Contract 44379-CO3
CITY SECRETARY GG OI h CONTRACT N0. "I' FART WORT City of Fort Worth Change Order Request Project Namel Magnolia Urban Vftge Sveemape City Sec# 44379 --, Client Project aM(s 5472-GR76-00630205480 Project Description The consMxtion of pedestrian and sheetscape improvements in the Magnolia Village on Hemphill Street between Oleander Street and Allen Street(COUNCIL DISTRICT 9) Far►Group Change Order# �`� Date 10/20/2014 City Project Mgr. Paul Roach/Arty Wheaton-Rodriguez j City Inspector Adilda Cazoda/Doug Dickinson Dept ery TPW Water Ser Contract Time Totals (WD) Original Contract Amount $1,227,222.50 $1,227.222.50 168 Extras to Date $49,652.80 $49,652.80 26 Credits to Date $0.00 0 Pending Change Orders(in M&C Process) Contract Cost to Date $1,276.875.30 $1,276,875.30 194 Amount of Proposed Cha Order $18 618.98 ra.00 10,00 $18,618.98 Revised Contract Amount $1,295,494.28 $1,295,494.28 194 Original Funds Available for Change Orders $55,601.11 $55,601.11 Remaining Funds Available for this CO $5,948.31 $5,948.31 Additional Funding(if necessary) $12,670.67 $12,670.67 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.56% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,534,028.13 - JUST#F]CATiON REA °ID See attached sheet. `moo a0 rn V ° � a a o �a�oaua AupsW by: � A�a OFFICIAL RECORD rn CITY SECRETARY Mary J. Kayser, City Secretary � WORTH,TX n It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order Fain Group }ke /O•/Ai/•i '♦�f♦} r�( 'rya /Z to r tole to , .' (z .1 / ilAc on' uir FORT WORTH City of Fort Worth Change Order Request M&C Number M&C Date Approved rn 0 CG Cl cif o 7t o ° cc LO)Z v � o 0 co 8' J a uj LO U n 4 a Li m o 2 m O n cm rn o } W M AM o U m C m U O C c Z o O U. °a op O � o J 1= s � o v J E u- d J ri Z d H O m C a cp a rn °o C? co 0 0 co rn css �s ai co co rs In 0 'v � 3 n 0 a d 00 a c 0 v d v 0 0 10 t u - � ° � $ _ /� a . 2 R § ` O § to & � £ m I © � § k cm n 5 2 � 0 U3 0 tio A CL r2 ® of k k W � p a E u 2' N / "- 0 2 E 2 co 7 � ® _ 3 U IL i s ■ C _ o Is � J 2 � z � o ■ � k70 I2 m c e 82 CD 0 k \ CL 0 \ ¥ v CL \ : A CL . Co °o C) 0 0 0 rfs rrs 0 rfs c 0 0 n 0 w CD m �a a N c O a ar v O a Do c m r u MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders COQ DATE AMOUNT Total $0.00 BACKGROUND INFORMATION 1. WATERLINE LOWERING Paul A. Roach From: Dustin Blaylock<dfb @freese.com> Sent: Monday, December 23, 2013 9:36 AM To: Paul A. Roach Subject: RE: Magnolia water on storm Attachments: D162-WATERLINE LOWERING DETAIL.PDF;D130-HORIZONTAL THRUST BLOCKING.PDF;33 11 10_Ductiie Iron Pipe.pdf; 3311 1 I—Ductile Iron Fittings.pdf;33 05 10 _Utility Trench Excavation Embedment and Backfill .pdf;8 inch water Hemphill-SD conflict.pdf Paul, The attached detail titled "D162—WATERLINE LOWERING DETAIL.PDF"depicts our proposed design to lower the waterline to avoid conflict with the 21"storm drain line. The other attached PDF's are referenced by the waterline lowering detail. Please let me know if you need anything else. Thank you, Dustin Blaylock,PE,SIT Transportation/Infrastructure Group Freese and Nichols,Inc. 4055 International Plaza,Suite 200 Fort Worth,Texas 76109 817-735-7437 817-735-7491 fax www.freese.com -q +write A�Irw1w1 From: Roach, Paul [mailto:Paul.Roach @fortworthtexas.gov] Sent:Wednesday, December 04, 2013 2:57 PM To: Dustin Blaylock Cc: Wheaton-Rodriguez, Arty Subject: FW: Magnolia water on storm Dustin, It looks like we are going to need the main lowered. Can you get a drawing of what needs to be done,and I will get Fain to cost it out?Thanks. Paul A. Roach, P.E. CP&Y, Inc. City of Fort Worth Planning and Development Department Project Manager 115 West 7th Street, Suite 1500 Fort Worth,TX 76102 817.662.1211 direct 214.914.8709 cell 817.354.4935 fax 1 INSTALL% STA. 31+45.00 I-15' STORM DRAIN INLET REPLACE 46 LF I` COPPER 70I - 648.75 -- SERVICE PIPE & fL • 644.75 STA. 31+75.67 19.75' RTJ 1- NEW METER BOX -- INSTALL: SEND LEFT 60' TA.32«54.00 19.75' Rr INSTALL: 31+00 �`� 32*00 BEND RIGHT 30' HEMPHILL STREET 21' RCP �✓'W A T 21" RCP 11 LF SD-S 76 LF 0 f .STA.. 3 +30.25 IEPL•ACE 22 LF 1* COPPER ERVICE PIPE & "s 1- NEW METER SOX ' STA.32+71.05 2350' RT INSTALL: -15' STORM DRAIN INLET 1 645.73 F = 644.00 l�fi G i s - r � m EXISTING GROUND N o .....,AT„q,ENTER LINE IR 654 c r X J I A W LL 14GL ' 650 a . 