3. Street Lights $ - $ - $ -
4. Street Name Signs $ - $ $
B. Engineering Design $ - $
C. Construction Engineering
and Management by DOE 2% $ 280.00
TOTALS $ 14,256.00 $ $ 14'356.00
Notes:
1. All Preliminary Plats filed after July 2000, will require sidewalks on all streets.
Sidewalk cost is included under street cost. The developer is responsible for
installation of sidewalk.
2. Developer's column for Item C represents two percent (2%) cost for construction
inspection fees and materials testing less 10% for contingency cost.
(*) Represents City participation for construction fees based on actual cost.
3. City not preparing plans and specifications.
N =
�` .�\'� pal 171.� j, '_i•,1 i
Y V'
CFA COOKS CHILDRENS HOSPITAL 3 v 1
/Ar^^ U
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Develo
has executed this instrument in triplicate,at Fort Worth,Texas this the 1 day of
,2000
Approval Recommended:
Transportation and Public Works
Department
Robert Goode,P. E.
Director
ATTEST: City Of Fort Worth
By.
ftYAY 1A-i'nq, 1l Marc Ott
City Secretary Assistant City Manager
Approved as to Form: do n-)cw �Qd2
Contract Authorization
Assistant City Attorney Date
ATTEST: DEVELOPER
Cook Children's Medical Center Corporate Secretary _ Russell K. Tolman,
President
OPIUM RNPM
Off SEIRET11a111
Paving_CFA REVISE[ H. WORK YEN.
IV
STREET NAME SIGNS
1 . The City will install the street name signs upon final approval
of the street construction. The street name signs will remain
the property of, and will be maintained by, the City.
2 . The City will pay for the street name sign installations required
for this development to the extent of $100 . 00 per intersection.
This unit cost will be revised annually by the Department of
Transportation and Public Works to reflect prevailing costs of
materials and labor.
3 . This development creates the following one (1) intersection at a
cost to the City of $ 00.00 :
Pruitt Street and Seventh Avenue
Cook Children's Hospital Inpatient Expansion --—
Fort Worth, Texas Date: August 6, �( ' �v�at2rIAo'[�`"' f
IV-1
rJ TN
m �
W PRE 1010 UP RR
W EL PASa
RIO GRANDE `
NfXERY
i
� y1RNS
DAGCET
OWA e
PENNSn ANIA t
V
a w PR ITT
CANN W CAN
b
4 LEUD
ti c W LEUDA
COOPER =
7ERRELL
Y
NUMBOLT
� N
WORTH � DA S HOOD
PULASKI
W RO All
ROS£ALE
VIC MAP I
FOR TI-E SCALE: 1VTS t
CONSTRUCTION OF IMPROVENtENTS !
TO SERVE
COOK CHILDREN'S MM131CAL CENTER !
HOSPITAL INPATIENT EXPANSION
A;t�Dunaway I
Engineers
Planners
Surveyors
44V Associates, Inc. Landscape Architects
tJOf 4rMwf CJiW,F..f00 f01 WpJ\7'%7�1p7►�:N7.JJJ.f 1Jf W.V.;Sf TAL J1J/Fw J/7JJ0.7437
tl
coo
O A✓1 V uj Q
m
Cd 000 LL. 'r. : ►� r 2
p Q y Q Z
LL
a y I o
I W J
U
Oct _ W � W j Q
• EP C5 c .
CL
----- ----- S W W
M
0 133YYS
b Y
Ulj-
-- — •• 0
OW cob ,•'• � ry�� I C�
2a Y J. ..a i I Q j U 0 w
N LL
W o� �: :iu.'.. , U � 2 i . w
92MJ
LAj
Oaf pN p0 U U Oa h QZ V4
aCO�m m�aN O N OAU -� y 2W U
k � k
o;a*< LL,
�Q � Qi C9 � �� ti I ^ o a
C, ►'1 p iJ� �u l�O P
�- V U¢ 4�i� z O coo- 3 I OAU t7
Wci
O,o U V• o WQm � ct y
�m Q�
0
N
� I
Dunaway Associates, Inc. May 19,2003
Toby K.Ford,P.E.
ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
Unit II: Paving Improvements to serve
COOK CHILDREN'S MEDICAL CENTER HOSPITAL INPATIENT EXPANSION
File No. W-1248
DOE No.: 3948
Unit II:Paving improvements
BID BID UNIT
ITEM UANTiTY uT�iiT DESCRIPTION PRICE COST
1 73 SY 7-inch Reinforced concretepavement* $35.00 $2,555.00
2 140 SY 7-inch HMACpavement" $30.00 $4,200.00
3 138 LF 7-inch Reinforced concrete curb $3.00 $414.00
4 20 LF 6-inch Reinforced concrete curb $2.50 $50.00
5 85 SY 6-inch Lime-Stabilized Subgrade $5.00 $425.00
6 1.275 TN Lime 30#/SY $105.00 $133.88
7 600 SF -inch Reinforced Concrete Sidewalk"' $4.00 $2,400.00
8 140 SY Sawcut&Remove Exist Asphalt Pavement $0.50 $70.00
9 137 LF Sawcut and remove existing reinforced concrete curb&Putter $5.50 $753.50
10 190 SF Sawcut and remove existing reinforced concrete sidewalk $2.50 $475.00
11 I LS Demolish and remove existing brick landscape wall $2,500.00 $2,500.00
'Refer to CFW Detail S-S 6,5 sack mix,3000 psi minimum @ 28 days,#3 @ 18"O.C.E.W. SUBTOTAL: $13,976.38
"5-inches Type B base course,2-inches Type D surface course.
5-sack mix,3000 psi minimum @ 28 days,#3 @ 18"O.C.E.W.
OF
,
...f.•..... ... ......•.......
T Y K. FOR s
o ;. 81037
�� '�'''F�ISTEaE.• ��� ,
9 �Ay
fed-3
NU
rn -cos TTRAL.As