Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 32754
CITY SECRETARY CONTRACT NO . u ,1Y SPECIFICATIONS I).©•E• IVUE AND CONTRACTOR'S 80NDING CC� CCONSTRU( TION'S COPY CONTRACT DOCUMENTS CLIEW -D PARTI`v -NT FOR ARBORLAWN DRIVE FROM BELLAIRE DRIVE INTERSECTION TO INTERNATIONAL PLAZA AND BELLAIRE DRIVE INTERSECTION EAST Roadway Grading Contract — Phase I CITY OF FORT WORTH, TEXAS DOE NO. 5103 TPW NO. C 115-020115023231 AUGUST 2005 MIKE MONCRIEF CHARLES R. BOS WELL MAYOR CITY MANAGER ROBERT D. GOODE, P.E., DIRECTOR •- TRANSPORTATION AND PUBLIC WORKS DEPARTMENT S. FRANK CRUMB, P.E., DIRECTOR ® WATER DEPARTMENT A. DOUGLAS RADEMAKER, P.E., DIRECTOR DEPARTMENT OF ENGINEERING PREPARED BY HUITT-ZOLLARS, INC. 500 W. 7 l Street, Suite 300 Fort Worth, Texas 76102 (817) 335-3000 _ 1:7 :; ,u i WWWqCFWNet110rQ rlI Home I Council Agenda I M&C I Employee Directory I Morning Report I Ads I PRS I IT Online Print M&C COUNCIL ACTION: Approved on 11/15/2005 DATE: 11/15/2005 REFERENCE NO.: **C-21147 LOG NAME: 30ARBORLAWN1 CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Authorize Execution of Contract with Orval Hall Excavating Company for Arborlawn Drive, Phase 1 (International Plaza to Bellaire Drive)— Roadway Grading RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract with Orval Hall Excavating Company in the amount of$187,524.00 for Arborlawn Drive, Phase 1 (International Plaza to Bellaire Drive) — Roadway Grading. DISCUSSION: As part of the Southwest Parkway, the City of Fort Worth is to provide two major arterial connectors that will serve as interchanges with the Southwest Parkway. Major arterial connectors accounted for$17,500,000 of the $49,500,000 of the 2004 CIP funding for the Southwest Parkway project. Additionally, as part of the City's Infrastructure Development Agreement (M&C C-20685 , City Secretary Contract 31709) with Edwards-Geren, Ltd, the City is required to provide certain arterial improvements in and adjacent to Tax Increment Finance District#11. To that end, the City has been working closely with the Texas Department of Transportation, the North Texas Tollway Authority, and Edwards-Geren, Ltd. (EGL) to develop plans and specifications for the construction of Arborlawn from International Plaza to Bryant Irvin and Bellaire Drive from its existing terminus to Arborlawn Drive. The construction contract is the first of several contracts to complete this work. City staff is recommending the construction work be phased in order to allow the work to proceed as quickly as possible while preserving some measure of flexibility as EGL, continues to refine their development plans in the area. The Arborlawn Drive project will serve as the east-west arterial connection, which includes portions of the original Bellaire Drive alignment approved in the 1998 CIP. As such, the project funding to support this contract comes from the 1998 CIP funding. This project, Phase 1 — Roadway Grading, consists of right-of-way preparation (clearing and grubbing) excavation and embankment to facilitate construction of this segment of the roadway. The project was advertised for bid in the Commercial Recorder on September 22 and 29, 2005. On October 20, 2005, the following bids were received: Bidders Total Bid Contract Time Orval Hall Excavating Company $187,524.00 60 Working Days Trent Bedford Investments, Inc. $225,942.00 Conatser Construction TX, L.P. $230,473.00 This project is located in COUNCIL DISTRICT 3, Mapsco 89 A and B. an Bond No. 104392988 PERFORMANCE BOND THE STATE OF TEXAS § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § LTD. St. Paul Fire and Marine That we (1) Orval Hall Excavating,( as Principal herein, and (2)Insurance Company , a corporation organized under the laws of the State of(3) Minnesota and who is authorized to issue surety bonds in the State of Texas, Surety herein, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties,Texas,Obligee herein, in the sum of: One Hundred Eighty-Seven Thousand Five Hundred Twenty-four and no/100....................................... ($187,524.00)Dollars for the payment of which sum we bind ourselves,our heirs,executors,administrators, successors and assigns,jointly and severally,firmly by these presents. JJ G V 1 2005 WHEREAS, Principal has entered into a certain contract with the Obligee dated the of 2005 a copy of which is attached hereto and made a part hereof, for the construction of: Arborlawn Drive,Phase 1 (International Plaza to Bellaire Drive)-Roadway Grading NOW THEREFORE, the condition of this obligation is such, if the said Principle shall faithfully perform the work in accordance with the plans, specifications, and contract documents and shall fully indemnify and hold harmless the Obligee from all costs and damages which Obligee may suffer by reason of Principal's default, and reimburse and repay Obligee for all outlay and expense that Obligee may incur in making good such default, then this obligation shall be void;otherwise,to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of such statute,to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. 