HomeMy WebLinkAboutContract 31957 CITY SECRETARY " D O-E. FILE ,� SPECIFICATIONS ri and CONTRACTORS BONDING CO. CONTRACT DOCUMENTS CONSTRUCTION'S COPY for CLIENT DFPARTNIENT 12Ua4 CAPITAL IMPROVEMENTS PROJECT MINDEN STREET(FROM I.H. 35 SERVICE ROAD TO COLE STREET) IT 1 —WATER IMPROVEMENTS� LNT S CITY SECRETARY Water Project No. P264-541200-60917-0006083 CONTRACT Nd. 3 Department of Engineering No. 4401 File No. X-16148 UNIT 2 —PAVING IMPROVEMENTS Transportation/Public Works No. C200-541200-20940-0006083 Department of Engineering No. 4401 File No. K-1867 in the CITY F FORT WORTH,TEXAS 200 IPP N 460 OF MICHAEL J. MONCRIEF CHARLES R. BOSWELL MAYOR ° CITY MANAGER JAMES,[,*,,, DDTtE 65841 e s FRANK CRUMB, P.E. D : ►��� ��, �a,,' ROBERT D. GOODE, P.E. ACTING DIRECTOR NAL t� DIRECTOR WATER DEPARTMENT ak 5 RANSPORTATION AND PUBLIC WORKS A. DOUGLAS RADEMAKER, P.E., DIRECTOR DEPARTMENT OF ENGINEERING r PREPARED FOR: # CITY OF FORT WORTH, TEXAS DEPARTMENT OF ENGINEERING w , . De0tt@, Inc. "f =r!rarr a!t!r 2553 East Loop 820 Horth Fort Worth,Texas 7611B fax 817-5W86M mvmm deolte,wm 817-58-OW r 2004 .JRIGI L FoRTWORTH WWW4CFWNet1tQrq `*� , Print M&C COUNCIL ACTION: Approved on 5/2412005 -Ordinance #16445-05-2005 DATE: 512412005 REFERENCE NO.: **C-20751 LOG NAME: 30MINDEN4401 CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Adopt Appropriation Ordinance and Authorize the Execution of a Contract with Stabile & Winn, Inc. for Pavement Reconstruction and Water Line Replacements on Minden Street (IH-35 Service Road to Cole Street), DOE 4401 and 2004CIP Project No- 00050 RECOMMENDATION: It is recommended that the City Council: 1- Adopt appropriation ordinance increasing estimated receipts and appropriation in the Water Capital Project Fund in the amount of$128,313.85 from the available funds, 2. Authorize the City Manager to execute a contract with Stabile & Winn, Inc- in the amount of$389,158-05 for pavement reconstruction and water line replacements on Minden Street (I1-1-35 Service Road to Cale Street); and 3. Authorize the transfer of$140,976.75 from the Water and Sewer Operating Fund to the Water Capital Project Fund-, DISCUSSION: On January 13, 2004, (M&C C-19931) the City Council authorized the City Manager to execute an engineering agreement with DeOtte, Inc. for Water and Sanitary Sewer Main Replacement Contract 2003 1NSM-G. This contract included preparation of plans and specifications for water and sanitary sewer replacement including pavement on Minden Street (11-1-35 service Road to Cale Street), Lamont Street (lH-35 Service Road to New York Avenue) and Dickson Street (I H-35 to Evans Avenue). Minden Street is included in the 2004 Capital improvement Bond Program and was advertised separately for construction. Lamont Street and Dickson Street are under design, construction will be advertised in May 2005 and are not included in this contract. The street improvements include pavement reconstruction, construction of standard concrete curb and gutter driveway approaches and sidewalks where shown on the plans and are included in this contract. The Water Department has determined that the deteriorated water lines should be replaced prior to street reconstruction. The project was advertised for bid on January 20, 2005 and January 27, 2005. On February 24, 2005, the following bids were received Bidders Alternate "A" Alternate "6" Alternate "A+C" Alternate"B+C" (HMAC) (Concrete) (Asphalt + Sidewalk) (Concrete+ Sidewalk) Stabile & Winn, Inc. No Bid $358,908.05 No Bid $389,158.05 McClendon Construction Co ,Inc. $362,017.35 $ 365,664.85 $400,517.35 $404,164.85 JLB Contracting, L.P. $ 371,751.26 $ 399,604.56 $409,261.26 $437,114.56 Time of completion is 75 working days. Bids were received on four alternates: • Alternate "A" consists of a pavement of 6-inch hot mix asphalt concrete (HMAC) over an 8-inch lime stabilized subgrade, • Alternate "B" consists of a pavement of 6-inch concrete over 6-inch lime stabilized subgrade_ • Alternate "A + C" consists of asphalt pavement (HMAC} and sidewalks; and • Alternate "B + C" consists of concrete pavement and sidewalks. After reviewing all bid proposals, City staff recommends Alternate "B + C" (concrete pavement with sidewalks) for construction because 1) the use of concrete will result in less maintenance cost over the street's useful life and 2) it includes sidewalks to provide access to a nearby park In addition, Stable & Winn, Inc. bid for Alternate "B + C", which represents the lower of the other three bids submitted. Funding in the amount of$11,369.00 is included for associated water construction survey; project management, pre-construction, material testing, inspection and project close out. The contingency funds to cover change orders for water work total $5,569.043. Funding in the amount of $26,658.00 is required for associated paving and drainage construction survey, project management; pre-construction, material testing, inspection and project closeout. The contingency fund for possible change order for pavement construction is $13,889.00. MIWBE- Stable & Winn, Inc. is in compliance with the City's MANBE Ordinance by committing to 31% MIWBE participation. The City goal on this project is 31%_ The project is located in COUNCIL DISTRICT 9, Mapsco 91 B. FISCAL INFORMATIONICBRTIFICATION: The Finance Director certifies that upon approval of recommendation 1 and the adoption of the appropriation ordinance, funds will be available in the current capital budgets, as appropriated, of the Water and Sewer Capital Project Fund and the Street Improvements Fund. TO Fund/Account/Centers FROM Fund/AccountJCenters 1&2) $128,313.85 1)PE45 538070 0609020 $128313.85 2)P253 531350 609170006052 $2 339.00 33P253. 541240 609170046083 $116.944.85 2)P253 531350 609170006060 $111.00 3J $277 782.20 2)P253 5311350 609170006080 $500.00 2)_P253 533010 609170006081 $111.00 2]P253 531350 609170006082 $440_00 2)P253 541200 609170006083 $116,944.85 2)P253 531350 609170006084 $1,114.00 2)P253 531350 609170006085 $6,683.00 2 P� 531350. 