Loading...
HomeMy WebLinkAboutContract 29412 General Contract Documents specifications 'CITY SEG�RETARY for CONTRACT NO.T - CONSTRUCTION PLANS FOR r ROSEDALE STREET IMPROVEMENTS WATER & SANITARY SEWER LINE REPLACEMENTS CONTRACT No. 2, UNIT III CITy SECRETARY (ALSTON AVE. TO S. MAIN ST.) ORIGINAL Dr FILE SECTION A - SANITARY SEWER LIFE REPLACEMENTS SEWER PROJECT No. PS4"70460133440 SECTION B - WATER LINE REPLACEMENTS CITY SECRETARY '�TOR'S BONDING f (:!dTER PROJECT NePW7746770153380 D.O.E. N.. 3808 D.O.E. FILEA.,TjysCOUV Grp T CONTRACTOR'S BONDING 0 Ake FoRTWoRTH CONSTRUCTIOM Copy CLIENT DEPARTMENT MIKE MONCRIEF MAYOR GARY W. JACKSON MARC A. OTT CITY MANAGER ASSISTANT CITY MANAGER A. DOUGLAS RADEMAKER. PE. DIRECTOR. DEPARTMENT OF ENGINEERING DALE A. FISSELER. P.E. DIRECTOR. WATER DEPARTMENT ROBERT D. GC ODE, PE DIRECTOR. DEPARTMENT OF TRAN6PORTATION & PUBLIC WORKS rA� WORD Pre"PreBr. e�5� VII Y WAP of d LOPEZGARCIA GROUP st;' •••t+ P 6850 Manhattan Blvd.Suite 300 •••.••.•••.••••••. •:••.0 Fort Worth,Texas 76120 1 .• RICHARD W. ALB I N to (817)446-1800 P go ........................ (817)446-1113 Fax 0 41388 lopezgardagroup.com �'•• v ani�FSF TER, r 4 2003 M&C Request Review Pagel of 3 y FORT WORTH Home I Council Agenda I M&C I tiriployee Directory I Morning Report I Ads I PRS I Solution Zone I Departruents I Site Map Print M&C COUNCIL ACTION: Approved on 12/2/2003 - Ord. 15767 DATE: 12/2/2003 REFERENCE NO.: **C-19870 LOG NAME: 309TH CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Appropriation Ordinance and Award of Contract to Conatser Construction, Inc. for Water Main and Sanitary Sewer Main Relocations on Rosedale Street (Alston Avenue to South Main Street), Contract 2, Unit III RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$1,057,915.50 from the Water and Sewer Fund to the Commercial Paper- Water Fund in the amount of$710,317.00 and the Commercial Paper-Sewer Fund in the amount of $347,598.50; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Commercial Paper-Water Fund in the amount of$710,317.00 and the Commercial Paper-Sewer Fund in the amount of$347,598.50 from available funds; and 3. Authorize the City Manager to execute a contract with Conatser Construction, Inc. in the amount of $954,915.50 for water main and sanitary sewer main relocations on Rosedale Street (Alston Avenue to South Main Street), Contract 2, Unit III. DISCUSSION: On March 23, 1999 (M&C C-17334), the City Council authorized the City Manger to execute an engineering agreement with Garcia &Associates Engineering, Inc. to prepare plans and specifications for water and sanitary sewer relocations on Rosedale Street from U.S. Hwy. 287 to Forest Park Boulevard. The relocation of the water main and sanitary sewer main is necessary in order to facilitate the proposed realignment and reconstruction of Rosedale Street by the Texas Department of Transportation. In order to reduce the construction impact to residents and businesses on Rosedale Street, which has a high vehicular traffic flow, the project was divided into the following contracts for design and construction purposes: Contract Limits Status Contract 1 South Main Street to IH-35W Construction completed Contract 2, Unit I Forest Park Boulevard to 9th Avenue Under construction Contract 2, Unit II 9th Avenue to Alston Avenue Bids received September 4, 2003 Contract 2, Unit III Alston Avenue to South Main Street Bids received September 18, 2003 Contract 3 IH-35W to U.S. Highway 287 Project will be advertised in February 2004 http://www.cfwnet.org/council_packet/mc_review.asp?ID=1220&councildate=12/2/2003 12/3/2003 M&C Request Review Page 2 of 3 The proposed improvements under Contract 2, Unit III consist of the installation of approximately 5,550 linear feet of water pipes ranging from 6 to 16-inches in diameter and 2,700 linear feet of sanitary sewer pipes ranging from 8 to 12-inches in diameter. This project was advertised for bid on August 28 and September 4, 2003. On September 18, 2003, the following bids were received: Bidder Amount Time of Completion Conatser Construction, Inc. $954,915.50 150 Calendar Days Jackson Construction, Ltd. $1,343,748.00 William J. Schultz, d/b/a $1,364,497.00 Circle "C" Construction Company Oscar Renda Contracting, Inc. $1,376,531.00 AUI Contractors, L.P. $1,432,720.00 In addition to the contract cost, $67,500.00 (water: $45,500.00 sewer: $22,000.00) is required for inspection and survey, and $35,500.00 (water: $19,500.00, sewer$16,000.00) is provided for water and sanitary sewer project contingencies. Conatser Construction, Inc. is in compliance with the City's M/WBE Ordinance by committing to 6% M/WBE participation and documenting good faith effort. Conatser Construction, Inc. identified several subcontracting and supplier opportunities. However, the M/WBEs contacted in the areas identified did not submit the lowest bid. The City's goal on this project is 17%. This project is located in COUNCIL DISTRICT 9, Mapsco 76L and M. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval and completion of recommendation No. 1 and adoption of the attached appropriation ordinance, funds will be available in the current capital budgets of the Commercial Paper-Water Fund and the Commercial Paper-Sewer Fund. TO Fund/Account/Centers FROM Fund/Account/Centers 1&21 $710,317.00 3) $645,317.00 PW77 472045 060770153580 3) PS46 541200 070460133440 $309,598.50 1&2) PS46 472045 070460133440 $347,598.50 1_)_PE45 538020 0609020 $710,317.00 2) PW77 541200 060770153580 $664,817.00 1) PE45 538070 0709020 $347,598.50 2) PW77 531350 030770153580 $45,500.00 2) PS46 541200 070460133440 $325,598.50 2) PS46 531350 030460133440 $22000.00 Submitted for Citt Manager's Office by: Marc Ott (8476) Originating Department Head: A. Douglas Rademaker(6157) Additional Information Contact: A. Douglas Rademaker (6157) http://www.cfwnet.org/council_packet/mc review.asp?ID=1220&councildate=12/2/2003 12/3/2003 M&C Request Review Page 3 of 3 ATTACHMENTS Ordinance.pdf http://www.cfwnet.org/council_packet/mc_review.asp?ID=1220&councildate=12/2/2003 12/3/2003 TABLE OF CONTENTS Part A - Notice to Bidders Comprehensive Notice to Bidders Special Instructions to Bidders —Water Dept. Part B - Minority/Women Business Enterprise Policy Bid Proposal Part C - General Conditions —Water Dept. Part C1 - Supplementary Conditions to Part C — General Conditions —Water Dept. Part D - Special Conditions—Water Dept. Part DA - Additional Special Conditions —Water Dept. Part E - Material Specifications—Water Dept. Technical Specification for Manhole Joint Sealing Certificate of Insurance Contractor Compliance with Worker's Compensation Law Vendor Compliance to State Law Equipment Schedule Experience Record Part F - Performance Bond Payment Bond Maintenance Bond Part G - Contract Standard Figures & Details Appendix A - Pavement Coring Test Hole Results op pw PART A— NOTICE TO BIDDERS COMPREHENSIVE NOTICE TO BIDDERS SPECIAL INSTRUCTIONS TO BIDDERS (WATER DEPT.) 4p FE op PART A NOTICE TO BIDDERS Sealed proposals for the following: FOR: Rosedale Street Improvements Water& Sanitary Sewer Line Replacements Contract No. 2, UNIT III—Alston Ave. to S. Main St. Water Project No. PW77-060770153580 Sewer Project No. PS46-070460133440 D.O.E. No. 3808 Addressed to Mr. Gary Jackson, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 p.m., September 18, 2003 and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. Plans, General Contract Documents and Specifications for this project may be obtained in the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas 76102. A fifty dollar($50) deposit is required for the first set of documents and additional sets may be purchased on a non-refundable basis for fifty dollars ($50) for each set. These documents contain additional information for prospective bidders. A pre-bid meeting will be held on September 11,2003 beginning at 2:00 p.m. in the TPW Conference Room 293. Bidders are encouraged to review the project plans and specifications prior to the pre- bid conference and be prepared to actively participate in the conference. Bidders'questions will be answered at the pre-bid conference. The major work will consist of the following: Section A—Sanitary Sewer Line Replacements 3,113 LF 4--12" SANITARY SEWER Section B—Water Line Replacements 5,541 LF 4--16" DI WATER PIPE For additional information, please contact Mr. Liam Conlon, Project Manager, City of Fort Worth - Department of Engineering at 817/392-6824;and/or Mr. Brent E. Lewis, Project Manager, LOPEZGARCIA GROUP at 817/446-1800. Advertising Dates: August 28, 2003 September 4, 2003 A-NTB(1) PART A COMPREHENSIVE NOTICE TO BIDDERS Sealed proposals for the following: FOR: Rosedale Street Improvements Water S Sanitary Sewer Line Replacements Contract No. 2, UNIT III —Alston Ave. to S. Main St. Water Project No. PW77-060770153580 Sewer Project No. PS46-070460133440 D.O.E. No. 3808 Addressed to Mr.Gary Jackson,City Manager of the City of Fort Worth,Texas,will be received at the Purchasing Office until 1:30 p.m.,September 18,2003 and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. Plans,General Contract Documents and Specifications for this project maybe obtained in the office of the Department of Engineering,Municipal Office Building, 1000 Throckmorton Street,Fort Worth,Texas 76102. One set of documents will be provided to prospective bidders for a deposit of fifty dollars ($50). All bidders will be required to comply with Provision 5159a of"Vernon's Annotated Civil Statutes"of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance no.7400(Fort Worth City Code Sections 13-A- 221 through 13-A-29)prohibiting discrimination in the employment practices. A pre-bid meeting will be held on September 11,2003 beginning at 2:00 p.m.in the TPW Conference Room 293. Bidders are encouraged to review the project plans and specifications prior to the pre-bid conference and be prepared to actively participate in the conference. Bidders' questions will be answered at the pre-bid conference. Bid security is required in accordance with Paragraph 2 of the Special Instructions to Bidders. The major work will consist of the following: Section A—Sanitary Sewer Line Replacements 1,561 LF 8"SANITARY SEWER 1,132 LF 8" DI SANITARY SEWER 20 LF 12"SANITARY SEWER 17 EA SANITARY SEWER MANHOLES 6 EA SANITARY SEWER(DROP) MANHOLES Section B—Water Line Replacements 282 LF 6" DI WATER PIPE 1,409 LF 8" DI WATER PIPE 1,389 LF 12"DI WATER PIPE 2,411 LF 16"DI WATER PIPE 28 EA 6"-12"GATE VALVES 5 EA 16" RESILIENT SEATED GATE VALVES&VAULTS Included in the above will be all other miscellaneous items of construction as outlined in the Plans, General Contract Documents and Specifications. The City reserves the right to reject any and/or all bids and waive any and/or all formalities. AWARD OF CONTRACT: No bid may be withdrawn until the expiration of ninety(90)days from the date bids are opened.The award of contract,if made, will be within ninety (90) days after the opening of bids, but in no case will the award be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the Contract. The bidder agrees to begin construction within 10 calendar days after issue of work order,and to complete the contract by May 15,2004 as set forth in the written order to be furnished by the Owner. Liquidated damages shall be assessed as indicated in Section 7-7-10, except that the sum per day shall be$3,000.00 for this contract. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the PROPOSAL form(s). Bids that do not acknowledge receipt of all addenda may be rejected as being non-responsive. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at(817)871-7910. A-CNTB(1) PART A COMPREHENSIVE NOTICE TO BIDDERS Bidders shall not separate,detach or remove any portion,segment or sheets from the contract document at any time. Bidders must complete the proposal section(s) and submit the complete specification book or face rejection of the bid as non-responsive. It is recommended that the bidder make a copy of the forms included in the Minority and Women Business Enterprise section for submittal within the time-line stated below or the bidder may request a copy of said forms from the City Project Manager named in this solicitation. SUBMISSION OF BID AND AWARD OF CONTRACT This document is designed as a single construction contract. The proposal has been separated into two sections, Section A—Sanitary Sewer Line Replacements and Section B—Water Line Replacements. Award of contract, if made, shall be to the responsive bidder for BOTH sections. The prospective bidder must submit their bid for the TWO sections and complete the Bid Summary on PageB-13. In accord with the City of FortWorth Ordinance No.15530,the City of FortWorth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM,SUBCONTRACTOR/SUPPLIER UTILIZATION FORM,PRIME CONTRACTOR WAIVER FORM,GOOD FAITH EFFORT FORM(with"Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received no later than 5:00 p.m.,five(5)City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the Documentation was received by the City. Failure to comply shall render the bid non-responsive. The managing department for this project is the Department of Engineering. For additional information, please contact Mr. Liam Conlon, Project Manager, City of Fort Worth - Department of Engineering at 817/392-6051; and/or Mr. Brent E. Lewis, Project Manager, LOPEZGARCIA GROUP at 817/446-1800. GARY JACKSON GLORIA PEARSON CITY MANAGER CITY SECRETARY By, on " )C Ric Trice, P.E., Manager, Department of Engineering, Engineering Services Division Advertising Dates: August 28, 2003 September 4, 2003 A-CNTB (2) PART A SPECIAL INSTRUCTIONS TO BIDDERS 1) PREOUALIFICATION REQUIREMENTS: All contractors submitting bids are required to be prequalified by the Fort Worth Water Department prior to submitting bids. This prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation:a current financial statement,an acceptable experience record,an acceptable equipment schedule and any other documents the Department may deem necessary,to the Director of the Water Department at least seven(7) calendar days prior to the date of the opening of bids. a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status to the submitting company. This statement must be current and not more than one(1)year old. In the case that a bidding date falls within the time a new statement is being prepared,the previous statement shall be updated by proper verification. b) For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received. c) The Director of the Water Department shall be the sole judge as to the acceptability for financial qualification to bid on any Fort Worth Water Department project. d) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. i e) The City,in its sole discretion,may reject any bid for failure to demonstrate experience and/or expertise. f) Any proposals submitted by a non-prequalified bidder shall be returned unopened,and if inadvertently opened,shall not be considered. g) The City will attempt to notify prospective bidders whose qualifications(financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a waiver of any necessary prequalification. 2. BID SECURITY: A cashier's check,or an acceptable bidder's bond,payable to the City of Fort Worth,in an amount of not less than five(5%)percent of the largest possible total of the bid submitted must accompany the bid,and is subject to forfeiture in the event the successful bidder fails to execute 11 the Contract Documents within ten(10)days after the contract has been awarded To be an acceptable surety on the bid bond,the surety must be authorized to do business in the state of Texas. In addition, the surety must(1)hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law;or(2)have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City,in its sole discretion,will determine the adequacy of the proof required herein. 3. BONDS: A performance bond,a payment bond,and a maintenance bond each for one hundred (100%)percent of the contract price will be required,Reference C 3-3.7. LGGROUP No. 198005.00 A-SITB(1) 4. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: (a) The contractor shall comply with all requirements of Chapter 2258,Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258,Texas Government Code. Such prevailing wage rates are included in these contract documents. (b) The contractor shall,for a period of three(3)years following the date of acceptance of the work, maintain records that show(i)the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract;and(ii)the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of D-3 Right to Audit pertain to this inspection. r (c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs(a)and(b)above. r (d) With each partial payment estimate or payroll period,whichever is less,an affidavit stating that the contractor has complied with the requirements of Chapter 2258,Texas Government Code. rThe contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. P 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal,the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. r6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601 g,Texas Revised Civil Statutes,the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state rin which the nonresident's principal place of business in located. "Nonresident bidder"means a bidder whose principal place of business is not in this state,but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this rstate. This provision does not apply if this contract involves federal funds. aw The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify I� that bidder. 8. PAYMENT: If the bid amount is$25,000.00 or less,the contract amount shall be paid within forty- five(45)calendar days after completion and acceptance by the City. 9. AGE: In accordance with the policy("Policy")of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers,members,agents employees,program participants or subcontractors,while engaged in performing this contract,shall,in connection with the employment,advancement or discharge of employees or in connection with the terms,conditions or privileges of their employment,discriminate against persons because of their age except on the bases of a bona fide occupational qualification,retirement plan or statutory requirement. LGGROUP No. 198005.00 A-SITB(2) Contractor fin-ther covenants that neither it nor its officers,members,agents,employees, subcontractors,program participants,or persons acting on their behalf,shall specify,in solicitations or advertisements for employees to work on this contract,a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification,retirement plan or statutory requirements. Contractor warrants it will fully comply with the policy and will defend,indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractor against City arising out of Contractor's and/or its subcontractors'alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"),Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public,nor in the availability,terms and/or conditions of employment for applicants for employment with,or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal,state and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors'alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accord with City of Fort Worth Ordinance No. 15530,the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary.The bidder shall submit the MBE/WBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM,PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM("with Documentation")and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m.,five(5)City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. Upon request,Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise(MBE)and/or women business enterprise (WBE)on the contract and payment thereof. Contractor fiirther agrees to permit any audit and/or examination of any books,records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts(other than a negligent misrepresentation)and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal,State or local laws or ordinances relating to false statements. Further,any such misrepresentation of facts(other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three(3)years. 12. FINAL PAYMENT AND ACCEPTANCE: The project shall be deemed accepted by the City of Fort Worth as of the date that the final punch list has been completed,as evidenced by a written statement signed by both the contractor and the City. The warranty period shall begin as of the date that the final punch list has been completed. LGGROUP No. 198005.00 A-SITB(3) ph rF PART B — MINORITY/WOMEN BUSINESS ENTERPRISE POLICY BID PROPOSAL op dk f FORT WORTH -"" — City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is$25,000 or more,the MIWBE goal is applicable. If the total dollar value of the contract is less than $25,000, the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. NIMBE PROJECT GOALS The City's MBE/W BE goal on this project is 17%of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated MIWBE goal,or 2. Good Faith Effort documentation,or; 3 3. Waiver documentation,or; 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION ` The applicable documents must be received by the Managing Department,within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid met or exceeded: opening date,exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if participation is less than opening date,exclusive of the bid opening date. statedgoal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if no M/WBE participation: opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid perform all subcontracting/supplier work: opening date, exclusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed goal. opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S M/WBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS Any questions, please contact the MIWBE Office at(817)871-6104. Rev.5/30/03 ffib ATTACHMENT IA Page 1 of 4 Fo--��,,°R-T-H city of Fort Worth Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: Check applicable block to describe prime CZ n 0L4 Se_r �()Yl 'I-YI.IL'�1Q !�C _T MAV/DBE NON-MM/DBE NAME: Rosedale Street Improvements BID DATE Water&Sanitary Sewer Line Replacements Contract No.2,UNIT III—Alston Ave.to S.Main St. City's MIWBE Project Goal: Prime's MfWBE Project Utilization: PROJECT NUMBIER Sewer Project No.PS46-070460133440 17% % Water Project No.PW77-060770153580 D.O.E.No.3808 Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications MNVBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1St tier, a payment by a subcontractor to its supplier is considered 2"d tier ALL MIWBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonaflde minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business Enterprise(DBE) is synonymous with Minority/Women Business Enterprise (M/WBE). If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease trucks from another M/WBE firm, including M/WBE owner-operators, and receive full M/WBE credit. The M/WBE may lease trucks from non-M/WBEs, including owner-operators, but will only receive credit for the fees and commissions earned by the M/WBE as outlined in the lease agreement. Rev.5/30/03 ATTACHMENT 1A Page 2 of 4 FoltrW�o` Primes are required to identify ALL subcontractors/suppliers,regardless of status; i.e.,Minority,Women and non-M/WBEs. Please list M/WBE firms first,use additional sheets if necessary. Certification N (check one) SUBCONTRACTOR/SUPPLIER T N T n Detail Detail Company Name i C X M Subcontracting Work Supplies Purchased Dollar Amount Address e M W T D W Telephone/Fax r B B R O B E E C T E A y Ma4Qri a is , sQ N Ci �!- '�-A4 1, LDo O 33(3MpevrjAeoWy � N'R�t,hbvtd1Fi115,TX �`'`I �� G YGtcJ� � C'31 �V 18fl amu('Pi 0--%7) 59 b-a 53 b 1F(P 9 3G'V0PeV1iV. gyp,v 0 y N .k, � � ,IcLrjd 4i'1V'TV- I Soo �s3 to yr-us P;go Vie— �I. S-rr-'Ra , ¢ / G M 00 perO� Lines 011 CcbKH;)1 9d I 6 U r 1 esor 'TA`7M CS 11)HY-7 - 37..0 C&�)e�Beeth ra ss �' $aj-0 Paftl ate, Am ewer P,PQ-, 49 71)) �. 4140100 . 4&APVC 1 �u�lasTi� 75��y 070D Rev.5/30/03 ATTACHMENT 1A FORT WORTH Page 3 of a Primes are required to identify ALL subcontractors/suppliers,regardless of status;i.e.,Minority,Women and non-MIWBEs. Please list M/WBE firms first,use additional sheets if necessary. .. Certification N (check one) SUBCONTRACTOR/SUPPLIER T n Company Name i N T Detail Detail Address M wC X M Subcontracting Work Supplies Purchased Dollar Amount T D VY Telephone/Fax r B B E E R O B C T E A l no16S Via 1+ c� l -I- $ 64P (X) oa � �0 &I ess I-rX '71.03 � CO)I) a�� -3�3� Rev.5/30/03 ATTACHMENT 1A Page 4 of 4 Fox, T_�H Total Dollar Amount of M/WBE Subcontractors/Suppliers $ 5 O0 CIO Total Dollar Amount of Non-MM/BE Subcontractors/Suppliers $ �g/ , 00 TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ -3 -3-7, -700-00 The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1)year. e le �(' J C<J1f1C�1' Sl i 'naturePrinted SI nature Title Contact Name/Title(if dffkreM) &a�IE IC ca YV4 LL r-+I nn. (SI-i'63q -1-7q3 Q6(Z1-7),53q-= Company Name Teleph and/or Fax ?.o. f c, t ' lerr� P-; C?tinct-I-Sef.�nr►� Addie" -snail Address r-o o1- U)jot Ct I I S I Q-M3 ckwftrwmp Datell Rev.5/30/03 ATTACHMENT 1 B FORT WORTH Page 1 of 1 City of Fort Worth ., Prime Contractor Waiver Form PRIME COMPANY NAME: Check applicable block to describe rime PROJECT NAME: M/W/DBE NON-M/W/DBE Rosedale Street Improvements BID DATE Water&Sanitary Sewer Line Replacements .� Contract No.2,UNIT 111—Alston Ave.to S. Main St. City's MIWBE Project Goal: PROJECT NUMBER: Sewer Project No. PS46-070460133440 Water Project No. PW77-060770153580 17% D.O.E. No.3808 If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form)_ All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO,then you must complete ATTACHMENT 1C. This form is only applicable if both answers are yes. Failure to complete this form in its entirety and be received by the Managing Department on or before 5:00 p.m.,five(5) City business days after bid opening,exclusive of the bid opening date,will result in the bid being considered non-responsive to bid specifications. Will you perform this entire contract without subcontractors? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, NO this is your normal business practice and provide an operational profile of your business. - Will you perform this entire contract without suppliers? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, �. this is your normal business practice and provide an inventory profile of your business. NO The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/WBE(s)on this contract, the payment therefore and any proposed changes to the original M/WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will PM substantiate the actual work performed by the M/WBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three(3)years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of Ir+ contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one(1)year. O Au horb:ed Signature Printed Signature Title Contact Name(if different) P1 Company Name Phone Number Fax Number Address Email Address A^ b y City/StaUMp Date ■ Rev.5/30/03 ATTACHMENT 1C Page 1 of 3 FORT WORTH --�• city of Fort worth Good Faith Effort Form PRIME COMPANY NAME: Check applicable block to describe rime Cp rxa er L'i IOYI 1=%ic-- M/W/DBE NON-M/W/DBE PROJECT NAME: Rosedale Street Improvements BID DATE Water&Sanitary Sewer Line Replacements Contract No.2,UNIT III—Alston Ave.to S. Main St. O City's MIWBE Project Goal: PROJECT NUMBER: Sewer Project No.PS46-070460133440 Water Project No. PW77-060770153580 17% D.O.E. No.3808 If you have failed to secure M/WBE participation and you have subcontracting and/or supplier opportunities or if your DBE participation is less than the City's project goal,you must complete this form. If the bidder's method of compliance with the M/WBE goal is based upon demonstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation the facts or intentional discrimination by the bidder. Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m.five(5) City business days after bid opening,exclusive of bid opening date,will result in the bid being considered non-responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunityl for the completion of this project, regardless of whether it is to be provided by a M/WBE or non-MIWBE. (DO NOT LIST NAMES OF FIRMS) On Combined Projects, list each subcontracting and or supplier opportunity through the 2 nd tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities u CA uk1 .- e l � r Rev.05/30/03 ATTACHMENT 1C Page 2 of 3 2.) Obtain a current(not more than three(3) months old from the bid open date) list of M/WBE subcontractors and/or suppliers from the City's M/WBE Office. Yes Date of Listing 21 2) 1 1 Q 03 No ri 3.) Did you solicit bids from M/WBE firms,within the subcontracting and/or supplier areas previously listed,at least ten calendar days prior to bid opening by mail,exclusive of the day the bids are opened? ✓ Yes (If yes,attach M/WBE mail listing to include name of firm and address and a dated copy of letter mailed.) No x 4.) Did you solicit bids from M/WBE firms,within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone,exclusive of the day the bids are opened? ✓ Yes (If yes,attach list to include name of M/WBE firm, ep rson contacted,phone number and date and time of contact.) No NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimile is used, attach the fax confirmation, which is to provide M/WBE name, date, time, fax number and documentation faxed. NOTE: If the list of M/WBEs for a particular subcontracting/supplier opportunity is ten (10) or less, the bidder must contact the entire list to be in compliance with questions 3 and 4. If the list of M/WBEs for a particular subcontracting/supplier opportunity is ten (10) or more, the bidder must contact at least two-thirds (2/3) of the list within such area of opportunity, but not less than ten to be in compliance with questions 3 and 4. 5.) Did you provide plans and specifications to potential M/WBEs or information regarding the location of plans and specifications in order to assist the M/WBEs? V Yes No 6.) Submit documentation if M/WBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the M/WBE was rejected and any supporting documentation the bidder wishes to be considered by the City. In the event of a bona fide dispute concerning quotes,the bidder will provide for confidential in-camera access to and inspection of any relevant documentation by City personnel. �* Please use additional sheets, if necessary, and attach. Company Name Telephone Contact Person Scope of Work Reason for Rejection Rev.05/30/03 ATTACHMENT 1C Page 3 of 3 ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain M/WBE participation on this project. The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. - The undersigned certifies that the information provided and the M/WBE(s) listed was/were contacted in good faith. It is understood that any M/WBE(s) listed in Attachment 1 C will be contacted and the reasons for not using them will be verified by - the City' M/WBE Office. ilpj-N h ized Signature Printed Si ature e Title OD Contact Name and Title(if different) r IAQQ Q� r A'���i►Y �$�7�53�►-�-t 7 3 (,T1-7)5314 -/-/551A � w Company Name Phone Number Fax Number Address mail Aildress W6� I -OS City/State/Zip Date Rev.05/30/03 PART B PROPOSAL TO: Mr. Gary Jackson City Manager Fort Worth, Texas FOR: Rosedale Street Improvements Water & Sanitary Sewer Line Replacements Contract No. 2, UNIT III —Alston Ave. to S. Main St. Water Project No. PW77-060770153580 Sewer Project No. PS46-070460133440 D.O.E. No. 3808 Pursuant to the foregoing "NOTICE TO BIDDERS", the undersigned has thoroughly examined the plans, specifications and contract documents and the site, understands the amount of work to be done and hereby proposes to do all the work, furnish all the labor, equipment and materials to fully complete all the work as provided in the plans, specifications and contract documents and subject to the inspection and approval of the Director, Department of Engineering of the City of Fort Worth. Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish a Performance Bond, a Maintenance Bond and a Payment Bond, approved by the City of Fort Worth, for performing and completing said construction work within the time specified for the following sum, to wit: Section A- Sanitary Sewer Line Replacements ITEM QTY. UNIT DESCRIPTION OF ITEM WITH UNIT COST UNIT COST TOTAL 4 NO. WRITTEN IN WORDS COST 1. 230 LF 4-Inch Sanitary Sewer Pipe for Service Lines (All Depths)" AD $ $ �D(i•V r;J f— Dollars and W01 Cents per Linear Foot tf 5 co 10. 350,O D 2. 50 LF 4-Inch(Class 51)Ductile Iron Sanitary Sewer Pipe for Private Service Line(All Depths) �:,'i b-A Dollars $ 00 and Cents per Linear Foot rj0, r 3. 70 LF 6-Inch Sanitary Sewer Pipe for Service Line (All Depths)" r:o1' m Dollars and X10 Cents per Linear Foot 4. 50 LF 6-Inch(Class 51)Ductile Iron Sanitary Sewer Pipe for Private Service Line(AII Depths) _S+ X b 7 Dollars $ DO $ OD and r1D Cents per Linear Foot ' ��ODD B-1 PART B PROPOSAL ITEM QTy. UNIT DESCRIPTION OF ITEM WITH UNIT COST UNIT COST TOTAL NO. WRITTEN IN WORDS COST 5. 1561 LF 8-Inch Sanitary Sewer Pipe(All Depths)* $ $ �:",s I-'I V,;ie-- Dollars C op and 1J O I Cents per Linear Foot 6. 1132 LF 8-Inch(Class 51)Ductile Iron Sanitary Sewer Pipe (AII Depths) S>x") 1 9— Dollars and NOCents per Linear Foot 1�5 DC' -73, 559-o) 7. 20 LF 12-Inch Sanitary Sewer Pipe(All Depths)* N4,.J Dollars $ $ andhStD I Cents per Linear Foot 8. 14 EA 4-Inch Sanitary Sewer Service Connection Per Item D-28 k 6 Dollars and j t 0 Cents per Each o�0C) 0 9. 2 EA 6-Inch Sanitary Sewer Service Connection Per Item D-28 1I $ $ �tt 1,4 1'24 Dollars and NO Cents per DO 10. 50 LF Reconnection of 4"Sanitary Sewer Service Line on Private Property"By a Licensed Plumber" 1+ $ $ `i 6�-1 Dollars and rl C2 Cents per Linear Foot Q ti DO 11. 50 LF Reconnection of 6"Sanitary Sewer Service Line on Private Property"By a Licensed Plumber" —Two Dollars and M ) Cents per Linear Foot 12. 17 EA Standard 4'Diameter Sanitary Sewer Manhole(0-6') �Pe'r Figure 104,l rr ease j } (40clwA Dollars $ $ 00 andN Cents per Each 13. 22 VF Added Depth for Standard 4'Diameter Sanitary Sewer Manhole,>6' �1 I,,,_t-I Owe 4 U tjd%j '` ►,``t Dollars $ �v�d $a �O7v °° and N� Cents per Verti I Foot i B-2 PART B PROPOSAL ITEM QTY. UNIT DESCRIPTION OF ITEM WITH UNIT COST UNIT COST TOTAL NO. WRITTEN IN WORDS COST 14. 6 EA Standard 4'Diameter(Drop)Sanitary Sewer Manhole(0-6') Per Figure 107 ,I FAhteeGn4121nSbl Dollars $ $ arkr&ID Cents per Each INC00 oI wO 00 15. 18 VF Added Depth for Standard 4'Diameter(Drop)Sanitary Sewer 1•FIN-A Manhole>6' t OAr- UMA if b-A Dollars $ $ and,of Cents per Vertical FootDO 16. 15 EA Remove Existing Sanitary Sewer Manhole JV Per Item D-29 -Thye 0LAAditd Dollars $ $ and r4V Cents per Each 17. 10 EA Concrete Collar for Sanitary Sewer Manhole Per Figure 121 $ $ Iwo �u�►dWcAkDollars �� and NO Cents perr Ea 18. 23 EA Watertight Insert for Sanitary Sewer Manhole (Polyethylene)Per Item D-27 V•t to Dollars I O and n1 D Cents per Each �j1 00 t 00 D 19. 154 LF Permanent Asphalt Pavement Repair Du Per Figure 4 ro r " Dollars $ $ andN ID Cents per Linear Foot y5.�b 20. 100 SY Permanent Concrete Pavement Repair Per Figure 1 r;' t`{ Dollars $ ��•� $��� b o and N O Cents per Square Yard i 21. 2058 LF Temporary Asphalt Pavement Repair— 6"Flex Base with 2"HMAC $ $ S"A) Dollars and N 10 Cents per linear Foot b 1141 22. 20 SY 4-Inch Concrete Sidewalk Replacement Per Item DA-45 Dollars D O and Cents per Square Yard B-3 PART B PROPOSAL ITEM pN, UNIT DESCRIPTION OF ITEM WITH UNIT COST UNIT COST TOTAL NO. WRITTEN IN WORDS COST 23. 20 SY 64nch Concrete Driveway Replacement Per Item DA-25 t-D«4 Dollars $ $ and ADT Cents per Square Yard 40.0") mQOD 24. 300 LF St.Augustine Block Sodding Per Item D-45 r Pae, Dollars and N O Cents per Linear Foot 3.00 90011 25. 192 LF Broadcast Seeding Per Item D-45 D Dollars vp and N Q Cents per Linear Foot Db 38 26. 40 LF Concrete Curb&Gutter Removal&Replacement O Per Item DA-24 --T'wen+d Dollars and rl O Cents per Linear Foot OO • LX.t� 27. 117 CY Pressure Grouting of Existing SS"To be Abandoned" Per Item D-20 seuvot``1 I r1 VT__ Dollars $ $ and N V) p�Cents per Cubic Yard "7rJ- O —M V 28. 2271 LF Pre-construction Cleaning&TV Inspection of Existing Sanitary Sewer"To Be Abandoned" Per Item D-35 wo Dollars and Cents per Linear Foot 50 CD��• 29. 2684 LF Post-construction TV Inspection of New Sanitary Sewer Per Item D-38 D $ Dollars ` b0 and Cents per Linear Foot So 30. 2605 LF Trench Safety System for Excavations>5'Depth Per Item D-55 ON`Q Dollars $ $ and W Cents per Linear Foot t 0� � /_ 31. 23 EA Vacuum Test New Sanitary Sewer Manhole 1 lS� Per Item D-36 aut�6c� Dollars ��00 and 0 Cents per Each PART B PROPOSAL ITEM QTy. UNIT DESCRIPTION OF ITEM WITH UNIT COST UNIT COST TOTAL NO. WRITTEN IN WORDS COST 32. 100 LF Concrete Encasement for Sanitary Sewer Per Item D-49 ff WPr sy $ $ Dollars and NO Cents per Linear Foot ODD 33. 20 CY Class"B"Concrete for Miscellaneous Placement Per Item D-21 n Dollars and N Q Cents per Cubic Yard `O 00 a DO 34, 20 CY Class"E"Concrete for Miscellaneous Placement Per Item D-21 n Dollars $ $ and,y O Cents per Cubic Yard I O D bo 35. 20 CY Crushed Limestone for Miscellaneous Placement Per Item D-22 1 $ $ Dollars and N D Cents per Cubic Yard �� /U�'00 36. 15 EA Two-way Sanitary Sewer Service Cleanout at Property Line Per Item D-61 __II W� A�VIR:A Dollars $ $ and N-n Cents per Each 3 W0 v 37. 40 VF Manhole Coating for Interior of Sanitary Sewer Manhole Per Item jj��A-9 3 Ru�utfo SI r I&Dollars $ 00 $ co and Cents per ertical Foot 38. 1 EA Repair Existing Storm Sewer Per Item D-6 Dollars and N O Cents per Each 39. 1 EA Pre-Construction Exploratory Excavation(D-Hole) Per Item D-51 `, IQI 4UIWM6 Dollars $ $ Qp and Cents per Each Cb qM B-5 PART B PROPOSAL ITEM QTY. UNIT DESCRIPTION OF ITEM WITH UNIT COST UNIT COST TOTAL NO. WRITTEN IN WORDS COST 40. 3 EA Cut and Plug Existing Sanitary Sewer Pipe Per Item D-29I I �h ree til u1Jd&C, Dollars $ $ and n1'D Cents per Each 41. 170 LF Potentially Petroleum Contaminated Material Handling cJ W Per Item DA-37(See Sht. 6,L-2279) 5; X Dollars and JU f) Cents per Linear Foot 6.00 ' 0 A0 t) 42. 25 CY Loading,Transportation,and Disposal of Contaminated Soil Per Item DA-38(See Sht. 6,L-2279) QIve- �uiJclrISCA Dollars $ $ 00 and 0 t7 Cents per Cubic Yard 'Q SCD Q 5a TOTAL AMOUNT OF BID FOR SECTION A=$ y• + TRANSFER TOTAL AMOUNT BID FOR SECTION ATO BID SUMMARY ON PAGE B-13. B-6 PART B PROPOSAL Section B -Water Line Replacements ITEM QTY. UNIT DESCRIPTION OF ITEM WITH UNIT COST UNIT COST TOTAL NO. WRITTEN IN WORDS COST 1. 50 LF 4-Inch(Class 51)Ductile Iron Water Pipe(All Depths) So t'-64 Dollars $ $ and b10 Cents per Linear Foot L40—OD e2Cw,'A 2. 282 LF 6-Inch(Class51)Ductile Iron Water Pipe(All Depths) P;1 T t Dollars $ �0 00 $ 00 and N O Cents per Linear Foot 1 L41 10& 3. 1401 LF 8-Inch(Class 51)Ductile Iron Water Pipe(All Depths) Dollars $ $ bo and N Q Cents per Linear Foot I'D ,g 1 h/_/�, 4. 1389 LF 12-Inch(Class 51)Ductile Iron Water Pipe(All Depths) `.aeJPntA Dollars $ $ and Cents per Linear FootaUO 5. 2411 LF 16-Inch(Class 51)Ductile Iron Water Pipe(All Depths) eh t�q Dollars $ $ and_ Cents per Linear FootSUP 1GdM O 6. 14 EA 6-Inch Gate Valve w/Cast Iron Box&Lid ��ll Per Figure 3 Ji X 9 U m)a re6 Dollars $ $ and h1 D Cents per Each 6M.00 7. 11 EA 8-Inch Gate Valve w/Cast Iron Box&Lid Per Figure 3 C QUen � U1,)6Mb Dollars $ $ and�Djy Cents per Each .O o —7 -760.C) ) 8. 3 EA 12-Inch Gate Valve and Vault Per Figure 4 Elm dPejd Dollars $ $ and Cents per Each 1000.00 313W.1)1) 9. 