646 — Z1` RCP • 0.30% 24" RC a. 642 $ MwO .p t_v, 4 " 21" RCP P 1.41% m'^ J N 11 3 w1 �b r Ir . zv c n v i HIV f0 _Wm fo o Q. 638 8 s ' 3 ' j FW:Magnolia water on storm Page 1 of 4 FW: Magnolia water on storm Roach, Paul Sent: Wednesday,February 26,2014 4:53 PM To: riacy@faingp.com Cc: Wheaton-Rodriguez,Arty;Cawria,Adilda;Dustin Blaylock[dfb@fmxw.com] Attachments: D162-WATERLINE LOWERING-I.PDF(170 KB);D130-HORIZONTAL THRUST B-1.PDF(191 ICU);33 11 10-Dudke Iron Pipe.pdf(145 KB);33 11 11—Ductile Iron Fitt-l.pdf(142 KB);33 05 10_UtdRy Trench Ex-I.pdf (227 K8);8 inch water Hemphill-SD—l.pdf(152 KB) Rod, Attached are the details for lowering the interfering 8-inch water line under the proposed 21-inch storm drain at 31+80.The consultant is providing a new storm drain profile to deal with the ductile sewer line at Oleander that will affect this point interference to some extent.The lowering will need to clear the storm drain by the specified amount shown on the detail. Please propose a cost to do the necessary water line lowering. Paul A. Roach, P.E. CP&Y,Inc. City of Fort Worth Planning and Development Department Project Manager 115 West 7th Street,Suite 1500 Fort Worth,TX 76102 817.662.1211 direct 214.914.8709 cell 817.354.4935 fax From: Dustin Blaylock[dfb@freese.coml Sent: Monday, December 23, 2013 9:35 AM To: Roach,Paul Cc:Wheaton-Rodriguez,Arty; Chris Bosco Subject: RE: Magnolia water on storm Paul, The attached detail titled"D162—WATERLINE LOWERING DETAIL.PDF"depicts our proposed design to lower the waterline to avoid conflict with the 21"storm drain line. The other attached PDF's are referenced by the waterline lowering detail. Please let me know if you need anything else. Thank you, Dustin Blaylock,PE,SIT Transportation/Infrastructure Group Freese and Nichols,Inc. 4055 International Plaza,Suite 200 Fort Worth,Texas 76109 817-735-7437 817-735-7491 fax www.freese.com https://legacy.fortworthtexas.gov/owa/?ac—Item&t=IPM.Note&id=RgAAAADBuep2rygZ... 4/10/2014 FW: Magnolia water on storm Page 2 of 4 Malcolm llaldrige 70N Auw�aa.�u From: Roach, Paul[mailto:Paul.Roach@fortworthtexas.gov] Sent:Wednesday, December 04, 2013 2:57 PM To: Dustin Blaylock Cc: Wheaton-Rodriguez,Arty Subject: FW:Magnolia water on storm Dustin, It looks like we are going to need the main lowered.Can you get a drawing of what needs to be done,and I will get Fain to cost it out?Thanks. Paul A. Roach, P.E. CP&Y, Inc. City of Fort Worth Planning and Development Department Project Manager 115 West 7th Street,Suite 1500 Fort Worth,TX 76102 817.662.1211 direct 214.914:8709 cell 817.354.4935 fax From: Kasavk:h,John Sent: Wednesday, December 04,2013 9:43 AM To: Sholola,Tony; Roach, Paul Cc: Sauceda, Robert Subject: RE: Magnolia water on storm Tony,I have not seen plans for this project in some time. My guess is that the project did not include any water or sewer to address these conflicts. Paul,will Freese adjust their storm sewer or does the water need to be lowered at this location? Downsizing from the main 21"to 18"at the current grade will not provide enough separation. It appears that Freese will need to develop plans to lower the water main. Thanks. John Kasavich. From: Sholola,Tony Sent:Tuesday, December 03, 2013 2:14 PM To: Kasavich,John Cc: Sauceda, Robert Subject: FW: Magnolia water on storm You aware of this? https:H legacy.fortworthtexas.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADBucp2rygZ... 4/10/2014 FW: Magnolia water on storm Page 3 of 4 From:Cawrla,Adilda Sent:Tuesday, December 03,2013 1:36 PM To: Dustin Blaylock; Roach, Paul Cc:Sholola,Tony; Wheaton-Rodriguez,Arty; Dickinson, Douglas Subject: RE: Magnolia water on storm About 100 feet is installed From: Dustin Blaylock[mailto:df 6freese.coml Sent:Tuesday,December 03, 2013 1:27 PM To: Roads, Paul Cc:Sholola,Tony;Wheaton-Rodriguez,Arty; Dickinson, Douglas;Cazorla, Adilda Subject: RE: Magnolia water on storm Paul, My initial thoughts are to downsize the pipe from a 21"to 1r;however,this would need to be approved by the city due to the fact that the city's minimum pipe size for the trunk line is 21". Also,how much of the storm drain is already installed? Thank you, Dustin Blaylock,E.I.T.,S.I.T. Transportation/Infrastructure Group Freese and Nichols.Inc. 4055 International Plaza,Suite 200 Fort Worth,Texas 76109 817-735-7437 817-735-7491 fax www.freesecom Makoo n Balch r arror...rMaey,er From: Roach,Paul [mailbD:Paul.R2ach9(ortNorthtwm.s3Dv1 Sent:Tuesday, December 03, 2013 11:19 AM To:Dustin Blaylock Cc:Sholola,Torry;Wheaton-Rodriguez,Arty; Dickinson, Douglas;Camrla, Adilda Subject: FW: Magnolia water on storm Dustin, The attached drawing shows the location of the water main described below. Evidently the main is about 