Loading...
HomeMy WebLinkAboutContract 46271 CITE'SECRETARY" CONTRACT N®. _ Developer and Project Information Cover Sheet: Developer Company Name: Pulte Homes of Texas ,LP Address, State,Zip Code: 4800 Regent Blvd, Ste 100,Irving TX 75063 Phone,E-Mail: 972-304-2800, clint.vincent @pultegroup.com Authorized Signatory/Title: Clint Vincent,Division Vice-President Land Development Project Name and Brief Description: Water, Sewer,Paving, Storm Drain and Street Lights to serve West Fork Ranch,Ph 8B Project Location: Northwest of Horseman Road Plat Case No.: FP-014-033 Plat Name: Parr Trust Mapsco: 35N Council District: 2 City Project No: 02338 CFA: 2014-065 DOE: 7281 To be comple e by staff.-_ �, ,,�,.' t Received by:=,%d l/RJR Date: `,V gL,CP,r4T-,P 1 RECEIVED DEC 18 A,M, COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as West Fork Ranch, Ph 8B ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW,THEREFORE,For and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section 11, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X , Sewer (A-1) X , Paving (B) X, Storm Drain (B-1) X , Street Lights & Signs (C) X. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. 3 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. 4 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said 5 contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects,in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started.within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. 6 iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) 7 Cost Summary Sheet Project Name: West Fork Ranch Phase 8B CFA No.: 2014-065 DOE No.: 7281 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $294,529.60 2.Sewer Construction $217,619.60 Water and Sewer Construction Total $ 512,149.20 B. TPW Construction 1.Street $ 456,891.55 2. Storm Drain $ 135,747.21 3.Street Lights Installed by Developer $ 57,060.15 TPW Construction Cost Total $ 649,698.91 Total Construction Cost(excluding the fees): $ 1,161,848.11 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 10,242.98 D. Water/Sewer Material Testing Fee(2%) $ 10,242.98 Sub-Total for Water Construction Fees $ 20,485.96 E. TPW Inspection Fee(4%) $ 23,705.55 F. TPW Material Testing(2%) $ 11,852.78 G. Street Light Inspsection Cost $ 2,282.41 H. Street Signs Installation Cost $ 1,960.00 Sub-Total for TPW Construction Fees $ 39,800.74 Total Construction Fees: $ 60,286.70 Financial Guarantee Options (Choose one) Amount Mark choice Bond= 100% $ 1,161,848.11 X