5 EA 16-Inch Resilient Seated Gate Valve and Vault Per Figure 4 �`' t'IyV-4UTA VGA Dollars $ c� $ and N 0 Cents per Each b Ob C 1'7 L��OD '* B-7 PART B v PROPOSAL ITEM QTY. UNIT DESCRIPTION OF ITEM WITH UNIT COST UNIT COST TOTAL NO. WRITTEN IN WORDS COST 10. 14 EA Class"A"Plastic Meter Box(Single Head Service) Oh)e-dumA rPA- Dollars $ $ and eyL7 Cents per E ch I �0 a,�cobD 11. 25 EA 1-Inch Single Head Service Tap to Main Per Item D-152.7 P-i jf- '�Uv jo r :� Dollars $ $ and Nn Cents per Each 5171 00 12. 763 LF 1-Inch Copper Service Line from Main to Meter,Including vll a� �c-tJ Setting Meter Box Per Item D-52.7 } r $ $ 0 Y•L Dollars � and�1O Cents per Linear Foot 2 5ab o 0 13. 2 EA Class"B"Plastic Meter Box(Single Head Service) �)0 4"f6od Dollars $ $ and ty1 n Cents per Each Off' 0 0 14. 2 EA 2-Inch Service Tap to Main Per Item D-52.7 7 4�' Dollars O and A-1 L"1 Cents per Each U 15. 50 LF 2-Inch Copper Service Line from Main to Meter,Including Setting Meter Box Per Item D-52.7 $ $ 6f � I Dollars and NO I Cents per Linear Footi O ^� QO 16. 3 EA 15'Yvinch x 17Yrinch Class"C"Plastic Meter Box of /(Bullhead Service) owAul'Ato-LJ re"((••t�Dollars $ $ and "Q Cents per Ea 1 1 ,v 0 17. 3 EA 1-Inch Bullhead Service Tap to Main `7 Per Item D-52.7 �41 R UV Dollars and D hl Cents per Each 00 18. 25 LF 3/4-Inch Copper Service Line on Private Property by a Licensed Plumber c tv-j Dollars 00 and N Q Cents per Linear Foot Od &8 PART B PROPOSAL ITEM QTY. UNIT DESCRIPTION OF ITEM WITH UNIT COST I UNIT COST TOTAL NO. WRITTEN IN WORDS COST 19. 2 EA 1 1/2-Inch Single Head Service Tap to Main Per Item D-52.7 S;X t wN6 IVA Dollars and ISO Cents per Each 7 ry-� I I�� 00 20. 80 LF 1 1/2-Inch Copper Service Line from Main to Meter, C9�� Including Setting Meter Box Per Item D-527 $ $ x-01! 6,4 f tom- Dollars and NO' Cents per Linear FootTJ'60 3 lOt-D,�D 21. 11 EA Relocate Existing Meter Box Per Item D-52.7 l $ $ �Q e W'46(6:� Dollars andCents per Each Q/ (JO 22. 6 EA Remove&Salvage Existing Fire Hydrant Per Items(D-29 wo Ltt4-� 4 Dollars $ $ andb Cents per Each 00 p0 23. 13 EA Standard Fire Hydrant(3'-6"Depth) Per Figure 5 qlANA C&3 Dollars and N1 h_Cents per Each I 15fr.QQ lQ D.0 0 24. 9 VF Standard Fire Hydrant Barrel&Stem Extension Per Figure 5 ,[i_Dollars and_1N)L'i Cents per Vertical Foot ( Caw $ 25. 4471 LF Trench Safety for Excavations>5'Depth t Per Item D-55 Dollars and W30 Cents per Linear Foot 1 .00 4.q�1 .UV 26. 5078 LF Temporary Asphalt Pavement Repair 1 6Flex Base 8 2'HMAC C oa n Dollars $ $ and _Cents per Linear Foot Ud00� B-9 PART B y PROPOSAL ITEM QTY. UNIT DESCRIPTION OF ITEM WITH UNIT COST UNIT COST TOTAL NO. WRITTEN IN WORDS COST 27. 188 LF Permanent Asphalt Pavement Repair Per Figure 4 V I'4 r t Dollars $ $ and nll? Cents per Linear Foot L15 Q I f�Q d0 28. 100 SY Permanent Concrete Pavement Repair Per Figure 1 Ft,4 Dollars $ $ andb)t7 Cents per Square Yard 29. 8 TN Cast Iron/Ductile Iron Fittings Per Item DA-52.14 rL° I Iousqnd Dollars and Nn Cents per Ton L-0 a l LLi J UD 30. 100 LF Seeding Per Item D-45 w 0 Dollars and)s1 D Cents per Linear Foot 31. 100 LF St.Augustine Block Sodding Per Item D-45 rOl? r Dollars $ $ and O Cents per Linear Foot I �� L4C� 32. 20 CY Class"B"Concrete for Miscellaneous Placement Per Item D-21 an1 0 Dollars 0 Cents per Cubic Yard O I 33. 20 CY Class"E"Concrete for Miscellaneous Placement l Per Item D-21 f?N Dollars and Cents per Cubic Yard l � 34. 20 CY Crushed Limestone for Miscellaneous Placement Per Item D-22 ;Li $ $ T vC Dollars ,�^� and Cents per Cubic Yard 1� v" 35. 50 LF Concrete Curb&Gutter Removal and Replacement l Per Item DA-24 Dollars /)b/ b and Cents per Linear Foot X.00 �, WD V B-10 PART B PROPOSAL ITEM QTY. UNIT DESCRIPTION OF ITEM WITH UNIT COST UNIT COST TOTAL NO. WRITTEN IN WORDS COST 36. 1 EA 6-Inch Blow-off With 6-Inch Gate Valve&Access Manhole Per Figure 18 -7k(+,4 V\IUV- 4 LAJJa red Dollars $ $ and pJ ri Cents per E 3150D.01D 3 —e-00-00 37. 1 EA 11-Inch Air Release Valve Per Figure 15 fV��Dlk':-ar-6 Dollars and Nn Cents per Each 31COO-0 38. 1 LS Provide 2"Temporary Water Service(Entire Project) Per Item D-52.8 $ $ e,11)4��QUSQ OC� —Dollars 00 and Ni:) Cents per Lump Sum ICDD- I Xb.60 39. 2 EA Remove and Salvage Existing 20-Inch Gate Valve Per Item D-29 —Dollars and W!0 2Cents per Each 40. 1 EA Remove and Salvage Existing 18-Inch Gate Valve Per Item D-29 T;LA r �Lk rs�� CQJC� Dollars and " n Cents per Each I I LIOUDL 41. 80 LF Concrete Encasement for Water Line Per Item D-49 Dollars and iN)Q I Cents per Linear Foot P0 42. 1 EA Pre-Construction Exploratory Excavation(D-Hole) Per Item D-51 4LANJ&V_d Dollars and–JN k -Cents per Each I zP0 43. 400 LF Extra Depth of 16"&Larger Water Mains Over 1-foot Below the Designed Elevation as Directed by Engineer (')6)9,= Dollars and—AllOL—Cents per Linear Foot I .,10 44. 20 SY 4-Inch Concrete Sidewalk Replacement fPer I m DA-45 re $ $ I'L Aonl, I Dollars -- , . —11 Cents per Square Yard co and.I-,M B41 PART B PROPOSAL 45. 20 SY 6-Inch Concrete Driveway Replacement Per Item DA-25 Dollars and Cents per Square Yard h 1� 46. 1 EA Remove and Replace and/or Adjust 4'or 6'Fireline V U70 SL1►'1d Dollars ander 7b Cents per Each arWD.00 47. 1 LS SWPPP Implementation and Maintenance Per ItemD-68 $ $ Ow �-y16CQ/d Dollars �a and N D Cents per Lump Sum I vD Coo. TOTAL AMOUNT OF BID FOR SECTION B=$ [�'7�, J� /• O TRANSFER TOTAL AMOUNT OF BID FOR SECTION B TO BID SUMMARY,PAGE B-13. B12 PART B PROPOSAL BID SUMMARY TOTAL AMOUNT BID FOR SECTION A= $ ✓ I O. 50 0 // LI 6 TOTAL AMOUNT BID FOR SECTION B= $ I -7• TOTAL AMOUNT BID FOR SECTIONS A&B= $ 9!5L4) 9 '5. 5 O B13 PART B PROPOSAL CITY APPROVED PRODUCT FOR *Contractor shall select the type of pipe to be used. STANDARD SPECIFICATION NO. DIAMETER (in.) E1-31 4 through 30 E1-25 4 through 15 E1-27 4 through 15 E1-28 18 through 27 E-100-2 18 through 48 Consult with City of Fort Worth"Standard Product List'to obtain the Generic/Trade name and manufacturer for the pipes listed above. F Failure to provide the information required above may result in a rejection of the bid as being "Non-responsive". Only products listed above will be allowed for use in this project. Any substitutions shall result in a rejection of the bid as being"Non-responsive". I� 614 PART B PROPOSAL Within ten (10)days of notification from the City, the undersigned will execute the formal contract and will deliver an approved surety bond and such other bonds as required by the Contract Documents,for the faithful performance of the Contract. The attached bid surety, in the amount of 5%of the total amount bid, is to become the property of the City of Fort Worth,Texas, in the event the contract and bond, or bonds, are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused, thereby. The undersigned bidder, certified that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of Mthose General Documents and the specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency, in either furnishing or referring employee applicants to the undersigned, are not discriminated against as prohibited by terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction 10 calendar days after issue of the work order, and to complete construction within 150 calendar days as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable) [ ]A. The principal place of business of our company is in the State of [ ] Non-resident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. [ ] Non-resident bidders in the State of , our principal place of business, " are not required to underbid resident bidders. XB. The principal place of business of our company, our parent company, or majority owner, is in the State of Texas. Receipt is acknowledged of the following Addenda: Addendum No. 1 Addendum No. 2 Addendum No. 3 (SEAL) If Bidder is a Corporation Respectfully Spbmitted, By: YC� Yom,-�SPi� T CSS Address: P.Q. E b i 15M -, 2 Telephone No.j,�Sl-l�y' 7 L3 w B15 Im PART C -GENERAL CONDITIONS (WATER DEPT.) OFFICIAL 2ECO2D FT. ' 20, TEES. .NOTE: The following revisions to Item C6-6.12 CONTRACTOR'S RESPONSIBILITY . FOR DAMAGE CLAIMS shall replace, to its entirety, that which is currently-shown on Pages C6-6 (8) to C6-6 (10) herein. C6-6.12 CONTRACTOR'S RESPONS161LITY FOR DAMAGE CLAIMS Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel �. at the project site for ContmCtor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner,its.officers, servants and employees, from and against any and all claims or suits for property loss, property damage,. personal injury, including death, arising out of, or alleged'to arise out of, the work and services to be performed hereunder by Contractor, its officers,agents, employees, subcontractors, licensees or invitees, whether or not anv such iniurv, damage or death is caused. In whole or in pirt by the neolioence or aliened neoliaence of Owner. its officers. servants. or employees. Contractor likewise covenants and agrees to indemnity and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any dampg% loss ct , a,struct;cn.&J'property-the Owner c: :;.:y :;.a;, ;};c p&-;romance of any of the terms and conditions of this Contract, whether or-not any such iniury or damage is caused In whole or In par* b:, the neoliaence or alleged nealiaence of Owner. its officers. servants or employees. event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until.Contractor either (a) submits to O./ner satisfactory evidence :hal t.'�e c!aim has been settled and/or a release frcrn the T claimant involved, or (b) provides Owner with a letter from Contraetcr's liability insurance carrier that the claim has been referred to the insurance cagier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against' whom a claim for damages is outstandi;.g as a result of work performed under a City Contract. PART C - GENERAL. CONDITIONS TABLE OF CONTENTS NOVEMBER, 1, 1987 TABLE Of CONTENTS Cl-1 DEF INIT=O`S �+ C 1-1 . 1 Def in of Terms C1-1 (1) Cl-1 . 2 Contrac= Documents C1-1 (1 ) C1-1 . 3 Notice tc Bidders Cl-1 (2 ) C1-1 . 4 Proposa_ C1-1 (2 ) Cl-i.5 Bidder C1-1 (2) C1-1. 6 General Conditions C1-1 ( 2) C 1-1 . 7 Special Conditions C1-1 (2 ) ' C1-1. 8 Specific=_ions Cl-1 ( 2 ) Ci-i. 9 Bond C1-1 (2) C1-1. 10 Contract Cl-1 (3 ) C1-1.11 Plans C1-1 (3 ) C1-1.12 City Cl-1 (3 ) c1-I.13 City Council Ci-1 (3 ) c-1 -1.14 Mavor C1-1 (3 ) C1-1.15 City Ma-= `r Cl-1 (3 ) C1-1.16 Citv At 6-c=ney Cl-1 (3 ) f C1-1 . 17 Director cf Public Wc_ks Cl-1 (4 ) C1-1.18 Direc ter, Citv Water De_a.t-ne^t C1-1 (4 ) C1-1. 19 Engineer C1-1 (4) C1-1. 20 Contractc_ Cl-1 (4 ) C1-1. 21 Sureties Cl-1 (4 ) C1-1. . 22' The Work c_ Project - Cl-1 (4 ) C1-1 . 23 Working _=v Cl-1 (4 ) C1-1 . 24 Calendar Dav Cl-1 (4 ) ,Cl-1. 25 Legal ::o_:day Cl-1 (4 ) Cl-1. 26 Abbreviations C1-1 (5 ) Ci-1 . 27 Change 0=_=_r Cl-1 (6 ) C1-1 . 28 Paved Streets and Alleys Cl-1 (6 ) C1-1 . 29 Unpaved Streets and Alleys Cl-1 (6 ) C1-1. 30 City Stre--ts C1-1 (6 ) C:1-1. 31 Roadwav C1-1 (6 ) 1. 32 Gravel 54- eet C1-1 (6 ) C2-2 INTER??=_A_ION AND P��---'1ARATION OF ,PROPOSAL C2-2 . 1 Procosal Form C2-2 (1 ) C2-2 . 2 Interpretation of Quantities C2-2 (1) C2-2 . 3 Examination of Contract Documents do and Site C2-2 (2) IF C2-.2. 4 Submit'%4n of Proposal C2-2 (3 ) C2-2. 5 Rejection of Proposals C2-2 (3 ) C2-2. 6 Bid Security C2-2 (3 ) ( 1 ) C2-2. 7 Delivery of Proposal C2-2 (4 ) C2-2. 8 Withdrawing Proposals C2-2 (4) C2-2 . 9 Teleg.-aphic Modification of Proposals C2-2 (4) C2-2 . 10 Public Opening of Proposal C2-2 (4 ) C2-2 . 11 Irregular Proposals C2-2 (4 ) C2-2. 12 Disquali_ication of Bidders ' C2-2 (5) C3-3 AWARD AND EXECUTION OF DOCUMENTS C3-3 . 1 Consideration of Proposals C3-3 (1) T C3-3 . 2 Minority Business Enterpise Women-Owned Business Enterprise comoliance C3-3 (1) C3-3 . 3 Equal Employment Provisions C3-3 (1) C3-3 . 4 Withdrawal of Proposals C3-3 (2) C3-3 . 5 Award of Contract C3-3 (2) C3-3. 6 Return of Proposal Securities C3-3 (2) C3-3 . 7 Bonds C3-3 (2) C3-3. 8 Execution of Contract C3-3 (4) C3-3 . 9• Failure to Execute Contract C3-3 (4) C3-3 . 10 Beginr.?nc Work C3-3 (4 ) C3-3. 11 Insura^ce C3-3 (4 ) C3-3 . 12 Contractor 's Obligations C3-3 (7) C3-3 .13 Weekly Payroll C3-3 (7) C3-3 .14 Contractor's Contract Administration C3-3 (7) C3-3 .15 Venue C3-3 (8 ) ° C=-4 SCOPE 0: WOR{ C4-4. 1 Intent of Contract Dcoc::merts C4-4 (1) C4-4 . 2 Special Provisions C4-4 (?) C4-4. 3 Increase or Dec=eased Quantities C4-4 (1) C4-4 . 4 Alteration. of Contract Documents C4-4 (2•) C4-4 .5 Extra Wcrk C4-4 (2) C4-4 . 6 Schedule of Operations C;-4 (3 ) C4-4 . 7 Procress Schedules for Water and Siwe= Plant Facilities C4-4 (4) C5-5 CONTROL Or WORK AND MAT:RIALS C5-5 .1 Authority of Engineer C5-5 (1) C5-5 . 2 Conformity with Plans C5-5 (1) C5-5 . 3 Coordination of Contract Documents C5-5 (2) C5-:-5 . 4 Cooperation of Contractor CS-5 (2) C5-5 . 5 Emergency and/or Rectification Work C5-5 (3 ) C5-5 . 6 Field 0=fice C5-5 (3) C5-5 . 7 Construction Stakes C5-5 (3) C5-5. 8 Authority and Duties of Inspectors CS-5 (4 ) C5-5. 9 Inspection CS-5 (5) C5-5 .10 Removal of Defective and Unauthorized Work C5-5 (5) C5-5 .11 Substitute Materials or Equipment C5-5 (5) C5-5 .12 Samples and Tests of Materials C5-5 (6) C5-5.13 Storage of Materials CS-5 (6) C3-5 .14 Existinc Structures and Utilities CS-5 (7) C3-5. 15 Interruption of Service C5-5 (7) C5-5 . 