HomeMy WebLinkAboutContract 32850 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.84M
WHEREAS, DeBartolo Eastchase LLP, hereinafter called "Developer", desires to
make certain improvements to Triland Eastchase Addition, an addition to the City of Fort
Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth, is hereby incorporated into this Community Facilities Contract
as if copy herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and
obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section 11, of the Policy.
D. The Developer shall award all contracts for the construction of
community facilities in accordance with Section Il, paragraph 7 of the
Policy.
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
�•. Q N..1 1
Triland Eastchase Addn-Newer CFA 4% and Utilities 10 17 05.doc
CITY SV,ANV"HKf
F. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such irduries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
G. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
H. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
I. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
J. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
K. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
construct current and future improvements provided for in this
agreement.
Triland Eastchase Addn-Newer CFA 4% anct Utilities 10 17 05.doc
� i.GV
L. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached.
M. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $179,491.68.
Triland Eastchase Addn-Newer CFA 4% ancBUtilities 10 17 05.doc
SUMMARY OF
COST
Triland Eastchase Addition
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $13,698.00 13,698.00
2. Storm Drainage $158,794.00 158,794.00
3. Street Lights $0.00 $ -
4. Street Name Signs $100.00 100.00
B. Engineering Design $
C. Construction Engineering
and Management by DOE $ F6,899.68 4% 6,899.68
TOTALS 179,491.68 $ - 179,491.68
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
Triland Eastchase Addn-Newer CFA 4% an4Utilities 10 17 05.doc
ap c ..
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in triplicate, at Fort Worth, Texas this the 2nd day of
November,2005.
Approval Recommended:
Transportation and Public Works
Department
Robert Goode, P. E.
Director
Ci of t
t W
Marc Ott
=OMEit�hQUIRI;D Assistant City Manager
ATTEST:
Marty Hendrix
City Secretary
Approved to Form: RECEIVED
Assistant COWtorney
DEVELOPER
DeBartolo Eastchase LLP
By: DeBartolo Development, LLC
Partner
By:
_ward M_ Kobeh�
Triland Eastchase Addn-Newer CFA 4% and Utilities 10 17 05.doc
PBury Partners Bury&Partners-DFW,Inc.
E N G I N E E R I N G S O L U T I O N S 5310 Harvest Hill Road,Suite 100
Dallas,Texas 75230
Tel 972/991-0011
Fax 972/991-0278
PAVING(EXHIBIT B)
DESCRIPTION QUANTITY UNIT COST/UNIT TOTAL COST.
6-inch Reinf.Conc.Pavement 3600psi) 120 SY $ 22.00 $ 2,640
6"Moisture Condititioned Sub rade 120 SY $ 2.25 $ 270
Remove Existing Metal Beam Guard Fence 82 LF $ 4.00 $ 328
6"Integral Curb 80 LF $ 2.00 $ 160
Remove Existing Pavement 1 LS $ 2,000.00 $ 2,000
24"Curb&Gutter 100 LF $ 30.00 $ 3,000
5-foot wide reinf.Conc.Sidewalk 230 LF $20.00 $ 4,600
Type I Sidewalk Ram 2 EA $ 350.00 $ 700
Paving Subtotal: $ 13,698
STORM DRAIN EXHIBIT B-1)
DESCRIPTION QUANTITY UNIT COST/UNIT TOTAL COST
54-inch RCP 296 LF $ 135.00 $ 39,960
60-inch RCP 73 LF $ 160.00 $ 11,680
72-inch RCP 385 LF $ 220.00 $ 84,700
Trench Safety 754 LF $ 1.00 $ 754
6'x6'Drop Inlet 1 EA $ 3,000.00 $ 3,000
6'X6'S uare Manhole 1 EA $ 3,500.00 $ 3,500
Connect to Existing 48"Storm Drain 1 EA $ 1,200.00 $ 1,200
Remove Existing Headwall 1 EA $ 1,500.00 $ 1,500
72-inch Sloped Hdwl. 1 EA $ 5,500.00 $ 5,500
Rock Rip Rap 200 SY 1 $ 35.00 $ 7,000
Storm Drain Subtotal: $ 158,794
GENERAL PROJECT COST SUMMARY
DESCRIPTION TOTAL COST
Water Department
Water Exhibit A $ 151,737
Sewer Exhibit A-1 $ 54,296
Water/Sewer Subtotal: $ 206,033
2%Inspection Fee: $ 4,121
DESCRIPTION TOTAL COST
Transportation&Public Works(TPW)Department
Paving Exhibit B $ 13,698
Storm Drain Exhibit B-1 $ 158,794
TPW Subtotal: $ 172,492
4% TPW Inspection Fee: $ 6,900
TOTAL ESTIMATED COST:1 $ 378,525
Notes:
1. The Preliminary Opinion of Probable Construction cost is made by an engineer,not a professional
cost estimator or construction contractor. The accuracy of the estimate is not guaranteed.
