HomeMy WebLinkAboutContract 29352 CITY SECRETARY N/ D.O.E. FILE CITY SECRETARY CONTRACTOR'S BONDING CO.SPECIFICATIONS CONTRACT NO. AND CONSTRUCTION'S COPY CONTRACT DOCUMENTS ORIGINAL CLIENT DEPARTMENT FOR SANITARY SEWER REPLACEMENTS FOR M-391* From STA. 160+13.96 To STA. 184+11.47 And M-350* From STA. 0+00.00 To STA. 2+54.52 12-09-0-P- c DEPARTMENT OF ENGINEERING PROJECT NO. 3522 SEWER PROJECT NO. PS58-070580175660 r GARY W. JACKSON A. DOUGLAS RADEMAKER, P.E. CITY MANAGER DIRECTOR DEPARTMENT OF ENGINEERING ROBERT D. GOODE, P.E. MAEBELL BROWN, P.E. TRANSPORTATION AND INTERIM DIRECTOR, PUBLIC WORKS DIRECTOR WATER DEPARTMENT OF T�xqs 2003 ................................ WILLIAM 0: WENDLAND ............................... 9• 67958 CartersommBurgess , s`°N `777 Main Street `�� A Fort Worth, Texas 76102 9 .��a oo3 C&B No. 011077010 cIrf RAW M&C Request Review Pagel of 2 RTWoRTH • _. liome I Couvc:d Agenda I M&C f Employee Directory I Morning Report I Ads I PRS I Solution Zono I Department', t Site Map Print M&C COUNCIL ACTION: Approved on 12/2/2003 - Ord. 15770 DATE: 12/2/2003 REFERENCE NO.: **C-19874 LOG NAME: 30M-391 CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Appropriation Ordinance and Award of Contract to William J. Schultz, Inc. d/b/a Circle "C" Construction Company for Main M-391 and M-350 Sanitary Sewer Replacement RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$506,190.00 from the Water and Sewer Fund to the Sewer Capital Project Fund; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Project Fund in the amount of$506,190.00 from available funds; and 3. Authorize the City Manager to execute a contract with William J. Schultz, Inc. d/b/a Circle "C" Construction Company in the amount of$459,690.00 for Main M-391 and M-350 Sanitary Sewer Replacement. DISCUSSION: On November 11, 2002 (M&C C-18821), the City Council authorized the City Manager to execute an engineering agreement with Carter & Burgess, Inc. to prepare plans and specifications for Main M-391 Sanitary Sewer Replacement. The proposed improvements consist of the installation of 2,400 feet of 36-inch sanitary sewer pipe to provide adequate sewer capacity to accommodate increased sewage flows from existing and future development within an area located west of IH-35W and south of Bailey Boswell Road. The location of the project is shown on the attached location map. The project was advertised for bid on September 4 and 11, 2003. On September 25, 2003, the following bids were received: Bidder Amount Time of Completion William J. Schultz, Inc. d/b/a $459,690.00 150 Calendar Days Circle "C" Construction Company Barson Utilities, Inc. $531,042.70 S.J. Louis Construction of Texas, Ltd., LLP $576,917.74 Jackson Construction, Ltd. $608,315.50 Brett Contractor, Inc. $610,179.00 Cleburne Utility Construction $641,158.00 http://www.cfwnet.org/council_packet/mc_review.asp?ID=1221&councildate=12/2/2003 12/3/2003 r M&C Request Review Page 2 of 2 Conatser Construction, Inc. $654,909.00 John Burns Construction $654,909.00 Company of Texas, Inc. $728,676.00 AUI Contractors $746,745.50 Gin Spen, Inc. $750,715.10 Bowles Construction, Inc. $782,115.00 Tri-Tech Construction, Inc. $795,350.00 Texas Road & Utilities, Inc. $816,850.00 William J. Schultz, Inc. d/b/a Circle "C" Construction Company is in compliance with the City's M/WBE Ordinance by committing to 19% M/WBE participation. The City's goal on this project is 19%. In addition to the contract cost, $32,500.00 is required for inspection and survey, and $14,000.00 is required for project contingencies. This project is located in COUNCIL DISTRICT 2, Mapsco 35G and H. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval and completion of recommendation No. 1, and adoption of the attached appropriation ordinance, funds will be available in the capital budget, as appropriated, of the Sewer Capital Project Fund. TO Fund/Account/Centers FROM Fund/Account/Centers %2) $506j90.00 3) $459,690.00 2) PS58 541200 070580175660 $473,690.00 1) PE45 538070 0709020 $506,190.00 2) PS58 531350 030580175660 $32,500.00 Submitted for City Manager's Office by: Marc Ott (8476) Originating Department Head: A. Douglas Rademaker(6157) Additional Information Contact: A. Douglas Rademaker (6157) ATTACHMENTS Map.pdf ordinance.pdf http://www.cfwnet.org/council_packet/mc review.asp?ID=1221&councildate=12/2/2003 12/3/2003 CITY OF FORT WORTH, TEXAS DEPARTMENT OF ENGINEERING ADDENDUM NO. 1 TO THE SPECIFICATIONS AND CONTRACT DOCUMENTS FOR SANITARY SEWER REPLACEMENTS FOR M-391*From STA. 160+13.96 To STA. 184+11.47 And M-350*From STA. 0+00.00 To STA. 2+54.52 DEPARTMENT OF ENGINEERING PROJECT NO. 3522 SEWER PROJECT NO. PS58-070580175660 Addendum Issued: September 18, 2003 Bids Received Until: September 25, 2003 +� The Contract Documents and Construction Plans for the subject project are hereby revised or amended as follows: I. SPECIFICATIONS A. PROPOSAL Remove pages B-2 to B-Summary and replace with the attached Bid Proposal pages B-2 to B-7. Bidders shall complete the enclosed replacement pages and include them with the Contract Documents. B. PROPOSAL Bidder shall bid either PVC sanitary sewer pipe or HOBAS sanitary sewer pipe, but not both options. C. PART C—GENERAL CONDITIONS The section was not included in the specifications but is attached to this addendum. D. PART DA—ADDITIONAL SPECIAL CONDITIONS Add 2 new sections, DA-117 and DA-118, and revise the Table of Contents, Page ASC-3. Insert the attached new pages. ADDENDUM NO. 1 1 of 2 September 18, 2003 City of Fort Worth M-391*and M-350* Addendum No. 1 September 18, 2003 II. CONSTRUCTION PLANS A. On sheet 5, the profile note at M-391 R STA 184+11.47 shall be amended to match the plan note, e.g., replace"CONST STD"with "INSTALL PRECAST CITY OF FORT WORTH APPROVED" and replace "CONC COLLAR" with "ADJUSTABLE GRADE RING (24" MAX.)." B. On.sheet 5, the profile note at M-350R STA 1+93.03 shall be amended to match the plan note, e.g., replace "CONST STD" with "INSTALL PRECAST CITY OF FORT WORTH APPROVED" and replace "CONC COLLAR" with "ADJUSTABLE GRADE RING (24" MAX.)." All other provisions of the plans, specifications and contract documents for the project, which are not expressly amended herein, shall remain in full force and effect. This Addendum forms a part of the Contract Documents referenced above and modifies the original Contract Documents and plans. Acknowledge receipt of the Addendum on the space provided below and your Bid Proposal and note on the outer envelope of your bid. Failure to acknowledge receipt of this Addendum could subject bidder to disqualification. RECEIPT ACKNOWLEDGED: Department of Engineering A. Douglas Rademaker, P.E., Director By: ��_��. Qs��.-� By Title: /i�s �,,/ Rick Trice, P.E. [ Manager, Engineering Services Address: /-I® Aor !Ynx 9 4o f k7a.-A T� 7G iYv Telephone: _ 917 - Z 9-3- 963 OF TF. it * : •.� *. .* : ................................ W I L L I AIA 0: ;iwl AND .A;:......6 ....... 7958 • 90��S�UNAL E�\�� 8/o3 END ADDENDUM NO. 1 ADDENDUM NO. 1 2 of 2 September 18, 2003 SPECIFICATIONS AND CONTRACT DOCUMENTS FOR SANITARY SEWER REPLACEMENTS FOR M-391* From STA. 160+13.96 To STA. 184+11.47 And M-350* From STA. 0+00.00 To STA. 2+54.52 DEPARTMENT OF ENGINEERING PROJECT NO. 3522 SEWER PROJECT NO. PS58-070580175660 GARY W. JACKSON A. DOUGLAS RADEMAKER, P.E. CITY MANAGER DIRECTOR DEPARTMENT OF ENGINEERING ROBERT D. GOODE, P.E. MAEBELL BROWN, P.E. TRANSPORTATION AND INTERIM DIRECTOR, PUBLIC WORKS DIRECTOR WATER DEPARTMENT 2003 CartersonnBurgess 777 Main Street Fort Worth, Texas 76102 C&B No. 011077010 TABLE OF CONTENTS Part A - Notice to Bidders - Comprehensive Notice to Bidders - Special Instructions to Bidders - Minority and Women Business Enterprise Specifications Part B - Proposal Part C - General Conditions Part C1 - Supplementary Conditions to Part C Part D - Special Conditions Part DA -Additional Special Conditions Part E - Details Part F - Bonds& Insurance (City of Fort Worth): - Performance Bond - Payment Bond - Maintenance Bond -City of Fort Worth Standard Certificate of Insurance - Contractors compliance with Workmans' Compensation Law Part G - Contract (City of Fort Worth) Appendix A- Easement and Permit Documents r t r r PART A i NOTICE TO BIDDERS l r r PART A - NOTICE TO BIDDERS Sealed proposals for the following: SANITARY SEWER REPLACEMENTS FOR M-391* FROM STA. 160+13.96 TO STA. 184+11.47 AND M-350* FROM STA. 0+00.00 TO STA. 2+54.52 SEWER PROJECT NO. PS58-070580175660 DEPARTMENT OF ENGINEERING PROJECT NUMBER 3522 2334 L.F. 36" Diameter Sanitary Sewer Pipe by Open Cut 318 L.F. 36" Diameter Sanitary Sewer Pipe by Other than Open Cut 8 EA. 5' Diameter Manhole 1 EA. 5' Diameter Modified Type "A" Manhole Addressed to Mr. Gary W. Jackson, City Manager of the City of Fort Worth, Texas will be received at the Purchasing Office until 1:30 p.m., September 25. 2003, and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. Plans for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. One set of plans and documents will be provided for a non-refundable fee of$30.00. Bidders shall not separate, detach or remove any portion or segment of sheets from the Contract Documents at any time. Bidders shall submit the complete specifications book or risk rejection of bid. For additional information, contact Mr. Miguel Domenech, P.E., Project Manager, City of Fort Worth, at (817)392-6826, or Billy Wendland, P.E., Carter& Burgess, Inc., at (817)735-6183. Advertising Dates: September 4. 2003 September 11, 2003 r. NB-1 r COMPREHENSIVE NOTICE TO BIDDERS Sealed proposals for the following: SANITARY SEWER REPLACEMENTS FOR M-391" FROM STA. 160+13.96 TO STA. 184+11.47 AND M-350* FROM STA. 0+00.00 TO STA. 2+54.52 SEWER PROJECT NO. PS58-070580175660 DEPARTMENT OF ENGINEERING PROJECT NUMBER 3522 2334 L.F. 36" Diameter Sanitary Sewer Pipe by Open Cut 318 L.F. 36" Diameter Sanitary Sewer Pipe by Other than Open Cut 8 EA. 5' Diameter Manhole 1 EA. 5' Diameter Modified Type "A" Manhole Addressed to Mr. Gary W. Jackson, City Manager of the City of Fort Worth, Texas will be received at the Purchasing Office until 1:30 p.m., September 25, 2003, and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. Plans, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. Documents will be provided to prospective bidders for a non-refundable fee of 30.00. Additional sets may be purchased on a non-refundable basis for thirty dollars ($30.00) per set. These documents contain additional information for prospective bidders. A pre-bid conference will not be held for this project. All bidders will be required to comply with provision 5159 of"Vernon's Annotated Civil Statues" of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. r The City reserves the right to reject any and/or all bids and waive any and/or all formalities. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the Proposal form. Bids that do not acknowledge receipt of all addenda may be rejected as being non-responsive. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at(817) 871-7910. AWARD OF CONTRACT: No bid may be withdrawn until the expiration of ninety(90) days from r the date bids are opened. The award of the contract(s), if made, will be within ninety (90)days after opening of bids, but in no case will the award be made until all necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the contract. Bidders shall not separate, detach or remove any portion, segment or sheets from the Contract Documents at any time. Bidders must complete the proposal section(s) and submit the complete specifications book or face rejection of the bid as non-responsive. It is recommended f" that the bidder make a copy of the forms included in the Minority and Women Business I NB-2 Enterprise section for submittal within the time-line stated below or the bidder may request a copy of said forms from the City Project Manager named in this solicitation. In accord with the City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The Bidder shall submit the MBE/WBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, GOOD FAITH EFFORT FORM ("Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the Documentation was received by the City. Failure to comply shall render the bid non-responsive. The Managing Department for this project is the Engineering Department. For additional information, contact Mr. Miguel Domenech, P.E., Project Manager, City of Fort Worth, at(817) 392-6826, or Billy Wendland, P.E., Carter 8 Burgess, Inc., at (817) 735-6183. GARY W. JACKSON GLORIA PEARSON CITY MANAGER CITY SECRETARY Department of Engineering A. Douglas Rademaker, P.E. Director II Advertising Dates: By: 0 n Y � September 4. 