HomeMy WebLinkAboutContract 29554 AMENDMENT NO AMENDMENT NO. 2 STATE OF TEXAS (5 CITY SE CRE TARY CONTRACT NO. Vim•% (M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and Freese and Nichols, Inc. , (Engineer) made and entered into City Secretary Contract No. 27835, (the Contract) which was authorized by the City Council by M&C C-19124 on the 18th day of June 2002 and; subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Holly/Northside II 54-inch, Water Main Extension, Contract 1 . WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, of the Contract is amended to include the addition- al engineering services specified in M&C C-19938, adopted by the City Council on 20th day of January 2004 , and further amplified in a proposal letter dated October 28, 2003, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $82,554 . 15. 2 . Article II , of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not .exceed the sum of $1 ,066,503. 15. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of , 2004, in Fort Worth, Tarrant County, Texas. ATTEST:, Contract authorization G1or" a Pearson, City Secretary City Secretary Date APPROVAL RECOMMENDED: A. Douglas Rademaker, P.E. Marc A. Ott Director, Department of Assistant City Manager Engineering FREESE AND NICHOLS, INC. Engineer By: Name:Thomas Haster, P.E . Principal 4055 International Plaza, Suite 200 Fort Worth, TX 76109 APP RO AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney -2- Freese Nl c h o ls, IriC. Engineers Environmental Scientists Architects 4055 International Plaza,Suite 200 Fort Worth,Texas 76109 817 735-7300 817 735-7491 fax www.freese.com October 28,2003 Mr. Gopal Sahu Project Manager City of Fort Worth, Department of Engineering 1000 Throckmorton Street Fort Worth,Texas 76102 Re: Amendment#2 Proposal - Revised Holly 54-inch Water Main from Azle Avenue to Northside Pump Station City Secretary Contract Number 27835 Dear Mr. Sahu: We have revised the referenced proposal to remove the sanitary sewer lowering in Unit 2. The 500-foot sanitary sewer extension along Harrington Street(Unit 3) is still included, per Water Department request. A summary of the items included in the proposal follows: 1. Prepare a Storm Water Pollution Prevention Plan and NOI for Units 1,2, and 3 2. Design of various sanitary sewer improvements in Unit 2 (see attached Exhibit A-1 for locations) 3. Design of various sanitary sewer improvements in Unit 3 (see attached Exhibit A-1 for locations) 4. Survey for additional waterline improvements to be designed between Rupert Street and the flea market. 5. Survey of Sanitary Sewer Line L-701R*, for design of plugging of that line. Please find attached 7 copies of our proposal to provide these services for the lump sum fee of $82,554.15. Your expeditious execution of this Amendment#2 to our original contract would be greatly appreciated. We appreciate the opportunity to be of continued service to you. If you have any questions or comments,please contact me at(817) 735-7238. Sincerely, FREESE AND NICHOLS, INC. 4'" ;941 Thomas Haster,P.E. Principal AMENDMENT NO. 2 STATE OF TEXAS § CITY SECRETARY CONTRACT NO. 27835 COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Freese and Nichols, Inc., (Engineer) made and entered into City Secretary Contract No. 27835 (the Contract) which was authorized by the City Council by M&C C-19124 on the 181h day of June, 2002; and WHEREAS, the Contract involves engineering services for the following project: For Worth Holly 54" Water Transmission Line WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in the attached Exhibits — A-1, B-1, B-2, B-3A, B-3B, B-3C, B-4, and cost estimate, which are incorporated herein. The cost to City for the additional services to be performed by Engineer total $82,554.15. 2. Article H of the Contract is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, including this and all other amendments, so that the total fee paid by the City for all work and services shall be the sum of$1,066,503.15. 