16 Mutual Responsibility of Contractors CS-5 (8) C5-5 .17 Cleanup C5-5 Z8) C5-5 . 18 Final Inspection C5-5 (9) C6-6 LEGAL R LiTIONS AND PUELIC RESPONSIBILITY C6-6 . 1 Laws to be Observed co,-o (1) C6-6 . 2 Permits and Licenses C6'-6 (1) c6-6 . 3 Patentee Devices , Materials and Processes C6-6 (1) C6-6 . 4 Sanita:, Provisions C6-6 (2) C6-6 . 5 Public Safety and Convenience C6-6 (2) C6-6 . 6 Privileges of Contractor in Streets, Alleys, and Right-of-Way CE-6 ( 3 ) C6-6 . 7 Railway C_ossincs C6-6 (4 ) C6-6 . 8 Barricades, Warnincs and Watchmen C6-6 (4 ) C6-6. 9 Use of Explosives , Drcp Weight, etc. C6-6 (5 ) C6-6 . 10 Work Within Easements C6-6 (6 ) C6-6. 11 Independent Contractor C6-6 (8 ) C6-6 . 12 Contractor's Responsibility for Damage Ciaims C6-6 (8 ) C6-6 .13 Contractor's Claim for- Damages C6-6 (10) C6-6 .14 Adjus tent of Relocation of Public Utilities, etc. C6-6 (10 ) C6-6 . 1:5 Te:apora=y Sewer Drain Connections CS-6 (10 ) C6-6 .16 Arrance and Charges of Water Furnished by City 6 (11) C6-6.17 Use of a Section of ?crtion of the Work C.-o' (11) C6-6 .18 Cont=actc= 's Respor.si:.ility for Work C6-6 (1l) C6-6. 19 No Waiver c= Legal Fic;,ts Cc-6 (12 ) C6-6 . 20 Personal Liability Of Public Officials C6-6 (12) C6-6 . 21 Sate Saes Tax C6-6 (12) C7-7 PROS ECUT=ON AND PROGRESS C7-7. 1 Sublett_nc C7-7 (1) C7-7 . 2 Assigns::ent of Cont---r-act- C7-7 (1) C7-7. 3 Presecut_cr c= the Wo=k C7-7 (1) C7-7. 4 Limitaticns 'of Ope=aticns C7-7 (2) C7-7. 5 Character ct Workman and Ecu;nment C7-7 (2) C7-7. 6 Work Schedule C7-7 (3 ) C7-7. 7 Tirane of Ccrnencement and Completion C7-7 (4 ) C7-7 . 8 Extension of time of Ccmpletion C7-7 (4 ) C7-7. 9 Delays C7-7 (4 ) C7-7.10 Time o- Completion C7-7 (5 ) C7-7. 11 Suspension by Court Order C7-7 (6 ) C7-7 .12 Tempora:v Suspension C7-7 ( 6 ) Ci-7 . 13 Termination of Contract due to National Emergencv Ci-7 (7) C7-7 . 14 Suspension of Abandonment of the Work and Annulment of Contract C7-7 (7 ) C7-7 . 15 Fulfillment of Contract C11-7 ( 9 ) C7-7. 16 Termination for Convenience of the Onwer C7-7 (1 0 ) C7-7. 17 Safety Methods and Practices C7-7 (13 ) C8-8 MEASUREMENT AND PAYMENT C8-8 . 1 Measurement of Quantities C8-8 (1) Co-8 . 2 Unit Prices C8-8 (1) C8-8 . 3 Lump Sum C8-8 (1) C8-8 . 4 Scope of Payment C8-8 (1) C8-8 . 5 Partial Estimates and Retainage C8-8 (2) C8-8 . 6 Withholding Payment C8-8 (3 ) C8-8 . 7 Final Acceptance` C8-8 (3 ) C8-8 . 8 Final Payment C8-8 (3 ) CS-8 . 9 Adquacy of Design C8-8 (4). C8-8 .10 General Guaranty C8-8 (4 ) C8-8 .11 Subsidiary Work C8-8 (5 ) C8-8 .12 Miscellaneous Placement of Material C8-8 (5) C8-8 .13 Record Documents C8-8 (5) a ( 4 ) PART C - GENERAL CONDITIONS C1-1 DEFINITIONS SECTION CI-1 DEFINITIONS t Cl -1 . 1 DEFINITIO14S 0-7 TERMS : Whenever in these Contract Documents the following terms or pronouns in place of them are used , the intent and meaning shall be understood and interpreted' as follows: CI-1 . 2 CONTRACT DOCUMENTS: The Contract Documents are all 6f M the written and arawn documents , such as specifications , bonds , addenda , plans , etc . , which govern the terms and performance of the contract . These are contained in the General' Contract Dcc zients and the Special Contract Documents. a. GENE ..L CONTRACT DOCUMENTS : The General Cortract Documents covern all water Department' Projects and include the following it-ems: PART A - NOTICE TO B=DDERS (Sarivle) White PART B - PROPOSAL (Sample) white PART C - GENERAL COND_TIONS (CITY) Canary Yellow - - (Developer) Brown PART D S-H%_ CCNi?TTONS Green PART - SPECIFICA.=OVS El-White E2-Golden Rod E2^'-white P ERMITS/=ASEMENTS 3lue PART F - BONDS (Sample) Wh'_te PART G - CONTRACT (Sample) Wh'_te b. SPECIAL CONTRACT DOCUMENTS : The Special Contract Documents are prepared for each specific project as a sunnlement to the General Contract Documents and include the following items : PART A - NOTICE TO BIDDE RS (Adve.tisemert) Same as above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT PART H - PLANS (usual!-yr bound separately) C1- 1 . 3 NOTICE TO BIDDERS : All of the lecal publications either actually published in public advertising -ediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. C1-1 . 4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the- owner desires to have cone, together with the bid security, con's;itutes the Proposal , which becomes binding upon the Bidder when it is officially received by the Owner , has been publicly opened and read and not rejected by the Owner.• C1-1 . 5 BIDDER: Any person , persons , firm, partnership, company, association, corporation , acting directly or through a duly authorized representative , submitting a proposal for performing the work contemplated under the Contract Docu ments , constitutes a bidder. C1-1 . 6 GENERAL CONDITIONS : The General Conditions a:e the usual Construction znd contract re uirements which ;overn the performance of the work so that it will be ca::ied on in accordance with the customary procedure, the local statutes , and requirements of the City os Fort Worth ' s carte: and promulgated ordina::ces. Wherever there may be a conflict between the General Conditions and Special Conditions , the latter Sha-11 take precedence and shall govern. C1 -1 . 7 SPECIAL CONDITIONS : Smecial conditions are the specific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions . When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1 . 8 SPECIFICATIONS : The Soecifications is that section or part of the Contract Documents which sets forth in detail the recuirements' which must be met by all materials , cons tructicn, workmanship , equ zment and services in order to render a completed and useful project . Whenever reference is made to standard specifications, regulations , requirements , statutes , et-- . , such referred to documen is shall become a part of the Contract Documents just as though they were embodied therein. C1-1 . 9 BOND: The bond or bonds are the written guarantee or security furnished by the Con tractor for. th.e prompt and C1-1 ( 2 ) = aithful perfor:,,ance of the contract and include the following : a. Performance Bond ( see paragraph C3-3 . 7 ) b. Payment Bond (see paragraph C3-3 . 7 ) C. Maintenance Bond ( see paragraph C3-3 . 7 ) d. Proposal or Bid Security (see Special Instructions to Bidd=_s, Part A and C2-2 . 6 ) C1-1 . 10 CONTRACT: The Contract is the formal signed agreement between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. C1-1 . 11 PLANS : T e plans are the drawings or reproducti ons therefrom made by the Owner ' s representative showing in detail the location , dimension and position of the varices elements CIA. the project , including such profiles , typical cross-sections, layout diagrams , working drawings, preliminary drawings -and such supplemental drawings as the Owner may issue to clarify other drawings or for the purpose of showing changes in' the work hereinafter authorized by the Owner. The plans are usually bcund sepa=a rely from other parts of the Contract Documents , but they are a part of the Contract Documents just as tncuch they were bound therein. C1-1 . 12 CITY : The City of Fo_t Worth , Texas , a municipal ccrporatlon, authorized and C i-rt:ered under the Texas State CtatL•tes , act:::C by a:.d through J.'Cs governing body cr its City *dancer , each of w ich is rec•-, ired by ct.arter to perform specific duties . Responsibility for final enforcement of Contracts involving the City of Fort Worth is by Charter vested in the Cit_v Manager . The terms City and Owner are synonymous . C1 - 1 . 13 CITY COUNCIL : The duly elected and qualified ve_ning body of he City of Fort Worth, Texas . C1-1 . 14 MAYOR : The officially elected Mayor , o: in his absence, the Mayor Pro te.m of the City of :ort Worth, Texas. C1-1 . 15 CITY MANAG=:c: The of=_cially appointed and authorized C_ tyManager of the City of Fc.t Worth , Texas , or his duly a- thorized representative. C1-1 . 16 CITY ATTORN?Y: The officially appointed City Attorney a_ the City of Fort Worth , Texas , or his duly authorized representative. C1-1 ( 3 ) CI-1 . 17 DIRECTOR 0:' PUBLIC WORs:S : The duly appointed official of the City of Fort Worth , referred to in the Charter as the City Engineer, or his duly authorized representative. CI-1 . 18 DIRECTOR , CITY WATER DEPARTMENT: The duly ap aointed Director of the City Water Department of the City of Fort Worth , Texas , or his duly authorized representative , assistant, or agents. C1-1. 19 ENGINEER: The Director of Public Works, the Director of the Fort Worth. City Water Department , or their duly authorized assistants , agents , engineers , inspectors, or superintendents , acting within the scope° of the particular duties entrusted to them. C1 -1 . 20 CONTRACTOR: The person , persons , partnership , company, firm, association , or corporation , entering into a contract with the Owner for the execution of the work, acting directly or through a duly authorized representative. A - sub-contractor is a person, firm, corporation, or ethers under contract with the principal contractor, supplying labor and ruaterials or only labor, for. work at the site of the project. C1-1 . 21 SURET_ES : The Corporate bodies which are bound by such bonds are recu.ired with and -for the Contractor . The sureties encaged are to be --fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all -recuirements as set forth in the Contract Doc=ents and approved chances therein. C1-1. 22 THE WORK OR PROJECT: The completed work ccn templated in and covered by the Contract Documents , including but not limited to the furnishing of all labor , materials , tools , equipment, and incidentals necessary to produce a completed and serviceable project. C1-1 . 23 WORKING DAY: . A working day is defined as a calendar day, not including Saturdays , Sundays , and legal holidays , in which the weather or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven ( 7 ) hours between 7 : 00 a .m. and 6 : 00 p .m. , with exceptions as permitted in paragraph C7-7 . 6. C1-1 . 24 CALENDAR DAYS : A- calendar day is any day of the week or month, no days being excepted. C1-1. 25 LEGAL HOLIDAYS : Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City e.M.Dloyees as follows: C1-1 ( 4 ) 1 . New Year ' s Dal January 1 2 . M. L. Xing, J=. Birthday Third Monday in January 3 . Memorial Day Last Monday in May 4 . Independence Day July 4 5 . Labor Day First Monday in September 6 . Thanksgiving Day Fourth Thursday in November 7 . Thanksgiving Friday Fourth Friday in November 8 . Christmas DEV December 25 9 . Such other days in lieu of boli days as the City Council may determine When one of the above named holidays or a special holiday is declared by the City Council , falls on Saturday, the holiday shall be observed on the preceding Friday or i:: it falls on Sunday;' it shall be cbse=ved on the following Md -yby those e.«ployees working or. working day operations . E:1ployees working calendar day operations will consider the calendar holiday as the hol:day. Cl-i . 26 ABBREVIATICNS Wherever the abbreviations defined herein appear in Cc:tract Documents , the intent and meaning shall be as follows: ,S rrO - �.�terican Assoc-ation o= MGD - Million G__lons '== State cichwm_7 Transportation Dav Officials A SCS - American Scci etv of C-vil C.S - Cub__ Foct per �rgi^ee=: Second In Accordance With ASTM - P.Terican Scciety of Min. - Mi ni^_,m Testing Materials Mono. - Monolithic F,ririA - American water Works I - Pe_centum Association R - Radius ASA - American Standards Association I.D. - Inside Diameter Hydraulic Institute O . D . - Outside Diamaet-ar Asch. - Asphalt Elev. - Elevation Aae. - Avenue F - Fahrenheit Blvd. - Boulevard C - Centic__ade CI - Cast Iron In. - Inch CL - Center Line Ft. - root G! - Galvanized I=on St. - Street Lin. - Linea: or Li nealCY - Cubic Yard l b. - Pound Yd. - Yard M. - Manhole SY - Scua.a Yard Max. - Maximum L.F. - Linear Foot D. I . - Ductile Iron C1 - 1 . 27 CHANGE ORDER : A " Change Order " is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unle'ss the *increase or decrease is more than 25% of the amount of the particular item or items in the original proposal. All "Change Orders " shall be prepared by the City from information as necessary furnished by the Contractor. CI-1 . 28 PAVED STREETS AND ALLEYS : A paved street or alley, shall be defined as a street , o r alley having one of the following types- of wearing surfaces applied over the natural unimDroved surface: 1. Any type of asphaltic concrete with or without separate base material . 2. Any type of asphalt surface treatment , not includinc an oiled surface , with or without separate base material. 3 . Brick, with or withoutseparate base material. 4 . Concrete, with or without separate base --a retial. 5. Any ccrab_:.ation of the above. Cl-1 . 29 UNPAVED STREETS OR ALLEYS : An unpaved street, alley, roadway or other sursace is any area except those defined above for "Paved St=ee.ts and Alleys . " C1-1. 30 CITY STREETS : A city street is defined as that area between the right-o -way lines as the street is dedicated. C1-1 . 31 ROADWAY: The roadway is defined as the area between parallel lines two ( 2 ' ) feet back of the curb lines or four ( 41 ) feet back of the average edge of pavement where no curb exists. Cl-1 . 