2003 Ar Rick Trice, P.E. September 11, 2003 Manager, Engineering Services NB-3 SPECIAL INSTRUCTIONS TO BIDDERS 1. PREQUALIFICATION REQUIREMENTS: All contractors submitting bids are required to be prequalified by the Fort Worth Water Department prior to submitting bids. This prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, an acceptable experience record, an acceptable equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven (7) calendar days prior to the date of the opening of bids. a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status to the submitting company. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. b) For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received. c) The Director of the Water Department shall be the sole judge as to the acceptability for financial qualification to bid on any Fort Worth Water Department project. d) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. e) The City, in its sole discretion, may reject any bid for failure to demonstrate experience and/or expertise. f) Any proposals submitted by a non-prequalified bidder shall be returned unopened, and if inadvertently opened, shall not be considered. g) The City will attempt to notify prospective bidders whose qualifications (financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a waiver of any necessary prequalification. 2. BID SECURITY: A cashier's check, or an acceptable bidder's bond, payable to the City of Fort Worth, in an amount of not less than five (5%) percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten (10) days after the contract has been awarded To be an acceptable surety on the bid bond, the surety must be authorized to do business in the state of Texas. In addition, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or(2) have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required 06104/03 SM G.UOB1011077CWeSPMd&V8101107701.00b.doc under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. 3. BONDS: A performance bond, a payment bond, and a maintenance bond each for one hundred (100%) percent of the contract price will be required, Reference C 3-3.7. 4. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: a) The contractor shall comply with all requirements of Chapter 2258, Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258, Texas Government Code. Such prevailing wage rates are included in these contract documents. b) The contractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show(i) the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and (ii)the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of D-3 Right to Audit pertain to this inspection. c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a) and (b) above. d) With each partial payment estimate or payroll period, whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas Government Code. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, r the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. �- 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601g, Texas Revised Civil Statutes, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business in located. "Nonresident bidder" means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not apply if this contract involves federal funds. osro4iO3 SI-2 G:UOB%011077CwespaWence\01107701.00D.Ooc The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the bid amount is $25,000.00 or less, the contract amount shall be paid within forty-five (45) calendar days after completion and acceptance by the City. 9. AGE: In accordance with the policy("Policy")of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members, agents employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except on the bases of a bona fide occupational qualification, retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirements. Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractor against City arising out of Contractors and/or its subcontractors'alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal, state and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractors and/or its subcontractors'alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accord with City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("with Documentation")and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. OfVO4103 SI-3 G.V 081011077%Cortespondence%01107701.00b.doc Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or women business enterprise (WBE) on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation)and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal, State or local laws or ordinances relating to false statements. Further, any such misrepresentation of facts (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three (3)years. 12. FINAL PAYMENT, ACCEPTANCE AND WARRANTY: a) The contractor will receive full payment (less retainage)from the city for each pay period. b) Payment of the retainage will be included with the final payment after acceptance of the project as being complete. 1110 c) The project shall be deemed complete and accepted by the City as of the date the final punch list has been completed, as evidenced by a written statement signed by the contractor and the City. ,101 d) The warranty period shall begin as of the date that the final punch list has been completed. e) Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable. f) In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding (i)final quantities, or (ii) liquidated damages, city shall make a progress payment in the amount that city deems due and payable. g) In the event of a dispute regarding either final quantities or liquidated damages, the parties shall attempt to resolve the differences within 30 calendar days. i 06/04/03 SI-4 I- G.1,IOEM1107MmespmndenceM 107701.00b.doc P, FORT WORTH OW City of Fort Worth Minority and Women Business Enterprise Specifications AID SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract Is$25,000 or more,the MIWBE goal Is applicable. If the total dollar value of the contract is less than$25,000,the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. M/WBE PROJECT GOALS The City's MBE/W BE goal on this project is 19 %of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal,or 2. Good Faith Effort documentation,or: 3. Waiver documentation,or; 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. Subcontractor Utilization Form,if goal is received by 5:00 p.m., five (5) City business days after the bid met or exceeded: opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if participation is less than opening date,exclusive of the bid opening date. statedgoal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if no M/WBE participation: opening date, exclusive of the bid opqning date. 4. Prime Contractor Waiver Form,if you will received by 5:00 p.m., five (5) City business days after the bid perform all subcontracting/supplier work: opening date, exclusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid rto met or exceed goal. opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED r NON-RESPONSIVE TO SPECIFICATIONS rAny questions,please contact the M/WBE Office at(817)871-6104. rRev.5/30/03 ATTACHMENT IA Page 1 of 5 FORT WORTH City of Fort Worth 10-02-03P12 : 57 RCVD Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: _ Check applicable block to describe prime WILLIAM J.SCHULTZ,INC.DBA CIRCLE C CONSTRUCTION MW/DBE I X NON-MNV/DBE PROJECT NAME: BID DATE SANITARY SEWER REPLACEMENT M-391&M-350 9/25/03 City's M/WBE Project Goal: Prime's M/WBE Project Utilization: PROJECT NUMBER 19% 19% DOE#3522 Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications MIWBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1°' tier, a payment by a subcontractor to its supplier is considered 2"d tier ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace,that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business Enterprise (DBE) is synonymous with MinorityNVomen Business Enterprise (MI BE). If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease trucks from another M/WBE firm, including M/WBE owner-operators, and receive full M/WBE credit. The M/WBE may lease trucks from non-M/WBEs, including owner-operators, but will only receive credit for the fees and commissions earned by the M/WBE as outlined in the lease agreement. r fit-901 LOY 7 . q.T11 U A OW ;1704�M 1! 4 W, 440 X .03rc)jj1.L1,jj1- t'j- JL) !;allawvet f*, eb Ast"­1 Odin pninsqc; wi 2yct� casvreu,3 (e* ivii m q Eii)1? n ii, ci,; O.J. t,r4t rs, t1d Aw 1"11"yv s Irl. --inn. fag- -ml o-I 11,W 'h4jis 1 11DJL, ',t 1-1peib tc ez)sl In -JEO.--"--I (I oj ILA of evien I(kip,I C47 V) tms 3wpwQup 'IM el tmkI+'-,sAAU, bid to *M11 At If, q3raquosm am nt apurifeud PNO-ri vi1ft-qA,1 - &jnliq -kr� wulb:'! *a laved S; ?!aiT .1%vtO 'taff :j L 0,I,Q'WU,4 6 C1 1"5WySq f3 'Ifzj t LWIevric: --rjiwi, of ii It, f) J, 0. it;01) , AISM -1 r1l, I 1,sfw Itjnggot�,,d to smit�;M1B emQocl 64itt:ip tAJ&DO.' °'Zf)Tll 0011: y(gwdj�rj k7OC ,STP ,oUsticqrriuiT ID VkWil h'T''3, }JX' IT L--Itp ef" ;f-roi Z.15 iilou qd 1111-co -3rn4q sW b"Wvr wii tzoi,;,-- u oil rI tri "ElIVA: �Irl-V r,'! 7;Epit I A3wA,:J,,;I1 rTr,,, --AVVki i-+mtl a!j 1 os 9;�o9l 4rj,;i ni bsriMoo Zl� ;4s,4,v -A -W ATTACHMENT 1A Page 2 of 5 10-02-03P12 : 57 RCVD FoR�T W�O�— Primes are required to identify ALL subcontractorstsuppliers,regardless of status;i.e., Minority,Women and non-MNVBEs. Please list MNVBE firms first, use additional sheets if necessary. Certification N (check one) SUBCONTRACTOR/SUPPLIER T n i N T Detail Detail Company Name Address e M w x M Subcontracting Work Supplies Purchased Dollar Amount Tele hone/Fax T D B p r E E R O B C T E A M & M CONSTRUCTION 1 X SUPPLYING SAND, ROCK, $45,975.00 9725 SALORN DR. MATERIAL ASPHALT, & CROWLEY, TX. 76036 CONCRETE M & M CONSTRUCTION I x HAULING MATERIAL & $27,585.00 9725 SALORN DR. HAUL OFF CROWLEY TX. 76036 RICOHET FUEL DIST. 1 X SUPPLYING FUEL, OIL & $13,792.00 1101 A BEDFORD RD. MATERIAL HYD. FLUID BEDFORD, TX. 76002 REDI-MIX CONCRETE 1 X SUPPLYING CONCRETE $10,000.00 P.O. BOX 112578 MATERIAL CARROLLTON, TX. LATTIMORE 1 X SUPPLYING CONCRETE $10,000.00 MATERIALS CO. P.O. MATERIAL BOX 556 MCKINNEY, TX. 75070 AMERICAN CAST IRON 1 X SUPPLYING PIPE & $22,037.40 17950 PRESTON RD. MATERIAL RELATED JOB DALLAS, TX. 75252 MATERIAL HUGHES SUPPLY 1 X SUPPLYING PIPE & $82,058.00 P.O. BOX 951297 MATERIAL RELATED JOB DALLAS, TX. 75395 MATERIAL tilt• ', .` �K�,. ,� .-:4 11$fflC:'. - VVOe luxe Opl rl It' 7.➢" a�-+11 '9V ?w'u.'srl�.•91'.� argl - ,- le fl n Il �P7sY -'15}! r ,dlru," -=iS ul3'I-,,-r, r Al�{.tt�rr ,� ,#ti�;w{i 'il?h;.l 1+, 1"�� 4h a t<r w11�N1#4 30 h G `84' .rte } "� IA {Al-A iI1AH -tO rf-?AH I �4 �9'4Ji.r'tr flrJ d S '_!YH WA:Y-iTAOt 1 ell 0s'?�+"-C` i w 97 I I q'j' .'Ny};1f 13 a y�� fi T '1 x^Ir, Y,,I jAi 4711 AM �1gjq f:� iq.q A ,, -X �I M1 I-.1 M 1 FORT WORTH 1 0-0 2-0 3 P 1 2 : 5/ R C V D ATTACHMENT t o Page 3 of 5 ••Primes are required to identify ALL subcontractors/suppliers, regardless of status;i.e., Minority,Women and non-M/WBEs. Please list M/WBE firms first, use additional sheets if necessary. Certification N (check one) o SUBCONTRACTOR/SUPPLIER T n Detail Detail Company Name i N T Address e M wC X M Subcontracting Work Supplies Purchased Dollar Amount VY � Telephone/Fax r B B T D E E R O B C T E A APAC, INC. 1 X SUPPLYING SUPPLYING $ 1,000.00 P.O. BOX 848164 MATERIAL ASPHALT DALLAS, TX 75284 AMERICAN 1 X SUPPLYING BARRICADES $ 5,000.00 BARRICADES, INC. MATERIAL 107 ENON AVE. EVERMAN, TX. 76140 RENTAL SERVICE 1 ) RENTAL EQUIPMENT $ 6,000.00 CORP. RENTAL P.O. BOX 840514 DALLAS, TX. 75284 UNITED RENTAL INC. 1 X RENTAL EQUIPMENT $ 6,00000 3120 SPUR 482 RENTAL SUITE B IRVING, TX. 75062 JOHN A. MILLER & 1 XINSURANCE BONDING, WC. $41,310.00 ASSOC. AND GENERAL P.O. BOX 7214 INSURANCE FT.WORTH, TX. 7611 A Via_ Ir ic ,F:, �top � IN V B 6 � CJ ItY j �j�_�fi,, 4,1 `�. ..." - i r ,i'�r'i:�, _i, is � }�' —��Y71��.y�, � �°�'a f �A.