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. JT , _ _ .. EXECUTED on this the day of , 2003_, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: A.Douglas Rademaker, P.E. Marc Ott Director, Department of Assistant City Manager Engineering ATTEST: Freese and Nichols, Inc. ENGINEER Gloria Pearson, City Secretary By: za Name: Thomas Haster, P.E. Principal APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney EXHIBIT 66A-1" SUPPLEMENTAL SCOPE OF SERVICES The following is a clarification of the tasks that the ENGINEER will perform under Amendment 2 to the existing contract for Holly/Northside II Phase I Units 1,2,and 3.Work under this attachment includes engineering services for sewer improvements, waterline surveying, and SWPPP preparation for the following: • SWPPP and NOI for the 54" waterline project (from Holly WTP to Northside II tank). Requested by Department of Engineering. • Design of 43 feet of 6"sanitary sewer to replace existing 6"sanitary sewer line L-1436,from station 2+08 to 2+51. Requested by Water Department. • Design of 143 feet of 8"sanitary sewer to replace existing 6"sanitary sewer line L-1436, from station 2+51 to 3+94. Requested by Water Department. • Design of 25 feet of 6"sanitary sewer to replace existing 6"sanitary sewer line L-1436,from station 3+94 to 4+19. Requested by Water Department. • Design of 42 feet of 6"sanitary sewer to replace existing 6"sanitary sewer line 1-4262,from station 1+88 to 2+30. Requested by Water Department. • Design of 96 feet of 8"sanitary sewer to replace existing 6"sanitary sewer line L-1262,from station 2+30 to 3+26. Requested by Water Department. • Design of 706 feet of 8"sanitary sewer to replace existing 8"sanitary sewer line L-677R,from station 1+76 to 8+82. Requested by Water Department. • Design of 182 feet of 8"sanitary sewer to replace existing 8"sanitary sewer line L-701,from station 1+87 to 3+69. Requested by Water Department. . • Design of 351 feet of 8" sanitary sewer to replace existing 6" sanitary sewer line L-2107, from station -0+45 to 3+06. Requested by Water Department. • Design of 319 feet of 12" sanitary sewer to replace existing 12" sanitary sewer line L-1984, from station —0+82 to 2+37. Requested by Water Department. • Design of 65 feet of 10"sanitary sewer to replace existing sanitary sewer line L-7086,from station 3+97(65' LT) to 3+97. Requested by Water Department. • Design of 399 feet of 10" sanitary sewer to replace existing 10" sanitary sewer line L-7086, from station 3+97 to 7+96. Requested by Water Department. • Design of 72 feet of 8"sanitary sewer to replace existing 6"sanitary sewer line L-7086,from station 7+96 to 8+68E. Requested by Water Department. • Design of 840 feet of 16" sanitary sewer to replace existing 12" sanitary sewer line L-2596, from station 0+00 to 8+40. Requested by Water Department. • Design of 317 feet of 8"sanitary sewer to replace existing 6"sanitary sewer line L-2596, from station 8+40 to 11+57E. Requested by Water Department. • Design of 2,208 feet of 12" sanitary sewer to replace existing 12" sanitary sewer line L-1898, from station 0+00 to 22+08. Requested by Water Department. • Design of 33 feet of 8"sanitary sewer to replace existing 6"sanitary sewer line L-3772,from station 0+00 to 0+33. Requested by Water Department. • Design of 45 feet of 8"sanitary sewer to replace existing 6"sanitary sewer line L-7060,from station 0+00 to 0+45. Requested by Water Department. • Design of extension of 500 feet of 8" sanitary sewer for sewer line L-701, from station -3+08 to 1+92. Requested by Water Department. • Survey of line L-701R* from station 0+00 to 1+92, for design of plugging the line. Requested by Water Department. • Survey for design of 12" and 8" waterlines to abandon existing 30" waterline F-25, from station 63+00 to 84+75. Requested by Water Department. Upon receipt of notice to proceed, the ENGINEER will perform the following tasks. TAFort WortMolly 54\Amendment#2\Exhibit ALdoc PART I—SANITARY SEWER DESIGN ENGINEER Will Provide the Following Information: All plans, field notes,plats, maps,legal descriptions,or other specified documents prepared in conjunction with the requested services shall be provided in a digital format compatible with the electronic data collection and computer aided design and drafting software currently in use by the OWNER. All text data such as plan and profile, legal descriptions, coordinate files, cut sheets, etc., shall be provided in the American Standard Code for Information Interchange (ASCII) format, and all drawing files shall be provided in Autocad (DWG or DXF) format , or as otherwise approved in writing by the OWNER,and all data collected and generated during the course of the project shall become the property of the OWNER. A. Survey The survey for the proposed 54"waterline will be used for the sanitary sewer plans,except for Line L701 R*. B. Preliminary Engineering Pg_ lans ENGINEER will prepare construction plans as follows: 1. Plan view of proposed sanitary sewer lines and tie-ins to existing sewer lines. Plan of abandonment of existing sewer lines. 