Completion Agreement=100%/Holds Plat $ 1,161,848.11 Cash Escrow Water/Sanitary Sewer= 125% $ 640,186.50 Cash Escrow Paving/Storm Drain= 125% $ 812,123.64 Letter of Credit=125%w/2yr expiration period $ 1,452,310.14 8 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary,with the corporate seal of the City affixed, and sai eveloper has execu d this instrument in quadruplicate, at Fort Worth,Texas this '- day of , 201 q_. CITY OF FORT WORTH-Recommended by: Water Department Transportation&Public Works Department d �J tj Wendy Chi-Ba ulal, EMBA, P.E. Douglas W.Wiersig,P.E. Development Engineering Manager Director Approved as to Form &Legality Approved by City Manager's Office Douglas W. Black Fernando Costa Assistant City Attorney Assistant City Manager M&C No. N Date: ATTEST. °� Mary J.Kayser ��"°°00000°° City Secretary �AS ATTEST: DEVELOPER: Signature /�/y/ Signature (Print)Name: Print Name: Clint Vincent Title:Vice-President,Land Development RECORD �7 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 v Z87 I SITE \ B ILEY - BOSW LL �N 1 ' B SSWO D B VD i 1§:6:] \� a mo \ p WESTERN CENTER BLVD \ 35 \V� 28 2 Z � o O jk LL i° _.........--- ---------------------------- _....---......................._..._.................---..............._........._..........................................._..............._......_...._....__...._...._...__...._..-_........_..........---°...-'- ENGINEER: OWNER/ DEVELOPER: (�!�1 pELOTON °P WEST FORK RANCH PULTE HOMES OF TEXAS, L.P. I LAND fOt UTI ONE NORTH PHASE 8 SUITE 4800r100 BLVD. NOT TO SCALE 5751 SUO EE$DRIVE IRVING,TX 75063 KELSUI 1 76244 JI DATE:SEPTEMBER,2014 972-304-2800 PHONE:817-562-3350 i 41 g 1g 10 fl 40 10I 95 12 13 9. 95 i6 57 ORT\p,\e t1 J J_ ER pD 1 O \6 20 j CORD 39 WHITE E FEATHER TR,S\-\�. \ilVES'CM�pRGE 95 12 38 15 10 14 13 2 11 10 9 S 7 1 6 5 4 3 2 1 37 � � � 36 1 ---- ------------- I 12 I 35 I _----LQT-2M_-PRIVATE OPPNMA --- I J 34 I ( ( 10 g 8 7 1 5 4 3 2 1 91 I 40 33 1 I 1 11 LOT IX ®ARK S TE I 1 32 10889 AC I I ANGEIN LANE _ I 12 31 \t\O I I I 1 2 3 4 5 6 7 8 9 12' 29 c PEGS\O 13 ( I ( 13 2 14 G 8\yvc 10 ( I I 15 1 18 17 16 15 14 13 12 11 10 1 I I I 8 I I I 16 BRA_HORN LANE I 1� 7 i I i 17 Q 1 2 3 4 5 6 7 8 9 10 12 FPNWE 6 5 I f I I 1 19 >1 20 19 18 17 16 15 14 13 12 11 �Sp� I > N 1 40 4 I ( 20 21 _ CHIFORD 3 I 10 11 2 I I 22 1 2 3 4 5 6 7 8 9 4 0 I 1 i I 23 13 12 Q 24 23 22 21 20 19 18 17 16 15 14 I I 1 25 12• f (� HOLSTEIN WAY 13 R I 2 1 2 3 4 5 6 7 8 9 10 11 12 PU`,1Ea1SN``p I I I 27 - 5 OF is URE I PNpSE I III ( FUTURE BAILEY-BOSWELL ROAD-- 29 T-1 �T30"RDINj� 30 31 Q" = ——— 50 32 TI 1 I ==--- 1 19 10 9 7 �?,''t� 5 ` 12" 35 E��WN II II AL E GPRY 3HE \VP 636139 11 1 II 4 1 H p2.0 \C T E 5 FORK 9 OR\ N R\C E C R 1 I ( II 4 pPE 1174' ESP SE p5ti \ 3 \ WE GN i O i29-1 8 ....