2. Estimate is based on City of Fort Worth unit price list¤t construction costs.
3. Based on Civil Plans dated October 7,2005.
V� �L•JbZ K
Page 2 of 2
I . STREET LIGHT COST ESTIMATE
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 0 EA $ 2, 000 $0, 000. 00
MID-BLOCK RESIDENTIAL 0 EA $ 2, 000 $0, 000. 00
CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2, 000 $0, 000. 00
MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 . 00
MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 500 $0, 000 . 00
RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 . 00
Subtotal $00,000.00
City' s Cost $00,000 .00
Developer's Subtotal $00,000.00
10% Contingency $00,000.00
Project Total $00,000.00
Adjacent Developer' s Cost $00,000.00
Developer' s Cost $00,000.00
2% Inspection Fee $00,000.00
CFA CODE #2005095
DEVELOPER'S COST:
TRILAND EASTCHASE ADDITION
October 17, 2005
Fort Worth, Texas
October 17, 2005
PAGE I OF Exhibit C
II. STREET LIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at the
approximate locations shown in Exhibit "C", immediately after final
acceptance of the street construction, in accordance with engineering plans
and specifications approved by the Transportation and Public Works
Department.
2. Streetlights on residential and /or collector streets can be installed
using overhead or underground conductors with the approval of the Director
of Transportation and Public Works.
3. The City will install all the streetlights that use overhead or underground
conductors on residential, and collector streets. The developer agrees to
pay the city the amount shown below prior to the City starting its design
efforts.
4 . Streetlights on arterial streets shall be installed with underground
conduit and conductors.
5. The Developer agrees to dedicate all easements required for the
installation and maintenance of the street lights and to provide for the
installation of any electrical transformers required for the proper
operation of the street lights
6. The estimated cost of this street light installation is detailed on page 1
of exhibit C and is summarized below, the street lights will remain the
property of, and will be maintained by the City of Fort Worth.
DEVELOPER'S COST:
TRILAND EASTCHASE ADDITION
October 17, 2005
FORT WORTH, TEXAS
CFA CODE #2005095
Page II of Exhibit C
III
"NO STREETLIGHTS"
TRILAND EASTCHASE ADDITION
Page III of Exhibit C
Iv
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of $100.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following one (1) intersection at a cost to
the Developer of$100.00:
Eastchase Pkwy & Cottonwood Pkwy
Triland Eastchase Add
CFA code: 2005095 July 27, 2005
P,
Z c-
0
�J Z
O
Z
-0(n _
;;a C r
/ c m JOHN T WHITE N
M o
^ F �C7
a
� ti F A � ^00
U)
�yY EAS HASE P WY /
O >
G7
� O
o D
rn 0 O
0) O ^�
0
co
r
G
O
W
m 7 Z D LOTS 2 THROUGH 7 r Bury+Partners
zzZ BLOCK 1 ENGINEERING SOLUTIONS
0 V) TRILAND EASTCHASE ADDITION 5310 Harvest Hill Road, suite loo
CITY OF FORT WORTH Dallas, Texas 75230
TARRANT COUNTY, TEXAS Tel. (972)991-0011 Fax ( —_
Bury+Partners-DFW, Inc. ilgfit' 2a05
soot ;iqBuSd000-auj 'AA(I-csaUIaad+Sang SVX31 'Jl1Nno:D INVU VI
e120-zss(M) —A izo0-T66(246) •tad. HiHOM IHOA -40 Alli o
?noszsc gux188 '�nNOIlI00�d 3SVHOlSV3 CINVII I
OOI a; g 'peog ??� ;eaeaeA OIC9 ES A a o
SNOI1f1;0S 'JNIb33NION3 181HX3 m Z
8 1
saaupu(j+�Lmq d �Nlnb'd
1 c o o N
0
+
+
mH $xFa
0 V) 0 �ZZ�ZZ�
ZO U}<}yPy U p v
GJUFO G— ~
y:Ulo co ilm
U K G Z 3 U i5
XPO LJ
iR
Z- zw
5�5 IJU<m UO'n
�m<jw Ulj<
avi<g
oto W2 La
8 m
w "'mss ^<06
Inv,811 I mV< m U<+
9!
