Loading...
HomeMy WebLinkAboutContract 36826 AMENDMENT NUMBER 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. 368& (q COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (CITY) and TCB, Inc. , (CONSULTANT) made and entered into City Secretary Contract No. 33771, (the CONTRACT) which was authorized by the City Council by M&C C-21560 on the 11th day of September, 2006 and a contract amendment #1, City Secretary Contract No. 35588, dated July 30, 2007; WHEREAS, the Contract involves engineering services for the following project: Bridges located on North Main Street, Henderson Street, and White Settlement Road over the future Trinity River By-Pass Channel; WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in the proposal letter dated December 28, 2007, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by CONSULTANT total $215,744 .00 . 2 . Article II of the Contract is amended to provide for an increase in the fee to be paid to CONSULTANT for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be the sum of $1, 542,744 . 00 . A hourly rate schedule is also added for tasks that are to be paid based on hourly rate to a maximum fee. Page 03-18-08 P03: 30 i �" i 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED on this the 94- day of M 2008 in Fort Worth, Tarrant County, Texas. ATTEST: APPROVED: LL-- Marty Hendrlbz Fernando Costa, Acting City Secretary Assistant City Manager APPROVAL RECOMMENDED: Contract huthoriaatioa 31 (4 l o� ��- Date - Robe ode, P.E. Dire tt�v' Transportation/Public Works Department -r'-_ t'4'-' -a CONSULTANT TCB, Inc. Ann Kovich, AICP Vice-President APPROVED AS TO FORM AND LEGALITY: /Oz"" Amy Rams Assista ity Attorne, _.a--- Page -2- T'.11 J➢ Y�4q. Ann E.Kovich,AICP TOB AECOMM Vice President TCB 1200 Summit Avenue,Suite 600, Fort Worth,Texas 76102-4409 T 817.698.6718 F 817.698.6701 ~.tcb.aecom.com December 28, 2007 Mr. Randle Harwood Trinity River Vision 1000 Throckmorton Fort Worth, TX 76102 Subject: Request for Supplemental Agreement#2 Central City Bridges—City of Fort Worth Contract No. 33771 Dear Mr. Harwood: At the Central City Bridges SRC Meeting on April 11, 2007, the TCB design team received instructions to continue moving forward with the design of the three bridges in spite of channel modeling work that was yet to be completed. The thought at that time was that the channel configuration would not change as a result of future computer modeling efforts. However, over the course of the next few months, the channel changed considerably due to H&H considerations and discussions between the Corps of Engineers, CDM, TRWD and TRVA staff. As a result of these channel modifications, the TCB design team presents the following scope of work for items that are not part of the original project scope.A detailed breakdown of the required effort and fee for each task is provided below and on the attached spreadsheet. The following assumptions are the basis for this supplemental agreement: 1. Tasks 1, 2, 3 and 6 are based on a lump sum compensation basis. Tasks 4 and 5 are reimbursable on a time and materials basis with the fee not to exceed the amount shown. Time and material tasks shall be invoiced based upon the hourly wage schedule attached to this letter as Exhibit A. 2. Two additional Steering Committee meetings will be held per the original scope. We assume one meeting in January 2008 and a final meeting in February 2008. 3. No major design revisions will occur after the Steering Committee meeting in January 2008, or after the results of the physical model are complete in January 2008. 4. No major revisions will occur to the channel configuration provided to TCB in September 2007. 5. One additional HEC-RAS model incorporating the revised bridge designs will be completed by CDM. No additional HEC-RAS modeling will occur. 6. For the completion of the Categorical Exclusion documents, no additional public involvement will be required beyond the original MAPO included in the original scope. 