� O. 22 9 15 \ E o \ 51 pNF E Q i . X-2 52 13 2 0 50 2 50 49 . LEGEND I PROPOSED GATE VALVE ' --NA-- EXIST GATE VALVE PROPOSED FIRE HYDRANT - -- EXIST FIRE HYDRANT NOTE:ALL PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE NOTED EXHIBIT A - WATER - ---------- --------------------------------------------------------- '------- - ---------------------- V OWNER/ DEVELOPER: 1101 P E LOTO N o NORTH 300 WEST FORK RANCH PULTE HOMES OF TEXAS, L.P. I1 LAND 3C.Y,IDN3 PHASE 8 4800 SU REGE TEI100 BLVD. 5751 SUOEE SUITE 185 IRVING,TX 75063 KELLER,TX 76244 972-304-2800 PHONE:817-562-3350 GRAPHIC SCALE DATE:SEPTEMBER,2014 11 12 1 15 16 V lkot, 174 111 ' 10 4 3TI O�W 10 9 8 7 1 V5 Lj 3 E21 0 33 Q�jNLIJ NE LOT 1X Ah 32 (9ARK SITE 10.889 AC. 29 PID 0 13 SO 18 17 16 15 14 13 12 11 10 El 23 22 21 2 9 18 17 16 15 I[El' HO-S E-�j AM k 10 11 se PRI 11N 111 10 9 8 sf 613 NN 3 t 12 2 50 1 25 LEGEND PROPOSED SEWER LINES EXIST SEWER LINES SDR 26 SERVICES NOTE:ALL PROPOSED SANITARY SEWER LINES ARE 8"UNLESS OTHERWISE NOTED EXHIBIT Al — WASTEWATER OWNER/ DEVELOPER: 1101 PELOTON NORTH PULTE HOMES OF TEXAS, L.P. 11'111 0 3oo, WEST FORK RANCH 4800 REGENT BLVD. 5751 KROGER DRIVE PHASE 8 SUITE 100 SUITE 185 IRVING,TX 75063 KELLER,TX 76244 GRAPHIC SCALE DATE:SEPTEMBER,2014 972-304-2800 PHONE:817-562-3350 49 9 19 10 17 40 �OU�Si 12 13 94 15 16 57N ORP�\ON 91 16 ER O�\ON 6 20 GOW LLS ERE\NVEE 66 1 PPGE 99 39 WITE FEATHER P,SG\�'- 92 15 38 ��LES'N1 VOI.UMG.R�CT. � 90 iq 13 92 19 90 9 8 7 6 5 4�3 2 9 0� 37 ���� i2 I 35 I I ——— LQT-2L——PEtIVME OPEN_SPAaF——— I �9 i' I Ia o P4Rq SE D 89 13 i I I I I i(I�I I I I(i II I I 10 g _— IN 1 L 2 NE 3 2 1 34 0 33 PARK SITE LOT iX 32 10.889 AC. I 2 0 I 9 3 1 2 3 4 5 N 29 30 IN 13 14 \ 14 13 12 11 1 0 90 18 17 16 15 g g 95 1 p I HORN NE $ 16>tH 17 Q 7 -10 1 2 3 4 5 6 7 1 I I t l \y� P\.\p's 9 18 6 9 0 5 1 20 19 18 17 16 15 14 13 12 0 C IF R L NE - 3 21 10 11 �2 2 i I 22 1 2 3 4 5 6 7 8 9 1� I ( 41 1 I 23 13 12 Q I� 24 23 22 21 20 19 18 17 16 15 14 I I I (� 25 _HO S 13 ELL 26 11 12 �. ES 14 27 1 2 3 4 5 6 75 8 9 10 pF CEO E p I 1PR TFIFF ' FU5 PS II I I FUTURE BAILEY-BOSWELL ROAQ� 1 29' (130'ROW) 30 31 Q = —-------- 8 7 6 50 \\ 33 3�+// li I ( � 119 90 9 \ 34�+, fR\TCN to I I ( I I I 5 \ 35_@ s i G%GY L f,'1393 I I I I K H 