HomeMy WebLinkAboutContract 32846 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No
WHEREAS,D.R. Horton —Texas, LTD., hereinafter called "Developer", desires
to make certain improvements to Blake Meadows Phase II, an addition to the City of
Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth, is hereby incorporated into this Community Facilities Contract
as if copy herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and
obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
Blake Meadows Addition Ph.II-Newer CFA14% and Utilities 10 03 05.docv}g�� 'iljQQ; �p/,��o�
F. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
construct current and future improvements provided for in this
agreement.
Blake Meadows Addition Ph.II-Newer CFA2N and Utilities 10 03 05.doc CRY ��
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain (B-I)-Attached; Street Lights and Signs (C)Attached.
M. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $276,278.85.
Blake Meadows Addition Ph.II-Newer CFA31% and Utilities 10 03 05.doc
SUMMARY OF
COST
Blake Meadows Addition Phase II
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $202,589.05 202,589.05
2. Storm Drainage $45,756.00 45,756.00
3. Street Lights $17,600.00 17,600.00
4. Street Name Signs $400.00 400.00
B. Engineering Design $
C. Construction Engineering
and Management by DOE $ $
4% 9,933.80 9,933.80
$ $
TOTALS 276,278.85 $ - 276,278.85
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
Blake Meadows Addition Ph.II-Newer CFA,#% and Utilities 10 03 05.doc `v���� �11 h � II �7
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary,with the corporate seal of the City affix d said D eloper
has executed this instrument in triplicate,at Fort Worth,Texas this theLday of
,2005.
Approval Recommended:
Transportation and Public Works
Department
Q /-"?--',
Robert Goode,P. E.
Director
City oft
f ort o
NO M&C REQUIRED c Ott
Assistant City Manager
ATTEST:
CA
Marty Hendrix
City Secretary
Approve to Form:
//////,V/�' ' a�//
A istant ty ttomey
ATTEST: DEVELOPER4SCA--'-� ; A V' rc
By:
Corporate Secretary hefil�—A%t.
RECEIVED
Blake Meadows Addition Ph.II-Newer CFAX%and Utilities 10 03 05.doc �', �
Ciff '
N
O
N
O
O
r-1
F �
r-1
J~ S S S S S S S SSS O
Q OCS O 2 O O S p p 1.FC
"� O C7 C?CO �O CD CO t0 � 1�
O O C7 r t0 N N
Q M M Ni M M fA fA fA fA fA H
S S S S S S S S S S
vvmnrnSSSSea
w wwweAw o rn m m
~_U w w w C%i
z�
�a
LLA
F-
W Q
a �-
�_
H 47 Q
W Cc ¢
a
Nam a0
U)O Q
O
U ; N
z L a
O m
d x
Q Y F- _
_A QQ QQ
(n m z J J J J J W W W LJ,J J
z M
O a
U H
0
m
a�
Y
l0
C?
d
t9
E
.N
LU
W 5
Z F- O
rn U
O r H
F y
LL
W z CJ
N y W co
¢
ccLU
O G t
O N w Z d
Z
02 ¢ c
Q = Z O m
Q Q F-
¢ rn
U
z O r J O
2 D OC a
O ~
aaao aF - � v~i= O m
F- CJ CJ U U CJ o W U F- O
N L= LL Q CL Q 2 Z N d w
0
N N S M Cq O
co
N
y
U
d
O
y'
Xnit�.__ .__.....
N
O
r-�
O
O
d q� ro � S oS m
F' CV N '- O M I
�i O ^ O II9 C
r Q yj 69 EA b9 EIi 69(A N
O) c0 S S S S S
LU
O �O
~U
z 2
7�
W
r
WCt
q}
r d O¢ co co
CC
W Ca O
N a W O
y O q
O
N
z °a
O
y x
Y r
cnQQ
(%m z U) U) Q J W J W
Z r L
0 O
a
0
m
Y
C?
