Loading...
HomeMy WebLinkAboutContract 32655 AMENDMENT NO. 2 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO.,,Ud�3 (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Transystems Corporation Consultants. made and entered into City Secretary Contract No. 27574 , (the Contract) which was authorized by the City Council by M&C C-18999 on the 19th day of March 2002; and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Trinity Boulevard Water Main Extension from Greenbelt Road to State Highway 360 WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated October 27, 2005, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $24 ,820. 00 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $455, 615.00 . .� �. �� 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. mm EXECUTED on this the day of 2005, in Fort Worth, Tarrant County, Texas. ATTEST 7� contract uthor i zatioa Marty Hendri City Secr ary Date APPROVED: A. Douglas Rademaker, P.E. Marc Ott _ Director, Department of Assistant City Manager Engineering Transystems Corporation Consultants ENGINEER I Name:Joseph C. Masterson, P.E. Vice President 500 W. 7th St. STE 600 Fort Worth, TX 76102-4773 APPROVED AS TO FORM AND LEGALITY: Assistant ty Attorney -2- y}� 11C),r R J'.Li131� U'S1 T vsTEn�.s CGl�?F'Ol2AT/ON /,� C CJ N S U L T A N T S AMENDMENT NO. 2 SUMMARY OF DESIGN FEE October 27, 2005 Rakesh Chaubey, P.E. Department of Engineering City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102-6311 RE: Amendment No. 2 to Trinity Boulevard Water Main Extension, DOE 3600 Water Project No_ P161-060161141050 Dear Mr. Chaubey, We appreciate the opportunity to present this proposal for your consideration. Attached please find a fee estimate depicting the scope and limits of work to be provided by TranSystems. Additional work includes meetings, survey, site visits, re-design and revisions to the approved plans. The costs are summarized below: Additional survey $ 19,950.00 Preparation of one easement $ 2,800.00 Additional meeting for Grand Prairie $ 1,270.00 Flagman $ 800.00 LUMP SUM TOTAL $ 24,820.00 �:;t f�.:a.. is �:*•:::. Mr.Rakesh Chaubey,P.E. October 27,2005 Page 2 Original Contract Fee $379,195.00 Amendment No. 1 $ 51,600.00 Amendment No. 2 $ 24,820.00 TOTAL CONTRACT $ 455,615.00 Again, we appreciate the opportunity to submit Amendment No.2 to the original contract. This work effort will be accomplished for the total lump sum fee of $ 24,820.00. If you have any questions or require additional information please give me a call. Sincerely, TranSystems Corporation Consultants C- /C Joseph C. Masterson, P.E. Vice President G:1FWOI12643WrojectMgmilContractsladdendum 21Letteradd2-rev.doc - - T PROPOSEDFEE 36"Water Line 19-Oct-05 Project: 36"Water Line Trinity Boulevard Design Services HOURLY RATE WORK Total Estimated Manhours Cost Proi. Super. Design CADD Survev RPLS Estimate WORK TASK DESCRIPTION Prinicipal Mqr. Engr. Enqr. Tech. Crew Clerical M 210.00 150.00 120.00 85.00 95.00 100.00 110.00 45.00 A. SURVEYS 0.00 topo Jimison road 50 55 20 12 450.00 topo 157 32 38 1 6 7,500.00 sub total _19,960.0 B. MEETINGS With City(14) 0.00 Site visit 0.00 Meeting Grand Prairie 4 4 2 1 270.00 sub-total 1,270.00 C. REIMBURSABLES RR Flagman $ 800.00 Easement $ 2,800.00 Printing(additional plans&specs for 2 bid sets) sub-total 3 600.00 TOTAL $ 24 820.00 FEE DOES NOT INCLUDE: G*\FWOIO7 4WroiadMgmt%Contradstadde dum PjeGOMonal FEE"islomign Fee PAGE I a ) City of Fort Worth, Texas fflI nff or and Council Communication DATE REFERENCE NUMBER LOG NAME PAGE 3/4/03 **C-19500 30TRINITY 1 of 2 SUBJECT AMENDMENT NO. 1 TO ENGINEERING AGREEMENT WITH TRANSYSTEMS CORPORATION CONSULTANTS FOR THE TRINITY BOULEVARD WATER MAIN EXTENSION FROM GREENBELT ROAD TO STATE HIGHWAY 360 RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 27574 with TranSystems Corporation Consultants (the Engineer) in the amount of $51,600 to provide additional design and survey services on the project, thereby increasing the contract amount to $430,795. DISCUSSION: On March 19, 2002 (M&C C-18999), the City Council authorized the City Manager to execute an engineering agreement with the Engineer for the Trinity Boulevard water main extension from Greenbelt Road to State Highway 360. The original contract provided for the Engineer to investigate two potential alignments for the proposed water main and to prepare plans and specifications for the selected alignment. It was determined that neither of the initial alignments would be cost effective because of the existence of previously unknown and conflicting utility lines in the right-of-way. Staff therefore directed the Engineer to investigate two additional alignments for the water main. After reviewing the new alternates, an alignment located within the Dallas Area Rapid Transist (DART) railroad right-of-way was selected for the water main. This amendment will provide for the following additional services on the project- 1. roject:1. The preparation of the two additional potential alignments for the water main; and 2. Payment for the traffic control staff to be provided by DART during design survey on DART right- of-way; and 3. The preparation of storm water pollution prevention plans as will soon be required by the Texas Commission on Environmental Quality; and 4. Payment for additional effort involved with the design survey within DART railroad right-of-way. The Engineer proposes to provide the necessary additional design and survey services for a fee of $51,600.00. Staff considers this amount to be fair and reasonable. TranSystems Corporation Consultants is in compliance with the City's M/WBE Ordinance by committing to 5% M/WBE participation. The City's goal on this project is 5%. FISCAL INFORMATION/CERTIFICATION: City of Fort Worth, Texas 4"Invoir and Council Communication DATE REFERENCE NUMBER LOG NAME PAGE 3/4/03 **C-19500 30TRINITY 2 of 2 SUBJECT AMENDMENT NO. 1 TO ENGINEERING AGREEMENT WITH TRANSYSTEMS CORPORATION CONSULTANTS FOR THE TRINITY BOULEVARD WATER MAIN EXTENSION FROM GREENBELT ROAD TO STATE HIGHWAY 360 The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. MO:r Submitted for City Manager's FUND I ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) Marc Ott 8476 Originating Department Head: Douglas Rademaker 6157 (from) APPROVED 3/4/03 P161 531200 060161141050 $51,600.00 Additional Information Contact: Douglas Rademaker 6157