4 Z i GT. I I I I WE�f pHP j1$ D205 S Q o l EP P G E Os1 \ \\ 3 \ VIE T NK . O `'9i I I I I. X'22 28 12 1 D X22 015 2 \ ^ 5150 HP E 4 5 50 I II a I I I® 9 25 49 LEGEND O29' B-B/50' ROW (TYP) SIDEWALK BY DEVELOPER ---- SIDEWALK BY HOMEBUILDER O H.C. RAMPS BY DEVELOPER EXHIBIT B - PAVING -------------------------------- - --------------------------------------------'------------------------------------------------------------------------------------------------------------------------------.------------------- --------------------------: �j— OWNER/ DEVELOPER: 1101 PE LOTO N o NONE PULTE HOMES OF TEXAS, L.P. I' LAND 3OLU oNs 300 WEST FORK RANCH PHASE 8 4800 SU REGENT LVD, 5751 SUI EE8DRIVE IRVING,TX 75063 KELLER,TX 76244 972-304-2800 PHONE:817-562-3350 GRAPHIC SCALE DATE:SEPTEMBER,2014 45 9 19 10 97 Z 40 10 11 12 93 9d 15 16 17 CORPORg'j\ON I I R DD 20 91 18 GE 89 39 15 >fVHiTE FEATHE p,s��. E\�ESMEV�UM�RS�Sp 92 38 _J 10 i4 13 92 11 10 91 8 7 6 5 4 3 2 9 36 12 I I —_—____ —3VIATE OP SI-PAU——— 35 �O_2L 1 34 I I I 10 g 8 7 5 4 3 2 1 �' I 40 33 LOT 1X ®ARK SITE I I ( ANGEIN LANE I i 32 10.889 AC. ( I ( 12 — — 390\1\0 I i l 1 2 3 4 5 6 7 8 9 29 pp'(�E\1,�cpE 1 13 2 3 I ( 14 10'INLE S 10 S g`-'Rt i I i 15 18 2' 16 15 14 13 12 11 10 1 LEM 6 I I BRAHORN LANE 21''RCP 2 CP 7 E ® I I I I W 1 2 3 4 5 6 7 8 9 10 ' FpNAS 6 I I I 18� 1 3 5 iii I 1 19 I I 27"R1 RCP 17 16 15 14 13 12 11 \yO� 1 40 4 I I 20Q S_ v� CHIFORD LANE 3 i i __ 21 Z 2 RCP 10 11 �� I 22 a 1 2 3 4 5 6 7 8 9 \� 2 (� I 3 4 I (�q 23 y 1 I I I 4'S MH 15 14 13 12 Q I I I 24 23 21'RCP 20 19 18 17 16 9i I HOLSTEIN WAY 13 T I 36°RCP ;0 'IN 2 S3 4 5 6 7 8 9 10 11 12 I I I 27 _ 5 OF T uSURE s; ( I21'RCP 39°RCP FU RE BAILEY-BOSWELL RO —— ® 29: 30 rI 604 �is0'ROW'f �O 48°RCP 31 Q' 7 6 50 \ 32 / 8 \ 33 v// 11 10 9 I \ 34 1F / GPRY FR\�GFRSGN N I I ( I I I 5 \ 35� N 4 S� NPN p2053813T3 I I I I) I\ K 56 &N FOR CFR;f C• I I I I Se 114 A II ( I) ��X2228 I12 1D 2222229 0 2 15 \ / 5150 HpEq b lii 14 50 1 25 49 l' LEGEND �- PROPOSED STORM DRAIN INLET 0 --�-- EXIST STORM DRAIN INLET -f- PROPOSED STORM DRAIN MANHOLE PROPOSED STORM DRAIN HEADWALL EXHIBIT B1 — STORM DRAINAGE -----I �j- OWNER/ DEVELOPER: 11111 PELOTON NORTH PULTE HOMES OF TEXAS, L.P. 0 300' WEST FORK RANCH I ��NO ,o��T,oN. PHASE 8 4800 SU TEr100 BLVD. 5751 SUOEE 8 DRIVE IRVING,TX 75063 KELLER,TX 76244 GRAPHIC SCALE DATE:SEPTEMBER,2014 972-304-2800 PHONE:817-562-3350 I 49 17 r14 10 40 11 12 13 15 16 OD \ 20 Q ORAj\pN 19 " GORP 33 gUDE'.