Loading...
HomeMy WebLinkAboutContract 32656 AMENDMENT NO. 2 STATE OF TEXAS 8 CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and Stream Water Group, Inc. made and entered into City Secretary Contract No. 28909, (the Contract) which was authorized by the City Council by M&C C-19647 on the 8th day of July 2003 and subsequently revised by one previous amendment; and WHEREAS, the Contract involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2003; STM-D WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope,, of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated October 17, 2005 a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $4,000.00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $75,581 .00. L ORIGINAL 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. ` EXECUTED on this the day of 2005, in Fort Worth, Tarrant County, Texas. ATTEST: U a��L�� I NO M&C RLQUdRED Marty Hendri , City Secretary APPROVAL RECOMMENDED: A. Douglas Rademaker, P.E . Marc Ot Director, Department of Assistant City Manager Engineering STREAM WATER GROUP INC. ENGINEER Name:Shamsul Arefin, P.E. President 6707 Brentwood Stair, Ste 630 Fort Worth, TX 76112 APPROVED AS TO FORM AND LEGALITY: Assistant ty• Attorney -2- 'J C1 i1( STREAM WATER GROUP,INC. Consulting Engineers ftwp October 17,2005 Mr. Rakesh Chaubey,P.E. Project Manager Department of Engineering; City of Fort Worth 900 Monroe Street, Suite 201 Fort Worth, TX 76102 Phone: 817 392 6051 RE: Contract Amendment No. 2 Water and Sewer Replacement Contract 2003 STM-D; DOE No. 4059 Water Project No. PW53-060530177750; Sewer Project No. PS58-070580176080 Dear Mr. Chaubey: The following is a summary of additional work requested for Amendment No. 2 to the Water and Sewer Replacement Contract 2003 STM-D, per recent design meetings with City of Fort Worth officials. The proposed amendment includes preparation of SWPPP documents. The total cost to perform the additional services included in Contract Amendment No. 2 is as follows: Preparation of S WPPP Documents $ 4,000.00 Sub-Total Amendment No. 2 $ 4,000.00 The current status of the contract between Stream Water Group, Inc and City of Fort Worth for the Water and Sewer Replacement Contract 2003 STM-D is as follows: Original Contract Amount= $65,366.00 Amendment No. 1 Amount= $ 6,215.00 Amendment No. 2 Amount= $ 4.000.00 Total Contract Amount including Amendment No. 1 = $75,581.00 Please process Amendment No. 2,to the Water and Sewer Replacement Contract 2003 STM-D in the amount of$4,000.00. If you require any additional information or have any questions regarding this matter, please do not to hesitate to give me a call at 817-446-4171 or my cell phone 972-898-5685. We appreciate the opportunity to provide Engineering design services for the City of Fort Worth. Sincerely, Stream Water Proup,Inc. _4�1_ Shamsul Arefin, P.E. President Copy:File z� . I-ort %\,)itIt. 'I '. :rI12 • Phone $17446 -ll r I ,trranmaterLruup_cottl =.�.. f l'� {i•c4l.lii� ��...