1,10V Z�aS SIGNED and SEALED this of ,2005. 0�3dM611 Excavating, LTD. pop B Y: , -� �'Yl..��G - � Orval Hat!Excavating(� LTD. K Janet St l. ,� t?/Secretary PRINCIPAL(4) OHE GR LLC, its General Partner BY: Title: President of OHE GP, LLC, its general (SEAL) 201 NE 29th Street partner Fort Worth,TX 76106 (Address) St. Paul Fire and Marine Insurance Company fitness as to Principal Sur �J C-301 t1 E'Z0 rt e-4 �t�fn��I� Q���/Jf' Address BY: b&�� '13, AT T: (Alto e -in-fact)(5) Lisa M. Bonnot ^� Attorney—in—fact (Surety)Secre 385 Washington Street St. Paul, MN 55102 (Address) (SEAL) NOTE: Date of Bond must not be prior to date of Contract (1) Correct Name of Contractor (2) Correct name of Surety (3) State of incorporation of Surety Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be attached to Bond by Attorney-in-Fact. The date of bond shall not be prior to date of Contract. LS Witne as to S 2711 N. Haske 1 Avenue 1800, Dallas, TX 75204 (Address) r Bond No. 104392988 PAYMENT BOND -� THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § LTD. St. Paul Fire and Marine That we,(1)Orval Hall Excavating 6MlggLy�,as Principal herein, and(2) Insurance Company -,a corporation organized and existing under the laws of the State of(3) Minnesota , as surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the amount of One Hundred Eighty-Seven Thousand Five Hundred Twenty-four and no/100..................... Dollars ($187,524.00) for the payment whereof, the said Principal and Surety bind themselves and their heirs,executors, administrators, successors and assigns,jointly and severally, firmly by these presents: WHEREAS,the Principal has entered into a certain written contract with the Obligee dated the day of 2005,which contract is hereby referred to and made a part hereof as if fully and to the same extent as if copied at length, for the following project: Arborlawn Drive,Phase 1 (International Plaza to Bellaire Drive)-Roadway Grading NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully make payment to each and every claimant(as defined in Chapter 2253, Texas Government Code, as amended)supplying labor or materials in the prosecution of the work under the contract,then this obligation shall be void;otherwise,to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute,to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. SIGNED and SEALED this day of, 2005. m. - Orval Hall Excavating LTD. PRINCIPAL offM Excavatln9, LTD. By: � �� y _ _. ; Name: M.F. Hall j&*m0%nem[yV.PjSecretary President of OHE GP, LLC, OHE GR LLC, its General Partner Title: its general partner (S E A L) Address: 201 NE 29th Street Fort Worth, TX 76106 itness as to Principal St. Paul Fire and Marine Insurance SUR7TY' Company ATTEST: By:1�2 � Name: Lisa M. Bonnot Secretary Attorney in Fact (S E A L) Address: 385 Washington Street 'J" St. Paul, MN 55102 ^c Witness to Su ty Telephone Number: 214/570-6633 NOTE: (1) Correct name of Principal (Contractor). (2) Correct name of Surety. (3) State of incorporation of Surety 1.4 Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be attached to Bond by the Attorney-in-Fact. The date of bond shall not be prior to date of Contract. Bond No. 104392988 MAINTENANCE BOND THE STATE OF TEXAS § COUNTY OF TARRANT § LTD. St. Paul Fire and Marine That Orval Hall Excavating 6amOaty ("Contractor'), as principal, and Insurance Company a corporation organized under the laws of the State of Minnesota , ("Surety"), do hereby acknowledge themselves to be held and bound to pay unto the City of Fort Worth, a Municipal Corporation chartered by virtue of Constitution and laws of the State of Texas, ("City") in Tarrant County, Texas, the sum of One Hundred Eighty-Seven Thousand Five Hundred Twenty-four and no/100....................................................................................................................... Dollars ($187,524.00), lawful money of the United States, for payment of which sum well and truly be made unto said City and its successors, said Contractor and Surety do hereby bind themselves, their heirs, executors, administrators, assigns and successors, jointly and severally. This obligation is conditioned, however, that: WHEREAS, said Contractor has this day entered into a written Contract with the City of Fort