HomeMy WebLinkAboutContract 32656 AMENDMENT NO. 2
STATE OF TEXAS 8 CITY SECRETARY CONTRACT NO.
(No M&C Needed)
COUNTY OF TARRANT $
WHEREAS, the City of Fort Worth (City) and Stream Water Group,
Inc. made and entered into City Secretary Contract No. 28909, (the
Contract) which was authorized by the City Council by M&C C-19647
on the 8th day of July 2003 and subsequently revised by one previous
amendment; and
WHEREAS, the Contract involves engineering services for the
following project:
Water and Sanitary Sewer Replacement Contract 2003; STM-D
WHEREAS, it has become necessary to execute Amendment No. 2 to
said Contract to include an increased scope,, of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1 .
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated October
17, 2005 a copy of which is attached hereto and incorporated
herein. The cost to City for the additional design services to be
performed by Engineer total $4,000.00.
2 .
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $75,581 .00.
L
ORIGINAL
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect. `
EXECUTED on this the day of
2005, in Fort Worth, Tarrant County, Texas.
ATTEST:
U a��L�� I NO M&C RLQUdRED
Marty Hendri , City Secretary
APPROVAL RECOMMENDED:
A. Douglas Rademaker, P.E . Marc Ot
Director, Department of Assistant City Manager
Engineering
STREAM WATER GROUP INC.
ENGINEER
Name:Shamsul Arefin, P.E.
President
6707 Brentwood Stair, Ste 630
Fort Worth, TX 76112
APPROVED AS TO FORM AND LEGALITY:
Assistant ty• Attorney
-2-
'J C1 i1(
STREAM WATER GROUP,INC.
Consulting Engineers
ftwp
October 17,2005
Mr. Rakesh Chaubey,P.E.
Project Manager
Department of Engineering; City of Fort Worth
900 Monroe Street, Suite 201
Fort Worth, TX 76102
Phone: 817 392 6051
RE: Contract Amendment No. 2
Water and Sewer Replacement Contract 2003 STM-D; DOE No. 4059
Water Project No. PW53-060530177750; Sewer Project No. PS58-070580176080
Dear Mr. Chaubey:
The following is a summary of additional work requested for Amendment No. 2 to the Water and Sewer
Replacement Contract 2003 STM-D, per recent design meetings with City of Fort Worth officials.
The proposed amendment includes preparation of SWPPP documents. The total cost to perform the
additional services included in Contract Amendment No. 2 is as follows:
Preparation of S WPPP Documents $ 4,000.00
Sub-Total Amendment No. 2 $ 4,000.00
The current status of the contract between Stream Water Group, Inc and City of Fort Worth for the Water
and Sewer Replacement Contract 2003 STM-D is as follows:
Original Contract Amount= $65,366.00
Amendment No. 1 Amount= $ 6,215.00
Amendment No. 2 Amount= $ 4.000.00
Total Contract Amount including Amendment No. 1 = $75,581.00
Please process Amendment No. 2,to the Water and Sewer Replacement Contract 2003 STM-D in the
amount of$4,000.00.
If you require any additional information or have any questions regarding this matter, please do not to
hesitate to give me a call at 817-446-4171 or my cell phone 972-898-5685. We appreciate the opportunity
to provide Engineering design services for the City of Fort Worth.
Sincerely,
Stream Water Proup,Inc.
_4�1_
Shamsul Arefin, P.E.
President
Copy:File z�
. I-ort %\,)itIt. 'I '. :rI12 • Phone $17446 -ll r I
,trranmaterLruup_cottl
=.�..
f l'� {i•c4l.lii� ��...