WHEREAS, the City of Fort Worth (City) and Dunaway Associates, L.P., (Engineer)
made and entered into City Secretary Contract No. 27112, (the Contract) which was authorized
by the City Council by M&C 18759 on the 2"a day of October, 2001; and subsequently revised by
six amendments; and
WHEREAS, the Contract involves engineering services for the following project:
DESIGN WATER AND SANITARY SEWER LINES FOR GREENWAY MODEL
BLOCK ADDITION
WHEREAS, it has become necessary to execute Amendment No. 7 to said Contract to
include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the additional engineering services
specified in the proposal letter dated July 1, 2005, a copy of which is attached hereto and
incorporated herein. The cost for the additional professional services to be performed by
the Engineer totals $16,150.00.
2.
Article 11 of the Contract is amended to provide for an increase in the maximum fee to be
paid the Engineer for all work and services under the Contract, as amended, so that the total fee
paid by the City for all work and services shall not exceed $424,111.80.
All other provisions of the Contract which are not expressly amended herein shall remain
in full force and effect.
EXECUTED on this day of
2005, in Fort Worth, Tarrant County, Texas.
ATTEST:
City Secretary j �� r` NO M&CREQUIRED
APPROVAL RECOMMENDED: APPROVED:
A. Douglas Rademaker, P.E. Marc Ott
Director, Department of Engineering Assistant City Manager
Dunaway Associates, L.P.
ENGINEE
By:
Assoc
Name: Brian Darby, P.E.,
1501 Merrimac Circle, Suite 100
Fort Worth, TX 76107-6572
APPROVED AS TO FORM AND LEGALITY:
A
ary inb�rger
Assiit6nt City Attorney
o1 � � x !
f
4%
Dunaway -Egineers
2* V Planners
T D Surveyors
L
Associates, .1 Landscape Architects
DAI No. 2001089
July 1, 2005
Mr. Fred Ehia, P.E.
City of Fort Worth
Department Of Engineering
Fort Worth, Texas 76102
Reference: Amendment No. 7 - Revised
Greenway Addition Model Block
Water Project No. PW 53-060530176130
Sewer Project No. PS 58-070580175450
Dear Mr. Ehia:
Dunaway Associates, L.P. is pleased to present this Amendment No. 7 for the following
additional services that are beyond our original scope of services.
• Additional site investigation & option development for highway crossing per specific
request by City. Alignment alternatives were investigated to route north at Craver Street
and to route south on Pharr Street. Site visits with TXDOT were required to determine if
the alignment option solutions were feasible.
• Additional geotechnical borings for highway crossing per specific request by the City to
determine the existing soil conditions at the bore location. This entailed coordination with
a geotechnical engineer and additional site visits to determine ideal bore locations.
• Additional TXDOT geotechnical boring permit for highway crossing and associated
required traffic control plan. An additional TXDOT permit is required to carry out the
necessary geotechnical bores and an associated traffic control plan had to be developed
and submitted to TXDOT for there approval.
• Additional coordination meetings with the various staff in the multiple City departments,
construction contractors for all portions of active construction in the area (public and
private), and the various staff in the multiple TxDOT departments for highway crossing
options and geotechnical borings as mentioned above.
• Additional site visits for highway crossing options and geotechnical borings as mentioned
above.
1501 Merrimac Circle•Suite 100•Fort Worth,Texas 76107
Tel:817.335.11 Z1•Metro:817.429.2135•Fax:817.335.7437
www.dunawayassociates.com
• Amendment No. 7 - Revised
July 1, 2005
Page 2
• Past escorted site visits with the Project Manager, Inspector, and/or City Contractor to
construction site per specific City request by the Project Manager in January, February,
and June to address the following issues:
o January 2005 — Field investigation, consultation, alternate evaluation, and formal
recommendation report for water line fittings arrangement at intersection of Mony
Street & 1-35W frontage road
o January 2005 - Field investigation, consultation, altemate evaluation, and formal
recommendation report for water line fittings arrangement at western tie-in
connection in Mony Street.
o January 2005 - Field investigation, consultation, alternate evaluation, and formal
recommendation report for water line alignment adjustment along 1-35W frontage
road.
o February 2005 - Field investigation, consultation, alternate evaluation, and formal
recommendation report for sanitary sewer pipe boring material and location
options under creek crossing Delga.
o June 2005 - Field investigation, consultation, alternate evaluation, and formal
recommendation report for Cold Springs alignment options around verified utility
locations among multiple groupings&owners of multiple railroad facilities.
o July 2005 - Field investigation, consultation, alternate evaluation, and formal
recommendation report for previously cleared Southwestern Bell overhead
facilities conflict.
• Past updates to plans & re-issue of plans to incorporate requested revisions based on the
site visits for the reasons listed in the item above.
• Amendment No. 7 - Revised
July 1, 2005
Page 3
A summary of the proposed budget for this proposal is as follows:
Basic Fee
Investigation &options for highway crossing $ 1,200.00
Geotechnical borings for highway crossing $ 2,500.00
TxDOT geotech boring permit for highway crossing &traffic control $ 1,800.00
Coordination for highway crossing $ 2,000.00
Site visits for highway crossing $ 2,000.00
Past site visits to project at City's request $ 3,200.00
Past updates to plans for site visits $ 3,200.00
Subconsultant Coordination 101/6 $ 250.00
TOTAL PROPOSED AMENDMENT $ 16150.00
Please review the enclosed information and do not hesitate to call me if you have any
questions or require additional information regarding this proposal.
Sincerely,
DUNAWAY ASSOCIATES, L.P.
e _
Brian S. Darby, P.E.
Associate
2001089 Amendment#7 FEhia bsd 05-07-01-Revised.doc
—^n -
FORT WORTH
TO: A. Douglas Rademaker,P.E.
FROM: Fred Ehia,P.E.
DATE: July 14, 2005
RE: DESIN OF WATER LINE IN GREENWAY INDUSTRIAL PARK,DOE #4533,
AMENDMENT#7
As requested by the Water Department, DUNAWAY ASSOCIATES,INC., Inc. has submitted a
proposal to redesign water Line.
DUNAWAY ASSOCIATES,INC..requested to perform these additional services for a fee not to exceed
$16,150.00 increasing the contract fee to $424,111.80
Staff considers this fee to be fair and reasonable for the scope of services proposed. Please authorize this
additional design by your signature on the attached Contract Amendment form.
Xc: Rick Trice
ENGINEERING DEPARTMENT
THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311
(817) 871-7941 * FAx (817) 871-7854
Printed on recycled paper