Loading...
HomeMy WebLinkAboutContract 32154 AMENDMENT No. 7 THE STATE OF TEXAS § CITY SECRETARY CONTRACT NO. C--�,(-)J-5L[ (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Dunaway Associates, L.P., (Engineer) made and entered into City Secretary Contract No. 27112, (the Contract) which was authorized by the City Council by M&C 18759 on the 2"a day of October, 2001; and subsequently revised by six amendments; and WHEREAS, the Contract involves engineering services for the following project: DESIGN WATER AND SANITARY SEWER LINES FOR GREENWAY MODEL BLOCK ADDITION WHEREAS, it has become necessary to execute Amendment No. 7 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in the proposal letter dated July 1, 2005, a copy of which is attached hereto and incorporated herein. The cost for the additional professional services to be performed by the Engineer totals $16,150.00. 2. Article 11 of the Contract is amended to provide for an increase in the maximum fee to be paid the Engineer for all work and services under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed $424,111.80. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this day of 2005, in Fort Worth, Tarrant County, Texas. ATTEST: City Secretary j �� r` NO M&CREQUIRED APPROVAL RECOMMENDED: APPROVED: A. Douglas Rademaker, P.E. Marc Ott Director, Department of Engineering Assistant City Manager Dunaway Associates, L.P. ENGINEE By: Assoc Name: Brian Darby, P.E., 1501 Merrimac Circle, Suite 100 Fort Worth, TX 76107-6572 APPROVED AS TO FORM AND LEGALITY: A ary inb�rger Assiit6nt City Attorney o1 � � x ! f 4% Dunaway -Egineers 2* V Planners T D Surveyors L Associates, .1 Landscape Architects DAI No. 2001089 July 1, 2005 Mr. Fred Ehia, P.E. City of Fort Worth Department Of Engineering Fort Worth, Texas 76102 Reference: Amendment No. 7 - Revised Greenway Addition Model Block Water Project No. PW 53-060530176130 Sewer Project No. PS 58-070580175450 Dear Mr. Ehia: Dunaway Associates, L.P. is pleased to present this Amendment No. 7 for the following additional services that are beyond our original scope of services. • Additional site investigation & option development for highway crossing per specific request by City. Alignment alternatives were investigated to route north at Craver Street and to route south on Pharr Street. Site visits with TXDOT were required to determine if the alignment option solutions were feasible. • Additional geotechnical borings for highway crossing per specific request by the City to determine the existing soil conditions at the bore location. This entailed coordination with a geotechnical engineer and additional site visits to determine ideal bore locations. • Additional TXDOT geotechnical boring permit for highway crossing and associated required traffic control plan. An additional TXDOT permit is required to carry out the necessary geotechnical bores and an associated traffic control plan had to be developed and submitted to TXDOT for there approval. • Additional coordination meetings with the various staff in the multiple City departments, construction contractors for all portions of active construction in the area (public and private), and the various staff in the multiple TxDOT departments for highway crossing options and geotechnical borings as mentioned above. • Additional site visits for highway crossing options and geotechnical borings as mentioned above. 1501 Merrimac Circle•Suite 100•Fort Worth,Texas 76107 Tel:817.335.11 Z1•Metro:817.429.2135•Fax:817.335.7437 www.dunawayassociates.com • Amendment No. 7 - Revised July 1, 2005 Page 2 • Past escorted site visits with the Project Manager, Inspector, and/or City Contractor to construction site per specific City request by the Project Manager in January, February, and June to address the following issues: o January 2005 — Field investigation, consultation, alternate evaluation, and formal recommendation report for water line fittings arrangement at intersection of Mony Street & 1-35W frontage road o January 2005 - Field investigation, consultation, altemate evaluation, and formal recommendation report for water line fittings arrangement at western tie-in connection in Mony Street. o January 2005 - Field investigation, consultation, alternate evaluation, and formal recommendation report for water line alignment adjustment along 1-35W frontage road. o February 2005 - Field investigation, consultation, alternate evaluation, and formal recommendation report for sanitary sewer pipe boring material and location options under creek crossing Delga. o June 2005 - Field investigation, consultation, alternate evaluation, and formal recommendation report for Cold Springs alignment options around verified utility locations among multiple groupings&owners of multiple railroad facilities. o July 2005 - Field investigation, consultation, alternate evaluation, and formal recommendation report for previously cleared Southwestern Bell overhead facilities conflict. • Past updates to plans & re-issue of plans to incorporate requested revisions based on the site visits for the reasons listed in the item above. • Amendment No. 7 - Revised July 1, 2005 Page 3 A summary of the proposed budget for this proposal is as follows: Basic Fee Investigation &options for highway crossing $ 1,200.00 Geotechnical borings for highway crossing $ 2,500.00 TxDOT geotech boring permit for highway crossing &traffic control $ 1,800.00 Coordination for highway crossing $ 2,000.00 Site visits for highway crossing $ 2,000.00 Past site visits to project at City's request $ 3,200.00 Past updates to plans for site visits $ 3,200.00 Subconsultant Coordination 101/6 $ 250.00 TOTAL PROPOSED AMENDMENT $ 16150.00 Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Sincerely, DUNAWAY ASSOCIATES, L.P. e _ Brian S. Darby, P.E. Associate 2001089 Amendment#7 FEhia bsd 05-07-01-Revised.doc —^n - FORT WORTH TO: A. Douglas Rademaker,P.E. FROM: Fred Ehia,P.E. DATE: July 14, 2005 RE: DESIN OF WATER LINE IN GREENWAY INDUSTRIAL PARK,DOE #4533, AMENDMENT#7 As requested by the Water Department, DUNAWAY ASSOCIATES,INC., Inc. has submitted a proposal to redesign water Line. DUNAWAY ASSOCIATES,INC..requested to perform these additional services for a fee not to exceed $16,150.00 increasing the contract fee to $424,111.80 Staff considers this fee to be fair and reasonable for the scope of services proposed. Please authorize this additional design by your signature on the attached Contract Amendment form. Xc: Rick Trice ENGINEERING DEPARTMENT THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102-6311 (817) 871-7941 * FAx (817) 871-7854 Printed on recycled paper