609170006091 $111.00 Submitted for Cita Manager's Office by: Marc Ott(8476) Originating Department Head: A. Douglas Rademaker (6157) Additional Information Contact: A. Douglas Rademaker (6157) _ATTACHMENTS 3.OMinden4401_pdf CITY OF FORT WORTH DEPARTMENT OF ENGINEERING ADDENDUM No. t TO THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR 2004 CAPITAL IMPROVEMENTS PROGRAM MINDEN STREET(FROM W 35W SERVICE ROAD TO COLE STREET) Project No. 40060 Water Project No, P264-541200-60917-0006083 T&PVV Project No. 0200-541200-20940-00060$3 DOE No. 4401 File No. X-16148, K-1857 B10 RECEIPT DATE; February 24, 2005 ISSUED: February 16, 2005 This Addendum No. 1 forms a parr of the Contract Documents reteren ed alcove and modifies the Original Contract Documents and Plants. Acknowledge receipt of this addendum in the space provided below,in the Proposal Secfion of]he Contra Documents(Page E3-Proposal)and on the outer envelope for your bid Failure to acknowledge receipt of this Addendum could subject the bidder to disqualrficaatiion. M WBE Requirernenl:�.: The MIWBE Goal for 130 Aliernale A is 24%of the bid value. The mm/BE Goal for Brit Alternate A and C is 28/0 of the bid value. The MNVEE Goal for Bid Alternate 8 is 271/9 of the bid value. The M/WBE Goal for Bid Alternate B and C is 31%of the bid value. All other provisions and addmdurns,plans,specifications and contract documarim for the project which are not expressly arrended herein shaft remain in full fv�and effect. The Contractor shall acknowledge receipt of this Addendum in the apace provided below, in the Proaesal Section of the Contract Documents(Page 8-Proposal)and on the outer envelope of your bid. Failure to return a signed copy of the addendum with the proposal shall be grounds.for rendering the bid non- responsive_ A signed copy of this addendum shall be placed into the proposal at the time of bid submittal, RECEIPT ACKNOWLEDGED, A.Do s Rademake7P. .,Dire r e Ri P.E,Manger Cnnsuft t Services ADDENDUM UM No. 7 pagQ 1 of 1 ZJZ 'd 9099"9N Wb33NION3 hiO10I NVH1 A0Z ' t?I AOa TABLE OF CONTENTS PART A NOTICE TO BIDDERS COMPREHENSIVE NOTICE TO BIDDERS PART B FORT WORTH MIWBE POLICY BID PROPOSAL: UNIT 1 —WATER IMPROVEMENTS UNIT 2— PAVING IMPROVEMENTS SPECIAL INSTRUCTIONS TO BIDDERS (Water Department) SPECIAL INSTRUCTIONS TO BIDDERS (Transportation & Public Works Department) PREVAILING WAGE RATES (T&PW & Water) PART C GENERAL CONDITIONS (Water Department) PART CA SUPPLEMENTARY CONDITIONS TO PART C— GENERAL CONDITIONS (Water Department) PART D SPECIAL CONDITIONS (Water Department) PART DA ADDITIONAL SPECIAL CONDITIONS (Water Department) PART E SPECIFICATIONS AND DETAILS PROJECT SIGN (Water Department) SILICONE JOINT SEALING SPECIFICATIONS PROJECT DESIGNATION SIGN (Transportation & Public Works Department) SPECIAL PROVISIONS FOR STREET AND STORM DRAIN IMPROVEMENTS (Transportation & Public Works Department) TOC PART F CERTIFICATE OF INSURANCE CONTRACTOR COMPLIANCE WITH WORKERS" COMPENSATION LAW PERFORMANCE BOND PAYMENT BOND MAINTENANCE BOND VENDOR COMPLIANCE TO STATE LAW PART G CITY CONTRACT APPENDIX A STANDARD FIGURES AND DETAILS APPENDIX B TxDOT PERMIT APPENDIX C GEOTECHNICAL REPORT Toc PART A NOTICE TO BIDDERS COMPREHENSIVE NOTICE TO BIDDERS 1 1 1 I '� 1 I � 1 ' NOTICE TO B1llDN:ItS NOTICE TO BIDDERS Sealed proposals for the following: 2005 CAPITAL_IMPROVEMENTS PROJECT MINDEN STREET (FROM I.H. 35 SERVICE ROAD TO COLE STREET) rUnit 1 —Water Improvements Water Project No. P264-541200-60917-0005083 rD.O.E. NO. 4401 Unit 2--Paving Improvements T1PW Project No. C200-541200-20940-0006083 D.O.E. NO, 4441 Addressed to Mr. Charles R. Boswell, City Manager for the City of Fort Worth, Texas will be received at the Purchasing Office until 1:30 p.m., Thursday, February 24, 2005, and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. Plans, Specifications and Contract Documents for this project may be obtained at the Office of the Department of Engineering, Municipal {Office Building, 1000 Throckmorton, Fort Worth, Texas, 76102. One set of plans and documents will be provided For a non-refundable fee of fifty dollars ($50.00). The major work on the above referenced project consist of the following: FUnit I -Water Improvements 1,687 LF 6 to 8-inch Water Pipe Replacement Unit 11 - Paving Improvements 4,700 SY 6-inch H.M.A.C. 'Pavement with 5,600 SY 8-inch Lime Stabilization OR r 5,300 SY 6-inch Concrete Pavement 5,600 SY 6-inch Lime Stabilization AND 3,000 LF 7-inch Reinforced Concrete Curb 4,000 SF 6-inch Reinforced Concrete Driveway C.� 11,000 SF 6-inch Reinforced Concrete Sidewalk Bidders shall not separate, detach or remove any portion, segment of sheets from the contract documents at any time. Bidders must complete the proposat sections and submit the complete specifications book or face rejection of bid as non-responsive. A Pre-Bid Conference will be held on Tuesday, February 15, 2045, at 11 a.m. in the Transportation and Public Works Conference Room, Room 274, 2"d Floor, City Municipal Building, 1000 Throckmorton Street, Fort Worth, Texas. All bidders are encouraged to attend. For additional information concerning this project, please contact Gopal Sahu, P.E., Project Manager, City of Fort Worth, Department of Engineering at (817) 392-7941 or Jim DeOtte, P.E. at (817) 589- 0000. Advertising Dates: January 20, 2005 January 27, 2005 Fort Worth, Texas r NTB - 1 1 COMPREHENSIVE NOTICE TO BIDDERS r r t r r COMPREHENSIVE NOTICE TO BIDDERS Sealed proposals for the following: 2005 CAPITAL IMPROVEMENTS PROJECT MINDEN STREET (FROM I.H. 35 SERVICE ROAD TO COLE STREET) Unit 1 -Water Improvements Water Project No. P264-541200-50917-0006083 r" D.G.E. NO. 4401 Unit 2-Paving Improvements TIPW Project No. 0200-541200-20940-0006053 D.Q.E. NO. 4401 Addressed to Mr. Charles R. Boswell, City Manager for the City of Fort Worth, Texas will be received at the Purchasing Office until 1.30 p.m., Thursday, February 24, 2005, and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers, Plans, Specifications and Contract Documents for this project may be obtained at the Office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton, Fort Worth, Texas 76102 One set of plans and documents will be provided for a non-refundable fee of fifty dollars ($50.00). A Pre-Bid Conference will be held on Tuesday, February 15, 2005, at 11 a.m, in the Transportation and Public Works Conference Room, Room 270, 2,d Floor, City Municipal Building, 1000 Throckmorton Street, Fort Worth, Texas. All bidders are encouraged to attend. All bidders will be require to comply with Provision 5159a of "Vernon's Annotated Civil Statutes of the State of Texas"with respect to the payment of prevailing wage rates and City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13=A- 21 through 13-A-29) prohibiting discrimination in the employment practices. Bid security is required in accordance with Paragraph 2 of the Special Instructions to Bidders. The major work