�'� � 1��+� , y q j 1 ATTACHMENT 1A FoRTWORTH 1 0-02-03° ' `� : � RCVD Page 4 of 5 Total Dollar Amount of M/WBE Subcontractors/Suppliers $ 87,352.00 Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $260,757.00 TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $348,109.00 The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Request for Approval of ChangWAddition. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1) year. CAROL J. SCHULTZ Au orized Signature Printed Signature VICE PRESIDENT Two Contact Nanarritle(if different) CIRCLE C CONSTRUCTION 817-293-1863 FAX 817-293-1957 Company Name Telephone and/or Fax A�J POK 4032b CIRCLECI@MS.COM Address Email Address FORT WORTH,TX.76140 10/01/03 Cityistateizip Date 00.5691,C.To 'G I JI L2 �+ �',!!�I 1aUiJ �I 4�1 T�4 ,�dryry _ ,yy��j rr��,� e1Jpfi..agrj©VIS +.-s '1rQ-"J 4r°_. IN) g7tl' !'pfd;� A "i �• loilllj �r it oorSl'8'v' fwkd '�S)1i1Y aht cl e--no t�11k�2`4�l a-w ti!1:JI I"a�. °ItM u'4f;:V� .3 I'iAtim" Ill '9rft V;.x,l) sangY?gb. -,o -)lsgaf1sM %)'• O agocill ppaojaU i^I IS11 -M r3 OF-1-e tS;'16 fAQ 10 �jg;,F,01 r-SIil?a0l Yll -40� tT v:rrlrsl`I� .. 'V! &rf 1YdP l�;; $011Ada r1'':� 9ll l',-v Lvlc��:�'1� rk' :fr'�frtlt -jt,) r14 w— . -r— V -" �.V.l 1^ rlclo 061 twcit--8 .."JO To nc );,LJL:zI Y 1C, f' 'off') I�,'a v;`1ra.P�5,:111,,+�Ufir�.'L= F�,C�1� ��11 ala*, �I,r , fr JVlal�;'er7�a��r11 a +�k k1,�, i. le_PQ'� dlff.ly{.r '•a�" is Id,. ) , . I "145 74 .')P +ilk Defib-hoq )hclw ill L;111ftIll,•I f1c."!ermotri1 vis I Ai ii - I! 1. �F`, � p r �}� LM!', Y`.•b Ta i !,^ � -.�-�_ '411; Vcim ora ev-SICE lebtil cs� Ynf'l lied) kJ blgr� '-561 tails >t- 7"'"e1) iS7 , yy,i!_4., _�� �Gn�r� �;ia�1i 'M'�'iE • ��� i,l�'i�i,__'-es4�,� �^` '4"N�,A t t-J} a i ,-s, � r rri.r:';,1+ IcUl"m t'l' 11'r F Isrij t.1E,3111f10 &1! r10 Y!.4 +_uok4 . '�C g• ..w•; ,�" .''' '• u1-0 >' lsf'10 et2n wL. ba lim vn't it, nr�11stnei-F1'3'C;-'ImI _ "VrlfI A - . 'd!•`k-'_Irr � i*Y�''d"�Jf M..,,yx a. 'tio'y'V M�14 V �c� i5 .. g'i - i k M1I r Y� - 1 - 1 '"' _ . -,i " �,�'k ". l' 'Y',I. =��G.' f Fsl4'_ y;°. _ � "�. ,�;� ,11`t '� - '*r•-r-_ � �r y �I- - , _, •� .1p-'�� l�l � �'#I'� �-���'+ ti71 J°��e �•. 'i '1 �'"i}I". -{�� �I y�,l ka+Vra — -- — VrrrR�r•4Vrr?Ik(E gk1'T�•rar.,' i.rtlilfFn�N .�--- — ---- ____� - - — + ` PART B - PROPOSAL (This Proposal must not be removed from this book of Contract Documents) TO: Mr. Gary W. Jackson Fort Worth,Texas City Manager 2003 City of Fort Worth,Texas FOR: SANITARY SEWER REPLACEMENTS FOR M-391* FROM STA. 160+13.96 TO STA. 184+11.47 AND M-350* FROM STA. 0+00.00 TO STA. 2+54.52 DEPARTMENT OF ENGINEERING PROJECT NO. 3522 SEWER PROJECT NO. PS58-070580175660 Includes the furnishing of all materials (except as specified to be furnished by the City), equipment and labor for the installation of sanitary sewer improvements, all necessary appurtenances and incidental work to provide a complete and serviceable project. Pursuant to the foregoing "Notice to Bidders,"the undersigned bidder, having thoroughly examined the contract documents, including plans, special contract documents, and the General Contract Documents and General Specifications for Sewer Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the inspection and approval of the Director of the City Water Department of the City of Fort Worth, Texas; and binds himself upon acceptance of this proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: (Furnish and install, including all appurtenant work, complete in place, the following items): i B-1 PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 1A.* 2,334 L.F. 36" Diameter PVC** Sanitary Sewer Pipe by Open Cut (All Depths)for wyf Dollars & 8y SO - -, wts/97ZZ3sa A/41 Cents per L.F. -- 2A.* 318 L.F. 36" Diameter DIP (Class 51) by Other Than Open Cut for lids �an diad Dollars & a(� no Cents per L.F. $ c5-0000 /SgOOO 1B.* 2,334 L.F. 36" Diameter HOBAS (SN 46) Sanitary Sewer Pipe by Open Cut (All Depths)for Dollars & Cents per L.F. $ N O 2B.* 318 L.F. 36" Diameter HOBAS Sanitary Sewer Jacking Pipe (with safety factor of 2.5 and minimum SN 140) by Other Than Open Cut for /V o 6/1 C/ Dollars & Cents per L.F. $ JVo * Note: Contractor shall select only ONE (1) option from items numbered 1A and 2A or 1B and 2B. ** See "City Approved Products" list on page B-7 (Revision 1) B-2 PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 3. 8 Each 5' Diameter Manhole, Including Lid and Cover for Dollars & Od aG �y Cents per Each $ /f0 D 4. 1 Each 5' Diameter Modified Type "A" Manhole with bolt-down Lid and Cover for IWO f4a 4FJQ 17 Q� moo- 1"-7 o-1 -7 dr Dollars & Cents per Each $ 2 -1000 5. 90 V.F. Additional Depth for 5' Diameter Manhole (over 6') for epYIG hUn A/eGl -/WP'VJ Dollars & 00 6. �o Cents per V.F. $ /Z log-r o 0 6. 9 Each Concrete Manhole Collar for Dollars & /70 Cents per Each $ZSv 2 570 7. 8 Each Tethered, Stainless Steel Watertight M[anhole/Insert for Dollars & Cents per Each $ (Revision 1) B-3 PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 8. 1 Each Connect to Existing Sanitary Sewer Manhole/for Dollars & oD r,< Cents per Each $ l S'oo 9. 7 Each Remove /Existing Manhole for Dollars & c� Cents per Each $ 4,0o o 5'P o a 10. 9 Each Vacuum Testing of Sanitary Sewer Manholes for > / Dollars & � ej 00 Cents per Each $ /S-a 13,5"0 °D 11. 2,622 L.F. Pre-Construction TV Inspection for Dollars & no Cents per L.F. $ E/ ° /� yg8 ° 12. 2,652 L.F. Post-/Construction TV inspection for TLr/o Dollars& Cents per L.F. $ Z °° �j�0 y 60 13. 2,334 L.F. Grass Seeding for Dollars & >f Cents per L.F. $ / `5,© 00 5 / (Revision 1) B-4 PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 14. 144 V.F. Interior Manhole Protective Coating for Dile �u�c�iPc� P/OhTu v r Dollars & no Cents per V.F. $ 1��g' Z4--Vo 00 15. 90 C.Y. Pressure Grouting of Sanitary Sewer Lines to be Abandoned for vPf7 Dollars & r� Cents per C.Y. $ 7o o X300 0 0 16. 1,000 L.F. Wooden Stockade Fence Replacement for Dollars & nc� Cents per L.F. $ 16 o0 /0000 04 17. 2,334 L.F. Trench Safety for ori Dollars & Cents per L.F. $ / 00 TOTAL $ s 115-9, 690 00 Comprehensive General Liability Insurance: The Contractor shall procure and shall maintain during the life of this contract Contractor's Comprehensive General Liability Insurance (Public Liability and Property Damage Insurance)in an amount not less than $500,000 covering each occurrence on account of bodily injury, including death, and in an amount not less than $500,000 covering each occurrence on account of property damage with $2,000,000 umbrella policy coverage. Within ten (10)days after notification by the City, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for delay and additional work caused thereby. (Revision 1) B-5 The undersigned bidder certifies that he has been furnished at least one set of the General Contract Documents and General Specifications for Sewer Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and these specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within ten (10) calendar days after issue of the work order, and to complete the contract within 150 calendar days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) [ ] A. The principal place of business of our company is in the State of [ ] Nonresident bidders in the State of , our principal place of business is required to be_percent lower than resident bidders by state law. A copy of the statute is attached. [ ] Nonresident bidders in the State of , our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. Receipt is acknowledged of the following addenda: Addendum No. 1 Z , 4S Addendum No. 2 Addendum No. 3 Respectfully submjtted Z'),f//,4 ( SEAL ) BY: ��� . If Bidder is Corporation. TITLE: ADDRESS: (Revision 1) B-6 ** CITY APPROVED PRODUCTS *CONTRACTOR SHALL SELECT TYPE OF PIPE TO BE USED Standard Spec No. Size E1 - 31 4"through 30" E1 - 25 4"through 15" E1 - 27 4"through 15" E1 - 28 18"through 27" E1 —31, E100—2 18"through 48" Consult with "City of Fort Worth, Texas Standard Product List"to obtain the Generic/Trade Name and the Manufacturer for the pipes listed above. G Failure to provide the information required above may result in rejection of bid as non- responsive. Only products or methods listed above will be allowed for use in this project. Any substitution shall result in rejection of bid as non-responsive. r (Revision 1) B-7 E 1� PART C GENERAL CONDITIONS PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER, 1, 1987 TABLE OF CONTENTS C1-1 DEFINITIONS C1-1.1 Definition of Terms C1-1 (1) ' C1-1.2 Contract Documents C1-1 (1) C1-1.3 Notice to Bidders C1-1 (2) C1-1.4 Proposal C1-1 (2) C1-1.5 Bidder C1-1 (2) C1-1.6 General Conditions C1-1 (2) C1-1.7 Special Conditions C1-1 (2) C1-1.8 Specifications C1-1 (2) C1-1.9 Bond Cl-1 (2) C1-1.10 Contract C1-1 (3) C1-1.11 Plans C1-1 (3) -' C1-1.12 City Cl-1 (3) C1-1.13 City Council C1-1 (3) C1-1.14 Mayor C1-1 (3) - C1-1.15 City Manager Cl-1 (3) C1-1.16 City Attorney C1-1 (3) C1-1.17 Director of Public Works C1-1 (4) - C1-1.18 Director, City Water Department Cl-1 (4) C1-1.19 Engineer C1-1 (4) C1-1.20 Contractor C1-1 (4) C1-1.21 Sureties C1-1 (4) C1-1.22 The Work or project C1-1 (4) C1-1.23 Working Day C1-1 (4) C1-1.24 Calendar Day C1-1 (4) C1-1.25 Legal Holiday C1-1 (4) C1-1.26 Abbreviations C1-1 (5) C1-1.27 Change Order C1-1 (6) C1-1.28 Paved Streets and Alleys C1-1 (6) C1-1.29 Unpaved Streets and Alleys C1-1 (6) C1-1.30 City Streets Cl-1 (6 ) C1-1.31 Roadway C1-1 (6) - C1-1.32 Gravel Street C1-1 (6) 4 C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2 (1) C2-2.2 Interpretation of Quantities C2-2 (1) C2-2.3 Examination of Contract Documents and Site C2-2 (2) C2-2.4 Submitting of Proposal C2-2 (3) C2-2.5 Rejection of Proposals C2-2 (3) C2-2.6 Bid Security C2-2 (3) (1) C2-2. 7 Delivery of Proposal C2-2 (4) C2-2. 8 Withdrawing Proposals C2-2 (4 ) C2-2. 9 Telegraphic Modification of Proposals C2-2 (4) C2-2.10 Public Opening of Proposal C2-2 (4) C2-2. 11 Irregular Proposals C2-2 (4) C2-2.12 Disqualification of Bidders C2-2 (5) C3-3 AWARD AND EXECUTION OF DOCUMENTS C3-3. 1 Consideration of Proposals C3-3 (1) C3-3. 2 Minority Business Enterpise Women-Owned Business Enterprise compliance C3-3 (1) C3-3. 3 Equal Employment Provisions C3-3 (1) C3-3. 4 Withdrawal of Proposals C3-3 (2) C3-3.5 Award of Contract C3-3 (2) C3-3. 6 Return of Proposal Securities C3-3 (2) C3-3. 7 Bonds C3-3 (2) C3-3.8 Execution of Contract C3-3 (4) C3-3.9 Failure to Execute Contract C3-3 (4) C3-3.10 Beginning Work C3-3 (4) C3-3.11 Insurance C3-3 (4) C3-3.12 Contractor's Obligations C3-3 (7) C3-3.13 Weekly Payroll C3-3 (7) C3-3.14 Contractor's Contract Administration C3-3 (7) C3-3.15 Venue C3-3 (8) C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4 (1) C4-4.2 Special Provisions C4-4 (1) C4-4. 3 Increased or Decreased Quantities C4-4 (1) C4-4.4 Alteration of Contract Documents C4-4 (2) C4-4.5 Extra Work C4-4 (2) C4-4.6 Schedule of Operations C4-4 (3) C4-4.7 Progress Schedules for Water and Sewer Plant Facilities C4-4 (4) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5 (1) C5-5.2 Conformity with Plans C5-5 (1) C5-5.3 Coordination of Contract Documents C5-5 (2) C5-5.4 Cooperation of Contractor C5-5 (2) C5-5.5 Emergency and/or Rectification Work C5-5 (3) C5-5.6 Field Office C5-5 (3) C5-5.7 Construction Stakes C5-5 (3) C5-5.8 Authority and Duties of Inspectors C5-5 (4) C5-5.9 Inspection C5-5 (5) C5-5.10 Removal of Defective and Unauthorized Work C5-5 (5) C5-5.11 Substitute Materials or Equipment C5-5 (5) C5-5.12 Samples and Tests of Materials C5-5 (6) C5-5.13 Storage of Materials C5-5 (6) C5-5.14 Existing Structures and Utilities C5-5 (7) C5-5.15 Interruption of Service C5-5 (7) C5-5.16 Mutual Responsibility of Contractors C5-5 (8) C5-5 .17 Cleanup C5-5 (S) C5-5.18 Final Inspection C5-5 (9) (2) C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 Laws to be Observed C6-6 (1) C6-6.2 Permits and Licenses C6-6 (1) C6-6. 