32 GRAVEL STREET: A gravel street is any unpaved street to which has been added one or more applications of •gravel or similar material other than the natural material found on the street surface before any improvement was made. Cl-1 ( 6 ) SECTION C - GENERAL CJNDT_TIONS C2-2 INTERPRETATION AND PREPARATION OF PROPCBAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROP05;.L C2 - 2 . 1 PROPOSAL FORS!: The Owner will furnish bidders with proposal . form, which will contain an itemizedlist of the items of work to be done or materials to be furnished and upon which bid -prices are requested. The Proposal form w:ll state the Bidder ' s general understanding of the project to be completed,. provide a space for furnishing the amount of bid security , and stare the basis for entering into a formal contract . The Owner will furnish forms for the Bidder ' s " Experience Rebord, " "Equipment Schedule , " and ":inancial Statement, " all of which must be properly executed and filed with the Director o: the Citv Water Department one week urior to the hour for ouenine of bids . The financial state==;-,t recu_=ed shall have beer, -repared by an independent cerci ied DL'blic accountant or an in!eDende.6 public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial sta _s . This statement must be cuzzent and not more than one ( 1 ) :ear old. _n the case that a bidding date falls within the .:me a new statement is being prepared, the previous statement shall be updated by proper verification . Liquid assets in the amount of ten ( 10% ) perces:: -of the estimated project ccs_ will be recurred. For an experience record to be considered to be accertable for a given project , it must reflect the experience o the firm seeking qualif icatrcn in work of both the same nature and magnitude as that cf the project for which bids are to be received , and such experience must have been or, projects co:apleted not more than five ( 5 ) years prior to the date on which are to be received . The Director of the Water department shall be sole judge as to the acceptability of experience for qualification to bid on anv Fort worth Water Depar tment project. T Z e prospective bider shall schA e-dule the equipme^t he has available for the project and state that he will rent such additional equipment as .may be required to ccr..plete the project on which he submits a bid . C2-2 . 2 INTER:RETATION OF QUANTITIES : The quantities of work and materials to be -furnished as ira_,r be - listed in the proposal C2-2 ( 1 ) forms or other parts of the Contract Documer:_-s will be considered as ap- oximate only and will be uc== for the urpose of comparing bids on a uniform basis . Payment will be :zade to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans . The quantities of Work to be Derformed and ma_erials to be furnished may be increased or. decreased as hereinafter provided , without in any way , nvalida.ting the snit prices bid or any other req• :re*aents of the Contract Documents . C2-2 . 3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that the Contract Documents on file with the Owner shall constitute all 'of the information: which the Owner will furnish. All additional information and data which the owner will s=pply after promulgation of the formal contract documents shall be issued in the form of written addenda and shat+ become part of the Contract Dcc�_.�ents just as though such ac,.e:ca were actually written into -::e original Contract Documents. Bidders are required, prior to the filing of proposal, to read and become familiar ;with the Contract Documents , to cis4t the s - te of the prosect and examine carefully all local conditions , to in :,rm themselves .by their own independent _ research and inves_ications, tests , boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which w_ll be encountered during the construction of the project . They must judge for themselves the s d__ =iculties of the' work and all at.tend-inc cl-rCumstances a.ffecting the cost c doing the worst or the tine req_:red for its completion, and obtain all in=o.—oration required to make an intelligent proposal. No information given by the Owner or any representative of the Owne= other--than that contained in the Contract Documents and officially promulgated addenda 8. thereto, shall be binding upon the Owner. Bidders shall rely exclusively and solely upon their own estimates , investigation, research , tests , explorations , and other data which are necessary for full and complete information upon which the proposal is to be based. It is mutually agreed that the submission of a :roposal is prima-facie evidence that the bidder has made the investigations , examinations and tests her=_in required. C_.aims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings , if any, showing on the plans are for general information c:ily and may not be correct. Neither the C2-2 (2 ) Owner nor the- 'Encineer guava ^ tee that the data shown is representative of conditions which actually exist. C2-2 . 4 SUBMITTING Or PROPOSAL : The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the for:: shall be correctly filled in and the Bidder shall state the prices , written in ink in both words and numerals , for which he proposes 'to do the wcrk contemplated or furnishe the Nater ials required . All such prices shall be written legibly. In case of discrepancy between the price w.ritten in words and the price written in numerals , the price most advantagecus to the City shall govern. If a proposal is submitted by an individual, his or her name must be signed by him (her ) or his (her) duly authorized agent. If a `proposal is submitted by a firm, association , or partnership, the mine and address of each me:zber must be given , and the =rcposal must- be signed by a me=*Z_-r of the firm , associaticn , or partner ship , or by a person duly aut'horiz.ed . If a proposal is submitted by a ccmpanv or corporation , the co:apany or corporate name a-d business address :rust be c_;;en, and theproposal signed cy an of:ic_al or duly authorized aunt. The C^rmordte seal must be f=ixsd. Power of Attorney. authorizing agents or others to sign prcposal must be p:eperly certi�ied and must be in «rill.^.g and submitted with the proposal. C2-Z. 5 REJECTION OF PROPOSALS : Proposals .may be re ect_d if they show any zlterazion of worts or figures , addizions not called for , conditional or uncalled fo-r alter:ate bic:s , incomplete bids, erasures , or irregularities of any kind, or contain unbalance value of any items . Proposal tendered or delivered after the official time designated for receipt of r oposal shall be returned to the Bidder unopened. C2-2 . 6 BID - SECURITY: No proposal will be considered unless it is accompanied by a "Proposal Security" of the c1-1-ratter and in the amount indicated in the " Notice to Bidders" and the "Proposal . " The Bid Security is required by the Owner as evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract , the --=rider will within the recuir=d time execute: a forma' contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition is made thereof. The bid security of all other bidders may be returned promptly after the canvass of bids. C2-2 ( 3 ) � . C2-2 . 7 DELIVERY OF PROPOSAL: No proposal will :,e considered unless it is delivered ; accompanied by its proper Bid Security , to the City Manager or his representative in the official place of business as set forth in the "Notice .to Bidders . " It is the Bidder ' s sole responsibiliVy to deliver the proposal at the proper time to the. proper place. The mere fact that a proposal was dispatched will not be considered. - The Bidder must have the proposal actually delivered. Each proposal• shall be in a sealed envelope plainly marked with the word "PROPOSAL, " and the name or description of the.project as designated -in the "Notice to Bidders. " The envelope shall be addressed to the Citv Manager., City Hall, Fort Worth, Texas. C2-2 . 8 WITHDRAWING PROPOSALS : Proposals actually filed with the City Manager cannot be withdrawn prior to the time set for opening proposals . A request for non-conside_ation of a proposal must be made in writing , addressed 'Co the City Manager , and filed with him prior to the time set for the cpening of proposals. After all proposals not requested for non-consideraticn are opened and publicly read aloud, the proposals- for which non-consideration requests have been properly filed mav; at the option of the Owner, be returned unopened. C2-2 . 9 TELEGRAPEiC MODIFICATION OF PROPOSALS: An_ bidder may modify his proposa by telegraphic - communication at any time prior to the time set for opening proposals, prC=sided such telegraDhic common cation is received by the City Manager prior to the said proposal opening time, and provided further, ' that the City Man_cer is satisfied that a written and duly authenticated confirmation of such telegraphic c=,muaication over the signature of the bidder was mailed prior to the proposal opening tfine. If such confirmation is not received within forty-eight (48) hours aster the proposal opening time, no further consideration will be given to the proposal. C2-2 . 10 PUBLIC OP=KING OF PROPOSAL: Proposals which have been properly filed and for which no "Non-consideration Request" has been received will be publicly opened and reed aloud by the City Manager or his authorized representative at- the time - and place indicated in the "Notice to Bidders. " All proposals which have been opened and read will remain on file with the Owner until the . contract has been awarded. Bidders or their - authcrized representatives are invited to be present for the opening of bids. C2-2 . 11 IRREGULAR FROPOSA.LS: P_ovosals shall be considered as - being "Irregular" i= they show any omissions , alterations of form, additions , or conditions not called for, unauthorized alternate bids, or irregularities o, any kind. However , the - C2-2( 4 ) Owner reserves' the right to waive any and all i__ecularities and to make the award of the contract to the best interest of the City . Tendering a proposal after the closing hour is an irregularity which cannot be waived. C2 - 2 . 12 DISQUF:L: ?ICATION OF BIDDERS : Bidders may be disqualified and r eir proposals not considered for any of , but not limited tc, the following reason: a. Reasons for believing that collusion exists among bidders. b . Reasonable grounds for believing that any bidder is intereS_ed in more than one proposal for work contemplated. C. The bidder being interested in any litigation against the Owner or where the Owner mmav have a claim against or be engaged in litigation against the bidder d. The bidder being in arrears on anv existing cont=act or havi n. defaulted or. a previous contract. e. The bid=er having pe=-ormed a prior co-__act in an unsatis==c_ory manner. f . Lack of c--mpetencv as revealed by tine financial statement. , experience record , a:uipmen_ schedule , and such incuiries as the Owner may see fit to make. g . Uncompleted work wh 4 ch , in the judcm:nt of the Owner, will prevent or hinder the o=omptcompletion Of adcs__rnal work i= awarded. h . The not i?1.^.0 with the owner , one week in advance c' the hour c the opening of p_coosals the fol? owinz: 1. Financial Statement s =lowing the `financial cc-dition of the bidder as s_oeci:ied in Part "A" - SDecial instructions . 2. A current experience record showing especially the projects of a nature similar to the one under consideration , which have been success-ully comp_ated by the Bidder. 3 . An ecuipment schedule showing the, eau_pment the bidder has available for use on the oro j ect. The Bid Proposal of a bidder who, in the judgment. of the Engineer, is disqualified under the requirements stated herein, shall be set aside and not opened. C2—? fS ) s PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS SECTION C3-3 AWARD =':D EXECUTION OF DOCUMENTS: C3 -3 . 1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of' the quoted prices , the quantities shown in the proposal , and the application of such formulas or other ,methods of bringing items to a common basis as may be established in the Contract Documents. The total obtained by taking the sum of the products of unit prices quoted and the estimated cuantities plus any lump sum items and such other cuoted amounts as may enter into the cost of.. the completed pr-ject will be considered as the amount of the bid. Until the award c= the contact is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re-advertise for new preposals, or to proceed with the work in any manner as maybe cons'_dered for the best interest c,!. the Owner , C3 -3 . 2 MINORITY -BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE • Contractor agrees to provide to Owner ' upon request , co:►.:)lete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and or a a woman.-owned Business Enterprise (WBE) on the contract and the pavment therefor . Contractor further agrees , upon request by Owner , to allow and audit and/or an examination of any books , records , or files in the possession of Contractor that will substantiate the actual work performed by the MBE or WBE. Anv material misrepresentation of anv nature will be grcunds for termination of the contract and for initiating any action under appropriate federal , state or local laws and ordinances relating to false statements ; further , any such misrepresentation may be grounds for diseualification of Contracto_ at Owner ' s discretion for bidding on future Contracts with the Owner for a period of time of not less than six ( 6 ) months . C3 - 3 . 