3 " into the storm drain.Can we change the SD profile to clear the main? Paul A. Roach, P.E. CP&Y,Inc. City of Fort Worth Planning and Development Department Project Manager https://legacy.fortworthtexas.gov/owa/?ae=ltem&t=I PM.Note&id=RgAAAADBuep2rygZ... 4/10/2014 FW:Magnolia water on storm Page 4 of 4 115 West 7th Street, Suite 1500 Fort Worth,TX 76102 817,662.1211 direct 214.914.8709 cell 817.354.4935 fax From: Cazoda,Adilda Sent:Tuesday,December 03, 2013 10:24 AM To: Roach, Paul Cc: Dickinson, Douglas Subject: Magnolia water on storm Paul,we have conflict with storm line,it is intersecting, an 8"water line on Hemphill. Contractor is leaving,they can't work no more on this storm until gas line and water line get relocated Adilda Cazorla Construction Inspector 8852 Camp Bowie West Fort Worth,Tx.76116 Ph. 817-223-2282 Fax 817-392-7895 How am I doing? please contact my supervisor: 0 lingo v Please consider the environment before printing this message. This electronic mail message is Wdended exclusively for the individual or enfily to which N is addressed This message,together with any attachment, may contain the sender's organization's confidential and privileged information.The recipient Is hereby nolHled to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sendefs organization.Any unauthorized review,printing,relentlon, copying,disclosure,distribution,retransmission,dissemination or other use of,or taking or any action in reliance upon,this information by pemans or enlil es other than the intended recipient is prohibited If you received this message in error,please immediately contact the sender by ropiy email and delete all copies of the material from any computer Thank you for your cooperation https://legacy.fortworthtexas.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADBucp2rygZ... 4/10/2014 N CV N LLI in CD ull cn I fl ir LU 711, '26 10 ir _j 0 if LL Z 10- .00 ul 1.26 16 C; ir z7� JI 2f -4. BLOCKING SHALL EXTEND TO UNDISTURBED EARTH AFL DUCTILE IRON FITTINGS SHALL BL WRAPPED 'N RESTRAINED POLYETHYLENE PER PLUG OR CAP TEE SECTION 33 H 11 1 1 � X. BEND BLOCKING SHALL EXTEND TO UNDISTURBED EARTH PLAN VIEVV HORIZONTAL THRUST BLOCKING TABLE PwcS, TEES, 90'BENDS 45' BENDS 22 5' BENDS '1,26' HL NOS PIPE "X° DEAD-ENDS SIZE DIM."' MIN. A A MIN. AREA M A (SF) (SF) (S ) (SF) (51-)� t 4.00* 4.50 4.00" 4,00" 4.00^ 5.65 8.00 4.33 4.00• 4.00' 10" 1'-6 1 8.84 12.50 6.76 4.00• 4.00• 12" r-8" 12.-2 17.g9 9.74 4.96 4.00- 18" F: 31.99 17.31 8.83 4.43 -0" 35.34 40.99 27.05 13.79 6.93 50,89 71.97 38.95 19.96 9.98 MINIMUM THRUST BLOCKING SURFACE AREA SHALL BE 4 SQUARE FEET '•DIMENSION °X° TO BC A MINIMUM Oh CNF HJOT AND SIX 'NCHFS, BUT IS TO BE INCREASED WHERE NECESSARY TO PROVIDE BEARING AGAINST UNDISTURBED TRENCH WALL. NO IES. 1. THRUST BLOCKING AREAS SHOWN ARE BASED ON. 1.1. 275 PSI TEST PRESSURE 1.2. 3.000 °SF HORIZONTAL OR LATERAL BEARING PRESSURE FOR ACCEP i AHI F SOILS 1.3. MINIMUM COVER OF 42" 1,4. A SAFETY FACTOR OF 1.5. 2. THE ENGINCER SHAL_ PROVIDE A SEPARATE BLOCKING TABLE WHEN THE CONDITIONS DO NOT MEET THE ABOVE ASSUMPTIONS. 3. THE CONTRACTOR IS REQUIRED TO -ROVIDE THRUST RESTRAINT BY MEANS OF THRUST BLOCKING FOR ALL PIPES. THIS 'TEM SHALL BE CONSIDERED SUBSIDIARY TO THE VARIOUS ITEMS BID. 4. ALL MJ FTTINGS SHALL BE ADDITIONALLY RESTRAINED WITH RETAINER GLANDS. 5. BLOCKING FOR WATER LINES LARGER -HAN 24" SHALL BE DESIGNED FOR THE SPECIFIC LOCATION AND SHOWN ON THE DRAWINGS. 6. All DUCTILE IRON FITTINGS SHALL HE WRAPPED IN POLYETHYLENE ENCASEMENT PRIOR TO PLACING OF BLOCKING. 7. CONCRETE MATERIAL SHALL CONFORM TO SECTION 03 34 16. ORT%b CITY OF FORT WORTH,TEXAS REVISED:06-19-2013 HORIZONTAL THRUST BLOCKING 33 11 00-D130 3305 12-1 WATFR LINE LOWERING Page I af4 1 SECTION 33 05 12 2 WATER LINE LOWERING 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 l. Locations where existing 12-inch or smaller water lines are crossed by a new storm 7 sewer,sanitary sewer or water transmission main and the existing water line is to be 8 lowered under the proposed improvement and no design profile has been provided 9 in the Drawings 10 2. Locations where a new 12-inch or smaller water line is installed and crosses an 11 existing underground conflict which requires the water line to be lowered greater 12 than two feet below the standard depth and has not been detailed in the Drawings 13 3. 