HomeMy WebLinkAboutContract 30848 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.0&&IB
WHEREAS, Eagle Mountain-Saginaw Independent School District, hereinafter
called "Developer", desires to make certain improvements to Chisholm Ridge
Elementary School Offsite Storm Drain Improvements located at Marlow Lane, an
addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL THESE PRESENTS:
That said Developer, acting herein by and through John Price, its duly authorized
Associate Superintendent for Eagle Mountain-Saginaw Independent School District, and
the City, acting herein by and through Marc Ott, its duly authorized Assistant City
Manager, for and in consideration of the covenants and conditions contained herein, do
hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Contract as if copy herein
verbatim. Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the t
r ti:
RHI I'soll
Community Facilities Agreement and the Policy shall be resolved in favor of
this Agreement.
C. Developer shall provide the City with a statement signed by a duly
authorized officer that Developer has appropriated sufficient moneys to pay
for its obligations contained herein.
D. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy.
E. The contracts for the construction of the public infrastructure shall be
administered conformance with paragraph 8, Section II, of the Policy.
F. To the extent allowed by law, and specifically to the extent that liability
would exist under Chapter 101, Texas Civil Practice and Remedies Code
("Code"), including without limitation Section 101.051, Developer further
covenants and agrees to, and by these presents does hereby indemnify, hold
harmless and defend the City, its officers, agents and employees from all
claims, suits, or causes of actions which could be maintained against
Developer under Chapter 101 of the Code, in any way connected with the
construction of the improvements or facilities described herein and due to the
negligence or misconduct of Developer, its contractors, subcontractors,
agents, or employees.
G. Developer shall install or adjust all of the required utilities to serve
the development or to construct the improvements required herein.
H. Developer agrees that no street construction or storm drainage will begin
prior to City Council approval of this Community Facilities
Agreement. (Article 104.100, Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been constructed.
(Article 104.100, Ordinance 7234).
J. Developer hereby releases the City for any inadequacies in the preliminary
plans, specifications and cost estimate supplied by the Developer for this
contract.
�� 7,7_,
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to construct
current and future improvements provided for in this agreement.
Il. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street name sign and other community facility improvements
shown as "current improvements" on the attached Exhibit A.
B. As shown below in the "Summary of cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "Paving & Drainage
Improvements" and shall either (i) award its own contract for construction and
pay the City the cost of construction inspection, construction engineering and
management as shown below, or (ii) pay to the City its share of the cost of
street, storm drainage, street lighting, street name signs as shown below. The
estimated total cost of current improvements and related support services
specified in this agreement, including design, construction and inspection is
estimated to be $.;A L4A4 �G_.
Item EM-SISD Cost CITY Cost Total Cost
A. Construction
Paving and Drainage sz,(C� $0.00 ��3,Wc1S
B. Inspection (-j%)
$04".61So $0.00 $ci4-V i0
TOTALS $'��y�, $0.00
SUMMARY OF COST
Chisholm Ridge Elementary-Eagle Mountain ISD
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $18,895.00 $ 18,895.00
2. Storm Drainage $4,800.00 $ 4,800.00
3. Street Lights $0.00 $ -
4. Street Name Signs $ - $
B. Engineering Design $
C. Construction Engineering
and Management b DOE 4% $ 947.80 7.
TOTALS $ 24,642.80 $ - $ 24,642.80
h
4
LJ`i:
Notes:
1. All Preliminary Plats filed after Julyl 1, 2000 will require sidewalks on all streets.
2. Developer's column for Item B represents two percent (4%) costs for construction
inspection and materials testing.
(*) Represents City participation for construction fees.
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said
Developer has executed this instrument in quadruplicate, at Fort Worth this the�fj day
Of o\ip l r , 2004.
Approval Recommended:
Transportation and Public Works Department
�S �G
Robert Goode, P. E.
Director
ATTEST: City of Fort Worth
f Y 44 By:;A4M
M-cw�,/ C'16 Marc Ott
City Secretary Assistant City Manager
LCLIn
ved as t Form: contract Authori.zatioR
Assistant City Attorney date
ATTEST: DEVELOP'-"
- �,..�i c.L�
BY:
Corporate Secretary `
'AMY IEKINKFF
FT. `tKAOITHI Mllz
OPINION OF PROBABLE CONSTRUCTION COST
PROJECT. CHISHOLM RIDGE ELEMENTARY OFFSITE DATE: 101812004
STORM DRAIN IMPROVEMENTS
TNP JOB # VLK03301 PREPARED BY. SRM
ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL
I PAVING IMPROVEMENTS
1 Remove/Replace Existing Pavement 20 SY $51.00 $1,020
2 4" Conc Sidewalk 5500 SF $3.25 $17,875
PAVING SUBTOTAL $18,895
II DRAINAGE IMPROVEMENTS
3 36" RCP 30 LF $110.00 $3,300
4 Connect to existing Storm Drain 1 EA $1,000.00 $1,000
5 Trench Safety 30.00 LF $16.67 $500
DRAINAGE SUBTOTAL $4,800
SUBTOTAL $23,695
4% INSPECTION $948
CFA FEE $500
TOTAL COST $25,143
4% INSPECTION FEE $948
CFA FEE $500
TOTAL FEE $1,448
-iVE13
i;CT 1 ? 2004
NINC. V
TEAGUE NALL AND PERKINS \
ENGINEERS•SURVEYORS•CONSULTANTS ^
Responsive Service. Reliable Results S
wwwInp-ongnacom nF %
Svc � i
D
1„-1 00' Y
1
M1
h
CHISOLM
t RIDGE
ry ( ELEMENTARY
rt�J\
h
W
3qq %
o
O
O
w /
b
C h
6" RCP
REMO REPLAQ
RECEIVED EXIS77N PA I/EM NT n OFFSITE STORM DRAIN IMPROVEMENTS TO SERVE
PER Cl STAN ROS ,--- CHISOLM RIDGE ELEMENTARY
OCT 1 � 2004 EXHIBIT "A"
\ �\ \
N//V!C.
EXISTING 4"^
TEAGUE NALL AND PERKINS SIDEW�LK
MUMEERS•SURVEYORS•CONSULTANTS ^
Responsive Service. Reliable Results \
» \
www.tn -online.com POSED
S/ ALK AP s
i
PROPOSED 4"
SIDEWALK
N
O
i
df
I z
j I
CHISOLM
RIDGE
ELEMEN TAR Y
PROPOSED 4"
SIDEWALK
PROPOSED 4"
SIDEWALK
v v h
PROPOSED 4"
C SIDEWALK
COK n
CHISOW RIDGE EMM N.TARY
EXHIBIT "B"