d
E
LU w
O
z r = U
O W Q m a
r W m¢ W LL
<
CL > w z = U_
¢ w - = 0 >
U 2 C.7 U m y Q N
U) C7 � o Z ¢ » a m
LU Z w ¢ ¢ V a a
Q— r Q X m O W a
W m W Q 2 Z WC
a Z U w a E
�
O W Urijw
� ¢ N U
W �wzF JWUJ
J Q
Um z U u W Q
O r J O ¢ w LL r m
H z uj CC w No
fn ¢ m
O
� � a r o¢ � O
iD io J fn 47 U m Cl)
co
N
H
U
d
O
g
X
DR HORTON Fax:682-.647-3331 Aug 31 2005 7:56 P.08
UNIT M. STORM DRAIN
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO QUANTITY. BID PRICES WRTCTEN IN WORDS PRICE AMOUNT
r
(Furnish and install,including all appurtenant work, complete in place,the following
items)
1. 252 L.F. 21"Class III R.C.P:;
Per Linear Foot;
Fn� ll Dollars
and ,ire Cents
_ 2. 74 L.F. 24"Class III R.C.P.;
Per Linear Foot:
&d"Ave Dollars $ y100 $ 33,330.c�
and ,vo Cents
3. 23 L.F. 30" Class ID R.C.P.;
Per Linear Foot:
S;� + Dollars $ is D.Ob $
Cents
-- 4. 91 L.F. 36" Class III R.C.P.;
Per Lin=Foot:
SeygtJV -t ve _Dollars $ S-0 S
and tie Cents
5. 16 L.F. 42"Class 111 R.C.P.;
Per Linear Foot:
/J!'nty- ✓e Boilers $ 9S DO $ zo, o
and :vo Cents
— 6. 6 EA. Standard 10' Curb Inlet;
Per Each:
two t h o ura"dDollars S j-Z koogb
and ..o _Cents
of 1vi;;'�
13-7 �d% ? u
DR HORTON Fax:682-647-3331 Aug 31 2005 756 P.09
7. 1 EA. Standard 4' Storm Drain M.H.;
Per Each:
Dollars $ 4900-4 $.,,�,k0o.as
ant A40 Cents
8. 1 EA. Type 1 Storrs Drain M.H.;
Per Each:
���K Sr�t�u"�`"13oUars S��ya•oa �..�5�DODO.DQ
~ aad .vim Cents
9. 421 L.F. Trench Safety Systern, D-18;
-' Per Linear Foot:
/)ne . Dollars $ /.Da $ yzl.OQ
and dec Cents
10. 2 EA. Standard 15' Curb Inlet;
Per Each:
�a � �u�n�ollars $ 00•Q $ S .00
and Cents
TOTAL AMOUNT BID UNIT III: STORM DRAIN
B-s � � �?
DR HDRTON Fax:682-647-3331 Aug 31 2005 7:57 P. 10
UNIT IV: PAVING MTROVEIIENTS
ITEM APPROY. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
(Furnish and-install,including all appurtenant work,complete in place,the following
items)
1. 8031 S.Y. 6"Reinforced 3500 psi Concrete
Pavement w/7" Curb; Per Square
Yard:
Zie YZ Yo
l ien i 4 Dollars
and ,{ridet'i Cents
2. 8579 S.Y. 6"Lime Stabilized Subgrade @ 27
Lbs./S.Y.; Per Square Yard:
6n a Dollars 71.Il
and e�dh tv- 're. Cents
�T
3. 108 TONS Lime;
Per Ton:
:nett- :I�e� Dollars $ . 85.00 S .2(60.00
and .✓o Cents
4. 74 L.F. Sawcut and Connect to Existing
Pavement;Per Linear Foot:
F"�fce� Dollan $ /5.00 $ 1/D.00
and--___ace_Cents
5. 50 L.F. Concrete Flume with 5"Curb, 3 ft
B=B;Per Linvor Foot:
�&en Dollars
and & Cents
6. 8 Each Barrier-Free Ramps (No Pavestone);
Per Each:
5,9&19A Dollars $_ &Q.0 $ S400.60
and .vo Cents
B-9
- � •�ij'il�'�f u l � (
DR HORTON Fax:682-647-3331 Aug 31 2005 7:57 P. 11
7. 2 Each Standard Street-End Barricade and
.. Header,Per Each:
,I,'n hC4 aiyd, /Dollars $ 100.00 S
and .v O Cents
r -
TOTAL AMOUNT BID UNIT IV: PAVING $ X02 5�9�Q5
V
B-10
DR HEIRTON Fax:682-.647-3331 Pug 31 2005 7:57 P. 12
TOTAL AMOUNT BID-UNIT I WATER $ $ p
TOTAL AMOUNT BID-UNIT II- SEWER
/D 7, S&'b.LIS
TOTAL AMOUNT BID-UNIT III-STORM DRAIN $ YS.256 .00
TOTAL AMOUNT BID-UNIT IV-PAVING
'- IMPROVEMENTS $ 2 D� �1 os
GRAND TOTAL AMOUNT BID $
B-11
DR HCIRTON Fax-.682-647-3331 Aug 31 2005 7:57 P.13
.. 'PART B-PROPOSAL(Cont.)