3 Patented Devices, Materials and Processes C6-6 (1) C6-6.4 Sanitary Provisions C6-6 (2) C6-6.5 Public Safety and Convenience C6-6 (2) C6-6.6 Privileges of Contractor in Streets, Alleys, and Right-of-Way C6-6 (3) C6-6.7 Railway Crossings C6-6 (4) C6-6.8 Barricades, Warnings and Watchmen C6-6 (4) C6-6. 9 Use 'of Explosives, Drop Weight, etc. C6-6 (5) C6-6.10 Work Within Easements C6-6 (6) - C6-6.11 Independent Contractor C6-6 (8) C6-6.12 Contractor 's Responsibility for Damage Claims C6-6 (8) C6-6.13 Contractor's Claim for- Damages C6-6 (10) C6-6.14 Adjustment of Relocation of Public Utilities, etc. C6-6 (10) C6-6.15 Temporary Sewer Drain Connections C6-6 (10) C6-6.16 Arrangement and Charges of Water ir Furnished by 'City C6-6 (11) C6-6.17 Use of a Section of Portion of the Work C6-6 (11) C6-6.18 Contractor's Responsibility for Work C6-6 (11) C6-6.19 No Waiver of Legal Rights C6-6 (12) C6-6.20 Personal Liability of Public Officials C6-6 (12) C6-6.21 State Sales Tax C6-6 (12) C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 (1) C7-7.2 Assignment of Contract C7-7 (1) C7-7.3 Prosecution of the Work C7-7 (1) C7-7.4 Limitations of Operations C7-7 (2) C7-7.5 Character of Workman and Equipment C7-7 (2) C7-7.6 Work Schedule C7-7 (3 ) C7-7.7 Time of Commencement and Completion C7-7 (4) C7-7.8 Extension of time of Completion C7-7 (4) C7-7.9 Delays C7-7 (4) w C7-7.10 Time of Completion C7-7 (5) C7-7.11 Suspension by Court Order C7-7 (6) C7-7.12 Temporary Suspension C7-7 (6) C7-7.13 Termination of Contract due to National Emergency C7-7 (7) C7-7.14 Suspension of Abandonment of the Work and Annulment of Contract C7-7 (7) C7-7.15 Fulfillment of Contract C7-7 (9) C7-7.16 Termination for Convenience of the Onwer C7-7 (10) rC7-7.17 Safety Methods and Practices C7-7 (13) C8-8 MEASUREMENT AND PAYMENT on C8-8.1 Measurement of Quantities C8-8 (1) C8-8.2 Unit Prices C8-8 (1) (3) C8-8. 3 Lump Sum C8-8 (1) C8-8. 4 Scope of Payment C8-8 (1) C8-8.5 Partial Estimates and Retainage C8-8 (2 ) C8-8.6 Withholding Payment C8-8 (3) C8-8.7 Final Acceptance C8-8 (3 ) C8-8.8 Final Payment C8-8 (3) C8-8.9 Adquacy of Design C8-8 (4) C8-8.10 General Guaranty C8-8 (4) C8-8.11 Subsidiary Work C8-8 (5) C8-8.12 Miscellaneous Placement of Material C8-8 (5) C8-8.13 Record Documents C8-8 (5) (4) PART C - GENERAL CONDITIONS C1-1 DEFINITIONS SECTION C1-1 DEFINITIONS C1-1 . 1 DEFINITIONS OF TERMS : Whenever in these Contract Documents, the following terms or pronouns in place of them are used , the intent and meaning shall be understood and interpreted as follows: C1-1.2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn ocuments , such as specifications , bonds , addenda , plans , etc . , which govern the terms and performance of the contract . These are contained in the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects and include the following items: PART A - NOTICE TO BIDDERS (Sample) White PART B - PROPOSAL (Sample) White PART C - GENERAL CONDITIONS (CITY) Canary Yellow , (Developer) Brown PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATIONS El-White E2-Golden Rod E2A-White PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White PART G - CONTRACT (Sample) White b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A - NOTICE TO BIDDERS (Advertisement) Same as above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT PART S - PLANS (Usually bound separately) C1-1 (1) LN C1-1 . 3 NOTICE TO BIDDERS : All of the legal publications either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. C1-1. 4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal , which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. C1-1 . 5 BIDDER: Any person , persons , firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documents , constitutes a bidder. C1-1. 6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes, and requirements of the City of Fort Worth' s charter and promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions , the latter shall take precedence and shall govern. C1-1 . 7 SPECIAL CONDITIONS: Special conditions are the specific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions. When considered with the - General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1.8 SPECIFICATIONS: The Specifications is that section or part of the Contract Documents which sets forth in detail the requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed and useful project. Whenever reference is made to standard specifications, regulations, requirements , statutes, etc . , such referred to documents shall become a part of the Contract Documents just as though they were embodied therein. C1-1 . 9 BOND: The bond or bonds are the written guarantee or � secur ty Eirnished by the Contractor for the prompt and C1-1 (2) faithful performance of the contract and include the following: a. Performance Bond (see paragraph C3-3.7) b. Payment Bond (see paragraph C3-3.7) C, Maintenance Bond (see paragraph C3-3.7) d. Proposal or Bid Security (see Special Instructions to Bidders, Part A and C2-2.6) C1-1.10 CONTRACT: The Contract is the formal signed agreement between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. C1-1.11 PLANS: The plans are the drawings or reproductions therefrom made by the Owner's representative showing in detail the location, dimension and position of the various elements of the project , including such profiles , typical cross-sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner. The plans are usually bound separately from other parts of the Contract Documents , but they are a part of the Contract Documents just as though they were bound therein. - C1-1 . 12 CITY: The City of Fort Worth, Texas, a municipal corporation, authorized and chartered under the Texas State Statutes, acting by and through its governing body or its City Manger, each of which is required by charter to perform specific duties . Responsibility for final enforcement of Contracts involving the City of Fort Worth is by Charter vested in the City Manager. The terms City and Owner are rsynonymous. C1-1 . 13 CITY COUNCIL: The duly elected and qualified rgoverning body of the C ty of Fort Worth, Texas. C1-1 . 19 MAYOR: The officially elected Mayor , or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. z= C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. C1-1.16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas , or his duly authorized representative. - Cl-1 (3) C1-1 . 17 DIRECTOR OF PUBLIC WORKS: The duly appointed official of the City of Fort Worth, referred to in the Charter as the City Engineer, or his duly authorized representative. C1-1. 18 DIRECTOR CITY WATER DEPARTMENT: The duly appointed D rector o the City Water Department of the City of Fort Worth , Texas , or his duly authorized representative, assistant, or agents. C1-1. 19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department , or their duly authorized assistants , agents , engineers , inspectors , or superintendents, acting within the scope of the particular duties entrusted to them. C1-1 . 20 CONTRACTOR: The person , persons , partnership, company, firm, association, or corporation, entering into a - contract with the Owner for the execution of the work, acting directly or through a duly authorized representative. A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor, supplying labor and materials or only labor, for -work at the site of the project. C1-1. 21 SURETIES: The Corporate bodies which are bound by - such bonds are required with and for the Contractor . The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therein. C1-1. 22 THE WORK OR PROJECT The completed work contemplated n and covered by the Contract Documents, including but not limited to the furnishing of all labor, materials, tools, equipment, and incidentals necessary to produce a completed and serviceable project. C1-1. 23 WORKING DAY: A working day is defined as a calendar ay, not including Saturdays, Sundays, and legal holidays, in which the weather or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven (7 ) hours between 7: 00 a.m. and 6 : 00 p.m. , with exceptions as permitted in paragraph C7-7 .6. C1-1. 24 CALENDAR DAYS : A calendar day is any day of the week or month, no days being excepted. C1-1. 25 LEGAL HOLIDAYS: Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City employees as follows: C1-1 (4) 1. New Year's Day January 1 2. M. L. Ring, Jr. Birthday Third Monday in January 3. Memorial Day Last Monday in May 4. Independence Day July 4 5. Labor Day First Monday in September 6. Thanksgividg Day Fourth Thursday in November 7. Thanksgiving Friday Fourth Friday in November S. Christmas Day December 25 9. Such other days in lieu of holidays as the City Council may determine When one of the above named holidays or a special holiday is declared by the City Council, falls on Saturday, the holiday shall be observed on the preceding Friday or if it falls on Sunday, it shall be observed on the following Monday, by those employees working on working day operations. Employees working calendar day operations will consider the calendar holiday as the holiday. C1-1.26 ABBREVIATIONS: Wherever the abbreviations defined herein appear in Contract Documents, the intent and meaning shall be as follows: AASHTO - American Association of MGD - Million Gallons Per State Highway Transportation Day Officials ASCE - American Society of Civil CFS - Cubic Foot per Engineers Second LAW - In Accordance With ASTM - American Society of Min. - Minimum Testing Materials Mono.- Monolithic AWWA - American Water Works % - Percentum Association R - Radius - ASA American Standards Association I.D. - Inside Diameter HI - Hydraulic Institute O. D. - Outside Diameter p Asph. - Asphalt Elev.- Elevation Ave. - Avenue F - Fahrenheit Blvd. - Boulevard C - Centigrade CI - Cast Iron In. - Inch CL - Center Line Ft. - Foot GI - Galvanized Iron St. - Street Lin. _ Linear or Lineal CY - Cubic Yard lb. Pound Yd. - Yard MH - Manhole SY - Square Yard Max. - Maximum L.F. - Linear Foot D.I. - Ductile Iron C1-1 (5) C1-1 . 27 CHANGE ORDER : A " Change Order " is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more than 25% of the amount of the particular item or items in the original proposal. All "Change Orders" shall be prepared by the City from information as necessary furnished by the Contractor. C1-1. 28 PAVED STREETS AND ALLEYS: A paved street or alley shall be deflned as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: 1. Any type of asphaltic concrete with or without separate base material. 2. Any type of asphalt surface treatment , not including an oiled surface , with or without separate base material. 3. Brick, with or without separate base material. 4. Concrete, with or without separate base material. 5. Any combination of the above. C1-1. 29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, roadway or other sur ace s any area except those defined above for "Paved Streets and Alleys." C1-1. 30 CITY STREETS: A city street is defined as that area between the right-of-way lines as the street is dedicated. C1-1. 31 ROADWAY: The roadway is defined as the area between parallel lines wo ( 21 ) feet back of the curb lines or four (4 ' ) feet back of the average edge of pavement where no curb exists. - C1-1. 32 GRAVEL STREET: A gravel street is any unpaved street to which has een a ed one or more applications of gravel or similar material other than the natural material found on the street surface before any improvement was made. C1-1 (6) SECTION C - GENERAL CONDITIONS C2--2 INTERPRETATION AND PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 PROPOSAL FORM: The Owner will furnish bidders with proposal . form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder ' s general understanding of the project to be completed, provide a space for furnishing the amount of bid security, and state the basis for entering into a formal contract. The Owner will furnish forms for the Bidder ' s "Experience Record, " "Equipment Schedule, " and "Financial Statement," all of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for opening of bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status. This statement must be current and not more than one (1 ) year old. In the case that a bidding date falls within the time a new _ statement is being prepared, the previous statement shall be updated by proper °ver if icat ion. Liquid assets in the amount of ten (108) percent of the estimated project cost will be required. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as that of the project for which bids are to be received , and such experience must have been on projects completed not more than five (5) years prior to the date on which are to be received . The Director of the Water department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. C2-2.2 INTERPRETATION OF UANTITIES: The quantities of work and materials to be furnishedas may be listed in the proposal C2-2(1) forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans . The quantities of work to be performed and materials to be furnished may be increased or • decreased as hereinafter provided , without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. C2-2. 3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that the Contract Documents on file with the Owner shall constitute all *of the information which the Owner will furnish. All additional information and data which the owner will. supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. F Bidders are required, prior to the filing of proposal, to read and become familiar with the Contract Documents, to visit the site of the project and examine carefully all local conditions , to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project . They mu$t judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time required for its completion, and obtain all information required to make an intelligent proposal. No information given by the Owner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the Owner. Bidders shall rely exclusively and solely upon their own estimates , investigation , research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is mutually agreed that the submission of a proposal is prima-facie evidence that the bidder has made the investigations, examinations and tests herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings, if any, showing on the plans are for general information only and may not be correct. Neither the C2-2(2) Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. C2-2.4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project, contained in the form shall be correctly filled in and the Bidder shall state the prices , written in ink in both words and numerals , for which he proposes 'to do the work contemplated or furnishe the materials required. All such prices shall be written legibly. In case of discrepancy between the price written in words and the price written in numerals, the price most advantageous to the City shall govern. If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and address of each member must be given, and the proposal must be signed by a member of the firm, association , or partnership, or by a person duly authorized. If a proposal is submitted by a company or corporation, the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. C2-2.5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration o words or figures, additions not called for , conditional or uncalled for alternate bids, incomplete bids, erasures , or irregularities of any kind, or contain unbalance value of any items. Proposal tendered or delivered after the official time designated for receipt of proposal shall be returned to the Bidder unopened. C2-2.6 BID- SECURITY: No proposal will be considered unless it s accompanied y a "Proposal Security" of the character and in the amount indicated in the "Notice to Bidders" and the "Proposal. " The Bid Security is required by the Owner as MP evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition is made thereof . The bid security of all other bidders may be returned promptly after the canvass of bids. r C2-2(3) C2-2 .7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the City Manager or his representative in the official place of business as set forth in the "Notice to Bidders . " It is the Bidder ' s sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidder must have the proposal actually delivered. Each proposal. shall be in a sealed envelope plainly marked with the word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders. " The envelope shall be addressed to the City Manager, City Hall, Fort Worth, Texas. C2-2. 8 WITHDRAWING PROPOSALS : Proposals actually filed with the City Manager cannot be w thdrawn prior to the time set for opening proposals . A request for non-consideration of a proposal must be made in writing, addressed to the City Manager , and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C2-2. 9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposaly telegraphic commun cation at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. C2-2.10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly filed and for which no ."Non-consideration Request" has been received will be publicly opened and read aloud by the City Manager or his authorized representative at the time and place indicated in the "Notice to Bidders." All proposals which have been opened and read will remain on file with the Owner until the contract has been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids. C2-2.11 IRREGULAR PROPOSALS: Proposals shall be considered as eing "Irregular" if t ey s ow any omissions , alterations of form, additions , or conditions not called for, unauthorized alternate bids, or irregularities of any kind. However, the C2-2(4) = Owner reserves the right to waive any and all irregularities and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an irregularity which cannot be waived. C2 -2 . 12 DISQUALIFICATION OF BIDDERS : Bidders may be isqualifie and their proposals not considered for any of, but not limited to, the following reason: a. Reasons for believing that collusion exists among bidders. b. Reasonable grounds for believing that any bidder is interested in more than one proposal for work contemplated. C. The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. d. The bidder being in arrears on any existing contract or having defaulted on a previous contract. e. The bidder having performed a prior contract in an unsatisfactory manner. f. Lack of competency as revealed by the financial statement, experience record, equipment schedule, and such inquiries as the Owner may see fit to make. g. Uncompleted work which, in the judgment of the Owner, will prevent or hinder the prompt completion of additional work if awarded. h. The bidder not filing with the Owner, one week in advance of the hour of the opening of proposals the following: 1. Financial Statement showing the financial condition of the bidder as specified in Part "A" - Special Instructions. 2. A current experience record showing especially the projects of a nature similar to the one under consideration , which have been successfully completed by the Bidder. 3. An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of a bidder who, in the judgment of the Engineer, is disqualified under the requirements stated herein, shall be set aside and not opened. C2-2(5) PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3.1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposa s will be tabulated on the basis of- the quoted prices , the quantities shown in the proposal, and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for the best interest of the Owner. C3-3 . 2 - MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner, upon request, complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and or a a Woman-owned Business Enterprise (WBE) on the contract and the payment therefor. Contractor further agrees, upon request by Owner , to allow and audit and/or an examination of any books, records, or files in the possession of Contractor that will substantiate the actual work performed by the MBE or WBE. Any material misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal , state or local laws and ordinances relating to false statements; further , any such misrepresentation may be grounds for disqualification of Contractor at Owner' s discretion for bidding on future Contracts with the Owner for a period of time of not less than six (6) months. C3-3 . 3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with Current City Ordinance prohibiting discrimination in employment practices. C3-3 (1) The Contractor shall post the required notice to that effect on the project site, and, at his request, will be provided assistance by the City of Fort Worth ' s Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. C3-3 . 4 WITHDRAWAL OF PROPOSALS: After a proposal has been read y the Owner it cannot Be withdrawn by the Bidder within forty-five ( 45 ) days after the date on which the proposals were opened. C3-3 . 5 AWARD OF CONTRACT: The Owner reserves the right to wit holdf nal action on t e proposals for a reasonable time, not to exceed forty-five ( 45 ) days after the date of opening proposals, and in no event will an award be made until after investigations have been made as to the responsibility of the proposed awardee. The award of the contract, if an award is made, will be to the lowest and best responsible bidder. The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. C3-3 .6 RETURN OF PROPOSAL SECURITIES: As soon as proposed price totals have been determ ned or comparison of bids, the Owner may, at its discretion, return the proposal security - which accompanied the proposals which, in its judgment, would not be considered for the award. All other proposal securities, usually those of the three lowest bidders , will be _ retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of the bids, after which they will be returned by the City Secretary. C3-3 .7 BONDS : With the execution and delivery of the Contract Documents, the Contractor shall furnish to, and file with the Owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND : A good and sufficient performance bond in an amount not less than 100 percent of- the amount of the contract, as evidenced by the proposal tabulation or otherwise , guaranteeing the full and faithful execution of the work and performance of the contract, and for the protection of the Owner and all other persons against damage by reason of negligence of the Contractor, or improper execution of the work or the use of inferior materials. This performance C3-3 (2) bond shall guarantee the payment for all labor , materials, equipment, supplies, and services used in the construction of the work, and shall remain in full force and effect until provisions as above stipulated are accomplished and final payment is made on the project by the City. b. MAINTENANCE BOND : A good and sufficient maintenance ond, 1n the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt , full and faithful performance of the general guaranty which is set forth in paragraph C8-8.10. C, PAYMENT BOND: A good and sufficient payment bond, n an amount not less than 100 percent of the amount of the contract , as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful payment of all claimants as defined in Article 5160, Revised Civil Statutes of Texas, 1925 , as amended by House Bill 344 Acts 56th Legislature, Regular Session, 1959 , effective April 27, 1959 , and/or the latest version thereof, supplying labor and materials in the prosecution of the work provided for in the contract being constructed under these specifications. Payment w Bond shall remain in force until all payments as above stipulated are made. d. OTHER BONDS: Such other bonds as may be required y these Contract Documents shall be furnished by the Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested. in any litigation against the owner. All bonds shall be made on the forms furnished by the Owner and shall be executed by an approved surety company doing business in the City of Fort Worth, Texas, and which is acceptable to the owner . In order to be acceptable, the name of the surety shall be included on the current D. S . Treasury list of acceptable sureties, and the amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury list for that company. Each bond shall be properly executed by both the Contractor and Surety Company. Should any surety on the contract be determined unsatisfactory at any time by the Owner, notice will be given the Contractor to that effect and the Contractor shall immediately provide a C3-3 (3) new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties , as required, have qualified and have been accepted by the Owner. The contract shall not be operative nor will any payments be due or paid until approval of the bonds by the Owner. C3-3 . 