2. Plan view of proposed sanitary sewer manholes. 3. Profile of proposed sanitary sewer lines, showing line size, type, class, slope, flowline elevations, manholes,and tie-ins to existing lines. 4. Tables showing numbers of anticipated long and short sewer service lines replacements. 5. The Engineer shall submit 5 sets of preliminary plans and specifications to the Owner. 6. The Engineer shall submit a preliminary estimate of probable construction cost with the preliminary plans submittal. 7. The Engineer shall submit plans to the City's utility coordinator for submission to franchised utilities. C. Final Engineering Plans 1. Final Construction Documents shall be submitted to OWNER 30 days after approval of Preliminary Construction Plans. Following OWNER approval of the recommended improvements, the ENGINEER shall prepare final plans and specifications and contract documents to OWNER (each sheet shall be stamped,dated,and signed by the ENGINEER)and submit two(2)sets of plans and construction contract documents within 15 days of OWNER's final approval. 2. The ENGINEER shall submit a final estimate of probable construction cost with the final plans submitted. D. Construction Assistance 1. Bid Documents Submittal The ENGINEER will make available for bidding,upon request by the OWNER,up to 20 sets of the final approved and dated plans and specifications and contract documents for the projects to the OWNER for distribution to potential bidders. Proposal will be provided in electronic format. TAFort Worth\HoUy 5AAmendment#2\Exhibit ALdoc 2. Bidding Assistance The ENGINEER shall assist the OWNER during phase including preparation and delivery of addenda to, responses to questions submitted to the OWNER by prospective bidders. ENGINEER shall attend the scheduled pre-bid conference. The ENGINEER shall assist in reviewing the bids for completeness and accuracy. The ENGINEER shall attend the project bid opening(s), develop bid tabulations in hard copy and electronic format and submit four(4) copies of the bid tabulation. 3. Assistance During Construction The ENGINEER shal I attend the pre-construction conference for the project. The ENGINEER shall also consult with and advise the OWNER on design and/or construction changes, if necessary. PART H—SURVEY ENGINEER Will Provide the Following Information: A. Surveys for Design 1. ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information which will be needed for use by the ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations for all sanitary and adjacent storm sewers, rim/invert elevations, location and buried utilities, structures, and other features relevant to the final plan sheets. For sewer lines located in alleys and backyards,ENGINEER will obtain the following: Obtain permission for surveying through private property Locate horizontal and vertical alignment of utility lines. Tie improvements, trees, fences, walls, etc. horizontally along rear lines in an approximately 20' wide strip. In addition, locate all rear house corners and building corners in backyards. Compile base plan from field survey data at 1"=20'horizontal and 1" =2' vertical scale. Profile existing water and/or sewer line centerline. Compile base plan from field survey data at 1"-20' scale. When conducting design survey at any location on the project, the consultant or its sub-consultant shall carry readily visible information identifying the name of the company and the company representative. All company vehicles shall also be readily identified. 