Loading...
HomeMy WebLinkAboutContract 31657 U=1-Qii-i1�A� I AMENDMENT NO. 3 STATE OF TEXAS 8 CITY SECRETARY CONTRACT NO.81LC-" � (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and A.N.A Consultants, L.L.0 (Engineer) made and entered into City Secretary Contract No. 27918 (the Contract) which was authorized by the City Council by M&C C-19186 on the 8th day of August, 2002; and WHEREAS, the Contract involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2002, STM-B. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated February 18, 2005, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $13, 600 . 00 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $168, 904 .00 IT SEG 2 R � , YES'. ��a 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. (' EXECUTED on this the day of l� , 2005, in Fort Worth, Tarrant County, Texas. f AT NO M&C REQUIRED Marty Hendrix, City Secretary APPROVAL RECOMMENDED: APPROVED: A. Douglas Rademaker, P.E. arc A. Ott Director, Department of Assistant City Manager Engineering A.N.A Consultants, INC. ENGINEER By: Name: Mark N. Assad, P.E. Vice President 1701 River Run, Ste 610 Fort Worth, TX 76107 APPROVED S,TO FO AND L$GALITY: a Steinb e Assistant CPty Attorney ENGI.FRM(NO M&C) -2- 1701 River Run -- Suite 610 coNSULTA, Fort Worth, Texas 76107 (817) 335-9900 Fax (817) 335-9955 February 18, 2005 Rakesh Chaubey, P.E., Project Manager City of Fort Worth - Department of Engineering 900 Monroe Street, Suite 201 Fort Worth, TX 76102 Re: Amendment No. 3 Water and Sanitary Sewer Replacement Contract 2002, STM-B Water Project No. PW53-060530176430 Sewer Project No. PS58-070580175840 D.O.E. No. 3702 Dear Mr. Chaubey: At the request of the city, ANA Consultants was asked to include construction plans for L-525, L- 1594", L-525R, L-525'`and M-63" prepared by Dunaway and Associates in the advertisement for A. N. A.'s project STM-B. in addition, ANA Consultants was asked to prepare a Storm Water Pollution Prevention Plan for Peak Street. This request for additional services is not part of our existing contract and will exceed our current scope of work for this project. A.N.A. Consultants, L.L.C. is recommending that our current contract be amended to include this additional service and corresponding fee adjustment. The following summary for Amendment No. 3 additional services are being presented for your review: SPECIAL SERVICES: Revise Construction Plans to Add Unit II Dunaway Assoc. Sewer Plans $ 2,500.00 Revise Specifications (STM-B, DAI) $ 2,500.00 Additional Design Surrey to tie Dunaway coordinate base to STM-13 $ 1,000.00 Coordination and meetings with Dunaway&Assoc. $ 1,000.00 SWPPP $ 5,500.00 Reproduction (DAI) $ 1,000.00 Half Size Prints (4) $ 100.00 SUB-TOTAL $ 13,600.00 The following is a revised Project Fee Summary to include Amendment No. 2: Original Contract $ 108,200.00 Amendment No. 1 $ 41,204.00 Amendment No. 2 $ 5,900.00 Amendment No. 3 $ 13,600.00 TOTAL $ 168,904.00 7m, TES'. J.10204301contractlamendmentlAmendment No 3.doc CLIENT SATISFACTION IS OUR BUSINESS �A /`7 V o— All current contractual requirements shall apply to Amendment No.3 services. A.N.A. Consultants is dedicating an additional 10% DBE participation to Hugo C. Trevino and Associates in the amount of$1,360.00 for additional reproduction services. If you have any questions or require additional information, please contact me. Sincerely, Richard D. Contreras, Principal A.N.A. Consultants, L.L.C. L J:102O4301contractlamendmentkAmendment No 3.doc eb 1d Ub 11 : 4be 1 02/19/1994 22:11 6173359955 4 N A CD14SUL7ANTS PAGEAm, EL F1Z 1701 River Run Suite 610 ceps LIUM at.� Fort Worth,Texas 76107 (817)335-9900 Fax (817)335-9955 February 18, 2005 Mr. Rakeash Chavbey, P,E. Consultant Services Division Depariment of Engineering City of Fort Worth 900 Monroe Strest, Suite 201 Fort Worth,7X 76102-6311 Re: Amendment No. 3 Water and Sanitary Sewer Replacement Contract 2002, STNI-B DOE No.3702 Water Project No. PW63-08DS30179430 S&wer Project No.PS56-070580175840 Le#t®r of Intent Dear Mr. Chaubeyy Please be advised that Trevino and Associates, Inc. will perform additiorml reproduction services for Amendment No. 3 for the amount of$ 1,360,00 in order to meet our M/WBE goal for the above referenced project, Sincerely, A.NA Consu?tents,L.L.C. Richard Contreras Principal Accepted Trevino and Associates.Inc. t77 " �- n�'>� G;44NAFORMS%FW 1wm3UG04-2005V aller ollnfbnf Travl:i02.18-05,do1 CLIENT SATISFACTION IS OUR®US7NESS +J 1��.��r• I�/1 f ��rJ�y REQUEST FOR M/WBE PROJECT GOAL THIS PORTION TO BE COMPLETED BY REQUESTING DEPARTMENT Check type of project: Construction ✓ Professional other, please explain Construction Management Design/Build IS THIS A FEDERALLY FUNDED PROJECT? Yes No DEPT. NAME: First Advertisement Date: Second Advertisement Date: IS THIS A REVISION? Yes No ✓' If yes, enter the revision number IS THIS A COMBINED PROJECT? Yes No / v/ IS THIS A CHANGE ORDER/AMENDMENT? Yes ./ No If so, enter number If this is not the initial change order/amendment submit copies of all previous change order/amendments regardless of whether a M&C was required for funding. DATE/TIME SUBMITTED TO MNVBE OFFICE: 02 - 09 - 2-OO FS PROJECT NAME: IzG�-Pi-ACEfv1EMT C—CNTi2AC`�'f 2� T S i i+�1 I3 Project/DOE# TOTAL PROJECT ESTIMATE: $ Cc (Please ATTACH a line item cost breakdown of the requested scope of work) Name of Design Firm: All A Ca W St I is i M4—t L L P (Fill in this blank,if this request is for a construction goal) t;zAyi=sH C'HA0GI=!r EXT.: (,q( 3g2 - 601 PM ORBUYERNAME (PRINTED) DATE: 09 PM OR BUYER $ 1GNATURE Check here to acknowledge that if pay item quantities are added to the proposal section after an M/WBE goal has been provided by the M/WBE Office,the revised proposal must be submitted to the M/WBE Office for review. A compliance review will not be performed if additional pay items or quantities, which will potentially impact the M/wDBE goal, are added to the proposal section after the issuance of a M/WBE goal. Submit a separate Request for a M/WBE goal per major scope of work,unless justification can be provided for the need of only one(1)contractor. THIS PORTION TO BE COMPLETED BY D/M/WBE OFFICE DATE/TIME RECEIVED BY D/MMBE OFFICE: MMBE PROJECT GOAL: Comments: MfWBE Sp c" list: / �� --EXT: DATE: SIG WATUREOF P CIALIST Re 06/01/03