3 EQUAL EMPLOYMENT PROVISIONS : The Contractor shall comply with Current City Ordinance prohibiting discrimination in employment practices . C3-3 ( 1 ) The Contractor shall post the required notice to that effect on the project site , and', at his request , will be provided assistance by the City of Fort Worth ' s Equal Employment Officer who will refer any qualified applicant he may have ,on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment .Officer. C3-3 . 4 WITHDRAWAL OF PROPOSALS : After a proposal has been read 5y the Owner it cannot be withdrawn by the • Bidder within forty-five ( 45 ) days after the date on which the proposals were opened: C3-3 . 5 AWARD OF CONTRACT: The Owner reserves the right to withholdfinal action on the propofsals for a reasonable time , not to exceed forty-five ( 4 5 ) days after the date of opening proposals, and i'n no event will an award be made until after investigations have been made as to the responsibility of the proposed awardee. The award of the cc-ntract, if an award is made, w-,-', I- be to the lowest and best res:,onsible bidder. The award. of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. 71 C3 -3 . 6 RETURN OF PROPOSAL SECURITIES: As soon as proposed price totals have been determined for comparison of bids , the Owner may, at its discretion , return the proposal security which accompanied the proposals which, in its judgment, would not be considered ' for the award . All other proposal securities , usually those of the three lowest bidders , will be retained by the Owner until the required contract has been executed and bonds furnished or the Owner has otherwise disposed of the bids, after which they will be returned by the City Secretary. C3-3 .7 BONDS :' With the execution and delivery of the Contract Documents, the Contractor shall furnish to , and file with the Owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND : A good and sufficient performance bond in an amount not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise , guaranteeing the full and faithful execution of the work and performance of the contract, and for the protection of the Owner and all other persons against damage by reason of negligence of the Contractor, or improper execution of the work or the use of inferior materials . This per::ormance C3-3 (2 ) bond shall guarantee the payment for all labor , materials , equipment , supplies , and services used in the c;.:struction of the work, and s:all remain in full fc=ce and effect until provisions as above stipulate= are accomplished and final payment is made on t h. project by the City. b. MAINTENANCE BOND : A good and sufficient maintenance bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced :.v the proposal tabulation or otherwise , guaranteeing the prompt , full and faithful performance of the general guaranty which is se't forth in paragraph C8-8 . 10. C. PAYMENT _CND : A good and sufficient Pa-- .ent band, i in an a nice nt not less than 100 percent- of the amount o_ the contract , as evidenced by the proposal tabulation or otherwise , guaranteeing the prompt, .•.11 and faithful payment of all clam ; 6 as defined- in Article -9160 , Revised Civ-1 Stat::_es of Texas , 1925 , as amended by Eouse B-ll 344 Ac_s 56th Legislature, Regular Session , 1959 , effect-.ve April 27 , 1959 , and/or the latest version thereof, supply-nc labor and materials in the prosecution of the work provided for in the contract being constructed under these specifications . ?aymti::t Bond shall remain in force until all payments as above st_pu ated are rade. d. OTHE'R BONS : Such o.he_ bonds as may ze required by t.ese C=.tract Documents shall be fu=nished by the Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested in any lit-gation aca+nst the owner . All bonds shall be made on the forms furnished by the Owner and shall be executed by an app:cved surety cc:apany doing business in the City of Fort Worth , Texas , and which is acceptable to the owner . In order to be acceptable , the name of the surety shall be included en the current U . S . Treasury list of acceptable sureties , and the amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury list for that company . Each bond shall be properly executed by both the Contractor and Surety Company. Should any surety on the contract be determined unsatisfact;ry at any time by the Owner , notice will be given the Contractor to that affect and t-e Contractor shall immediately provide a new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties , as required , have qualified and have been accepted by the Owner. The contract shall not be operative nor will any payments he due or paid until approval of the bonds by the Owner. C3-3 . 8 EXECUTION 0? CONTRACT: Within ten (10) days after the Owner has by appropriate resolution , or otherwise, awarded the contract., the Contractor shall execute and file with the Owner the Contract and such bonds as may be required in the Contract Documents . No contract shall be binding upon the owner until it has been attested by the City Secretary , approved as to form and legality by the Gity Attorney, and executed for the Owner by either the Mayor or City Manager. C3 -3 . 9 FAILURE TO EXECUTE CONTRACT : The failure of the zwardee to execute the required -bond or bonds or to sign the r ecuired contract within ten ( 10 ) days after the contract is awarded shall be ccrsidered by the Owner as an abandonment of his proposal, and tae Owner may annul the Award. By reason of the uncertainty of the market prices of material and labor, and it being impracticable and difficult to accurately determine the amount of damages occur_ng to the Owner by reason of said awardee ' s failure to execute said bonds and contract within ten ( 10 ) days , the proposal security accompanying the Proposal shall be the agreed amount of damages which Owner will suffer by reason of such failure on tae part of the Awa.-dee and shall thereupon immed?ately be f crf eited to the Owner. '^^e filing of a prep osal will be considered as an acceptance of this provision by the Bidder. C3 -3 . 10 BEGINNING WORK: The Contractor shall not commence work until authorized in writ-ina to do so by the Owner . sh.ould the Contractor fail to commence work at the site of the project within the time stipulated in the written authorization usually termed the "Work Order" or "Proceed Order" , it is agreed that the Surety Company will, within ten ( 10 ) days after the commencement date set forth in such written authorization, commence the physical execution of the con-tract. C3-3 . 11 INSURANCE: The Contractor shall not commence work ." under this contract until he has obtained all the insurance required under the Contract Documents , and such insurance has been approved by the Owner. The prime Contractor shall be re-sponsible for delivering to the Owner the sub-contractors ' C3-3 ( 4 ) certif icate of ,insurance for approval . The prim: contractor shall indicate on the certificate of insurance inc aced in the documents for execution whether or not his ins;::_nce covers sub-contractors . It is the intention of the Owrez that the insurance coverage required herein shall include he coverage of all sub-contractors. a. COMPENSATION INSURANCE : The Cont:_cor shall maintain , during the life of this contract , Workers ' Compensation Insurance on all of his employees to be engaged in work on the project under this contract , and for all sub-ccntractors. in case any class of employees engaged in hazardotis work on the project under this contract is not protected under the Workers ' Compensation Statute , the Contractor shall provide adequate emoloyer ' s general !_=ability insurance for the protection of such of his employees not so protected. b. COMPREEENSIVL GENERAL LIABILITY INSv?=NCE: The Contractcr shah. procure and shall ma,in__';n duri:ig the life or th Is contract ° Co ..— actor ' s ComprehenE ve General Liability Insurance ( Public Liability and Property Damage in sur=_.ce) in an amount nct less than $ 500 , 000 covering each occurrence on account of bodily injury, including death , and in an amount not less than $ 500 , 000 covering each eccurzence on account c: property dam-ace w'_ti, $2, 000 , 000 =:hrella policy ccr__ac�. C. ADDITIONAL LIAPIL=717_ : The Contractor shall furnish insurance as separate policies or by additional endo r sement to one of the above-mentioned policies , and in the amc_nt as set forth for public liability and property d_-41age, the following insurance: 1. Cc ,-, 6ingent Liability ( covers General • Contractor ' s Liability f. or acts of sub-contractors ) . 2. Blasting , prior to any blasting bei nc done. 3 . Collapse of buildings or structures adjacent to excavation ( if excavations are to be performed adjacent to same) . 4 . Damage to underground utilities for $500, 000 . C3-3 ( 5 ) 5 . Builder 's risk (where above-ground structures are involved ) . 6. Contractual Liability ( covers all i;demnification requirements of Contract) . d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY DA-MAG?: The Contractor shall procure and maintain, during. the life of this Contract, Comprehensive Automcbile Liability insurance in an amount not less than $ 250 , 000 for injuries including accidental death to any , one person and subject to the same limit for each person an amount not less than 15500 , 000 on account of one accident, and automobile property damage insurance in an amount not less than $100 , 000 . • e. SCOPE OF INSURANCE AND SPECIAL HAZARD : The insurance required under the above paragraphs shall Provide adequate •protection for the Contractor and his su::-contractors , respectively, against damage claims which may arise from operations under this contra-_, whether such operations be by the insured or by anyone directly or indirectly emiployed by him, ani also against any of the following special hazards which may be encountered in the performance of the Contract. f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the owner with satisfactory proof of cever_;e by insurance required in these Contract Documents in amounts and by carriers sstisfactory to the Owner . ( Sample attached. ) All insurance require:cents made upon the Contractor stall apply to the sub - contractor , should the Prime Contractor ' s insurance not cover the sub-co,:t_actors work coerations. g. LOCAL AGENT FOR INSURANCE AND BONDING : The insurance and bonding companies with whom the Contra-tor ' s insurance and performance, payment, maintenance and all such other bonds are written shall be represented by an agent or agents having an office located within the city 1•imits of the C3-3 City of Fort Worth , Tarrant County, Teras . Each such agent shall be a duly qualified, one upon whom service of process may be had , and must have authority and power to act on behalf of the insurance and/or bonding company to necctiate and settle with the City of Fort Worth, or� any other claims:t, any claims that the City of For= north or other claimant or any property owner who has been damaged , may have against the Contractor , insurance, and/or bonding company. If the local insurance representative is not so empowered by the insurance or bonding ccmpan`ies, then suc:, authority must be vested in a local agent or claims officer residir:c in the Metroplex , the Fort Wcrth-Dallas area. The name of the agent or' agents shall be set forth- on all of such bonds and certificates of insurance. C3 -3 . 12 CONTRACTOR' S OBLIGATIONS : Under the Co n _act, the Contractor shall pay for all materials , labor a::d services when- due. C3 -3 . 13 WEE::LY PAYROLL: A certified copy of e-ach payroll covering payment of wages to all person ercaged in work on the project at the site of the project shall be furnished to the Owner ' s reoresentatve within seven ( 7 ) days after t he close of each payroll period. A copy or copies of the applicable ML..nimuzn wag= rates as set forth In. the Contract Documents shall be kept posted in a cors:_cuous place at the of the project at all times. during the course of the Contract . Copies of the wage rates will be furnished- the Cc:._:actor. by the Owner; however, pcstirg and protection of the wage rates shall be the r=esponsibility of the- Contractor. C3-3 . 