on the above project shall consist of the following: Unit I -Water Improvements I 1,687 LF 6 to 8-inch Water Pipe Replacement Unit 11 - Paving Improvements 4,700 SY 6-inch H.M.A.C. Pavement with 5,600 SY 8-inch lime Stabilization OR 5,300 SY 6-inch Concrete Pavement 5,600 SY 6-inch Lime Stabilization AND 3,000 LF 7-inch Reinforced Concrete Curb 4,000 SF 6-inch Reinforced Concrete Driveway 11,000 SF 6-inch Reinforced Concrete Sidewalk Included in the above will be all other items of construction as outlined in the Plans and f' Specifications. All bidders are urged to become familiar with the entire project regardless of the extent of their bid. CNTB - 1 The City reserves the right to reject any and/or all bids and waive any and/or all irregularities. AWARD OF CONTRACT; No bid may be withdrawn until the expiration of ninety (90) days from the date the MIWBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, andlor the GOOD FAITH EFFORT FORM ("Documentation") as appropriate, is received by the City. The award of contract, if made, will be within ninety (90) days after this document is received, but in no case will the award be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the contract. Bidders shall not separate, detach, or remove any portion, segment(s), or sheets from the contract documents at any time. Bidders most complete the proposal section(s) and submit the complete specifications book or face rejection of bid as non-responsive. The affidavit statement of the City of Fart Worth Minority and Women Business Enterprises Specifications must be submitted with the bid at the time of bid opening. Failure to submit the affidavit statements with the bid shall result in rejection of the bid as being non-responsive. In accordance with the City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBEIWBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and the GOOD FAITH EFFORT FORM WITH Documentation and/or the JOINT VENTURE FORM as appropriate. The documentation must be received by the managing department no later than 5:00 PM, five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non- responsive. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the proposal form. Bids that do not acknowledge receipt of alI addenda may be rejected as being non- responsive. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at (817) 392-7910- For additional information concerning this project, please contact Mr. Gopal Sahu, P.E., Project Manager, City of Fort Worth, Department of Engineering at (817) 392-7941 or Jim DeOtte, P.E. at 817-589-0000. CHARLES R. BOSWELL MARTY HENDRIX CITY MANAGER CITY SECRETARY DEPARTMENT OF ENGINEERING A. DOUG AS RADEMAKE IRECTOR � B � ICK L. TWE. P.E., Manager, Engineering Services I Advertising Dates January 20, 2005 January 27, 2005 Fort Worth, Texas r- CNTB - 2 PART B FORT WORTH MIWBE POLICY BID PROPOSAL SPECIAL INSTRUCTIONS TO BIDDERS (Water Department) SPECIAL INS1'RUC'I IONS TO BIDDERS (T&PW Department) PREVAILING WAGE RATES (T&PW & WATER) ' 1 1 1 1 1 1 1 exovosnL i 1 1 1 1 1 f 1 1 1 ATE *1131, Fa RT WORTH City of Fort Worth Minority and Women Business Enterprise Specifications } SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is$25,000 or more,the NIMBE goal is applicabie. If the total dollar value of the contract is less than$25,000, the M/WBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (MIWBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. MfWSE PROJECT GOALS The City's MBElWBE goal on this project is %of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to comply with the intent of the City's MANBE Ordinance by either of the following: 1. Meet or exceed the above stated MANSE goal,or 2. Good Faith Effort documentation,or; 3. Waiver documentation,or, 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTA-PION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. Subcontractor Utilization Form, if goal is received by 5.00 p.m., five (5) City business days after the bid met or exceeded: opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) Clty business days atter the bid Utilization Form, if participation is less than opening date, exclusive of the bid opening date. statedgoal: 3. Good Faiths Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if no MIWBE participation. opening date,exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid perform all subcontractin suppiierwork: opening date,excIusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed goal. opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S MIWBE ORDINANCE,WILL RESULT 111E THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS Any questions,please contact the MMSE Office at(1317)392-5.104. ATTACHMENT 1A Page 1 of 4 FORT WORTH City of Fort Worth Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: Cheek applicable block to describe prime S-rt-AS%X-S 4- 1�.1� 1rAC . PROJECT NAME: (CalMM/DBE NON-MfWIDBE BID DATE o> �+ �,�►� InPR 1. � �s car` 1 6)r'1; Sgcv- F��. _4, 7 00 City's MI%VBE Project Goal: Prime's WWBE Project 1Jrill2m ion: PROJECT r MI13ER Z % 34 % Doc * DC7 t Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documenta5on, and received by the Managing Department on or before 5:00 p.m. five(5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the MIWBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration, of disquaiitication and will result in the bid being considered non-responsive to bid specifications MIWBEs listed toward meeting the prosect goal must be located in the nine (9) county marItetplace or currently doing business in the marketplace at the time of hid. Marketplace is the geographic arca of Tarrant,Parker,Johnson,Collin,Dallas, Denton,Ellis,Kaufman and Rockwall counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered I51 tier, a payment by a subcontractor to its supplier is COP.sidered tad tier ALL MIWBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bona5de minority or women businesses by the North Central Texas Regional Certification Agency(NCTRCA),or the Texas Department of Transportation (TQC DCT},highway division. Disadvantaged Business Enterprise(DEE)is synonymous withMinorityfWomen Business Enterprise(MJWBE). If hauhng services are utilized,the prime will be given credit as long as the NI/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The N4 WBE may lease trucks from another MIWBE firm,including MIWBE owner-operators,and receive full M/WBE credit. The M/WBE may lease trucks from non-MIWSEs, including owner-operators, but will only receive credit for the fees and commissions earned by the MNVBE as outlined in the lease agreemenL Rev-5130103 t ALTUMTE a _ 777 ��}} ATTACHMENT 1A Primes arc squired to identify AIL subcontractors/suppliem regardless of status,i.e.,Minority,Women and non-MIWBft Please list MJWHE firms first,use additional sheets if necosary. Certiflta@on n (check arse) n SUBCONTRACTORISUPPLIER T Company Name I N T Detail Detail Address W C X M Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax r g a T 0 W E E R ❑ B C T E A ac>x �$3 1,1T"`►�`� c� ' 102� 1-A 0� Std - %+14-jr-0z9"Z. 8)1V - 441 - 0xa-4 xo i caa 7-Llys 5%4\-4-'T6-CV4 s rim, s It3.