16-inch and larger water lines are excluded from this Section and should be 14 specifically designed for lowering and paid for by unit price items 15 B. Deviations from this City of Fort Worth Standard Specification 16 1. None. 17 C. Related Specification Sections include,but are not necessarily limited to: 18 1. Division 0—Bidding Requirements,Contract Forms,and Conditions of the 19 Contract 20 2. Division 1—General Requirements 21 3. Section 33 04 40—Cleaning and Acceptance Testing of Water Mains 22 4. Section 33 05 10—Utility Trench Excavation,Embedment,and Backtill 23 5. Section 33 11 10—Ductile Iron Pipe 24 6. Section 33 11 11 —Ductile Fittings 25 7. Section 33 11 12—Polyvinyl Chloride(PVC)Pressure Pipe 26 8. Section 33 12 25—Connection to Existing Water Main 27 1.2 PRICE AND PAYMENT PROCEDURES 28 A. Measurement and Payment 29 1. Water Line Lowering 30 a. Measurement 31 1) Measurement for this Item shall be per each by size of each Water Line 32 Lower performed. 33 b. Payment 34 1) The work performed and the materials furnished in accordance with this 35 Item shall be paid for at the unit price bid per each"Water Line Lowering" 36 installed for: 37 a) Various Sizes 38 c. The price bid shall include: 39 1) Furnishing and installing Ductile Iron or PVC Pipe and Ductile Iron 40 fittings Crry OF FOR"r WORTti Llnsert Project Namel STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS IInscn Project Number] Revised December 20,2012 33 05 12-2 WA"IER LING LOWERING Page 2 o1`4 1 2) Polyethylene encasement 2 3) Paving removal 3 4) Excavation 4 5) Hauling 5 6) Disposal of excess material 6 7) Furnishing and placement of embedment 7 8) Furnishing,placement,and compaction of backfill 8 9) Thrust restraint 9 10) Bolts and nuts 10 11)Gaskets 11 12)Clean-up 12 13)Cleaning 13 14)Disinfection 14 15)Testing 15 16)Connections to the existing water line 16 1.3 REFERENCES 17 A. Reference Standards 18 1. Reference standards cited in this Specification refer to the current reference 19 standard published at the time of the latest revision date logged at the end of this 20 Specification,unless a date is specifically cited. 21 2. Texas Commission on Environmental Quality(TCEQ) 22 a. Title 30 Texas Administrative Code(TAC)Chapter 290,Public Drinking 23 Water. 24 1.4 ADMINISTRATIVE REQUIREMENTS[NOT USED] 25 1.5 SUBMITTALS[NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS[NOT USED[ 27 1.7 CLOSEOUT SUBMITTALS[NOT USED] 28 LS MAINTENANCE MATERIAL SUBMITTALS [NOT USED[ 29 1.9 QUALITY ASSURANCE[NOT USED[ 30 1.10 DELIVERY,STORAGE,AND HANDLING[NOT USEDI 31 1.11 FIELD[SITE]CONDITIONS[NOT USED] 32 1.12 WARRANTY[NOT USED[ 33 PART 2- PRODUCTS 34 2.1 OWNER-FURNISHED[OR]OWNER-SUPPLIED PRODUCTS[NOT USEDI 35 2.2 EQUIPMENT,PRODUCT TYPES,MATERIALS 36 A. Materials 37 1. Ductile Iron Pipe shall conform to Section 33 11 10. 38 2. Ductile Iron Fittings with retainer glands shall conform to Section 33 l 1 11. CrfY OF FORT WORTH [Insert Project Name) STANDARD CONSTRUC"PION SPECIFICATION DOCUMENTS [Insert Project Number) Revised December 20,2012 330512-3 WATER LINE LOWERING Page 3 of 4 1 3. Polyvinyl Chloride(PVC)pressure Pipe shall conform to Section 33 11 12. 2 2.3 ACCESSORIES[NOT USED] 3 2.4 SOURCE QUALITY CONTROL[NOT USED] 4 PART 3- EXECUTION 5 3.1 INSTALLERS[NOT USED) 6 3.2 EXAMINATION 7 A. Evaluation and Assessment 8 1. Verify elevation of conflict which requires the water line to be relocated. 9 3.3 PREPARATION[NOT USED] 10 3.4 INSTALLATION 11 A. General 12 1. Water lines lowered to resolve conflicts between the water line and a proposed 13 utility shall be lowered to maintain a 2-foot separation between the outside 14 diameters of the water line and the other buried utilities. 15 a. When approved by the Water Department,the separation may be reduced to 12- 16 inches. 17 b. No exception shall be granted to the criteria in Article 3.4 B of the Section. 18 B. Water Crossing Sanitary Sewer 19 1. Water lines crossing sanitary sewer shall be in accordance with the TCEQ Title 30 20 TAC Chapter 290. 21 C. Water Lines Crossing under Storm Drains 22 1. Water lines crossing within 2 feet below storm drains shall be constructed of 23 Ductile Iron Pipe in accordance with Section 33 11 10. 24 D. Install Ductile Iron Pipe in accordance with Section 33 11 10. 25 E. Install Ductile Iron Fittings with retainer glands in accordance with Section 33 11 11. 26 F. Install Polyvinyl Chloride(PVC)Pressure Pipe in accordance with Section 33 11 12. 27 G. Disinfect and test at the direction of the City. 28 H. Complete connections to the existing main in accordance with Section 33 12 25. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMF.NTS [Insert Project Number] Revised December 20,2012 330512-4 WATER LINE LOWERING Page 4 of 4 1 3.5 REPAIR/RESTORATION[NOT USED] 2 3.6 RE-INSTALLATION[NOT USED] 3 3.7 FIELD QUALITY CONTROL[NOT USED] 4 3.8 SYSTEM STARTUP[NOT USED] 5 3.9 ADJUSTING[NOT USED] 6 3.10 CLEANING[NOT USED] 7 3.11 CLOSEOUT ACTIVITIES[NOT USED] 8 3.12 PROTECTION[NOT USED] 9 3.13 MAINTENANCE[NOT USED] 10 3.14 ATTACHMENTS[NOT USEDI I l END OF SECTION 12 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D.Johnson LLA—Clarification of when Section is applicable 13 CITY OF FORT WORTH [insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number[ Revised December 20,2012 1 Paul A. Roach From: Rod Lacy<RLacy@faingp.com> Sent: Monday,March 10,2014 3:44 PM To: Paul A. Roach Subject: Water Line Lowering Attachments: SCAN3854 OOO.pdf Paul, Attached you will find our cost breakdown for the lowering of the 8"water line for the Magnolia Urban Village project. Please be aware that until we can get approval for this change order,we will then have to adjust accordingly for the days impacted. Also,I have left a message for Mr. Boothe regarding the meeting on Wednesday.He has not got back with me as of yet.I will let you know as soon as 1 speak with him. Please let me know should you have any questions. Respectfully, Rod Lacy Fain Group -----Original Message-- From:rlacv@fal,,-,ao.com[mallto:rlacye'fainimcoml Sent:Monday,March 10,2014 9:57 AM To:Rod Lacy Subject: t TITLE: PCO Item: 21218 City of Fort Worth CO#3 Magnolia Urban Village 8"Water Line Lowering Labor Labo,7r [Additional FAIN Labor Items: Crew Unit Hours Rate Cost 4 Man Pipe Crew 1 CH 30 $ 65.00 $ 1,950.00 Foreman 1 30 $ 37.50 $ 1,125.00 Subtotal FAIN Labor. $ 3,075.00 Burden @ 116%: $ 1,2911.50 Total FAIN Labor: $ 4,366.60 Additional FAIN Material Items; Quantity Unit Unit Cost Material Cost Pipe Material 11 LS $ 1,821.14 $ 1,821.14 Sand 8 CY $ 12.00 $ 96.00 Flowable Fill 12 CY $ 79.00 $ 948.00 Trust Blocking 0.5 CY $ 89.00 $ 44.50 Vertical Tie Down Blocking 2 CY $ 89.00 $ 178.00 Concrete Street Reosk 4 CY 89.00 350.00 Total Materiel: 8 44&L Additional FAIN Equipment: Quantity Unit Hours Equipment Unit Equipment Cost l Cat 330 Excavator 1 EA 30 $ 110.00 $ 3,300.00 850 Loader 1 EA 30 $ 65.00 $ 1,950.00 Subtotal FAIN Equipment: $ 5,250.00 Total FAIN Equipment $ 5.250.00 Additional Subcontractor Items: Quantities Unit Unit Price Total, Trucking 4 HR $ 70.00 $ 280,00 Total Subcontractor Items: $ 280.00 Summary of Costs Total Items: $ 13,340.14 10%Overhead $ 1,334.01 Subtotal $ 14,674.15 5`Ya Profit $ 733.71 Subtotal $ 15,407.86 Bond-1.5% $ 231.12 UNIT PRICE —— 15,638.88 We are respectfully asking for an additional 14 days to complete this work. in Date 3/06/14 HD SUPPLY WATERWORKS, LTD. Entered by: MS2 THE FAIN GROUP INC DALLAS TX STOCK-DALLAS PO Box 569250 PO BOX 750 Dallas TX 75356 FORT WORTH TX 76101 Telephone: 214-631-9410 Telephone: 817-927-4388 Fax: 214-905-0768 Fax: 817-927-4389 ttention: LARRY FRAZIER 3/06/14 Bid ID: 3750703 FORT WORTH WM LOWERING MAGNOLIA Page 1 Sell Net Extended Line Quantity Per Description Price Price 10 40 FT 8 C900 DR14 PVC PIPE (G) 8.80 352 .00 MARKINGS PC200 OR PC305 20 4 EA 8 MJ 45 BEND (I) CP DI C153 88.40 353.60 30 2 EA 8 MJ L/P SLEEVE(I) CP DI C153 110.50 221.00 40 12 EA 811MJ ACC SET L/GLAND COR BLUE 24.38 292.56 50 12 EA 8 PVC 4008 STARGRIP RESTR (I) 42.05 504.60 GLAND ONLY 60 1 EA 29 1IX200' POLY TUBE ROLL F/DIP 80.37 80.37 70 3 EA 2"X100' POLYWRAP TAPE 5.67 17.01 Subtotal: 1,821.14 Tax: .00 Bid Total: 1,821.14 2. PAVEMENT MARKING REMOVAL Paul A.Roach From: Paul A. Roach Sent: Wednesday,April 30,2014 10:38 AM To: 'rlacy@faingp.com' Cc: Wheaton-Rodriguez,Arty(Arty.Wheaton-Rodriguez@fortworthtexas.gov);Cazorta,Adilda (Adilda.Cazoda@fortworthtexas.gov) Subject: MW-Pavement Marking Removal Rod, As we have previously discussed,we do not have pavement marking removal as a bid item.Looking at the site,I find we have three or four existing stop bars and a zebra crosswalk at Casatta School. The rest of the markings are raised markers.For simplicity,I think we should establish a 12-inch wide marking removal and pay for each pass on the zebra crosswalk.TXDOT's 677 specification considers the raised marker removal to be incidental to the striping removal.300 linear feet should be more than sufficient to remove the striping.Please propose a cost to do this work.Thanks. Paul A.Roach,PE Associate Senior Project Manager CP"� 115 West Seventh Street,Ste.1500 Fort Worth,TX 76102 817.662.1211 Direct 817.662.6828 Fax 214.914.8709 Cell proach@cpyt.com I www.cQyLcom 1 Pavement Markings Magnolia Page 1 of 1 Pavement Markings Magnolia Rod Lacy [RLacy @faingp.com] Sent: Friday,May 02,2014 10:28 AM To: Roach,Paul Cc: Wheaton-Rodriguez,Arty Attachments: SCAN4372_000.pdf(15 I®) Paul, Here is the pricing you requested for the elimination of the existing markings.Let me know should you have any questions.Also,I will be out all next week but I will have my phone and checking my emails should anyone need to get in touch with me. Thank you, Rod Lacy Fain Group https://l egacy.fortworthtexas.