7. If additional historical documentation (i.e., a de minimus 4f) is required for the completion of the Categorical Exclusion documents, such documentation is not included in this scope of work. 8. Schematic documents will not include any proposed local streets shown in the Trinity Uptown Plan. 9. No additional meetings with the USACE or TxDOT bridge division staff will occur during this concept design phase. .r 5 Mr. Randle Harwood December 28, 2007 Page 2 Task 1 - Revise Schematic Plans and Conceptual Bridge Designs (Lump Sum Basis) a. Revise schematic plans for the three bridges based on the channel configuration received in September 2007. Revisions consist of changes to approach roads, channel bridges and railroad bridges. 1) Approach road revisions include: tapers, retaining wall limits, cross sections, earthwork and bridge limits. 2) Channel bridges revisions will be incorporated in revised schematic plans. These revisions include revised layout of bridge supports, modifications to bridge-deck structure and modifications to abutments and foundation structures. 3) Railroad bridge revisions include modification of spans and possible additional bridge bents. 4) Revise conceptual traffic control plan based on change in channel configuration and revised channel bridges. 5) Revise Engineer's Opinion of Probable Construction Costs for three bridges. 6) Update proposed right-of-way based on channel modifications. 7) Re-issue revised sections, create TIN files and cut new section along channel and roadway. 8) Create computer 3-D model of revised bridge conceptual designs in electronic format in both Rhino v. 4 and a CAD-compatible version for the physical modeler. Task 1 Lump Sum Fee: $122,626 Task 2 - Update Exhibits for Property Impacts (Lump Sum Basis) a. Provide TRWD an updated exhibit showing property impacts. Impacts will be presented based on channel construction and bridge/road construction, including temporary construction-phase impacts. Base map will show buildings and property lines. Task 2 Lump Sum Fee: $3,680 Task 3 - H&H Modeling and Access Exhibits (Lump Sum Basis) a. Provide TRWD with an exhibit showing overall levee maintenance access points along the entire by-pass channel.Working with TRWD staff, show access scheme suitable for maintenance equipment identified by the TRWD staff. b. Prepare and coordinate H&H modeling and exhibits for the revised channel configuration provided in September 2007. Exhibits provided are: plan and profile views of channel bridges with a table showing elevations of arches and deck for modeling purposes. c. This task specifically excludes any modeling effort required by any future channel configuration changes that occur as a result of future HEC-RAS computer models or physical modeling. d. Additional modeling tasks are described in attached scope from CDM. Task 3 Lump Sum Fee: $29,455 Task 4- Additional Project Meetings (Time and Materials Basis) a. Attend one meeting with TxDOT Environmental staff to determine extent of revisions necessary for approval of Categorical Exclusions. TRWD staff will also attend to explain l f; relationship of FEIS and previous environmental approvals obtained for overall Central Cit,, project, including the three bridges. ' TCB AECOM Mr. Randle Harwood December 28, 2007 Page 3 b. Attend two meetings with project stakeholders to develop revised pedestrian access concepts adjacent to bridgeheads based on revised channel design (by others) and hard levee configuration (by others). Design and prepare exhibits illustrating approved concepts for access at bridgeheads (plan and profile exhibits). Task 4 Time and Material Fee Not to Exceed: $8448 Task 5 - Categorical Exclusion Documents (Time and Materials Basis) a. -Revise-CE-documents previously submitted to reflect revised channel location and configuration. b. Prepare documentation for Indirect and Direct Cumulative Impacts to address comments received on original CE documents. c. Any public involvement required by additional