►l►��t,Tx. 5v�/ i �- 4445 q�Z- tiw�- FaL°fO ~ SOX t21 H } o ARA-1 kkMal 'Tx. 41 5 ,1 • -L-AS-Z.t5 l %to% - Sa tZo,- r'1,,, COG. avw" t \-T-Y, Tx . .Vb 141 �3t� ►-4�5- 4t%570 2140o *1,%, 34r—%A I po - ATTACHMENT 1A FORTWDRTH Page 3 of 4 Primes are required to identify ALL subcontractorslsuppliers,regardless,of status;ire.,Minority,Women and non-WWBEs. Please list MfWBE Firms first,use additional sheds if necessary. L Certification (check one) � SUBCONTRACTOR/SUPPLIER T r Company Name I � T Detail detail Company s M W C X 1 Subcontracting Work Supplies Purchased Dollar Amount AddreTelephorrelFax r g S T o >r E E R C E C T E A Yir.7t�S 5"t'f�$1yt3A�'['1e7w1 ' 914-14 110 rzZ"j i . M y y IRBK I Total Dollar Amount of M,IWBE Subcontractors/Suppliers Total Dollar Amount of Ni on-MI WBE SubcontractorslSuppliers500 Z-I TOTAL DOLLAR =OUNT OF ALL.SUECONTi RACTCRSISUPPLIERS • The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Rearrest for Approval o ChangelAdditivn. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed WWBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide,directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including WW/DBE(s) amngeiments y submitted with the bid, The Offeror also agrees to allow an audit and/or examination of any books,records and files held by their company. The bidder agrees to allow the transmission of interviews with owpe:s,principals, officers,employees and applicable subcontractors/suppliers/contmetors participating on the contract that will substantiate the actual work performed by the MIWIDBE(s)on this contract= by an authorized officer or employee of the City. Any intentional and/or k-nowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not Ims than three (3) years and for initiating action. under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1)year. 260 SI A nzed Signatura Printed signature n I 5� �r�T ���-�-`� �r sa�7Etzs a+••.1 � �sTi rr�-row , Title Contact Nomei7ille(it difrerrnt) B!�a-Zaa`III -G,� - _L09 u Company Name ^� �1 Telephone andfor Fax >c fit�,Iner%c!ers-rne e—wIrZr'!_Cl3Yr^1 Address Ismail Adders S A c,t ta,4\1-1 �c , 1 - 1 M,�su► z� zV 4 s CtyFSra:�7.ip pare i i IL 017 FORT WORTH City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is$25,000 or more,the NUWBE goat is appllcabte. If the total dollar value of the contract is Fess than$25,0003,the MNVBE goal is not applicable. POLICY STATEMENT It is the policy of the City of Fork Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (MfWBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. M1WBE PROJECT GOALS The City's MBENVBE goal on this project is 311 %of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of$25,000 or more, bidders are required to compfy with the intent of the City's MIWBE Ordinance by either of the following: 1. Meet or exceed the above stated M1WBE goal, or 2. Good Faith Effort documentation,or; 3. Waiver documentation,or, 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department,within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 1. Subcontractor Utilizabon Forms,if goal is received by 5:00 p.m., five (5) Clty business days after the bid met or exceeded: opening date, exclusive of tate bid opening date. 2. Goad Faith Effortand Subcontractor received by 5:00 p.m., five (5) City`business days after the bid Utilization Form, if participation is less than opening date, exclusive of the bid opening date. stated goak 3. Goad Faith Effort and Subcontractor received by 5:003 p.m., five (5) City business days atter the bid Utilization f=orm,if no MMBE Participation:_ opening date,exclusive of the bid❑ ning date. 4. Prime Contractor Waiver Form,If you will received by-5:00 p.m., five (5) City business days after the bid erform all subcontractingisu lies woric o ening date,exclusive of tate bid opening date. S. Joint Venture Form, If utlitze a joint venture received by 5:00 p.m., five (5) City business days ager the bid to met or exceed goal. opening date,exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S MNVBE ORDINANCE,WILL RESULT IN THE BIC EYEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS Any questions, please contact the MNVSE Office at(817)392-6104. f �� x. ;1;1 -"w'� L� � .` _ •r� �, , ,`, ,� .It_ r� ATTACHMENT 1A Page I of 4 FoRT"W oRTH City of Fart Worth Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: Check applicable block to describe prime 5-T ra$►Ls + `r,,�1► c. PROJECT NAME: tv!lWIDSE hiC}ta-MIWIL7I3E BID DATE C �tTs+L lr-►pp.v. Ptie� e.1 M%1"'►1>L*JL s�t�... F SS. zN, -LOCS7 City's MAVRE Project Goal: Prime's MAVBE Project Miliaatiou: PROJECT NUMBER Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5.00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the MANBE firm(s) listed in this + utilization schedule, conditioned upon execution of a contract with the City of Fork Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications M/G'irBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant,Parker,Johnson,Collin,Dallas, Denton,Ellis,Kaufman and Rockwall counties, Identify each'bier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered I'tier, a payment by a subcontractor to its supplier is considered 2'°`! tier ALL M/WBEs MUST BE CERTBUD BEFORE CONTRACT AWARD. Certification means t}tose firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency(NCTRCA),or the Texas/Department of Transportation (TX DOT),highway division. Disadvantaged Business Enterprise(DEF,)is synonymous with Minority/Women Business Enterprise(MfWBE). If hauling services are utilized,the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease trucks from another M1WBE firm, including MIWBE owner-operators,and receive full lVjWBE credit. The MIWBE may lease trucks from non-M/WBEs, including owner-operators, but will only receive credit for the fees and commissions earned by the MMBE as outlined in the lease agreement. Rav-613OM " ' PrffiCS ire tittdCl1� Of I c;, Ii3�IT Women mid II01!