Within ten (10) days after acceptance of this Proposal, the undersigned will execute the
formal contract and will deliver an approved Surety Bond and such other bonds as
required by the Contract Documents, for the faithful perfornuanee of the Contract. The
attached bid security in the amount of 5% is to become the property of the City of Fort
Worth, Texas, in the event the contract and bond or bonds are not executed and delivered
within the time above set forth, as liquidated damages for the delay and additional work
caused thereby.
r
The undersigned bidder certified that he has been furnished at least one set of the General
Contract Documents and General Specifications for Water Department Projects dated
January 1, 1978,and that he has read and thoroughly understands all the requirements and
conditions of those General Documents and the specific Contract Documents and
appurtenant plans.
The successful bidder shalt be required to perform the work in accord with the
following publications, boar of which are incorporated herein and made a part
hereof for all purposes.,
._ 1. The -General Contract Documents and General Specifications for
Water Department Projects dated January 1, 1978, which may be purchased
from the Water Department.
2. The Standard Specifications for Street and Storm Drain Construction
which may be purchased from the Department of Transportation & Public
Works.
The undersigned assures that its employees and applicants for employment and those of
any labor organization, subcontractors, or employment agency in either furnishing or
referring employee applicants to the undersigned are not discriminated against as
prohibited by the terms of City Ordinance'No. 7278 as amended by City Ordinance No.
7400.
The Bidder agrees to begin construction within 7 calendar days afterissue of the wank
order, and to complete the contract within 100 working days after beginning construction
as set forth in the written work order to be fi=-shed by the Owner.
(Complete A or B below,as applicable:)
A. The principal place of business of our company is in the State of
Nonresident bidders in the State of our principal
place of business,arerequired to be percent lower than resident bidders
by state law. A copy of the statute is attached.
B-12 NT. - C'P A7U` Oaf
Da HCRMN Fax:682-647-3331 Aug 31 2005 7:58 P. 14
r
Non resident bidders in the State of_ ,our principal
place of business,are not required to undabid-resident bidders.
B.The principal place of business of our company or our parent company or
majority owner is in the State of Texas.
r
V
I
Y�
Y
B-13
DR HORTON Fax=682-647-3331 Aug 31 2005 7:58 P. 15
I(we)ackr►awledge receipt of the following addenda to the pians and specifications„ali of
the provisions and requirements of which have been taken into consideration on
preparation of the foregoing bid:
Addendum No. l (Initials) Addendum No.3 (Initials)
Addendum No.2 (Initials) Addendum No.4(Initials)
Respectfully submitted,
o L.
_ b Y Co fta�rr ani [A G/'d-P/ZAC' ltj c p
By:
Address
dart rtA, 76ll4
Telephone: S6/7-S3 Y- /Z Y3
(Seal)
Date: -Suer,6 cr 0 o5
J
B-14
I. STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 3 EA $ 2, 000 $6, 000 . 00
MID-BLOCK RESIDENTIAL 3 EA $ 2, 000 $6, 000. 00
CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000. 00
MID-BLOCK COLLECTOR 2 EA $ 2, 000 $4, 000. 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000. 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000. 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000. 00
Subtotal $16,000.00
City' s Cost $00,000. 00
Developer' s Subtotal $16,000.00
10% Contingency $1,600.00
Project Total $17, 600.00
Adjacent Developer' s Cost $00,000.00
Developer' s Cost $17,600.00
2% Inspection Fee $00,000.00
CFA CODE #2005091
DEVELOPER' S COST: $17,600. 00
BLAKE MEADOWS ADDITION, PHASE II
Fort Worth, Texas
August 4, 2005
PAGE I OF Exhibit C
II. STREET LIGHTS WORK DESCRIPTION:
1 . The Developer shall provide for the installation of streetlights at the
approximate locations shown in Exhibit "C", immediately after final
acceptance of the street construction, in accordance with engineering plans
and specifications approved by the Transportation and Public Works
Department.