documentation for the CE is excluded from this scope of work. Task 5 Time and Materials Fee Not to Exceed: $27,071 Task 6- Overall Project Management(Lump Sum Basis) a. Coordinate and attend three additional SRC meetings (November and December 2007 and January 2008), including preparation of meeting agendas and minutes. b. Provide overall coordination with project subconsultants and project stakeholders from October 2007 through January 2008. c. Provide monthly invoicing and MWWBE reports to the City's Project Manager. Task 6 Lump Sum Fee: $24,464 Total Lump Sum Fees: $180,225 Total Time and Materials Fee Note to Exceed: $ 35,519 TOTAL FEES: $215,744 The scheduled completion of the work in this Agreement is changed from October 2007 to February 2008. The maximum fee in the Agreement is revised as follows: Original Agreement $ 1,321,750 + S.A. #1 $ 5,250 Previously Approved: $ 1,327,000 Total SA#2: $ 215,744 New Contract Total $ 1,542,744 Original MWBE Participation 26% Revised MWBE Participation 25% (Does not include fees for modeling for CDM included in the first or second supplemental agreements.) I TCB I AECOM Mr. Randle Harwood December 28, 2007 Page 4 TCB appreciates the opportunity to work on this exciting project for the City of Fort Worth. Please let me know if you wish to discuss any portion of this supplemental request in more detail. Res ectfully yours, Ann Kovich, AICP Vice President Attachments: 1) Exhibit A, Hourly Wage Schedule 2) Exhibit B, Fee Schedule c: Tom Leuschen, PE Pat Buckley, PE i TCB AECOM Mr. Randle Harwood December 28, 2007 Page 5 EXHIBIT A Hourly Wage Schedule Labor Rate/Hour Project Manager $244.00 Lead Engineer $160.00 Hydraulic Engineer $120.00 Project Engineer $110.00 Bridge Engineer $180.00 Sr. Environmental Specialist $90.00 Engineer in Training $80.00 Clerical $65.00 TCB AECOM .c'. a vmi_e e H oa ym n ma N,° ()N Q y N N y P i9 Q !! C b O O yQ y A O W u O Q Q I� Q m��. � �•'! ry N N M1 U'Z: aq onmp0000� 00 m Dom T[['J A ~ U C o Iri ai r r' D �m o 0 x S 0 Cl N S h '• y F C; O U Q Q W�o�LL y)xp y W W O o d p°C 1 U) Z ° T�. 'N m b O 0 y tn o N n O o O Qm°'1 Kwy0 ONE-il.-::�__N o b°�O��N�_':_:�'-'7.i!i�!I 1I I i i•1I �I O o o Q N b 0o O o O O°o Ob^! O HN b N w�mO�.'-:''.':�i�m m 0 N to oo P e 0 o m m m'1 •O N E b Nm Nb h�j j i i(f t l!i�Om ma Ny N�b>:`'.--..'i. �`p P N O O O m O 0 o o O�o m oN O c m O O;�3 l 1 9 I j I I Y:t I t 1 t I b<Do N O O V�1n 7 b o NO A p a A I O 0 U ..V N Q k N a p N O°O�m 1 I 3i II I I.1 i i i o O 37, ° _ lu 9 J AiWi =W 77. j is ° Ta o . ME tl El u U- G; N b`��m O O o N O o o m P o y�m E-p m�p N N O o o o p A - 517 l�j�t In t1�/9 , dw m E•S: £ n.�: y W;1.Il o' m 30 ol y KKK:d'fY K�:¢'U S m UyQ=F-:a U K d Q V�: O x _ O BING THOM ARCHITECTS INC. Fort Worth Bridges Supplemental Fees - US$ DRAFT October 2, 2007 Change in Channel Configuration Design Session with Arup in Vancouver Staff Hours Rate Fee Amount Bing Thom 8.00 $275.00 $2,200.00 Sr. Architect 8.00 $130.00 $1,040.00 Sub total $3,240.0 0 Design layout of bridge supports Staff Hours Rate Fee Amount Bing Thom 8.00 $275.00 $2,200.00 Sr. Architect 35.00 $130.00 $4,550.00 Int. Architect 35.00 $100.00 $3,500.00 Subtotal $10,250.00 3D Modeling of new design, details plans and sections Staff Hours Rate Fee Amount Sr. Architect 75.00 $130.00 $9,750.00 Int. Architect 75.00 $100.00 $7,500.00 Subtotal $17,250.00 otal Supplemental Fees $30,740.0 0 r W 4 ` 4- aC It O C'7 � r a_ z° a N CO OD,.. Lo c� N LO N °' �: Ln LO la -� ® CNI I Gew 6 � oa o �'' N N F- ~ 2 M O ® C: O N ol Q C N O cn U E J 60- p o O 0 m V) (D 00 00 cn U � T T O 0 c cfl 00 N ti r co � � T W L a`) o 'E E= J C6 r- N It N LO a) 0)— CD T W 6rH N a) 2 CD (6 :3 O U 0 6 m d' F U')O NT Q 6R LL m 22 0- (m6 O .S.'" U U cn T lf) Q O a) M 0 y 0 C a- N Q a, KT (B > O Lo O W T M u N o cn 4' a� O U �+ U W •- 'C N N C C -- m O LT d m �Q = wf'! J: : ri V�7& a CY) d n U U W LL = o U 0 W O H O (D V co co (D w V m w V N N (D (D (D 0 0 C)m O C\j C) n N c0 T O Q) co N ai. D) N O O O L CY) r- N to O M N 7 v iC m O N � a) 7 � (n Efl, Ef3 fA /H 69 c0 O m N N O co d C cD N QI - p r n LL N F ti a) n = a) O CL Q O 0 K > � W O` C U R d 69 (,y 60 av J N N oD N O N oo N co(D O (p r 0) _ ci N m O m t 0 O U U co m N N H U H) A (9 L (h N N co O O 0 o r CO M o rn Q L O m C m U a° N WU) ~ a p r co V N N V O co O 0 O N O o O o 0 0 U c N n m (a c (o u� E v) a v w u� � w fl O O O (D V 7 oD(D (D a' O N N N c p c) O o LL W N N O W N N O C U O N w N a C Q 63 (� f+H Efl fA t ^ N N N N N co N O O )D U )" .