8 EXECUTION OF CONTRACT: Within ten (10) days after the Owner has by appropriate resolution, or otherwise, awarded the contract•, the Contractor shall execute and file with the Owner the Contract and such bonds as may be required. in the Contract Documents. No contract shall be binding upon the owner until it has been attested by the City Secretary , approved as to form and legality by the City Attorney, and executed for the Owner by either the Mayor or City Manager. C3-3 . 9 FAILURE TO EXECUTE CONTRACT: The failure of the Awardee to execute the required bond or bonds or to sign the required contract within ten ( 10) days after the contract is awarded shall be considered by the Owner as an abandonment of his proposal, and the Owner may annul the Award. By reason of the uncertainty of the market prices of material and labor, and it being impracticable and difficult to accurately _ determine the amount of damages occuring to the Owner by reason of said awardee' s failure to execute said bonds and contract within ten ( 10 ) days , the proposal security accompanying the proposal shall be the agreed amount of damages which Owner will suffer by reason of such failure on the part of the Awardee and shall thereupon immediately be forfeited to the Owner. The filing of a proposal will be considered as an acceptance of this provision by the Bidder. C3-3 . 10 BEGINNING WORK: The Contractor shall not commence work until -aut orized in writing to do so by the Owner . Should the Contractor fail to commence work at the site of the project within the time stipulated in the written authorization usually termed the "Work Order" or •Proceed Order", it is agreed that the Surety Company will , within ten ( 10 ) days after the commencement date set forth in such written authorization, commence the physical execution of the contract. C3-3 . 11 INSURANCE: The Contractor shall not commence work under this contract until he has obtained all the insurance required under the Contract Documents, and such insurance has been approved by the Owner. The prime Contractor shall be responsible for delivering to the Owner the sub-contractors' C3-3 (4) certificate of insurance for approval. The prime contractor shall indicate on the certificate of insurance included in the documents for execution whether or not his insurance covers sub-contractors . It is the intention of the Owner that the insurance coverage required herein shall include the coverage of all sub-contractors. a. COMPENSATION INSURANCE: The Contractor shall maintain , during the life of this contract , Workers ' Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub-contractors. In case any class of employees engaged in hazardous work on the project under this contract is not protected under the Workers ' Compensation Statute, the Contractor shall provide adequate employer' s general liability insurance for the protection of such of his employees not so protected. b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor sEall procure and shall maintain during the life of this contract Contractor ' s Comprehensive General Liability Insurance (Public Liability and Property Damage Insurance) in an amount not less than $ 500 , 000 covering each occurrence on account of bodily injury, including death, and in an amount not less than $500 , 000 covering each occurrence on account of property damage with $2,000,000 umbrella policy coverage. C. ADDITIONAL LIABILITY: The Contractor shall urn s nsurance as separate policies or by additional endorsement to one of th'e above-mentioned policies, and in the amount as set forth for public liability and property damage, the following insurance: 1. Contingent Liability ( covers General Contractor ' s Liability for acts of sub-contractors) . 2. Blasting, prior to any blasting being done. 3. Collapse of buildings or structures adjacent to excavation ( if excavations are to be performed adiacent to same) . 4. Damage to underground utilities for $500,000. C3-3 (5) 5. Builder's risk (where above-ground structures are involved) . 6. Contractual Liability ( covers all indemnification requirements of Contract) . d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY 3 DAMAGE: The Contractor shall procure and maintain, IT Turing the life of this Contract, Comprehensive Automobile Liability insurance in an amount not -' less than $ 250 , 000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $500 , 000 on account of one accident , and automobile property damage insurance in an amount not less than $100,000. e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The insurance required under the above paragraphs. shall provide adequate protection for the Contractor and his sub-contractors, respectively, against damage claims which may arise from operations under this contract, whether such operations be by the insured or by anyone directly or indirectly employed by him, and also against any of the following special hazards which may be encountered in the performance of the Contract. f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with satisfactory proof of coverage by insurance required in these Contract Documents in amounts and by carriers satisfactory to the Owner . (Sample attached. ) All insurance requirements made upon the Contractor shall apply to the sub-contractor , should the Prime Contractor ' s insurance not cover the sub-contractor's work operations. g. LOCAL AGENT FOR INSURANCE AND BONDING : The insurance and bonding companies with whom the Contractor' s insurance and performance, payment, maintenance and all such other bonds are written shall be represented by an agent or agents having an office located within the city limits of the C3-3 (6) City of Fort Worth, Tarrant County, Texas . Each such agent shall be a duly qualified, one upon whom service of process may be had, and must have authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth, or any other claimant, any claims that the City of Fort Worth or other claimant or any property owner who has been damaged , may have against the Contractor , insurance, and/or bonding company. If the local insurance representative is not so empowered by the insurance or bonding companies, then such authority must be vested in a local agent or claims officer residing in the Metroplex, the Fort Worth-Dallas area. The name of the. agent or agents shall be set forth on all of such bonds and certificates of insurance. C3-3.12 CONTRACTOR' S OBLIGATIONS: Under the Contract, the Contractor shall pay for all materials, labor and services when due. C3-3 . 13 WEEKLY PAYROLL: A certified copy of each payroll cover ng payment of wages to all person engaged in work on the project at the site of the project shall be furnished to the Owner's representative within seven ( 7 ) days after the close of each payroll period. A copy or copies of the applicable minimum wage rates as set forth in the Contract Documents shall be kept posted in a conspicuous place at the site of the project at all times during the course of the Contract . Copies of the wage rates will be furnished the Contractor, by the Owner; however, posting and protection of the wage rates shall be the responsibility of the' Contractor. C3-3.14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor, whether a person , persons, partnership, company, firm , association , corporation or other who is approved to do business with and enters into a contract with the City for construction of water and/or sanitary sewer facilities, will have or shall establish a fully operational business office within the Fort Worth-Dallas metropolitan area . The Contractor shall charge, delegate, or assign this office (or he may delegate his Project Superintendent ) with full authority to transact all business actions required in the performance of the Contract. This local authority shall be made responsible to act for the Contractor in all matters pertaining to the work governed by the Contract whether it be administrative or otherwise and as such shall be empowered, thus delegated and directed, to settle all material, labor or other expenditures, all claims against the work or any other C3-3 (7) matter associated such as maintaining adequate and appropriate insurance or security coverage for the project. Such local authority for administration of the work under the Contract shall be maintained until all business transactions executed as part of the Contract are complete. Should the Contractor 's principal base of operations be other than in the Fort Worth-Dallas metropolitan area, notification of the Contractor' s assignment of local authority shall be made in writing to the Engineer in advance of any work on the project.' all appropriately signed and sealed, as applicable, by the Contractor ' s responsible officers with the understanding that this written assignment of authority to a local representative shall become part of the project Contract as though bound directly into the project documents . The intent of these requirements is that all matters associated with the Contractor ' s administration, whether it be oriented in furthering the work, or other, be governed direct by local authority. This same requirement is imposed on insurance and surety coverage. Should the Contractor's local representative fail to perform to the satisfaction of Engineer, the Engineer, at his sole discretion , may demand that such local representative be replaced and the Engineer may, at his sole discretion, stop all work until a new local authority satisfactory to the Engineer is assigned. No credit of working time will be for periods in which work stoppages are in effect for this reason. C3-3 . 15 VENUE: Venue of any action hereinunder shall be exclusively n Tarrant County, Texas. C3-3 (8) PART C - GENERAL CONDITIONS C4-4 SCOPE OF WORK SECTION C4-4 SCOPE OF WORK C4-4 . 1 INTENT OF CONTRACT DOCUMENTS: It is the definite intent on of these Contract .Documents to provide for a complete, useful project which the Contractor undertakes to construct or furnish , all in full compliance with the requirements and intent of the Contract Documents. It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents, shall do all extra or special work as may be considered by the Owner as necessary to complete the project in a satisfactory and acceptable manner. The Contractor shall, unless otherwise specifically stated in these Contract Documents, furnish all labor, tools, materials, machinery, equipment , special services , and incidentals necessary to the prosecution and completion of the project. C4-4 . 2 SPECIAL PROVISIONS: Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional proposed work which is not covered by these Contract Documents, then "Special Provisions" covering all such work will be prepared by the Owner previous to the time of receiving bids or proposals for such work and furnished to the Bidder in the form of Addenda. All such "Special Provisions" shall be considered to be a part of the Contract Documents just as though they were originally written therein. C4-4. 