Worth, dated the of d,M55, a copy of which is hereto attached and made a part hereof, for the performance of the following described public improvements: Arborlawn Drive, Phase 1 (International Plaza to Bellaire Drive) - Roadway Grading the same being referred to herein and in said contract as the Work and being designated as project number(s) C115-020115023231 and said contract, including all of the specifications, conditions, addenda, change orders and written instruments referred to therein as Contract Documents being incorporated herein and being made a part hereof; and, WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct `! the work that it will remain in good repair and condition for and during a period of after the date of the final acceptance of the work by the City; and WHEREAS, said Contractor binds itself to maintain said work in good repair and i condition for said term of Two (2) years; and WHEREAS, said Contractor binds itself to repair or reconstruct the Work in whole or in part at any time within said period, if in the opinion of the Director of the City of Fort Worth Department of Engineering, it be necessary; and, WHEREAS, said Contractor binds itself, upon receiving notice of the need therefore to repair or reconstruct said Work as herein provided. NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or reconstruct said Work in accordance with all the terms and conditions of said Contract, these presents shall be null and void, and have no force or effect. Otherwise, this Bond shall be and remain in full force and effect, and the City shall have and recover from Contractor and Surety damages in the premises as prescribed by said Contract. This obligation shall be a continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted. IN WITNESS WHEREOF, this instrument is executed in 8 counterparts, each of which shall be deemed an original, this day of A.D. 2005. SdOV 1 5 200 ATTEST: Orval Hall Excavating G8i44'SMYr LTD. (S E A L) Contractor Orval Hall Excavatln Q,__ Y� dtiphenson, V,P.ISecretary Name: M.F. Hall 0�E GP LLC, its General Partner Title: President of oHE GP, LLC, its general partner ATTEST: St. Paul Fire and Marine Insurance Company (S E A L) Surety Secretary Name: Lisa M. not Title: Attorney-in-fact 385 Washington Street St. Paul, MN 55102 Address meStPdul POWER OF ATTORNEY Seaboard Surety Company United States Fidelity and Guaranty Company St.Paul Fire and Marine Insurance Company Fidelity and Guaranty Insurance Company St.Paul Guardian Insurance Company Fidelity and Guaranty Insurance Underwriters,Inc. St.Paul Mercury Insurance Company r Power of Attorney No. 22824 Certificate No. 2152594 KNOW ALL MEN BY THESE PRESENTS:That Seaboard Surety Company is a corporation duly organized under the laws of the State of New York,and that St. Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company and St.Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota,and that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland,and that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters,Inc. is a corporation duly organized under the laws of the State of Wisconsin(herein collectively called the "Companies"), and that the Companies do hereby make,constitute and appoint Sheila Young,Lisa M. Bonnot,Robbi Morales,Don E.Cornell,Jerry P.Rose,Anuj Jain,Luke J.Nolan,Jr. and Chris J.Kutter Dallas Texas of the City of State their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above,to sign its name as surety to,and to execute,seal and acknowledge any and all bonds,undertakings, contracts and other written instruments in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF,the Companies have caused this instrument to he signed and scaled this 25th day of September 2002 Seaboard Surety Company United States Fidelity and Guaranty Company St.Paul Fire and Marine Insurance Company Fidelity and Guaranty Insurance Company St.Paul Guardian Insurance Company Fidelity and Guaranty Insurance Underwriters,Inc. St.Paul Mercury Insurance Company g� Y =1�OPCOM�>[.tf: W:�Opi0N9ff:m y�¢J �. PETER W.CARMAN,Vice President s j`..SEALio^f 3\SBICL�'p N sr 1951 OF {�' `�. af5.•ANAL 1p...,..'t � � State of Maryland City of Baltimore THOMAS E.HUIBREGTSE,Assistant Secretary ' On this 25tH day of September 2002, before me, the undersigned officer, personally appeared Peter W. Carman and Thomas E. Huibregtse,who acknowledged themselves to be the Vice President and Assistant Secretary,respectively,of Seaboard Surety Company,St. Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company,St. Paul Mercury Insurance Company,United States Fidelity and Guaranty Company.Fidelity and ' Guaranty Insurance Company,and Fidelity and Guaranty Insurance Underwriters,Inc.;and that the seals affixed to the foregoing instrument are the corporate seals of said Companies;and that they,as such,being authorized so to do,executed the foregoing instrument for the purposes therein contained by signing the names of the corporations by themselves as duly authorized officers. In Witness Whereof,I hereunto set my hand and official seal. e pOrARY 03 UQUC My Commission expires the Ist day of July,2006. �Rf cz+�o REBECCA EASLEY-ONOKALA,Notary Public 86203 Rev.7-2002 Printed in U.S.A. S1T PAUL St.Paul Travelers Bond TRAVELERS Richardson Collins Blvd arr dson TX 75081 Phone:800-842-0612 Fax:214-570-6405 IMPORTANT NOTICE �^ TO OBTAIN INFORMATION OR MAKE A COMPLAINT: You may contact Travelers Casualty & Surety Company of America, Travelers Casualty & Surety Company, Travelers Indemnity Company, Standard Fire Insurance Company and/or Farmington Casualty Company for information or to make a complaint at: Travelers Bond Attn: Claims 1500 Market Street West Tower, Suite 2900 Philadelphia, PA 19102 (267) 675-3057 (267) 675-3102 Fax You may contact the Texas Department of Insurance to obtain the information on companies, coverages, rights or complaints at: Texas Department of Insurance P.O. Box 149104 Austin, TX 78714-9104 (800) 252-3439 ATTACH THIS NOTICE TO YOUR BOND. This notice is for information only and does not become a part or a condition of the attached document and is given to comply with Section 2253-021, Government Code, and Section 53.202, Property Code, effective September 1, 2001. ST PA U L St. Paul Travelers Bond .rr TRAVELERS 1301 E. Collins Blvd �• Richardson TX 75081 Phone:800-842-0612 Fax:214-570-6405 IMPORTANT DISCLOSURE NOTICE OF TERRORISM INSURANCE COVERAGE On November 26, 2002, President Bush signed into law the Terrorism Risk Insurance Act of 2002 (the "Act"). The Act establishes a short-term program under which the Federal Government will share in the payment of covered losses caused by certain acts of international terrorism. We are providing you with this notice to inform you of the key features of the Act, and to let you know what effect, if any, the Act will have on your premium. Under the Act, insurers are required to provide coverage for certain losses caused by international acts of terrorism as defined in the Act. The Act further provides that the Federal Government will pay a share of such losses. Specifically, the Federal Government will pay 90% of the amount of covered losses caused by certain acts of terrorism which is in excess of Travelers' statutorily established deductible for that year. The Act also caps the amount of terrorism-related losses for which the Federal Government or an insurer can be responsible at $100,000,000,000.00, provided that the insurer has met its deductible. Please note that passage of the Act does not result in any change in coverage under the attached policy or bond (or the policy or bond being quoted). Please also note that no separate additional premium charge has been made for the terrorism coverage required by the Act. The premium charge that is allocable to such coverage is inseparable from and imbedded in your overall premium, and is no more than one percent of your premium. CITY OF FORT WORTH,TEXAS CONTRACT THE STATE OF TEXAS KNOW ALL BY THESE PRESENTS COUNTY OF TARRANT N10V .1 5 2005 This agreement made and entered into this the day of A.D., 2005, by and ^" between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and existing under and by virtue of a special charter adopted by the qualified voters within said City on the I Vh day of December, A.D. 1924, under the authority (vested in said voters by the "Home Rule" .� provision) of the Constitution of Texas, and in accordance with a resolution duly passed at a regular meeting of the City Council of said city , and the City of Fort Worth being hereinafter termed Owner, Orval Hall Excavating Company , HEREINAFTER CALLED Contractor. WITNESSETH: That said parties have agreed as follows: 1. That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows: Arborlawn Drive,Phase 1 (International Plaza to Bellaire Drive)-Roadway Grading 2. That the work herein contemplated shall consist of furnishing as an independent contractor all labor, tools, appliances and materials necessary for the construction and completion of said project in accordance with the Plans and Specifications and Contract Documents prepared by the Department of Engineering for the Transportation and Public Works Department of the City of Fort Worth adopted by the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are hereto attached and made a part of this contract the same as if written herein. 