-M BEiM1 •• Y :. PIC=]istMIWBE firms first use additiaaal streets ifnemnery. Cadmeatlort (check one) a SUBCONTRACTOMSUPPLIER T n Company Name f N TDetail Detail - Address e W c X m Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax r g S R o B E E C T E A &1 Sys E aCyr 1, 1 x. 00 A �1 t3E►1ra,�R � IP � - — Z41►7 t _ -/'f-�'S f �►�Z- - ,\a 96c>x 121 a9H } 000 4, cD�© �1� • "t'�r5-X151 551 D�.+.sr.� k•���, "v,-rI•y- � �. 7,\PM'S. 81�•+-�ErS- c}ssc OG +� 7-4'GO six. TV i ._ C r +•+.} � F-`4io 4��,ti"^'JJ ��hx tJnt •. L ' q_ f M I •Y Primes are ired to identify ALL subcontractorslsu . lie�+re r dlm of status;%e:.Minori Wow u and:non-MIWBEs. .. L 4u f!'� PP �, P,az � ty, Please list MIWBE flnns first,use additional sheets if necessary. Cerliflcation ! r (checkone) r SUBCONTRACTC WSUPPLIER T r Company'Name 1 N T Detail Detail Address a M 1N C x 1 Subcontracting Work Supplies Purchased Dollar Amount TelephonelFax r g B R o y E E C 1 C T E A YKLXf�i] 5'S'+C�91L1'�atFi"«of..� . 13oZ3 Gra;S`^e�'1' f�1.�tiiAl �1�� l.L L q-, Ty. .1; 4 30-&P 3++4 Sty-L130-v7- t r a Total Dollar Amount of MJWBE Subcontractors/SuppliersCA-Z-e>t°Q Total Dollar Amount of Von-;NUVRE Subcontractors/Suppliers -500 [TOTAL iJOLL;R",MUNT OF ALL S€1SCCNTi ACTCRSISUPPLlERS � IV i The Contractor will not make additions, deietions, or substitutions to this =r ied list without the prior approval of the Minority and 'Women Business Enterprise Office ivianager or designee through the submittal of a Regrresr far Approval o ChangelAddrtion. Any unjustified change or delerion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of now the requested change/addition or deletion will affect the committed I QWBE goal. If the detail explanation is not submitted, it will affect the final cornDliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request,complete and accurate information regarding actual work performer) by all subcontractors, including 1VI/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners,principals,officers,employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the MfW/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1)year. i Ld 75-0 >41,4 4-1. ST $L L A riled Slgnat,tro Printed Signature w 1�R>�S I U naT_ _ � ] - -`f' 1-1�,•a i7Errz5 0+�-� e sr,,r*r,�q-rblz Title — Canwrt Namemtle(if different) a Company name Telephone and/or Fax ? 0{ . y��a 3a C) perry,N-i0-n�er-S�n �S+Ab;Ee-win�j.cfl�n Address timail Address CtylssatMOP ~� Date .e .`ass"` _ � i` �r'v �a •h •.{! L %r ^jr�._- '!r`.'�. r Pih esrae rngnned'to ider�fy ALL su6co �rslsuppliar; og $St f7 men end" n-1vU9f BEs: . Please list MIWBE t-ums first:use addidan d,sheets ift ry_ �� Cortiticatlon P (cheat one) c SUBCONTi3ACTORISUPPI.IER T r Company dame I N T Detail Detail Address a M W C X a Subcontracting Work Supplies Purchased Dollar Amount honefFax r Tele T o N p != >` R ❑ t C T f A vZZ7j LL r - 1-4 " Total Dollar Amount of NI UWBE Subcontractors/Suppliers I ZZ Sb 1 � �Q otal Dollar Amount of Non-,YfWBE Subcontractors/Suppliers 106 ()Q'& -� TOTAL COLLA R:P4CUNT 0F,ALL GUECCNTRA'CTORSiSUPPLIERS -S 1C? The Contractor will not make additions, deletions, or substitutions to this c.-.,-tilted list without the prior approva.I or rhe' Minority and Women Business Enterprise Office. Manager or designee through the submittal of a Request far Approval o ChangelAdd&an. Any unjustified change or deletion shalI be a maierial breach of contract and may result:n debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change./addition or deletion ME affect the committed 441WBE goal. If the detail explanation is nor submitted. it will affect the sinal comn5ance determination. By affixing a signature to this form,the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/WADBE(s) arrangements " submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any boobs,records and files held by their company. The bidder agrees to allow the trartsmission of interviews with awners,principals, officers, employees and applicable subcontractors/Supplietslcontrac".ors participating on the contract that will substantiate the actual work performed by the M/WIDBE(s) an this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City worm for a period of not less than three (3) years and for initiating action under Federal, State or Local laws coneeming false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City worst for a period of these not less than one(I)year. Auth ' d SIgnature Printed Signature — 5 �,�1T 1Zsz'^� E•a�7ESZSau.! 5sTiM ?701L ' ride Contact lYameil-Ille of differtnO SMAIL ��.a,� �rac- - $1� al't0 E51=- k_�_4-7_0SR 1 compsap Name Ti elephane aadlor Fax Qr �3&c .Berry ,he.r%der5.cndS- k6;le�•rinn_c _ I Addmw E-mail Address 1 Crtgl51alv2:g - - nate i4 e _ 4 I PR t"�VO I City-of Fort o[th 7-02-J5 POI : 38 {?0T Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the tote! dollar value of the contract is$25,000 or more,the MfWBE goal is applicable. If the total dollar value of the contract is less than $25,000, the M1WBE g02i is not applicable. POLICY STATEMENT It Is the policy of the City of Fort Worth to ensure the full and equitable participatfon by Minority and Women Business Enterprises(MANBE) in the procurement of all goods and services to the City on a contractuaf basis. Ali requirements and regulations stated in the Citys current Minority and Women Business Enterprise Ordinance apply to this bid. MfWBE PROJECT GOALS Ir The City's MB'✓JWBE goal on this project is 2 A- %of the base bld value of the contract. COMPLIANCE TO BID SPECIFICATIONS On City contracts of 525,000 or more, bidders are required to comply with the intent of the City's MIVVBE Ordinance by either of the following: i 1. Meet or exceed the above stated M1WBE goat, or 2. Good Faith Effort documentation, or; 3. Waiver documentation,or, 4. Joint Venture, SUBMITTAL OF REQUIRED f30CUMENTATION W The applicable documents must be received by the Managing Department,within the following times allocated, in order for the entire bid to be considered responsive to the specifications. 