�.n� R``ESN'rcvOl.VtJ'CR PpE99 95 WHITS FEATHER A, 12 38 10 14 93�12 91 10 9�II 7 6 5 = 3 2 1 37 _ I 36 ———— I 92 I 35 I ————�QL2M——MvME-QP-EN-PAGE——— I .� I I �--- 1 34 11 1 10 S 8 7 5 4 3 2 1 " I 40 33 I I I 11 G IN NE _ I ®ARK SITE III ( 1 32 10.889 AG. I I ( 92 31D\q\O I i 1 1 2 3 4 5 6 7 8 9 1a 29 �{�YC �p-(\O 3 ( I 2 ASE\\, SUOE 13 I I I 14 G S 4 ( I I 18 17 16 15 14 13 12 11 10 I I 10 s NE 6 I I I 16> I Vol '$ I 7 I I I 17 1 2 3 4 5 6 7 8 9 10 �PHpSE 6 I I I 18 t 3 5 i l �. 1 9s� 120 19 18 17 16 15 14 1a 12 11 \ y0 1 40 4 1 1 20 C IF R _ NE �N 3 I i w 21 _ 11 I 2 I I I 22 1 2 3 4 5 6 7 8 9 10 \ 2 �O 1 ( I m 4 23 13 12 �Q I� 24 23 22 21 20 19 18 17 16 15 14 I I 25 HO S El Y — I� I� 13� I (� 26 1 2 3 4 5 6 7 8 9 10 11 12 .\EHOMEP 27 _ 5 aF�FRE >3 PHASE I I ICI ( FUTURE BAILEY-BOSWELL D ROA —— 29i 30 31 119 10 g 8 7 6 50 \\ 3433 I aW\F Y FR\�pNENGHEN I I ( I 4 5 35i p NANCY 538393 III I I) ( H 4 a` 1 p20 y pT. E T FOSS B .\ 0 R1 dB \ \\ RK W POE 7194 ESP SE 061 3 \ WE S i I I I I D X 22 2S -22 0 2 15 12 1 \ '/^\ SS PHA E d I I I II e i 1 14 50\ 1 50 I I I I 25 49 LEGEND PROPOSED STREET LIGHTS EXIST STREET LIGHTS EXHIBIT C - STREET LIGHTS ------------------------------------------------------------------ ---------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------------ OWNER/DEVELOPER: (i!EI PE LOTON o NORTH 30o PULTE HOMES OF TEXAS, L.P. WEST FORK RANCH I LAND ,DLIIT�DN3 REGE PHASE 8 4800 S TEI100 LVD. 5751 SUITE 18 DRIVE IRVING,TX 75063 KELLER,TX 76244 972-304-2800 PHONE:817-562-3350 GRAPHIC SCALE DATE:SEPTEMBER,2014 41 19 10 40 i6 �p�91 12 13 94 115(i6 i7 18 D ERT GOR9g��\ON IL 11 L-,oll 20 < ii 39 WHITE FEATHER LANE SE Eg01 vESTM pp,GE is; - NA S\.\D SMERE\UME 661 G-C 1� 38 10 14 13 92 99 10 9 8 7 6 5 p! 2 1 ELx-E \10 G.?-. 38 92 I 35 I I _--- LQL27X--P-RIVASE OPF�J-VACE_-- ( J I I 34 I I I 10 g 8 7 5 4 3 2 1 " 40 33 ( I ( ,1 G IN L NE _ I LOT 1X 32 40 PARK SITE 90.889 AC. I I I 12 - - 39 N I I I 1 2 3 4 5 6 7 8 9 29 SP.\ R ADS\\8913 ( I I 13 2 14 P"51 et 18 17 16 15 14 13 12 11 10 1 i0 P. s ao I I I 15 g— H R —L/ NE 6 I I I 16> _ 1� 7 i I i 17 1 2 3 4 5 6 7 8 9 10 p?Wse 1 6 I I I 18 3 5 ( 1 19� ' 20 19 18 17 16 15 14 13 12 11 `yQ i 40 4 I zo C IF R L NE �N 3 I iu�i 21 -- - 10 11 72 1 2 I'( 22 1 2 3 4 5 6 7 8 9 \� O 23 i I I 4 13 12 �Q (� 24 23 22 21 20 19 18 17 16 15 14 I I� 25 HO S El Y ry - 13 1 I'1- 26 11 12 ES i 1 2 3 4 5 6 7 8 9 10 POLgEµs .P- I,I I 27 5 0p IX (I I I FUTURE BAILEY-BOSWELL ROARS / 29` 71717— 31 30 i - ---__--- 50 t 32 t i 7 6 33 V/ (/ Iii 10 9 1 5 35 GPR�"(0:Rt N N I I I ( I N i y.1PK 0�p638i3�3 I I I II I.