- (n C y o) M a w T Go CO a y) by ss a) N 0 0 0 0 0 N 0 • m O m O O O O O i o O m M NCO N Vv N (D 0 0 (D T U c: L D) O N N m N )D C O) c O N N O U N - - C ti w n. 4 m V3 Ef3 EA V3 (1) fA(fl fA fA di tf) fA 1A .. .. .. a) N N N N N 0 0 0 • N A O 0 O w O O O ° 0 0 F O N N F ('o ° 2 > > CL a v m � (nn o m (n wv) Y LIJ_ _ J 6. > _ p O O O j U o O o .o 7 .n d U 7 C C J U) > > - LL a) °o > ° o E Z w N a u~) uu)) u~) uu) .o u ° aa) o > of- I=- (°� 0 o 00000 d ° U m c o) o O n > Z}O @ 7 s°� °» n n .m -7 >. lD N o N Y) w Own- E c $ N 0. Wr a E LU C Z O @ a3 0 Q C V rn O O O c N C V la C 7 N Z 0. O •U NO C (a - (a ;y O',�„ N d N O W N o v -p S W ° E u m n) _ o U) p a aa)) (n,N E X E o N 0 a) 5 w m cLi U c (-) c v J J �° E o W = D W W a m o U c c E 3 ° 2 2@ c� U E > = N V) °° W U v c o o F y d X F O o 0) J Q c E o v W °? = u 0 a u) o n o c ? E U - W _a a°) J c U m Q o E m o y Q LL V 'c m c 3 '� 3 m E ° U E o a W ° E N o W m -Oa a o E U) CA - N E � Z Q O a '� N 3°Q o W U o °�) v o m U Q .N c v Q m o o o d -o ma v) C U U m � ` FU Y N .v m a ° @ ° a) ° QOQ ° a>) F- a n W v Q � QOQ o aa)) Q W o o `o `o ? E a m t N w o o o W > D' UW � � UC7(n � VZOJ W Q UQOw VU (n E 0 CDM 777 Taylor Street,Suite I OSO Fort Worth,Texas 76102 tel: 817 332-8727 fax: 817 332-6870 October 11,2007 Ms. Ann E. Kovich Vice President Turner Collie& Braden,Inc. 1200 Summitt Avenue Suite 600 Fort Worth,TX 76102 Subject: Engineering Letter Agreement for Supplemental Consulting Services Dear Ann: Pursuant to the email correspondence on October 1, 2007, please consider this letter agreement to provide services to assist TC&B with supplemental H&H modeling of the redesigned bridge concepts for the Central City Project. We understand that these supplemental modeling services will be provided to assist in identifying the hydraulic impacts of the new bridge designs only. In order to perform these services,CDM will require detailed CAD drawings showing plan and elevation views of each bridge,with station and elevation data identified perpendicular to the channel. This work will include: • Incorporating the revised proposed bridge sections by TC&B for North Main St., Henderson Ave. and White Settlement Rd. into the current HEC-RAS model; • Evaluating the impact on the TRVA hydraulic design including water surface elevations, velocities, and valley storage; • Attendance at one meeting to discuss results of the model. These services are untended as supplemental modeling to determine, in general, the viability of the revised concepts to satisfy various project constraints. They do not include: • Final model configuration or regulatory submittals; • Written reports; • Changes to civil and/or grading plans; consulting•engineering-construction•operations CDM Ann Kovich October 11, 2007 Page 2 • Other changes to bridges,channel sections, or structures; • Additional HEC-RAS modeling to nutigate for potential hydraulic impacts from the redesigned bridges. The not to exceed amount for these initial services,under this letter agreement, is$9,000. We understand that prior written approval must be obtained for any additional efforts which exceed this amount. If this lett •agreement is acceptable, please sign both copies and return one signed agreement X. Funderlic, s opportunity to be service to TC&B,and the City of Fort Worth. . Associate Camp Dr esser& McKee Inc. Accepted: Date: By: Ann Kovich,Vice President w7;� J a� C:10ocumenls and SeltingOornbergjMl-ocal SellingsVemporary Internet Res10LMD61Kovich 