14 CONTRACTOR I S CONTRACT ADMINISTRATION: Any Contactor, whether a person , persons , partnership , company , firer. , association , corporation or other who is approved to do business with and enters a. a iC-; --v n� s into a cont_ act with t' for construction of water and/or sanitary sewer facilities, will have or shall establish a fully generational business office within the Fort worth - Dallas metropolitan area . The Contractor shall chase, delegate , or assign this c=:ice ( or he may delegate h: '_ s Pro ; eCt Superintendent ) with full authority to transact all bus ; tress actions required in the performance of the Contract . This local authority shall be :Wade responsible to act for the Contractor in all matters pertaining to the work governed by the Contract whether it be administrative or otherwise and as such shall be empowered , thus delegated and directed, to settle all materia_, labor or other expenditures, all claims against the work or any other C3-3 ( 7 ) matter associated such as maintaining adequate and appropriate insurance or security coverage for the project . Such local authority for administration of the work under the Contract shall be maintained until all business transactions executed as part of the Contract are complete. Should the Contractor ' s principal base of operations be other than in the Fort Worth-Dallas metropolitan area, notification of the Contractor ' s assignment of local authority shall be rade in writing to the Engineer in advance of any work on the project,- all appropriately signed and sealed, as applicable, by the Contractor ' s responsible officers with the understanding that this written assignment of authority to* a local representative shall become part of the project Contract as though boun-d directly into .the project documents . The intent of these recuirements is that all matte=s associated with the Contractor ' s administration , whether it be oriented in furthering the work, or other, be governed direct by local authority. This same recuiretent is imposed on i surance and surety coverage. Should the Cont- actor I slocal re=:esentative �ail to perform to -`he satisfaction. of Engineers = e Encineer, at his sole discretion , may demand that such local representative be replaced and the Engineer may, at. his sole discretion , stop all work until a new local authari.ty satisfactory to the Engineer is assigned . No credit 'of working time will be for periods in which work steppages are in effect for this =eason. C3 -3 . 15 VENUE : Venue of any action hereinund-e: `shall be exclusively in Tarrant County, Texas. C3-3 ( a ) PART C - GENERAL CONDITIONS C4-4 SCOPE OF WORK SECTION C4-4 SCOPE OF WORK C4 - 4 . 1 INTENT OF CONTRACT DOCUMENTS : It is the definite intention of these Contract Documents to prove for a complete , useful project which the Contractor un-�ertakes to construct or furnish , all in full compliance with the requirements and intent of the Contract Documents. It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents , shall do all extra or special work as may be considered by the Owner as necessary to complete the project in a satisfactory and acceptable manner. The Contractor shall, unless otherwise specifically stated in these Contract Doc ments , furnish all labor, tools, ==teria?s, machinery, equipment , special services , and i^c:dentals necessary to the prosecution and completion of the project. C4 -4 . 2 SPECIAL PROVISIONS : Should any work or conditions Which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional proposed work wh '_ ch is not covered by these Contract Doc-u,.ments, then "Special Provisions " covering all such work will be prepared by the Owner previous to the time of -recei-ving bids or proposals for such work and furnis=ed to the 3edder in the form of, Addenda. All such "Special __ovisions" shall be considered to be a part of the Contract Documents just as though they were originally written therein. C-4-4 . 3 INCREAS ED OR DECREASED QUA.ZTITIES: The Ow:;_z reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perforin the work as altered , increased or decreased at the un-: 4.- p=aces. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items. when such changes increase or decrease the original quantity of any item or iters of work to be done or materials to be furnished by -the 25 percent or more , then either pa.ty to the contract shall upon written rea est to the othez malty be entitled to a revised consideration upon that portion of the work above or below the 25 percent of the original quantity stated in the proposal ; such revised consideration to be determined by special agreement or as hereinafter provided for "Extra Work. " No allowance will be made for any changes in anticipated profits nor shall such changes be considered as C4-4 ( 1 ) waiving or invalidating any conditions or prcvis:cns o_` the Contract Documents. variations in quantities of sanitary sewer pipes -in dep4h categories , shall be interpreted herein as applying to the overall quantities or sanitary sewer pipe in each pipe size, but not to the various depth categories. C4-4 . 4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the Owner reserves the right to make such changes in the Contract Documents and* in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, provided such changes do not materially alter the original Contract Documents or change the general nature of the project as a whole. Such changes shall not be considered as waiving or invalidating any condition or provision of the Contract Documents. C4-4 . 5 EXTRA WORX: Additional` work :Wade necessary by changes and . alterations of the Contract Documents or of quantities or for other reasons - for which no prices are provided" in the Contract Documents, shall be defined as "Extra Work" and shall be performed by the Contractor in accordance with these Contract Documents or approved additions thereto; provided, however, that before any extra work is begun a "Change Order" shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the followinc methods: a. Unit -bid price previously approved. b. An acreed lump sum. C. The actual reasonable cost of (1) labor, (2) rental of equipment used on the extra work for the time so used at Associated General Contractors of America current equipment rental rates ; ( 3 ) materials entering permanently into the project, and (4 ) actual cost -of insurance , bonds , and social security as determined by the Owner , plus a fixed fee to be acreed upon but not to exceed 10% of the actual cost of such extra work. The fixed fee is not to include any additional profit to the Contractor for rental of equipment owned by him and used for the extra work. The fee shall be full and complete compensation to cover the cost of superintendence , overhead , other profit, general and all other expense not included in (1 ) , (2 ) , ( 3 ) , and ( 4 ) above . The Contractor shall keep accurate cost records on the form and in the method C4-4 ( 2 ) suggested by the Owner and shall give the Owner access 'Co all accounts , bills , vouche= s , and records relating to the Extra Work. No "Change Order" shall become effective until it has been approved and signed by each of the Contracting paries. No claim for Ext_= Work of ani kind will be allowed unless ordered in writing by the Owner . In case any orders or instructions , either oral or written, appear to the Contractor to involve Extra Work for which he should receive compensation , he shall make written request to the Engineer for written orders authorizing such Extra Work, prior to beginning such work. Should a difference arise as ` to what does or does not constitute Extra Work, or as to the payment the_eo_ , and the yngineer insists upon its per-ormance , the Contractor shall proceed with the work after raking written request for written orders and shall keep ani accurate account of the actual reasonable cost thereof as provided under method ( Item C ) . Claims for extra work will not be paid unless the Contractor shall file his c'_a_m with the Owner within five ( 5 ) days -• before the time for making the first estimate_ after such work is done and unless the claim is supported by sat_sactory vouchers and ce:t_ led payrolls covering all labor and materials expended upon the said Extra Work. The Contractor spall furn= ish the Owner such inSta_lation zeC r f 11 0 s fr the original •sir_ " ii o ' _ o ds o� a d vi_=icn_ �_on �.._ o g_naI Cc,.�_�c:. Doc..m nes -as may be necessary to enable the Owner to prepare for e—manent record a corrected set of plans showing the actual installation. The compensation agreed upon for ' extra work' whetaer or not iniitiated by a ' change order ' shall be a full , complete and final payment for all costs Contractor incurs as a result or relating to the chance or extra work, whether said costs are known , unknown, foreseen or unforeseen at that ti.-me, including without limitation, any costs for delay , extended overhead , ripple or impact cost , or any other effect on changed or uncharged work as a result or the change or extra work. C4- 4 . 6 SCHEDULE OF OPERATIONS : Before commencing any work under this contract, the Contractor shall submit to the Owner and receive the Owner ' s approval thereof, a "Schedule of Operations , " showing by a straight line method the date of commencing and finishing each of the major elements of the contract . There shall be also shown the estimated monthly cost of work for which estimates are to be expected. There C4—S (3 ) .. s hall be presented also a composite graph showing the anticipated progress of construction with the time being plotted horizontally and the percentage of completion plotted vertically. The progress charts shall be prepared on 8-1/2" 'x 11 " sheets and at least five black or blue line prints shall be furnished to the Owner. C4 -4 . 7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES: Within ten (10 ) days prior to submission of first monthly progress payment , the Contractor shall prepare and submit to the Owner for approval six copies of the schedule in which the Contractor proposes to carry on the work, the date c: which he will start the several major activities (includ_ng procureme..^.t of materials, plans, and equipment) and the contemplated dates for completing the same . The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses , the Contractor shall enter on the diacram the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments in contract time approved by the Engineer. Three copies of the uvdated schedule shall be delivered at such intervals as directed by the Owner. As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technical specificaticr_s . Prior to the final drafting of the detailed construction schedule , the Cont-ractor shall review the draft schedule With the Engineer to ensure the Contractor ' s understanding of the contract recu zements . The following guidelines shall be adhered to in preparing the construction schedule: a. Milestone dates and final project completion dates shall be developed to conform to time constraints , sequencing requirements and completion t'me. b. The construction process shall be divided into activities with time durations of approximately fourteen (14 ) days and construction values not to exceed $50 , 000 . Fabrication , delivery 'and submittal activities are exceptions to this guideline. C4-4 ( 4 ) c. Durations shall be in calendar days and normal holidays and weather conditions over the duration of the contract shall be accounted for within the duration of each activity. d. One critical path shall be shown on the construction schedule . e. Float time is defined as the amount of time between the earliest start date and the latest start date of a chain of activities of the CPM cons tructi on schedule. Float time is not for the exclusive use or benefit of either the Contractor or the Owner. f. Thirty days shall be used for submittal review unless ct:.erwise specified. The construction schedule shall as a minimum be divided into general cater:ries as indicated in the Proposal and Technical Specifications and each general category shall be broken down into a;_--tivities in enou--h detail to achieve activities. of approximately fourteen (14 ) days duration. For each general category, the cons t:uct-J on scaec;:__ shall identify all t_a- es or subcontracts whose wo =k is represented by activities that follow the cuidelines of this Section. For each of the trades or subcor.tracts , the construction schedule shall _4- dicate the following -procurements , construction and, c eacceptance activities and events in their logical sequence for ecui:.��ent and materials . 1 . Preparation and transmittal of sub r„ittals . 2 . Submittal review periods . 3% Shop fabrication and delivery. 4 . Erection or _.=tallation. 5 . Transmittal of manufacturer ' s eperat on and maintenance ins uctions . 6 . installed ecu;-ment and materials testing. 7 . Owner ' s operator instruction ( if applicable ) . 8 . Final inspection. C4-4 ( 5 ) 9 . Operational testing. 10 . Final inspection. If , in the opinion of the Owner , work accomplished falls behind that scheduled , the Contractor shall take such action as necessary to improve his progress. In addition, the Owner may require the Contractor to submit- a revised schedule demonstrating his program and proposed plan to make up lag in, scheduled progress and -to insure completion of the work within the contract time. If the Owner finds the proposed plan not acceptable , he may require the Contractor to increase the work force , the construction plant and equipment , the number of work shifts o: the _ overtime operations without additional cost to the Owner. Failure of the Contractor to comply with these recuirerents shall be considered grounds for determination by the Owner that the Contractor is failing to prosecute the work with such diligence as will insure its completion within the time specified. C4-4 ( 6 )