'i. Subcontractor Utiiization Form,if goal is received by 5:00 p.m-, five (5) City business days after the bid met or exceeded: opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if participation is less than opening date, exclusive of the bid opening date. stated goai: 3. Good Faith Effort and Subcontractor received by 5:00 p.m,, five (5) City business days after the bid Utilization Form, if no MIWBE participation: opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Forth, If you will received by 5:00 p.m., five (5) City business days after the bid perform all subcontracting/supplier work: opening date,exclusive of the bid openihq date. 5. Joint Venture Form, if utilize a joint venture received by 5.130 p.m., five (5) City business days after the bid to met or exceed goal. opening date,exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S MIWBE ORDINANCE,WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSWE TO SPECIFICATIONS Any questions, please contact the M WBE Office at(a17)392-6104, z. i At ; 1,A ORTW6 Gil Subcontractors/Su ' lieirs Utilization Form PRJW COMPANY NAME: Check applicable bloc lc to describe prime SSt-AtA —E + •r"kwll �MG. PROJECT NAME: NMIDBE NON-MIWfDBE BtT3 DATE 7-n0+} 911-rAL 1�Piz�. k�czo3�cT Mira,vr 4 <—:;x Fr_ep- 2A, Z005` City'r iM AVEE Project Goal: Prime's MIWBE Proltct Ulilianlion: PROJECT NUNFEER L 7k' % % Da'M 0- 1.�44Q i Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fart Worih. The intentional and/or knowing misrepresentation of Facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications i MIWB s listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic uca of Tarrant,Parker,Johnson,Collin,Dallas, Denton,Ellis,Kaufman and Rockwall counties. l Identify each`bier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered I`tier, a payment by a subcontractor to its supplier is considered 2nd tier ALL MJWBEs MUST BE CFRT=D BEFORE CONTRACT AWARD. Certification means those Ems, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency(NCTRCA),or the Texas Department of Transportation(TX DOT),highway division. Disadvantaged Business Enterprise (DBE) is synonymous with MlnoritylWomen Business Enterprise(MIWBE). If hauling services are utilized,the prime will be given credit as long as the N4fWBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The MIWBE may lease trucks from another M/WBE fixzn, including MIWBE owner-operators,and receive full MIWBE credit. The MIWBE may lease trucks from non-MIWBFs, including owner-operators, but will only receive credit for the fees and commissions earned by the MI WBE as outlined in the lease agreement. 1 r 5C3txt03 a , s� *.,.. ,1 «.. �" + J tY� 7br'1 '+' »�A ♦I-V .r * £ ., r �+ ' ` t ' Y ^• a G.+ ^tF fr' A r} ,°r,C °7 r 1 ♦ ,t f'i'r AR - Prime are required to fdentify AI.I.sube-ontractors/supplier%regardless of status;i.e.,Minority,Women and non-M/WBEs .. - Please list MMBE firms first use additional sheets if necessary- t Certivc-atfon N ` (cheek nr,ey - o SUBCONTRACTORISUPPLIER 7 n Company Name i k T Detail Detail Address a M W C X M Subcontracting Work Supplies Purchased Dollar Amount TelephonelFax r B a T p w E E R 0 s C T E A Sty - 44�-4�°Iz G C,efr-C,rX(-�Pr �1 flE1.1�1f■t � {- [0 L r �.totl l .►' SA�..�-7'�Gl� �o►�aT 2 33L1 � t�►.�+.h Ste, � SEr�� LA 145 . 2`- Baa P tiL�t►.�F►`Ks+.S -Tv —4dv01 Z rs. c 4f (D9D 81:j - 7-";5- X151 1 55t�r t7E..xvt•1 1���', t7�a►-�'1•v• � 50 3,►,Iu 114 ►- 65- 46570 215 I:V - 4&5-- a!;- LoFLtw+-+Q j s�+� r r, IR r -t 4 V •. mctsALL .-fes i6 City of Fort Worth Minority and Women Business Enterprise Specifications —CI-5 PCC : 38 OUT SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is$25,000 or more,the MIWBE goal is applicable. If the tots!dollar value of the contract is less than$25,400,the M/ WBE goal Is not applicable. POLICY STATEMENT Itis tate policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (MMIBF) in the procurement of all goods and services to the City on a contractual basis. Alf requirements and regulations stated in the City's current Minority and Worsen Business Enterprise Ordinance apply to this bid. MIWBE PROJECT GOALS The City's MBEIWB'E goal on this project is 311 °fti of the base bid value of the contract, COMPLIANCE TO BID SPECIFICATIONS On City contracts of$125,000 or more, bidders are required to comply with the intent of the City's MAAGE Ordinance by either of the following: 1. Meet or exceed the above stated MIWBE goal, or 2. Good Faith Effort documentation,or; 3. Waiver documentation,or, 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department,within the following times allocated, In order for the endra bid to be considered responsive to the specifications. 1. Subcontractor Utilization Form, if goad Is received by 5:04 p.m., five (5) City business days after the bid met or exceeded: openingdae, exclusive of the bid opening date. _ 2. Good Fa-sth Eftortand Subcontractor received by 5:40 p.m,, five (5) City business days after the bid Utilization Form, if part cipation is less than opening date,exclusive of the bid opening date. stated goal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form,if no MIWBE partici ation: ❑ ening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form,if you will received by 5:00 p.m., five (5) City business days after the bid perform all subcontractingfsupplierwark openifIg date,exclusive of the bid opening date- s. Joint Venture Form, if utiihe a joint venture received by 5.00 p.m., five (5) City business days after the bid to met or exceed goal. opening date,exclusive of the bid opening date, FAILURE TO COMPLY WATH THE CITY'S MIWBE ORDINANCE,WALL RESULT Its THE BID BEING CONStDEFtEE} NON-RESPONSIVE TO SPECIFICATIONS Any questions.please contact the M/WBE Offic€:at(8,171392-6104. R � � L - ,E r.;•' ejamf, _ I ATPACHLAENTTA Page t of FORT•WOR't'H City of Ftprt'North ' Subr-ontractorsiSuppliers Utilization Form OUT PRIME COKPANY NAME. Check applicable Mock to destrihe prime 5T 811r� + WI► 1►�l t�C. PROJECT tYANtE: �� M!WlDSE NON-M1WIDBE BID DATE i Ze�oy Cyq�ITA-+� ��l"IpR-v• �T�-b�"t-CT �Itira�7Er.� ST�' . ��.�s. �� '7.