2. Engineer Will Provide the Following Information: All plans,field notes,plats,maps, legal descriptions,or other specified documents prepared in conjunction with the requested services shall be provided in a digital format compatible with the electronic data collection and computer aided design and drafting software currently in use by the CITY Department of Engineering. All text data such as plan and profile, legal descriptions, coordinate files, cut sheets, etc., shall be provided in the American Standard Code for Information Interchange(ASCI)format,all drawing files shall be provided in Autocad (DWG or DXF) format, or as otherwi ' writing by the CITY,and all data collected and generated during the course of the project s aR beComl. t .- -Property pf the CITY. TAFort Worth\Holly 54\Amendment#2\Exhibit AI.doc The minimum information to be provided in the plans shall include the following: 1. A Project Control Sheet,showing ALL Control Points,used or set while gathering data. Generally on a scale not less than 1:400. 2. The following information about each Control Point; a. Identified (Existing City Monument#8901, PK Nail, 5/8" Iron Rod b. X,Y,and Z Coordinates,in an identified coordinate system,and a referred bearing base.Z coordinate on City Datum Only. c. Descriptive Location(Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast Corner of North Side Drive and North Main Street.) 3. Coordinates on all P.C.'s,P.T.'s,P.I.'s,Manholes,Valves,etc.,in the same coordinate system as Control. 4. No less than two horizontal control points, per line or location. 5. Bearings given on all proposed centerlines, or baselines. 6. Station equations relating utilities to paving, when appropriate. B. Public Notification and PersonneUVehicle Identification Prior to conducting design survey,ENGINEER will notify affected residents of the project in writing. The notification letter shall be on company letterhead and shall include the following: project name, limits, DOE project no., Consultant's project manager and phone no., scope of survey work and design survey schedule. The letter will be reviewed and approved by the City prior to distribution. When conducting site visits to the project location,the consultant or any of its sub-consultants shall carry readily visible information identifying the name of the company and the company representative. All company vehicles shall also be readily identifiable. C. Right-of-way Research The ENGINEER will conduct preliminary research for availability of existing easements where open-cut construction or relocation of existing alignments is probable. Temporary and permanent easements will be appropriated based on available information and recommendations will be made for approval by the City. D. Right-of-way/Easement Preparation and Submittal Preparation and submittal of right-of-way, easements and right-of-entry will be in conformance with "Submittal of Information to Real Property for Acquisition of Property". PART III—STORM WATER POLLUTION PREVENTION PLAN (SWPPP) A. Prepare a Notice of Intent Form and Storm Water Pollution Prevention Plan 1. Engineer will assist the City and its contractor with preparation of a Notice of Intent form to obtain coverage under the NPDES/TPDES general permit for storm water discharges from construction activities. In addition,Engineer will prepare a storm water pollution prevention plan(SWPPP)which the contractor is required to maintain at the construction site. TAFort Worth\Hotly 54\Amendment#2\Exhibit ALdoc EXHIBIT 44B-1" METHOD OF PAYMENT (SUPPLEMENT TO ATTACHMENT `B" OF ORIGINAL CONTRACT) I. METHOD OF PAYMENTS The ENGINEER shall be paid in monthly partial payments as outlined below: A. The ENGINEER shall be paid in monthly payments upon the receipt of individual invoices for each partial payment request from the ENGINEER. B. Partial payments shall not exceed the equivalent of 50%of the total lump sum fee,until City approval of the Preliminary Design. C. Partial payments shall not exceed the equivalent of 85%of the total lump sum fee,until City approval of the Final Design. D. The balance of the lump sum fee shall be payable after General Construction Representation is complete. II. PROGRESS REPORT A. The ENGINEER shall submit to the designated representative of Director of Department of Engineering monthly progress reports covering all phases of design by the 15t11 of every month in the format required by the City. B. If the ENGINEER determines in the course of making design drawings and specifications that the construction cost estimate of$787,684.00 will be exceeded whether by change in scope of the