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADBucp2rygZS... 5/5/2014 r.0 FAIN •• aiAMg RelenonYCec CoWnwin Fukm P.O.Box 750 Fad Wath TX 76101 917.9274399 817-9274389 Fax wrwlx awmm May 1,2014 Paul A.Roach,P.E. City of Fort Worth 115 West 7th Street,Suite 1500 Fort Worth,TX 76102 Re: Magnolia Urban Village PCO#4 Eliminate Existing Markings Mr.Roach: Below is the unit pricing you requested for the existing pavement marking removal for the Magnolia Urban Village project. Eliminate Ext Pavement Mrk Type I&Mrks(12") 1 300 LF S 2.00 5600.00 Total $600.00 Please contact me if you have any questions. Sincerely, Rod Lacy TY C(W)(ARROW► 6682112 PREFAB PAV MRK EA 4.000 465.00000 1 TY C(W)(RR KING) 6682116 PREFAB PAV MRK EA 141.000 189.35461 3 TY C(W)(WORD) 6682145 PREFAB PAV MRK EA 6.000 250.00000 1 TY C(W)(NUMBER) 6722008 PLOWABLE REFL EA 100.000 35.00000 1 PAV MRKR TY II-C- R 6722012 REFL PAV MRKR TY I EA 143.000 3.50000 2,038.000 4.27103 17 .0 6722014 REFL PAV MRKR TY I EA 84.000 4.20000 1 R 6722015 REFL PAV MRKR TY EA 868.000 3.23738 14,344.ODO 3.67345 24 II-A-A 6722017 REFL PAV MRKR TY EA 152.000 3.25000 7,340.000 3.49790 13 II-C-R 6722021 TRAFFIC BUTTON EA 40.000 840000 1 TYII-A-A 6722022 TRAFFIC BUTTON EA 55.000 6.83818 2 TY11-C-R 6727024 TRAFFIC BUTTON EA 718.000 2.20000 1 TY W 677 2001 EUM EXT PAV MRK LF 20,683.000 .50000 304,165.000 .33332 16 &MRKS(4") 6772002 EUM EXT PAV MRK LF 8,S19.000 .39000 1 &MRKS(6") 6772003 EUM EXT PAY MRK LF 611.000 .79820 5,490.000 .46365 5 &MRKS(8") 6772005 LF 5,527.000 2.05632 3 EUM EXT PAV MRK &MRKS(12") 6772006 ELIM EXT PAV MRK LF 100.000 2.00000 1 &M RKS(18") 6772007 ELIM EXT PAV MRK LF 147.000 2.00000 3,617.000 3.28423 8 &MRKS(24") 6772008 EUM EXT PAV MRK EA 4.000 35.00000 21.000 56.54762 4 &MRKS(ARROW) 6772009 ELIM EXT PAV MRK EA 6.000 50.00000 1 &MRKS(DBL ARROW) 6772018 ELIM EXT PAV MRK EA 2.000 45.00000 8.000 48.75000 2 &MRK5(WORD) 6772019 ELIM EXT PAV MRK EA 25.000 11.00000 1 &MRKS(18")(YLD TRI) 6772020 ELIM EXT PAV MRK FA 25.000 22.00000 1 &MRKS(36")(YLD TRI) 6782001 PAV SURF PREP FOR LF 24,577.000 DB583 343,313.000 .11453 15 MRK(4") 6782003 PAV SURF PREP FOR LF 2,516.000 .14547 31,759.000 .21975 13 MRK(8") 6782004 PAV SURF PREP FOR LF 957.000 .88720 14,331.000 .58422 11 MRK(1Y") 678200S PAV SURF PREP FOR LF 200.000 SDODD 1 MRK(18") 6702006 PAV SURF PREP FOR LF 1,432.000 .86522 6,799.000 99082 14 MRK(24") 6782007 PAV SURF PREP FOR EA 29.000 10.00000 112.000 17.13580 12 MRK(ARROW) 6782008 PAV SURF PREP FOR EA 8.000 14.50000 3 MRK(DBL ARROW) 678 2011 PAV SURF PREP FOR SF 23,093.000 .25000 1 MRK(ISLAND) 6782013 PAV SURF PREP FOR EA 1,490.000 .52987 4 MRK(RPM) 6782014 PAV SURF PREP FOR EA 7.000 127.91429 3 MRK(RR XING) 3. IRRIGATION SYSTEM RE: Magnolia Urban Village-Irrigation System Page I of 1 RE: Magnolia Urban Village- Irrigation System Rod Lacy [RLacy @faingp.com] Seat: Wednesday,June 04,2014 7:03 AM To: Roach,Paul CC: Wheaton-Rodriguez,Arty;Cazorla,Adilda;Dustin Blaylock[dfl@freese.com];Gordon,Cornell K. Paul, I have been in touch with ALS this morning and hopefully they can have something over to me today.Of course, this has shut down landscaping operations until this can be adjusted.We will have to adjust time accordingly due to the fact that we were installing the 200 class per plans and this change is not our fault. Hopefully,I can have it to you today. Thank you, Rod Lacy Fain Group From: Roach, Paul [mailto:Paul.Roach @fortworthtexas.gov] Sent:Tuesday,June 03, 2014 6:21 PM To: Rod Lacy Cc:Wheaton-Rodriguez,Arty; Cazorla, Adilda; Dustin Blaylock; Gordon, Cornell K. Subject: Magnolia Urban Village-Irrigation System Rod, We were asked today by CFW PACSD to discontinue installing the 200 Class PVC piping for the 1 1/4" header line and use Schedule 40 PVC instead.The header line already installed may stay in place. Please provide a cost proposal to make this substitution. Paul A. Roach, P.E. CP&Y, Inc. City of Fort Worth Planning and Development Department Project Manager 115 West 7th Street, Suite 1500 Fort Worth,TX 76102 817.662.1211 direct 214.914.8709 cell 817.354.4935 fax https://legacy.fortworthtexas.gov/owa/?ac=Item&t=IPM.Note&id=RgAAAADBucp2rygZ... 7/25/2014 C05 Request Page 1 of 1 COS Request Rod Lacy [RLacy @faingp.com] Sent: Thursday,June 05,2014 11:23 AM To: Roach,Paul Cc: Wheaton-Rodriguez,Arty;Cazorla,Adilda Attachments: SCAN4596_000.pdf(23 KB) Paul, Here is the Mainline Irrigation Adjustment Change Order you requested. Please look this over and let me know if you have any questions. I am trying to have them back on site tomorrow. Thank you, Rod Lacy Fain Group https:H legacy.fortworthtexas.