2 . Streetlights on residential and /or collector streets can be installed
using overhead or underground conductors with the approval of the Director
of Transportation and Public Works.
3. The City will install all the streetlights that use overhead or underground
conductors on residential, and collector streets. The developer agrees to
pay the city the amount shown below prior to the City starting its design
efforts .
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors.
5. The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for the
installation of any electrical transformers required for the proper
operation of the street lights
6. The estimated cost of this street light installation is detailed on page 1
of exhibit C and is summarized below, the street lights will remain the
property of, and will be maintained by the City of Fort Worth.
DEVELOPER' S COST: $17, 600.00
BLAKE MEADOWS ADDITION, PHASE II
July 30, 2005
FORT WORTH, TEXAS
CFA CODE #2005091
Page II of Exhibit C
151
III
"STREETLIGHTS"
INTERSECTIONS
REDCLOUD DR 6 SUNLIGHT DR 1
REDCLOUD DR 6 WINDOW DR 1
SUNLIGHT DR 6 WINDOW DR 1
MID BLOCK
SUNLIGHT DR 1
WINDOW DR 2
CHANGE OF DIRECTIONS
SUNLIGHT DR 1
WINDOW DR 1
BLAKE MEADOWS ADDITION, PHASE II
Page III of Exhibit C
Mv�b�. d�dV JNJ
Off
'x�:�'i5 l
Iv
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of$100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following four (4) intersections at a cost
to the Developer of$400.00:
Redcloud Dr & Anderson Blvd
Redcloud Dr & Sunlight Dr
Redcloud Dr & Windom Dr
Sunlight Dr &Windom Dr
Blake Meadows Addition, Phase II
CFA code: 2005091 July 30, 2005
TRICE
ANHATTEN
N FLOWER RCLEI
VIEW
SANDY BROOK LOWERY
SANDSTONE
0OWNH1
S20 ALL BROOK suNRl
< EAS
MISTY WILD AR
GLEN KUBAN
BOR PARK
White m
Cemetery
ARBOR HILL gn
JOHN T WHITE
FOX RIVER
W
< ` W
IE
ANDERSON g
BLUE CF
30
EDERVILLE
ISH MEADOWLANE
WORKS ME
W RRY = c
GREEN y<j
m ACRES < W
Y �
BRENTWOOD sT I rl Lal a p O
FRANW000 LAURIE LAURIE a c t� m
VANESSA
GARY + g VANESSA
<
YOLANDA n
YOLANDA 3 S d i Pf YOLANDA
TERRA _ 44V <MADEIRA MADEIRA
EWS =
V / C / N / T Y INA P
NOT TO SCALE
HLAIKE MEADOWS
A DDI TION, PHA SE 11
L OCA TION MAP
Q
Q
Q
kW � �
W ~
N-754
Q
0
0
N
II
--� W
ERSON BO ARD V
( 0 BJ.S 403 x't no d)
I 3 " d3 YOQV�[ RIV'I
B I.AlN�� p01I
� � G E Dt
WZM DR
130
Q
O
f-
Z
W
W
Q
a-
D c0
Z
W
0
W
J
O
m O Q
C) W �
m � W WO
k (J) � NO
Q
w
Q
Q
N
M=qnN An
II
a n x VIS o x ) 4i
I S OU rakH
w U
BI AKME O S U Z m
P E II O Of
= m
U
Ln
�
g
(/) U
N O
JillN
� U
1 so U)
I—
U) = LLJ
J ~
LLJ
Z
J O W
N
Z m Of 0-1�
J m O O O O
M
f—
O) o Nof U m 0) Vw
VIZa _ U O LLJ
W OWm wZ
(!) O I Z O O
m Z m Z
a- Q g N o oa oa
chOfaf afch
O U O mO a- c)
Z
W
0 �
WIJ
v)
vz -7 °oQ
iL WO
W (i � NCO
Q
0
0
N
II
w
SRSON HO ARD LLI
J
V
(QOn S 00 xZ 0 ) y
I d offol
'7 i:n,)Ws
SIJNIiGffWR
O
O-
I 90 I 90
W W
W J W
JOf
CIO (n
0 C)
W W W
V) cn (!)
O O O
0- F- a- 0_
O = Ox OZ
0_ 0 0_ 0 0' 0
a- :7j- a- m 0_ (n
Z
W ■ 1
C�
W
J