Project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City's Director of the Department of Engineer and, if so instructed by Director of the Engineer Department, shall suspend all work hereunder. ID-r TAFort Worth\E-folly 54�Amendment#2�Amendment 2.doc J Exhibit B2 COMPENSATION -LUMP SUM Compensation rates shall be as indicated in Exhibit B2 of City Secretary Contract Number 27835. EXHIBIT "B-3A" COST SUMMARY HOLLY 54" WATER TRANSMISSION LINE—AMENDMENT 2 Item 7 Total Fee MWBE Fee MWBE % of Total Fee A. Basic Services —Sanitary Sewer $61,439 $0 0.0% B. Special Services —Sanitary Sewer j 1. Survey $786.50 $786.50 I 100.0% I B. Subtotal Special Services ' $786.50 $786.50 100.0% C. Reproduction $2,5001 $2,5001 100.0% D. 10% for Subconsultant Markup $328.65 ;D. 0.0% TOTAL SANITARY SEWER $65,054.15 $3,286.501 5.1% Item Total Fee MWBE MWBE % of Fee Total Fee A. Basic Services —Water j $0 $0 ! 0.0% B. Special Services —Water I 1. SWPPP Preparation $ 4,300 ' 0.0% 2. Survey of Rupert Water Area $ 12,000 1 $12,0001 100.0% [ I B. Subtotal Special Services 1 $16,300 $12,000 73.6% i i C. Reproduction $0 $0 1 0% D. 10% for Subconsultant Markup j $1,200 $0 ! 0.0% TOTAL WATER/SEWER $179500 $129000 68.6% MWBE Sub-consultants Services Fee % of Total Fee Lopez Garcia Group Surveying $12,786.50 15.5% AlphaGraphics Reproduction $2,500 3.0% TOTAL MWBE Participation $15,286.50 18.5% r TAFort Worth\Holly 54\Amendment k2Vlmendment 2.doc �' EXHIBIT`B-3B" (SUPPLEMENT TO ATTACHMENT`B") PRE-SUMMARY OF TOTAL PROJECT FEES Description of Item Quantity Unit Unit Value Total Value Engineer's Opinion of Probable Construction Cost $787,684 TSPE Curve "A": % of Construction Cost 7.8 % 1.00 7.8% Basic Engineering Design Fee 7.8 % $787,684 $61,439 Special Services Fee $17,086.50 Reproduction Services Fee $2,500 10% Mark-Up for Sub-Consultants $1,528.65 TOTAL FEE $82,554.15 TAFon Worth\HoDy 54\Amendment#244mendment 2.doc EXHIBIT"B-3C" (SUPPLEMENT TO EXHIBIT "BI") .BREAKDOWN OF ENGINEERING FEE Task Part I-Sanitary Sewer Design Principal Project Project Geotech CADD Word Total - Estimated Manager Engineer Engineer Tech. Proc Hours Total Fee B Preliminary Engineering Plans 5 45 75 0 190 -7 I',322 $33,844- C 33,844C Final Engineering Plans 5 30 70 0 155 3 263 :$27,596 Dl D2 ` Sanitary Sewer Design Total - $61,440 Task Part -Survey A&B Design Survey 2,550 Linear Feet @$3.25/L.F.= $8,286.50 C&D Preparation of Easement Documents 6 Easement Documents @$750 Each= $4,500.00 10%Mark-up for Subconsultant $1,278.65 Waterline Survey Total $14,065.15 Task Part III-SWPPP A Prepare NOI and SWPPP 1 .3 12 0 : 25 01 41 $4,302 SWPPP Total $4,3021 Phase REPRODUCTION 1 19 Sets of Preliminary Plans 38 sets @ $11 /set $418 52 Sets of Final Plans 104 sets @ $11 /set $1,144 54 Sets of Specifications 198 sets @ $7 /set $792 1 Set of Record Drawing Reproducible 2 sets @ $76 /set $152 10%Markup for Subconsultant $250 REPRODUCTION Total $2,756 ENGINEERING FEE TOTAL $82,562 EXHIBIT `B-4" (SUPPLEMENT TO ATTACHMENT `B") SUMMARY OF CONSTRUCTION COSTS ITEM Total Cost Units 2 and 3 Sanitary Sewer $787,684 TOTAL CONSTRUCTION COST $787,684 TAFort Wonh\Holly 54\Amendment#2\Amendment 2.doc City of Fort Worth Holly 54"Main from Northside Tank to Northside Drive-Phase I . Units 1,2,and 3 Amendment#2-Sanitary Sewer Design,Rupert Water Improvements,SWPPP Preparation Preliminary Opinion of Probable Construction Cost rgk 10.28-03 Summary of Estimate a hem Cost 1 Unit 2 Sanitary Sewer Improvements $109,422 2 Unit 3 Sanitary Sewer Improvements 5678,262 Total $787,684 Unit # Item 4 Unit Quantity Cost Cost Unit 2 Sanitary Sewer 1 6-Pressure Rated.Sever Pie LF 110 $43.00 $4,730 2 8-Pressure Rated Sewer Pipe LF 945 S20.00 $18,900 3 Cleaning and Pre-Construction TV inspection 1200 1 00 1,200 4 4'dia.Manholes(up to 6'dee EA 2 $2,150.00 54,300 5 4'dia.Drop Manholes(up to 6'dee EA 1 I 53,350.00 53,350 6 4'dia.Shallow Manholes EA 4 $1,475.00 $5,900 7 Additional Depth for Manholes VF 10 $115.00 $1,150 8 Concrete Collars EA 7 5320.00 $2,240 9 watertight Manhole Inserts EA 7 $35.00 $245 t0 4'Service Tap to Main EA 14 $355.00 $4,970 11 4"Service Line LF 500 $26.00 $13,000 12 Remove Existing Manholes FA 7 $500.00 53,500 13 Concrete Encasement of 8-Sewer Line LF 945 S14.00 $13,230 14 Concrete Encasement of 6-Sewer Line LF 100 $12.50 $1,250 15 Vacuum Test Manholes EA 1 7 $101.00 $707 16 Post-Construction TV Inspection LF 1,200 $1.00 $1,200 17 Trench Safety System LF 1,100 $2.00 $2,200 16 Replace 7-Concrete Curb and Gutter LF 400 $12.00 $4,800 19 Concrete Driveway and Sidewalk Repair SY 500 533.00 $16,500 20 Hydromulch eeding LF 1.000 $0.55 $550 21 Temporary Asphalt Pavement Repair LF 1,100 $5.00 $5,560 Total Unit 2 Sanitary Sewer 5709,422 Unit # Item Unit Quantity, Cost Cost Unit 3 S nitary Sewer 1 16'Sewer Pie LF 640 564.00 $53.760 2 12'Pressure Rated Sewer Pie LF 2,527 $48.00 $121,296 3 10'Sewer Pie LF 464 $40.00 $18,560 4 8'Pressure Rated Sewer Pie LF 1,500 $32.00 $48,000 5 Cleaning and Pre-Construction TV Inspection LF 5,500 $2.00 $11,000 6 4'dia.Manholes(up to 6'dee FA 23 $2,500.00 $57,500 7 4'dia,Drop Manholes(up to 6'deep) EA 1 $3,000.00 $3,000 8 Additional Depth for Manholes VF 30 $200.00 $6,000 9 Concrete Collars FA 24 5200.00 $4,1100 10 Waters ht Manhole Inserts EA 24 $500.00 $12,000 11 4'Service Tap to Main FA 20 $200.00 $4,000 12 4'Service Line LF 750 $20.00 $15,000 13 Remove Existing Manholes EA 15 $500.00 $7,500 14 Concrete Encasement of 12'Sewer Line LF 1 2,527 $12.001 $30.T24- 15 Concrete Encasement of 8'Sewer Line LF 1,500 $9.00 $13,500 18 Vacuum Test Manholes EA 24 $300.00 $7,200 17 Post-Construction TV In tion LF 5,500 $2.00 $11,000 18 Trench Safety System LF 5,331 $2.00 $10,662 19 Replace 7-Concrete Curb and Gutter LF 1,200 $20.00 $24,000 20 Concrete Driveway and Sidewalk Repair SY 1,500 $55,00 582,500 21 Hydrornulch Seeding LF 3,000 $5.00 $15,000 22 Ternporary Asphalt Pavement Repair LF 5,000 $12.00 $60,000 23 Contingencies®10% LS 1 $61.660.20 $61,660 Total Unit 3 Sanitary Sewer $678,262 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 1/20/2004 DATE: Tuesday, January 20, 2004 LOG NAME: 30FREESEHOLLY2 REFERENCE NO.: **C-19938 SUBJECT: Amendment No. 2 to Engineering Agreement with Freese and Nichols, Inc. for Holly/Northside II 54- Inch Water Main Extension, Contract I RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 2 to City Secretary Contract No. 27835 with Freese and Nichols, Inc. in the amount of $82,554.15, thereby increasing the contract amount to $1,066,503.15. DISCUSSION: On June 18, 2002 (M&C C-19124), the City Council authorized the City Manager to execute an engineering agreement with Freese and Nichols, Inc. in the amount of $925,449.00 to prepare plans and specifications for the Holly/Northside li 54-inch Water Main Extension, Contract I. The project was divided into three units in order to expedite construction. Units 1 and 2 are under construction, and Unit 3 will be advertised for bid in January 2004. This contract was previously revised by Amendment No. 1 on August 12, 2003, in the amount of$58,500.00 for limited construction inspection services. Amendment No. 2 allows Freese & Nichols, Inc. to provide additional engineering services to prepare plans and specifications for approximately 2445 feet of 8-inch, 464 feet of 10-inch, 2527 feet of 12-inch, and 840 feet of 16-inch sanitary sewer pipes. These sanitary sewer lines are along the new 54-inch water line route and need to be replaced in conjunction with the construction of the new water main. This additional work was made at the request of the Water Department, and was not included in the original scope of work. In addition to these services, Freese and Nichols, Inc. will also prepare plans and specifications for storm water pollution prevention plans not included in the original scope of work. Freese and Nichols, Inc. proposes to provide these services for a lump sum fee of $82,554.15. City staff considers this fee to be fair and reasonable for the scope of services proposed. Freese & Nichols, Inc. is in compliance with the City's M/WBE Ordinance by committing to 19% M/WBE participation on this Amendment No. 2. The City's goal on this amendment is 17%. This project is located in COUNCIL DISTRICT 9, Mapsco 61C and H; 62E, J, N, P, U, and Y; and 76C. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. Logname: 30FREESEHOLLY2 Pase 1 of 2 TO Fund/Account/Centers FROM Fund/Account/Centers P163 531200 060163014104 82 554.15 Submitted for City Manager's Office by- Marc Ott (8476) Originating Department Head: A. Douglas Rademaker (6157) Additional Information Contact: A. Douglas Rademaker (6157) Logname: 30FREESEHOLLY2 Pap-e 2 of 2