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADBucp2rygZ... 10/9/2014 r.0 FAIN &gilding RaladonsHps Constructing Futures P.O.Box 750 Fart Worth,TX 76101 817-927.4388 817-927 4389 Fax www.Wngp.com June,5,2014 Paul A.Roach,P.E. City of Fort Worth 115 West 7th Street,Suite 1500 Fort Worth,TX 76102 Re: Magnolia Urban Village PCO#5 Mainline Irrigation Adjustment Mr.Roach: Below is the unit pricing you requested for the mainline irrigation adjustment for the Magnolia Urban Village project. As requested by CFW PACSD to discontinue installing the 200 Class PVC piping for the 1 '/o"header line and use Schedule 40 PVC Instead. Irrigation Mainline from Class 200 PVC to SCH 40 1 LS $ 2,820.00 $2,820.00 Total $2,81e.00 Since this was a change initiated by CFW PACSD,American Landescape Systems were removed from the job until confirmation of the change could be approved. We respectfully ask 3 additional days be added to the contract in lieu of this change request. Please contact me if you have any questions. Sincerely, Rod Lacy PM Fain Group 4. PLANT MATERIAL (65 GAL) (TREE) 2. PLANT MATERIAL (65 GAL) (TREE) RE: Magnolia Uban Village-Trees Page 1 of 2 RE: Magnolia Uban Village - Trees Wheaton-Rodriguez, Arty Sent: Wednesday,June 25,2014 2:46 PM To: Roach,Paul;Adams,Melinda J. Attachments: @(65 B) Melinda, We understand you are pretty busy dealing with storm cleanup. As you know,we chose 5 tree wells to do percolation tests to identify possible poor draining tree wells. We had a couple of those prove to be poor drainers(less than 2" in the allotted test time)and the others moderate drainers. We understand that one way to alleviate the poor drainage is to create an underdrain system. At this time both for financial and other site reasons,we cannot entertain that solution. Storm drain inlets on Hemphill are scarce and thus we cannot,at this time,add underdrains to the wells. We have spoken to the design engineers landscape architect and it has been suggested that another way to look at this situation is to recommend another tree species. Bald Cypress trees have been recommended to us and we would suggest replacing all trees with this species. Drought tolerance has been explained to us to be comparable to the Red Oaks we were planning to use on this project. Please give us a call at your convenience to discuss. We would like to give the landscape contractor enough notice so he can locate enough Bald Cypress trees for the job. Arty Arty Wheaton-Rodriguez Senior Planner,Comprehensive Planning Section Planning and Development City of Fort Worth 817-392-7373 tf? How am I doing? Please contact my supervisor at:eric.fladanerAfortworthgov.ora From: Roach, Paul Sent: Wednesday,June 25, 2014 1:39 PM To:Adams, Melinda J. Cc: Wheaton-Rodriguez, Arty Subject: RE: Magnolia Uban Village -Trees We will give you a call about 2:30 Thanks Melinda. Paul A. Roach, P.E. CP&Y,Inc. City of Fort Worth Planning and Development Department Project Manager 115 West 7th Street, Suite 1500 Fort Worth,TX 76102 817.662.1211 S" direct 214.914.8709 cell 817.354.4935 fax https://Iegacy.fortworthtexas.gov/owa/?ae=ltem&t=IP M.Note.Enterprise V auit.Shortcut&id... 9/24/2014 RE: Magnolia Uban Village -Trees Page 2 of 2 From: Adams, Melinda J. Sent: Wednesday, June 25, 2014 11:55 AM To: Roach, Paul Cc: Wheaton-Rodriguez, Arty Subject: RE: Magnolia Uban Village -Trees Maybe, but I'm in the middle of storm response at the moment. Try around 2:30 Melinda Adams City Forester Parks and Community Services 817 392 5705 melinda.adamsna:fortworthtexas.jzov_ City of Fort Worth— Working together to build a strong community << imageOOl Jpg @O1CF9084.1C295F70»« irnage002.png @OlCF9084.lC295F70>> From: Roach, Paul Sent: Wednesday, June 25, 2014 11:55 AM To: Adams, Melinda J. Cc: Wheaton-Rodriguez, Arty Subject: Magnolia Uban Village -Trees Melinda, Are you available for a phone call after lunch?Arty and I would like to discuss with you the findings of our perc tests and some ideas we are considering. I think it would be best to handle in a conversation rather than a string of emails. I will give you a call shortly after lunch to arrange the call. Paul A. Roach, P.E. CP&Y, Inc. City of Fort Worth Planning and Development Department Project Manager 115 West 7th Street, Suite 1500 Fort Worth,TX 76102 817.662.1211 (V direct 214.914.8709 tO cell 817.354.4935(!