\ppRK 56 RP N 4 St' RK p,R1 G- I I I I WE POPE j1'!A `� EgP AEp61 3 ` 5�� SEQ I I III I D'W-2 8 D. •22 9 15 X-22 12 13 0 52 50 2 50 4 25 49 LEGEND PROPOSED STREET NAME SIGNS 0 EXIST STREET NAME SIGNS EXHIBIT C1 - STREET NAME SIGNS ----------------------------------- --------------------- - - ------------------------------- ............. -------------------------------------------------------------- ........ - - --------- OWNER/DEVELOPER: PELOTON o NORTH soo PULTE HOMES OF TEXAS, L.P. I I LAND SOLUTION. WEST FORK RANCH PHASE 8 4800 SU REGENT TE 100 BLVD. 5751 SUOEE S DRIVE IRVING,TX 75063 KELLER,TX 76244 972-304-2800 PHONE:817-562-3350 GRAPHIC SCALE DATE:SEPTEMBER,2014 P E L O T O N CFA ESTIMATE FOR: PARR TRUST ADDITION I LAND SOLUTIONS WEST FORK RANCH PHASE 813 5751 KROGER DR.STE.185 1 KELLER,TX 76244 1 817.562.3350 11/2512014 EXHIBIT A-WATER IMPROVEMENTS ITEM# DESCRIPTION UNIT QTY UNIT PRICE TOTAL 3311.0461 12" PVC Water Pipe LF 1,578 37.60 59,332.80 3311.0261 8" PVC Water Pipe LF 3,870 20.60 79,722.00 3312.3005 12" Gate Valve EA 3 2,100.00 6,300.00 3305.1103 20"Casing by Other Than Open Cut L.F. 53 260.00 13,780.00 3312.0117 Connection to Existing 4"-12"Water Main EA 2 700.00 1,400.00 3312.0001 Fire Hydrant EA 5 3,100.00 15,500.00 3312.3003 8" Gate Valve EA 12 1,200.00 14,400.00 3305.1102 16"Casing By Other Than Open Cut L.F. 64 250.00 16,000.00 3312.2003 1"Water Service EA 101 700.00 70,700.00 3312.2203 2"Water Service EA 1 1,700.00 1,700.00 3305.0109 Trench Safety L.F. 5,448 0.10 544.80 2605.3031 4"CONDT PVC SCH 40(T) L.F. 140 10.00 1,400.00 2605.3032 4"CONDT PVC SCH 40(B) L.F. 160 40.00 6,400.00 9999.0000 Concrete Blocking CF 2 500.00 1,000.00 3311.0001 1 Ductile Iron Fittings w/Restraint I TON 1 1 1 6,350.00 1 6,350.00 TOTAL WATER $294,529.60 EXHIBIT Al -SANITARY SEWER IMPROVEMENTS ITEM# DESCRIPTION UNIT QTY UNIT PRICE TOTAL 3331.4115 8" Sewer Pipe LF 3,586 24.40 87,498.40 3331.3101 4"Sewer Service EA 101 540.00 54,540.00 3339.1002 4'Drop Manhole EA 1 3,900.00 3,900.00 3339.1001 4'Manhole (Over Existing) EA 1 2,700.00 2,700.00 3339.1001 4'Manhole EA 15 2,550.00 38,250.00 3339.1003 4'Extra Depth Manhole VF 17 100.00 1,700.00 3305.0109 Trench Safety LF 3,586 1.00 3,586.00 3301.0002 Post-CCTV Inspection LF 3,586 1.20 4,303.20 3301.0101 Manhole Vaccum Testing EA 17 0.00 0.00 3339.0001 Epoxy Manhole Liner VF 61 190.00 11,590.00 3331.4116 8"Sewer Pipe,CSS Backfill LF 1 240 1 39.80 1 9,552.00 TOTAL SANITARY SEWER $217,619.60 WFR_PH8B_CFA_20141013.X15, Ph8B