WHEREAS, the City of Fort Worth (City) and A.N.A Consultants,
L.L.0 (Engineer) made and entered into City Secretary Contract No.
27918 (the Contract) which was authorized by the City Council by
M&C C-19186 on the 8th day of August, 2002; and
WHEREAS, the Contract involves engineering services for the
following project:
Water and Sanitary Sewer Replacement Contract 2002, STM-B.
WHEREAS, it has become necessary to execute Amendment No. 1
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated February 18, 2005, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $13, 600 . 00
2 .
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $168, 904 .00
IT SEG 2
R � , YES'.
��a
3 .
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect. ('
EXECUTED on this the day of l� ,
2005, in Fort Worth, Tarrant County, Texas.
f
AT
NO M&C REQUIRED
Marty Hendrix,
City Secretary
APPROVAL RECOMMENDED: APPROVED:
A. Douglas Rademaker, P.E. arc A. Ott
Director, Department of Assistant City Manager
Engineering
A.N.A Consultants, INC.
ENGINEER
By:
Name: Mark N. Assad, P.E.
Vice President
1701 River Run, Ste 610
Fort Worth, TX 76107
APPROVED S,TO FO AND L$GALITY:
a Steinb e
Assistant CPty Attorney
ENGI.FRM(NO M&C)
-2-
1701 River Run
-- Suite 610
coNSULTA, Fort Worth, Texas 76107
(817) 335-9900
Fax (817) 335-9955
February 18, 2005
Rakesh Chaubey, P.E., Project Manager
City of Fort Worth - Department of Engineering
900 Monroe Street, Suite 201
Fort Worth, TX 76102
Re: Amendment No. 3
Water and Sanitary Sewer Replacement Contract 2002, STM-B
Water Project No. PW53-060530176430
Sewer Project No. PS58-070580175840
D.O.E. No. 3702
Dear Mr. Chaubey:
At the request of the city, ANA Consultants was asked to include construction plans for L-525, L-
1594", L-525R, L-525'`and M-63" prepared by Dunaway and Associates in the advertisement for
A. N. A.'s project STM-B. in addition, ANA Consultants was asked to prepare a Storm Water
Pollution Prevention Plan for Peak Street.
This request for additional services is not part of our existing contract and will exceed our current
scope of work for this project. A.N.A. Consultants, L.L.C. is recommending that our current contract
be amended to include this additional service and corresponding fee adjustment. The following
summary for Amendment No. 3 additional services are being presented for your review:
SPECIAL SERVICES:
Revise Construction Plans to Add Unit II Dunaway Assoc. Sewer Plans $ 2,500.00
Revise Specifications (STM-B, DAI) $ 2,500.00
Additional Design Surrey to tie Dunaway coordinate base to STM-13 $ 1,000.00
Coordination and meetings with Dunaway&Assoc. $ 1,000.00
SWPPP $ 5,500.00
Reproduction (DAI) $ 1,000.00
Half Size Prints (4) $ 100.00
SUB-TOTAL $ 13,600.00
The following is a revised Project Fee Summary to include Amendment No. 2:
Original Contract $ 108,200.00
Amendment No. 1 $ 41,204.00
Amendment No. 2 $ 5,900.00
Amendment No. 3 $ 13,600.00
TOTAL $ 168,904.00
7m, TES'.
J.10204301contractlamendmentlAmendment No 3.doc
CLIENT SATISFACTION IS OUR BUSINESS
�A
/`7 V
o—
All current contractual requirements shall apply to Amendment No.3 services. A.N.A. Consultants
is dedicating an additional 10% DBE participation to Hugo C. Trevino and Associates in the amount
of$1,360.00 for additional reproduction services.
If you have any questions or require additional information, please contact me.
Sincerely,
Richard D. Contreras,
Principal
A.N.A. Consultants, L.L.C.
L
J:102O4301contractlamendmentkAmendment No 3.doc
eb 1d Ub 11 : 4be 1
02/19/1994 22:11 6173359955 4 N A CD14SUL7ANTS PAGEAm, EL F1Z
1701 River Run
Suite 610
ceps LIUM at.� Fort Worth,Texas 76107
(817)335-9900
Fax (817)335-9955
February 18, 2005
Mr. Rakeash Chavbey, P,E.
Consultant Services Division
Depariment of Engineering
City of Fort Worth
900 Monroe Strest, Suite 201
Fort Worth,7X 76102-6311
Re: Amendment No. 3
Water and Sanitary Sewer Replacement Contract 2002, STNI-B
DOE No.3702
Water Project No. PW63-08DS30179430
S&wer Project No.PS56-070580175840
Le#t®r of Intent
Dear Mr. Chaubeyy
Please be advised that Trevino and Associates, Inc. will perform additiorml reproduction services
for Amendment No. 3 for the amount of$ 1,360,00 in order to meet our M/WBE goal for the above
referenced project,
Sincerely,
A.NA Consu?tents,L.L.C.
Richard Contreras
Principal Accepted
Trevino and Associates.Inc.
t77 " �- n�'>�
G;44NAFORMS%FW 1wm3UG04-2005V aller ollnfbnf Travl:i02.18-05,do1
CLIENT SATISFACTION IS OUR®US7NESS
+J 1��.��r• I�/1 f ��rJ�y
REQUEST FOR M/WBE PROJECT GOAL
THIS PORTION TO BE COMPLETED BY REQUESTING DEPARTMENT
Check type of project: Construction ✓ Professional other, please explain
Construction Management Design/Build
IS THIS A FEDERALLY FUNDED PROJECT? Yes No
DEPT. NAME: First Advertisement Date:
Second Advertisement Date:
IS THIS A REVISION? Yes No ✓' If yes, enter the revision number
IS THIS A COMBINED PROJECT? Yes No / v/
IS THIS A CHANGE ORDER/AMENDMENT? Yes ./ No If so, enter number
If this is not the initial change order/amendment submit copies of all previous change order/amendments regardless of whether
a M&C was required for funding.
DATE/TIME SUBMITTED TO MNVBE OFFICE: 02 - 09 - 2-OO FS
PROJECT NAME: IzG�-Pi-ACEfv1EMT
C—CNTi2AC`�'f 2� T S i i+�1 I3 Project/DOE#
TOTAL PROJECT ESTIMATE: $ Cc
(Please ATTACH a line item cost breakdown of the requested scope of work)
Name of Design Firm: All A Ca W St I is i M4—t L L P
(Fill in this blank,if this request is for a construction goal)
t;zAyi=sH C'HA0GI=!r EXT.: (,q( 3g2 - 601
PM ORBUYERNAME (PRINTED)
DATE: 09
PM OR BUYER $ 1GNATURE
Check here to acknowledge that if pay item quantities are added to the proposal section after an M/WBE goal has been
provided by the M/WBE Office,the revised proposal must be submitted to the M/WBE Office for review. A compliance
review will not be performed if additional pay items or quantities, which will potentially impact the M/wDBE goal, are
added to the proposal section after the issuance of a M/WBE goal.
Submit a separate Request for a M/WBE goal per major scope of work,unless justification can be provided for the need of only
one(1)contractor.
THIS PORTION TO BE COMPLETED BY D/M/WBE OFFICE
DATE/TIME RECEIVED BY D/MMBE OFFICE:
MMBE PROJECT GOAL:
Comments:
MfWBE Sp c" list: / �� --EXT:
DATE:
SIG WATUREOF P CIALIST Re 06/01/03