3. MIN The Contractor hereby agrees and binds himself to commence the construction of said work within ten (10) days after being notified in writing to do so by the Department of Engineering of the City of Fort Worth. on 4. r_ _ I The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Department of Engineering of the City of Fort Worth and the City Council of the City of Fort Worth within a period of 60 working days. If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract Documents within the time so stipulated, plus any additional time allowed as provided in the General Conditions, there shall be deducted from any monies due or which may thereafter become due him, the sum of$210 Per working day, not as a penalty but as liquidated damages, the Contractor and his Surety shall be liable to the Owner for such deficiency. 5. Should the Contractor fail to begin the work herein provided for within the time herein fixed or to a. carry on and complete the same according to the true meaning of the intent and terms of said Plans, Specifications and Contract Documents, then the Owner shall have the right to either demand the surety to take over the work and complete same in accordance with the Contract Documents or to take charge of and complete the work in such a manner as it may deem proper, and if in the completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said plans and specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost. 6 Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such injury, damaze or death is caused, in whole or in part, by the nealikence or allezed nezlizence of Owner, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in part bV the ne&iaence or alleged nez1iQence of Owner, its officers, ,.. servants or employees.. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 7. The Contractor agrees, on the execution of this Contract, and before beginning work, to make, execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful perfonnance of the terms and stipulations of the Contract and for the payment to all claimants for labor and/or materials fiirmshed in the prosecution of the work, such bonds being as provided and required in Article 5160 of the Revised Civil Statutes of Texas, as amended, in the form included in the Contract Documents, and such bonds shall be for 100 percent of the total contract price, and said surety shall be a surety company duly and legally authorized to do business in the State of Texas, and acceptable to the City Council of the City of Fort Worth. 8. Said City agrees and binds itself to pay, and the said Contractor agrees to receive, for all of the aforesaid work, and for all additions thereto or deductions therefrom, the price shown on the Proposal submitted by the successful bidder hereto attached and made a part hereof. Payment will be made in monthly installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice from the Contractor. The agreed upon total contract amount (including/excluding) alternates n/a, shall be One Hundred Eighty-Seven Thousand Five Hundred Twenty-four and no/100...........................................................................................Dollars, ($187,524.00) 9. It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or assigned to anyone else by said Contractor without the written consent of the Director of the Department of Engineering. 10. The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is classified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto and made a part hereof the same as if it were copied verbatim herein. 11. It is mutually agreed and understood that this agreement is made and entered into by the parties hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with references to and governing all matters affecting this Contract, and the Contractor agrees to fully comply with all the provisions of the same. r. IN WITNESS THEREOF, the City of Fort Worth has caused this instrument to be signed in 8 counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through its duly authorized officers in 8 counterparts with its corporate seal attached. Done in Fort Worth,Texas, this the day of ,A.D., 2005. RECOMMENDED: CITY OF FORT WORTH BY: DIRECTOR, DEPARTMENT OF CITY MANAGER ENGINEERING APPROVED: f arc A. Ott, ssistant City Manager TRANSPORTATION/PUBLIC WORKS DIRECTOR ATTEST: Orval Hall Excavating,Ltd. 201 NE 29th Street Fort Worth,TX 76106 CONTRACTOR G' CITY SECRETARY (S E A L) BY: � President of OHE GP LLC. Contract Authorization :Ys General Partner Date TITLE APPROVED AS TO FORM AND r;t* k" (em," LEGALITY: ADDRESS Gf T1��4"C ASST. C A ORNEY j November 1960 Revised May 1986 Revised September 1992 C �;:�L`.urvt 7� J