3 INCREASED OR DECREASEDQUANTITIES: The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items. When such changes increase or decrease the original quantity of any item or items of work to be done or materials to be furnished by the 25 percent or more, then either party to the contract shall upon written request to the other party be entitled to a revised consideration upon that portion of the work above or below the 25 percent of the original quantity stated in the proposal; such revised consideration to be - determined by special agreement or as hereinafter provided for "Extra Work. " No allowance will be made for any changes in anticipated profits nor shall such changes be considered as .. C4-4 (1) waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes 'in depth categories, shall be interpreted herein as applying to the overall quantities or sanitary sewer pipe in each pipe size, but not to the various depth categories. C4-4. 4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the Owner reserves the right to make such changes in the Contract Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, provided such changes do not materially alter the original Contract Documents or change the general nature of the project as a whole. Such changes shall not be considered as waiving or invalidating any condition or provision of the Contract Documents. C4-4. 5 EXTRA WORK: Additional work made necessary by changes and alterations of the Contract Documents or of quantities or for other reasons , for which no prices are provided in the Contract Documents, shall be defined as "Extra Work" and shall be performed by the Contractor in accordance with these Contract Documents or approved additions thereto; provided, however, that before any extra work is begun a "Change Order" shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the following methods: a. Unit bid price previously approved. b. An agreed lump sum. C. The actual reasonable cost of (1) labor, (2) rental of equipment used on the extra work for the time so used at Associated General Contractors of America current equipment rental rates ; ( 3 ) materials entering permanently into the project, and (4 ) actual cost of insurance , bonds , and social security as determined by the Owner, plus a fixed fee to be agreed upon but not to exceed 10% of the actual cost of such extra work. The fixed fee is not to include any additional profit to the Contractor for rental of equipment owned by him and used for the extra work. The fee shall be full and complete compensation to cover the cost of superintendence, overhead, other profit, general and all other expense not included in ( 1 ) , ( 2) , ( 3 ) , and ( 4) above. The Contractor shall keep accurate cost records on the form and in the method C4-4 (2 ) 4 suggested by the Owner and shall give the Owner • access to all accounts , bills , vouchers , and records relating to the Extra Work. No "Change Order" shall become effective until it has been approved and signed by each of the Contracting parties. No claim for Extra Work of any kind will be allowed unless ordered in writing by the Owner. In case any orders or instructions, either oral or written, appear to the Contractor to involve Extra Work for which he should receive compensation, he shall make writtgn request to the Engineer for written orders authorizing such Extra Work, prior to beginning such work. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the Engineer insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep an accurate account of the actual reasonable cost thereof as provided under method ( Item C ) . Claims for extra work will not be paid unless the Contractor shall file his claim with the Owner within five ( 5 ) days before the time for making the first estimate after such work is done and unless the claim is supported by satisfactory vouchers and certified payrolls covering all labor and materials expended upon the said Extra Work. The Contractor shall furnish the Owner such installation records of all deviations from the original Contract Documents as may be necessary to enable the Owner to prepare for permanent record a corrected set of plans showing the actual installation. The compensation - agreed upon for 'extra work' whether or not iniitiated by a 'change order' shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or extra work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result or the change or extra work. C4-4.6 SCHEDULE OF OPERATIONS: Before commencing any work un er this contract, the Contractor shall submit to the Owner and receive the Owner ' s approval thereof, a "Schedule of Operations , " showing by a straight line method the date of commencing and finishing each of the major elements of the contract. There shall be also shown the estimated monthly cost of work for which estimates are to be expected. There C4-4 (3) shall be presented also a composite graph showing the anticipated progress of construction with the time being plotted horizontally and the percentage of completion plotted vertically. The progress charts shall be prepared on 8-1/2" x 11" sheets and at least five black or blue line prints shall be furnished to the Owner. C4-4. 7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT _ FACILITIES: W th n ten (10) days prior to submission of rst monthly progress payment , the Contractor shall prepare and submit to the Owner for approval six copies of the schedule in which the Contractor proposes to carry on the work, the date of which he will start the several major activities ( including procurement of materials, plans, and equipment) and the contemplated dates for completing the same. The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses, the Contractor shall enter on the diagram the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments in contract time approved by the Engineer. Three copies of the updated schedule shall be delivered at such intervals as directed by the Owner. - As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technical specifications. Prior to the final drafting of the detailed construction schedule, the Contractor shall review the draft schedule with the Engineer to ensure the Contractor's understanding of the contract requirements. The following guidelines shall be adhered to in preparing the construction schedule: a. Milestone dates and final project completion dates shall be developed to conform to time constraints , sequencing requirements and completion time. b. The construction process shall be divided into activities with time durations of approximately fourteen (14 ) days and construction values not to exceed $500000 . Fabrication , delivery and submittal activities are exceptions to this guideline. C4-4 (4) C. Durations shall be in calendar days and normal holidays and weather conditions over the duration of the contract shall be accounted for within the duration of each activity. d. One critical path shall be shown on the construction schedule. e. Float time is defined as the amount of time between the earliest start date and the latest start date of a chain of activities of the CPM construction schedule. Float time is not for the exclusive use or benefit of either the Contractor or the Owner. f. Thirty days shall be used for submittal review unless otherwise specified. " The construction schedule shall as a minimum be divided .into general categories as indicated in the Proposal and Technical Specifications and each general category shall be broken down into activities in enough detail to achieve activities of approximately fourteen (14) days duration. r For each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that follow the guidelines of r this Section. For each of the trades or subcontracts, the construction schedule shall indicate the following procurements , construction and preacceptance activities and events in their logical sequence for equipment and materials. rI 1. Preparation and transmittal of submittals. 2. Submittal review periods. 3. Shop fabrication and delivery. 4. Erection or installation. ) 5. Transmittal of manufacturer ' s operation and maintenance instructions. r6. Installed equipment and materials testing. T 7. Owner's operator instruction (if applicable) . ,P B. Final inspection. R } C4-4 (5) 9. Operational testing. 10. Final inspection. if, in the opinion of the Owner, work accomplished falls behind that scheduled , the Contractor shall take such - action as necessary to improve his progress. In addition, the Owner• may require the Contractor to submit a revised schedule demonstrating his program and proposed plan to make up lag in scheduled progress and to insure completion of the work within the contract time. If the Owner finds the proposed plan not acceptable, he may require the Contractor to increase the work force, the construction plant and equipment, the number of work shifts or the overtime operations without additional cost to the Owner. Failure of the Contractor to comply with these requirements shall be considered grounds for determination by the Owner that the Contractor is failing to prosecute the work with such diligence as will insure its completion within the time specified. C4-4 (6) r r i PART C - GENERAL CONDITIONS C5-5 CONTROL OF WORK AND MATERIALS SECTION C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 AUTHORITY .OF ENGINEER: The work shall be performed to the satisfaction othe Engineer and in strict compliance with the Contract Documents. He shall decide all questions which arise as to the quality and acceptability of materials furnished , work performed, rate of progress of the work, overall sequence of the construction; interpretation of the Contract Documents, acceptable fulfillment of the contract, compensation, mutual rights between Contractor and Owner under these Contract Documents, supervision of the work, resumption of operations, and all other questions or disputes which may arise. Engineer will not be responsible for Contractor ' s means, methods , techniques , sequences or procedures of construction, or the safety precaution and programs incident thereto, and he will not be responsible for Contractor ' s failure to perform the work in accordance with the contract documents. 1P He shall determine the amount and quality of the work completed and materials furnished, and his decisions and estimates shall be final. His estimates in such event shall be a condition to the right of the Contractor to receive money due him under the Contract. The Owner shall have executive authority to enforce and make effective such necessary decisions and orders as the Contractor fails to carry out promptly. In the event of any dispute between the Engineer and Contractor over the decision of the Engineer on any such matters, the Engineer must, within a reasonable time, upon written request of the Contractor, render and deliver to both the Owner and Contractor, a written decision on the matter in controversy. C5-5.2 CONFORMITY WITH PLANS: The finished project in all cases shall conform with 1 nes , grades , cross-sections , finish, and dimensions shown on the plans or any other requirements otherwise described in the Contract Documents . Any deviation from the approved Contract Documents required by the Engineer during construction will in all cases be go determined by the Engineer and authorized by the Owner by Change Order. r C5-5 (1) r C5-5 . 3 COORDINATION OF CONTRACT DOCUMENTS: The Contract Documents are made up of several sections , which, taken together, are intended to describe and provide for a complete and useful project, and any requirements appearing in one of the sections is as binding as though it occurred in all sections. In case of discrepancies, figured dimension shall govern over scaled dimensions , plans shall govern over specifications, special conditions shall govern over general conditions and standard specifications, and quantities shown on the plans shall govern over those shown in the proposal. The Contractor shall not take advantage of any apparent error or omission in the Contract Documents, and the Owner shall be permitted to make such corrections or interpretations as may be deemed necessary for the fulfillment of the intent of the Contract Documents . In the event the Contractor discovers an apparent error or discrepancy, he shall immediately call this condition to the attention of the Engineer. In the event of a conflict in the drawings, specifications, or other portions of the Contract Documents which were not reported prior to the award of Contract, the Contractor shall be deemed to have quoted the most expensive resolution of the conflict. C5-5 . 