00us-Au
I w ds Kt►
_ S V aoO.J 1SV.J "
oovgm.■-." F
A Oon - - - - - - "iJt3
I
-
((AVM-eo-Low waM 3WVwVA)
)UVd 36VHOlSV3
O
Lp w�
F-
F¢-
(n
D:
Z
i
i I TALL APPROX 65 SY OF
RIP-RAP(COMMON)
TO W PUCE PER
TXDOT ITEM 432 VATH 16'
DEEP TOE WALL TO FL OF
CREEK
A + N 'A'- ' S/6•C.I.R.S.
STA 0+00 UT A-1 5/6'C.I.R.S.
72'x16'.50'WYE CONNECT I STA 0-20 !
CONST HEADW
/ PER DETA0.C10.1
. .. FL 460.00
/ STA 0+76.35 U 'A' SEND
W ALL 72-x MOPoZ
/f STA 0+69.63
^ry A
72•x30'60'WYE CONNECT
I STA 1+1 .57 U '
S A O+0 LAA-3
U
U)q0D BANK 72.16' 0•WYE CONNE
J O o 14,330 SF 4,076 9F m
\ F
0-, FF 1105.00 FF=504.00
\ W 4.TLL LOT 3.BLOCK I.
5 Q TR4.AND EASTCHASF ADDITION ( 1
� I _J
y0
COAAMMITY F CIUTIES
I I i � ' i
146 E ! F RETAIL A-2
20,300 SF
FF-500.00
5 I ST 3+64.64 UNE'A'
6 SQUARE MANHOLE
WI MH RISER PER DETAIL C5.7.5
A _ ---_--_ I RIM 507.15
_ __—_______ __—__— _—_fig. _ _
A 4+ 4.1 UNE'A'-
A
4+32.71 LINE'A'-
II A 0+00 UT'A-S'
60' CT
LOT 5, LOCK 1, LOT 8,BLOCK 1,
TRLLAND EAS ASE ADDI7n TRI D EASTOIASE ADDITION 1B 19
� 3 1
i
14 4 -
I 73 I m
Q I 1 6 ON� B
/ I 1 116
m
0 p �n0 9
I Q iACi
O I ,YI
O�I�fT I �V� �� .71
SO.90143W�
DTIOR i I ++9008.2
SD CT
I IN,S '9S�Hi{Po
5/8 R. I
OAK _
CALLED 1.33 ACRES 7+36.75UNE'A' / 7+31.75 UNE A'
STATE OE TEXAS REMOVE EX HEADCONST 6'x6'DROP INLET I_
VOL.70 R9T.P8.1647. II PER DETAIL 05.7.10
CONNECT TO EX 46'SO n
I I �
-------- �a(a' II 5/ C.I.R.S.
INTERSTATE 30 (EAST FREEWAY)
VARIABLE NODTH RIGHT-OE-WA 1
I STORM DRAIN P Bury+Partners
� oED
EXHIBIT B_1 ENGINEERING SOLUTIONS
:2 IIS 5310 Harvest Hill Road, Suite 100
T RILAND EASTCHASE ADDITION
� Dallas, Texas 75230
O
_n $ CITY OF FORT WORTH Tel. (972)991-0011 Fax (972)991-0278
UP TARRANT COUNTY, TEXAS Bury+Partnere-DFII, Inc. ®Copyright 2005
EASTCHASE PARKWAY
(VARIABLE WIDTH RIGHT-OF-WAY))
° — -nr.! --
�' —————————— —
I � 11TIF
`\ �\
r�
I �
� n
I I�rf= a
zr -D I w � A
C? 44- D
to
aro O �
mx con
a
o > PIN�
Z - 1
z D Z:2— 1 N m
v
co ��
p AN
1
w
W
— — - - L4
I
f
1
� I
W FAST FOOD A Z
4,254 SF '' M '
Z
= r I o
N m
m D
i D n I
SIGN Fm Bury+Partners
o o m EXHIBIT C ENOINEEREN6 SOLUTIONS
TRILAND EASTCHASE ADDITION 5310 Harvest Hill Roa ,
O �4 o Dallas, Texas 75230
CITY OF FORT WORTH Tel. (972)991-0011 F (§.Vf 1-U W._
TAR RANT COUNTY, TEXAS Bury+Partners-DFR, l 'i 'QM