101107.doc COUNCIL=ACTION Approved on 3/4/2008 _ - DATE: 3/4/2008 REFERENCE NO.: **C-22698 LOG NAME: 20TRVBRIDGEAMEN CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Amendment No. 2 to City Secretary Contract No. 33771 with Turner, Collie and Braden for Professional Engineering Design Services for Bridges Located on North Main Street, Henderson Street, and White Settlement Road Over the Future Trinity River By-Pass Channel RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 2 to City Secretary Contract No. 33771 with Turner, Collie and Braden for Professional Engineering Design Services for bridges located on North Main Street, Henderson Street, and White Settlement Road over the future Trinity River by-pass channel in the amount of$215,744 thereby increasing the contract amount to $1,542,744. DISCUSSION: The 2004 Capital Improvement Program included funds which would supplement other funding sources for design and construction of several components to support Trinity River Vision. On July 11, 2006, (M&CC-21560) the City Council authorized the City Manager to execute an agreement with Turner, Collie and Braden (TCB)for the Conceptual and Schematic Bridge Design/Engineering and Environmental Analysis for the Fort Worth Central City Project, also known as Trinity Uptown Bridges in the amount of$1,321,750. The scope of work for this contract included: • The conceptual design of the three Trinity Uptown Bridges in the first phase in the overall development of Trinity Uptown and the Central City Project; • Completion of an environmental document for each of the three bridges per TxDOT requirements; • Comprehensive project management for all tasks and project phases; The agreement was subsequently administratively amended (City Secretary No. 35588), to provide hydraulic modeling, which was not include in the scope of work in the original contract, in the amount of$5,250. Over the last nine months, the U.S. Army Corp of Engineers (CORPS) has been performing additional channel modeling to adjust the original proposed by-pass channel. As the schematic design of the three bridges over the future Trinity River By-Pass Channel was being developed, direction was given to proceed with the schematics even though the CORPS was continuing channel modeling work that had yet been completed. The consultants and staff have identified additional work that was not included in the original contract and find it necessary to submit Amendment No. 2 for this contract. In a letter from TCB dated December 28, 2007, additional work was identified which exceeds the scope of work from the original contract. A detailed breakdown of the additional work a-nd-proposed fee for each task is as follows: • Revise Schematic Plans and Conceptual Bridge Design; • Update Exhibits for Property Impacts; • Hydrologic and Hydraulic Modeling and Access Exhibits for TRWD; • Additional project meetings and management beyond what was originally scoped; • Construction Sequencing Workshop with stakeholders of the bridge construction; • Revise Categorical Exclusion Documents due to changes by CORPS; and • Additional Categorical Exclusion Documentation required. This proposed amendment will allow for TCB to perform the additional work. The amount of the proposed amendment is $215,744. City staff considers this fee to be fair and reasonable for the scope of services to be performed. TCB is in compliance with the City's M/WBE Ordinance by committing to an additional 15 percent M/WBE participation on this Amendment. The city's goal on this amendment is 15 percent. This project is located in COUNCIL DISTRICTS 2 and 9, Mapsco 62V and 62Y. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Street Improvements Fund. TO Fund/Account/Centers FROM Fund/Account/Centers C200 531200 209230014430 $215,744.00 Submitted for City Manager's Office by: Fernando Costa (Acting) (6122) Originating Department Head: Robert Goode (7913) Additional Information Contact: Randle Harwood (6101) Jim Walker (8009) F31