`fax imageOO1.jpg (3. 1KB) image002.pnq (3. 1KB) imageCO3.png image0C4.pnq (2.3K3) imageCO5.png (2.4KB) (13. 3KB) https:Hlegacy.fortworthtexas.gov/owa/?ae=Item&t=IPM.Note.Enterprise Vault.Shortcut&id... 9/24/2014 Magnolia trees Page 1 of 1 Magnolia trees Rod Lacy [RLacy @faingp.com] Sent: Thursday,July 10,2014 3:21 PM To: Wheaton-Rodriguez,Arty; Roach,Paul Arty.. Here is what we are running up against.. Basically they can get you any tree your looking for in a 65 gallon..The kicker is it will run $200-$250 per tree more..This looks like to be the only way to solve this problem unless they stay with the original plan of oaks_. The supply and demand on trees are making it very difficult and the farms seem to be able to charge at will.. Please let me know your thoughts.. I know there is budget issues but we are running out of options? Thanks Rod Sent from my iPhone https://legacy.fortworthtexas.gov/owa/?ae=Item&t=IPM.Note.Enterprise Vault.Shortcut&id... 9/24/2014 Magnolia Village: Hemphill Streetscape Page 1 of 1 Magnolia Village: Hemphill Streetscape Wheaton-Rodriguez, Arty Sent: Tuesday,July 15,2014 2:42 PM To: Rod Lacy(RLacy @faingp.com); Roach, Paul; Paul A.Roach[PROACHCChcpyi.coml Importance: High Attachments: HemphilMagnolia Planting P-1.pdf(912 KB) Rod, I have attached the planting sheets,complete with tree species callouts. The original bid called for a total of 73(qty),65 Gallon Trees(192.2026)at$480 each. What is shown on the attached revised sheets is 70(qty),mixed species trees(Shumard(Red)Oak,Cedar Elm, and Pond Cypress). The break down goes like this: QTY Species Size Installed Price 47 Shumard(Red)Oaks 65 Gallon, 12-14' ht,6-8'sp,3%:-4"cal $480 18 Cedar Elm B&B,equivalent ht and cal as Red Oaks $480(price from ALS 7-15-14 email) 5 Pond Cypress 65 Gallon,equivalent ht and cal as Red Oaks $680(original installed price plus$200 premium, price from R Lacy 7-10-14 email) For a total of 70 trees. We eliminated 3 total trees(marked with a cloud on the attached sheets). Please confirm the prices and size description with the landscape contractor and make any clarifications. Please Note: All trees will be inspected prior to installation. The City Forester has asked that the landscape contractor and nursery work to mark the north facing side of the tree and make that match the installation direction. This is especially important with the Red Oaks. We need 48 hours of lead to get these inspected. For the three(3) Pond Cypress being utilized in the paver grate areas. We need to have those paver grates opened to their largest setting. Apparently Cypress trees get a trunk flare in their early growth,so this will help accommodate that growth. When installing the 4"inspection tubes,a breathe hole needs to be added. This can be accomplished drilling a hole at the top end of the inspection tube or cap itself. This allows air to get to the bottom of the tree,which f helps with water percolation. Arty Arty Wheaton-Rodriguez Senior Planner,Comprehensive Planning Section Planning and Development City of Fort Worth 817-392-7373 How am I doing? Please contact my supervisor at:enc.fladageKftfortworthgov.org https://legacy.fortworthtexas.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADBucp2rygZ... 7/24/2014 1922017 VEGETATION SY 1,253.000 3.50000 1,253.000 3.50000 1 BARRIER 1922020 PLANT EA 28.000 7.00000 1 MATERIAL(1 t GAL)(TREE) 1922024 PLANT EA 38.000 330.00000 234.000 204.35897 2 MATERIAL(30 GAL)(TREE) 1922025 PLANT EA 367.000 251.77112 2 MATERIAL(45 GAL)(TREE) 1922026 PLANT EA 6.000 380.00000 1 MATERIAL(65 GAL)(TREE) 1922027 PLANT EA 130.000 750.00000 1 MATERIAL(100 GAL)(TREE) 1922028 PLANT EA 495.000 7.00000 1 MATERIAL(1 GAL)(SHRUB) 1922030 PLANT EA 4,985.000 23.75000 1 MATERIAL(3 GAL)(SHRUB) 1922031 PLANT EA 1,610.000 23.65652 3 MATERIAL(5 GAL)(SHRUB) 1922097 CONC LNDSCP LF 421.000 37.00000 1 EDG(12 IN WIDTH) 1932001 PLANT MO 12.000 600.00000 36.000 1,073.33333 3 MAINTENANCE 1932007 IRRIGATION MO 12.000 220.00000 24.000 460.00000 2 SYSTEM OPER AND MAINT