Iof3 11/25/2014 P E L O T O N CFA ESTIMATE FOR: PARR TRUST ADDITION LAND SOLUTIONS WEST FORK RANCH PHASE 813 5751 KROGER DR.STE.185 1 KELLER,TX 76244 1 817.562.3350 11/25/2014 EXHIBIT B- PAVING IMPROVEMENTS ITEM# IDESCRIPTION UNIT QTY UNIT PRICE TOTAL 3213.0101 6"Conc.Pvmt SY 12,107 30.45 368,658.15 3211.0501 6"Lime Treatment SY 12,941 2.40 31,058.40 3211.0400 Hydrated Lime TON 194.5 150.00 29,175.00 3213.0501 Barrier Free Ramp,Type R-1 EA 14 1,500.00 21,000.00 3471.0003 Traffic Control EA 1 500.00 500.00 9999.0000 Connect to Existing Pavement EA 4 1,250.00 5,000.00 9999.0000 1 Install Barricade and Construct Header EA 1 1 1 1,500.00 1 1,500.00 TOTAL PAVING $456,891.55 EXHIBIT 131-STORM DRAIN IMPROVEMENTS ITEM# DESCRIPTION UNIT QTY UNIT PRICE TOTAL 3341.0602 60"RCP,Class III LF 84 196.00 16,464.00 3341.0409 48"RCP,Class III LF 10 119.00 1,190.00 3341.0314 39"RCP,Class III LF 83 94.00 7,802.00 3341.0309 36"RCP,Class III LF 98 78.00 7,644.00 3341.0305 33"RCP,Class III LF 295 67.00 19,765.00 3341.0208 27"RCP,Class III LF 270 50.00 13,500.00 3341.0205 24"RCP,Class III LF 177 45.00 7,965.00 3341.0201 21"RCP,Class III LF 163 40.00 6,520.00 3349.3013 60"Straight Headwall,1 pipe EA 1 5,800.00 5,800.00 3349.5001 10'Curb Inlet EA 10 3,200.00 32,000.00 3137.0101 Concrete Rip-Rap(24"Thick) SY 124 60.00 7,440.00 3137.0101 Concrete Rip-Rap(18"Thick) SY 42 50.00 2,100.00 3349.0001 4'Storm Junction Box EA 1 3,650.00 3,650.00 3123.0101 Unclassified Excavation by Plan(Engineered Channel) LF 299 5.00 1,495.00 3305.0109 Trench Safety LF 1,180 0.50 590.00 3292.0400 Seeding,Hydromulch SY 1,253 0.27 338.31 3291.0100 jTopsoil I CY 1 209 1 7.101 1,483.90 TOTAL STORM DRAIN $135,747.21 WFR_PH8B_CFA_20141013.xis, Ph8B 2of3 11/25/2014 P E L O T O N CFA ESTIMATE FOR: PARR TRUST ADDITION LAND SOLUTIONS WEST FORK RANCH PHASE 8B 5751 KROGER DR.STE,185 1 KELLER,TX 76244 1 817.562.3350 11/25/2014 EXHIBIT C -STREET LIGHTING IMPROVEMENTS DESCRIPTION UNIT QTY UNIT PRICE TOTAL 3441.3002 Rdwy Ilium Assembly TY 8,11,D-25 and D-30 EA 14 1,677.85 23,489.90 3441.3201 LED Lighting Fixture EA 14 645.00 9,030.00 3441.3301 Rdwy Ilium Foundation TP 1,2 and 4 EA 14 1,220.00 17,080.00 2605.3015 2"CONDT PVC SCH 80(T) LF 735 8.20 6,027.00 3441.1408 NO 6 Insuitated Elec Condr LF 2,205 1 0.65 1,433.25 TOTAL STREET LIGHTS $57,060.15 EXHIBIT C1 -STREET SIGNS DESCRIPTION UNIT QTY UNIT PRICE TOTAL 3441.4006 1 Install Alum Sign Ground Mount EA 8 245.00 1,960.00 TOTAL STREET SIGNS $1,960.00 WFR_PH88_CFA_20141013.xk,Ph88 3of3 11/25/2014