4 COOPERATION OF CONTRACTOR: The Contractor will be urn shed w th three sets of the Contract Documents and shall have available on the site of the project at all times one set of such Contract Documents. The Contract shall give to the work the constant attention necessary to facilitate the progress thereof and shall cooperate with the Engineer, his inspector, and other Contractors in every possible way. The Contractor shall at all times have competent personnel available to the project site for proper performance of the work. The Contractor shall provide and maintain at all times at the site of the project a competent , English-speaking superintendent and an assistant who are fully authorized to act as the Contractor ' s agent on the work . Such superintendent and his assistant shall be capable of reading and understanding the Contract Documents and shall receive and fulfill instructions from the Owner, the Engineer, or his authorized representatives. Pursuant to this responsibility of the Contractor, the Contractor shall designate in writing to the project superintendent, to act as the Contractor ' s agent on the work. Such assistant project superintendent shall be a resident of Tarrant County, Texas and shall be subject to call, as is the project Superintendent, at any time of the day or night on any day of the week on which the Engineer determines that circumstances require the presence on the project site of a representative of the Contractor to C5-5 (2) adequately provide for the safety or convenience of the traveling public or the owners of property across which the project extends or the safety of property contiguous to the project routing. The Contractor shall provide all facilities to enable the Engineer and his inspector to examine and inspect the workmanship and materials entering into the work. C5-5 . 5 EMERGENCY AND/OR RECTIFICATION WORK: When, in the opinion of the Owner or Eng neer, a condi n of emergency exists related to any part of the work, the Contractor, or the Contractor through his designated representative , shall respond with dispatch to a verbal request made by the Owner or Engineer to alleviate the emergency condition . Such a response shall occur day or night, whether the project is scheduled on a calendar-day or on a working-day basis. Should the Contractor fail to respond to a request from the Engineer to rectify any discrepancies , omissions , or corrections necessary to conform with the requirements of the project specifications or plans, the Engineer shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may -take such remedial action with City forces or by contract. The City �. shall then deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due the Contractor on the project. C5-5 . 6 FIELD OFFICE: The Contractor shall provide, at not extra compensaon, an adequate field office for use of the Engineer, if specifically called for. The field office shall be not less than 10 by 14 feet in floor area, substantially constructed, well heated, air conditioned, lighted, and weather-proof , so that documents will not be damaged by the - elements. CS-5. 7 CONSTRUCTION STARES: The City, through its Engineer, will furnish the Contractor with all lines, grades , and measurements necessary to the proper prosecution and control of the work contracted for under these Contract Documents , and lines, grades and measurements will be established by means of stakes or other customary method of marking as may be found consistent with good practice. C5--5 (3) These stakes or markings shall be set sufficiently in advance of construction operations to avoid delay . Such stakes or markings as may be established for the Contractor ' s use or guidance shall be preserved by the Contractor until he is authorized by the Engineer to remove them. Whenever, in the opinion of the Engineer , any stakes or markings have been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees , the full cost of replacing such stakes or marks plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. C5-5 . 8 AUTHORITY AND DUTIES OF CITY INSPECTORS : City Inspectors will be aut or zed to inspect all work one and to be -done and all materials furnished. Such inspection may extend to all or any part of the work, and the preparation or manufacturing of the materials to be used or equipment to be installed. A City Inspector may be stationed on the work to report to the Engineer as to the progress of the work and the manner in which it is being performed, to report any evidence that the materials being furnished or the work being performed by the Contractor fails to fulfill the requirements of the Contract Documents , and to call the attention of the Contractor to any such failure or other infringements. Such inspection or lack of inspection will not relieve the Contractor from any obligation to perform the work in accordance with the requirements of the Contract Documents. In case of any dispute arising between the Contractor and the City Inspector as to the materials or equipment furnished or the manner of performing the work, the City Inspector will have authority to reject materials or equipment to suspend work until the question at issue can be referred to and be decided by the Engineer. The City Inspector will not , however, be authorized to revoke, alter, enlarge, or release any requirement of these Contract Documents, nor to approve or accept any portion or section of the work, nor to issue any instructions contrary to the requirements of the Contract Documents. He will in no case act as superintendent or foreman or perform any other duties for the Contractor, or interfere with the management or operation of the work. He will not accept from the Contractor any compensation in any form for performing any duties.' The Contractor shall regard and obey the directions and instructions of the City Inspector or Engineer when the same are consistent with the obligations of the Contract Documents , provided, however, should the Contractor object to any orders or instructions of the City Inspector, the Contractor may within six days make written appeal to the Engineer for his decision on the matter in controversy. C5-5 (4) C5-5. 9 INSPECTION: The Contractor shall furnish the Engineer with every reasonable facility for ascertaining whether or not the work as performed is in accordance with the requirements of the Contract Documents. If the Engineer so requests, the Contractor shall, at any time before acceptance of the work, remove or uncover such portion of the finished work as may be directed. After examination, the Contractor shall restore said portions of the work to the standard required by the Contract -Documents. Should the work exposed or examined prove acceptable, the uncovering or removing and replacing of the covering or making good of the parts removed shall be paid for as extra work, but should be work so exposed or examined prove to be unacceptable, the uncovering or removing and the replacing of all adjacent defective or damaged parts shall be at the Contractor ' s expense. No work shall be done or materials used without suitable supervision or inspection. C5-5. 10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK: All work, ,. materials, or equipment which has been re ected shall be remedied or removed and replaced in an acceptable manner by the Contractor at his own expense. Work done beyond the lines and grades given or as shown on the plans, except as herein specifically provided, or any Extra Work done without written authority, will be considered as unauthorized and done at the expense of the Contractor and will not be paid f or by the Owner . Work so done may be ordered removed at the Contractor ' s expense. Upon the failure on the part of the Contractor to comply with any order of the Engineer made under the provisions of this paragraph, the Engineer will have the authority to cause defective work to be remedied or removed and replaced and unauthorized work to be removed, and the cost thereof may be deducted from any money due or to become due to r the Contractor . Failure to require the removal of any defective or unauthorized work shall not constitute acceptance of such works. C5 - 5 . 11 SUBSTITUTE MATERIALS OR EQUIPMENT : If the Specifications, law, or nance, co es or regulat ons permit Contractor to furnish or use a substitute that is equal to any material or equipment specified, -and if Contractor wishes to furnish or use a proposed substitute, he shall, prior to the preconstruction conference , make written application to ENGINEER for approval of such substitute certifying in writing that the proposed substitute will perform adequately the 41 functions called for by the general design, be similar and of equal substance to that specified and be suited to the same use and capable of performing the same function as that specified; and identifying all variations of the proposed r • C5-5 (5) substitute from that specified and indicating available maintenance service . No substitute shall be ordered or installed without the written approval of Engineer who will be the judge of the equality and may require Contractor to furnish such other data about the proposed substitute as he considers pertinent . No substitute shall be ordered or installed without such performance guarantee and bonds as Owner may require which shall be furnished at Contractor ' s expense., Contractor shall indemnify and hold harmless Owner and Engineer and anyone directly or indirectly employed by either of them from and against the claims , damages, losses and expenses ( including attorneys fees) arising out of the use of substituted materials or equipment. C5-5. 12 SAMPLES AND TESTS OR MATERIALS: Where, in the opinion of the Engineer, or as called for in the Contract Documents, tests of materials or equipment are necessary, such tests will be made at the expense of and paid f or direct to the testing agency by the Owner unless otherwise specifically provided. The failure of the Owner to make any tests of materials shall be in no way relieve the Contractor of his responsibility of furnishing materials and equipment fully conforming to the requirements of the Contract Documents. Tests and sampling of materials , unless otherwise specified , will be made in accordance with the latest methods prescribed by the American Society for Testing Materials or specific requirements of the Owner. The Contractor shall provide such facilities as the Engineer may require for collecting and forwarding samples and shall not , without specific written permission of the Engineer, use the materials represented by the samples until tests have been made and the materials approved for use. The Contractor will furnish adequate samples without charge to the Owner. In case of concrete, the aggregates, design minimum, and the mixing and transporting equipment shall be approved by the Engineer before any concrete is placed, and the Contactor shall be responsible for replacing any concrete which does not meet the requirements of the Contract Documents. Tests shall be made at least 9 days prior to the placing of concrete , using samples from the same aggregate, cement, and mortar which are to be used later in the concrete. Should the source of supply change, new tests shall be made prior to the use of the new materials. C5-5 .13 STORAGE OF MATERIALS: All materials which are to be used in the construction operation shall be stored so as to insure the preservation of the quality and fitness of the work. When directed by the Engineer, they shall be placed on wooden platforms or other hard, clean durable surfaces and not on the C5-5 (6 )