-�a5 City's iNAVBE Project Gaais Prime's MItYBE Projedi Milixaden. PROJECT,NnIBER 3 1 pin 31, 5 % Oat O+ Identity all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to eater into a formal agreement with the MANGE firm(s) listed in this .. utillzation schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications MAVBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant,Parker,Johnson,Collin,Dallas, Denton,Ellis,Kaufman and Rockwall bounties. Identify each'l ier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered I' tier, a payment by a subcontractor to its supplier is considered 2°a ti er ALL MIWBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency(NCTRCA),or the Texas Department of Transportation(TX DOT),highway division. Disadvantaged Business Enterprise (DBE) is synonymous with Minority/Women Business Enterprise(M''4VBE). If hauling services are utilized,the prime will be given credit as long as the N VI BE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease trucks from another MIWBE firm,including MfWBE owner-operators,and receive full N1,'WBE credit. Tine MIWBE may lease trucks from non-MIWBEs, including owner-operators, but will only receive credit for the fees and commissions earned by the M/WBE as outlined in the Iease agreement. - y Rev.5130103 x, - �..7 arm. _„j.cx r .,y�., , a °-" IL } i Y Y f ' FCJ3 k " , prrriics aimquuedt ideamfyALL suhcae�aciaislsrIiei agsr i e,Minotity,'Wnmer►and nan-MIW13E2 PTcase list MiWBE firms use addidorW sbects ifnemssu y. Caniiica lon f (check one) a SUBCONTRACTOWSUPPLIER r Company Name l N T [�etall Detail Address a M W C x m Subcontracting Work Supplles Purchased Dollar Amount r TelephonelFax r B B T $ E E c T E A I M.E. F3�+Q-*a`�• s• -oz`az I �L �7E�CaifL � �.{,tll r• r 8,-z LAO '�xaw-7-l�c.L� Ste.raT LA 4 5 '1'�Z-4 - &Iho7— Pro. aux izT co�w + n� 41 �5D jai Ir - %A 5-z% I rl Ty -31\0 Ty _ O 131 03 00 x {� �iy�'F�'~s+t�_ M2. ��'� N i' �!+ ,ri-�^�F V iJ" .- .. f�1'�e[.r•J+K:,,L•'?y��Vi^a,`-'=,n.�+��� �'�+'�{� Friimesmrt required to rderr*ALL sv6contmcwnd6pp ersr;re�dIessoil~sta i e�if�mrrrityf, 4Vomcn emd•'nan-M1W8FF ="' Please list WWBE fire=s fust*um addidc; 'sheets if ne=ssary_ �T {� Certification (check ane) C SUECONTRACTQRISUPPI_!FR T r N T Detail Detail Company Name ; Address a WC X 1 Subcontracting Work Supplies Purchased Dollar Amount TelephonelFax r B s R o f ` E E C T f A rti~x �J TC491W�Ga� L-!r7+- �.� ,of Tom. �-L�w= 1 '1►4�7" +91- i 5b 0 w rr}fir•►���- 43�►4 8th-�l3v-t,zz3 ,,?.,, +„♦:-'K'''i 0;I ;`� t�"` �"'Pt ":y ik .p;.c''•-� y�:qy. i., x �Sy";;?'x' .yam Y. too Total Dollar Amount of)i VWBE SubcarmactorsfSuppIie-s lZ , 56k Total�oilar Amount of�Ion-�rIf9VSE Suoc4nuactorsJSunpliers � ��(91 COS lR) TOTAL OOLL,A PJACUNT OF ALL SUECONTRACTCRSiSUPPLIERS 72-IB, 515 The Contractor will not maize addidons, deietions, or substitutions to tlhis c---=-ed list without the prior approval of the Minority and Women Business Enterprise Ofl"ice-L'4fanager or designee through the submirtal of a Request for Approval of CTlart;eJAddition. Any unjustified change or deletion shall be arnaterial breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractar shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed lS+IfWBE goal. If the detail explanation is not s-Ubmitted, iti will affect the final comb iance demrurination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate iWformaiion regarding actual work performed by all subcontractors, including WWOBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files lyeld by their company. The bidder agrees to allow the &unsmission of inter-riews with owners, principals, omc:rs, employees and applicable subcontractors/supplierslcorLtactors participating on the contract that will substantiate the actual work performed by the WWIDBE(s) on this corrtmctt by an authorized officer or employee of the City. Any intentional and/or bowing misrepresentation of facts will be grounds for terminating the c:snnact or debarment from City wont for a period of not less than three (3) years and for initiating action uncle: Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a materia] breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1)year. Anih • d gnatura Prertted Signatura — A tet—' 1 — &e5 Title Cantnrf Namemae(irdifferent) 4 G ' Company Meme Teiephone and/or Fax ?address ]`mull Address GtyrS4aw7ag Dare I i K t SPECIAL INSTRUCTIONS TO BIDDERS WATER DEPAR'T'MENT SPECIAL INSTRUCTIONS TO BIDDERS 1) PREQUALIFICATION REQUIREMENTS: All contractors submitting bids are required to be prequalified by the Fort Worth Water Department prior to submitting bids. This prequalification process will establish a bid krait based on a technical evaluation and financial analysis of the contractor. It is the bidders responsibility to submit the following documentation, a current financial statement, an acceptable experience record, an acceptable equipment schedule and any other documents the Department may deem necessary, to the Director of the Water Department at least seven(7)calendar days prior to the date of the opening of bids. a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status to the submitting company. This statement must be current and not more than one (1)year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. b) For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the sarne nature and technical level as that of the project for which bids are to be received. c) The Director of the Water Department shall be the sole judge as to the acceptability for financial qualification to bid on any Fort Worth Water Department project. d) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. e) The City, in its sole discretion, may reject any bid for failure to demonstrate experience and/or expertise. f) Any proposals submitted by a non-prequalified bidder shall be returned unopened, and if inadvertently opened, shall not be considered. g) The City will attempt to notify prospective bidders whose qualifications (financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not he a waiver of any necessary prequalification. 2. BID SECURITY: A cashier's check, or an acceptable bidder's bond, payable to the City of Fort Worth, in an amount of not less than five (5%) percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten (10) days after the contract has been awarded. To be an acceptable surety on the bond, (1) the name of the surety shall be included on the current U.S. Treasury List, or(2)the surety must have capital and surplus equal to ten times the limit of the bond. The surety must be licensed to do business in the state of Texas. The amount of the bond shall not exceed the amount shown on the treasury list or one-tenth(1/10)the total capital and surplus. 3. BONDS; A performance bond, a payment bond, and a maintenance bond each for one hundred (100%)percent of the contract price will be required, Reference C 3-3.7. 4. WAGE RATES; Not less than the prevailing wage rates established by the City of Fort Worth, Texas, and as set forth in the Contract Documents must be paid on this project. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the Stake of Texas. T. NONRESIDENT BIDDERS. Pursuant to Article 601g, Texas Revised Civil Statutes, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business in located. "Nonresident bidder"means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not apply if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: if the bid amount is $25.000.00 or less, the contract amount shall be paid within forty- five(45)calendar days after completion and acceptance by the City. 9, AGE; In accordance with the policy("Policy")of the Executive Branch of the f=ederal Government, Contractor covenants that neither it nor any of its officers, members, agents employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment,discriminate against persons because of their age except on the bases of a bona fide occupational qualification, retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirements. Contractor warrants it witl fully comp;y with the policy and will defend, indemnify and hold City harmless against any claims or allegations asserted by third partieb or subcontractui against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: fn accordance with the provisions of the Americans With Disabilities Act of'199C (`ADV), Contractor warrants that it and any and all of its su bcont,acto rs will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or employees of Contractor or any of its subcontractors. Contractor warrants it will futly comply with ADA's provisions and any other applicable federal, state and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this f" agreement. Revised 5-2001 p+ RE PM rw SPECIA,L INSTRI]CTION TO BIDDERS (T&PW) r i SPECIAL.,INSTRUCTION TO BIDDERS (TRANSPORTATION AND PUBLIC WORKS) r+ 1. BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the City of Fort Worth, in an amount of not less than five(5%)per cent of the total of the bid submitmd must accompany the p„ bid,and is subject to forfeit in the event the successful bidder falls to execute the contract documents within ten(10)days after the contract has been awarded. To be an acceptable surety on the bid bond,the surety must be authorized to do business in the state of Texas. In addition,the surety must(l)hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law;or(2)have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion,will determine the adequacy of the proof required herein. Ila 2. PAYMENT, PERFORMANCE AND MAINTENANCE BONDS: The successful bidder entering �. into a contract for the work will be required to give the City surety in a sum equal to the amount of the contract awarded. In this connection, the successful bidder shall be required to furnish a performance bond and a payment bond,both in a sum equal to the amount of the contract awarded. The form of the bond shall be as herein provided and the surety shall be acceptable to the City. All bonds fumished hereunder shall meet the requirements of Chapter 2253,Texas Government Code. In order for a surety to be acceptable to the City,the surety trust(1)hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein Pb The City will accept no sureties who are in default or delinquent on any bonds or who have an interest in any litigation against the City, Should any surety on the contract be determined unsatisfactory at any time by the City, notice will be given to the contractor to that effect and the contractor shall immediately provide a new surety satisfactory to the City. If the contract amount is in excess of$25,000,a Payment Bond shall be executed, in the amount of the contract, solely for the protection of all claimants supplying labor and materials in the prosecution of the work, If the contract amount is in excess of$100,000, a Performance Bond shall be executed, in the amount of the contract conditioned on the faithful performance of the work in accordance with the plans, specifications, and contract documents. Said bond shall solely be for the protection of the City of Fort Worth. All contracts shall require a maintenance bond in the amount of one hundred percent (100%) of the original contract amount to guarantee the work for a period of two(2)years after the date of acceptance of the project from defects in workmanship and/or material. 10/27/04 1 3. LIQUIDATED DAMAGES:The Contractor's attention is called to Part 1,Item 8,paragraph 8.6,of the"General Provisions"of the Standard Specifications for Construction of the City of Fort Worth, Texas,concerning liquidated damages for late completion of projects. 4. AMBIGUITY:In case of ambiguity or lack of clearness in stating prices in the proposal,the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the proposal. 5. EMPLOYMENT: All bidders will be required to comply with City Ordinance No. 7278 as amended by City Ordinance No.7400(Fort Worth City Code Section 13-A-21 through 13-a-29)prohibiting discrimination in employment practices. 6. WAGE RATES: Section 8.8 of the Standard Specifications For Street and Storm Drain Constriction is deleted and replaced with the following: (a) The contractor shall comply with all requirements of Chapter 2258,Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258,Texas Government Code. Such prevailing wage rates are included in these contract documents. (b) The contractor shall,for a period of three(3)years following the date of acceptance of the work,maintain records that show(i)the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract;and(ii)the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of the special provision titled"Right to Audit"pertain to this inspection. (c) The contractor shatI include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs(a)and(b)above. (d) With each partial payment estimate or payroll period,whichever is less,an affidavit stating that the contractor has complied with the requirements of Chapter 2258,Texas Government Code. (e) The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. Section 8.9 of the'Standard Specifications for Street and Storm Drain Construction is hereby deleted. T FINANCIAL STATEMENT:A current certified financial statement may be required by the Department of Engineering if required for use by the CITY OF FORT WORTH in determining the successful bidder. This statement, if required,is to be prepared by an independent Public Accountant holding a valid permit issued by an appropriate State Licensing Agency. 8. INSURANCE: Within ten(10)days of receipt of notice of award of contract,the Contractor must provide,along with executed contract documents and appropriate bonds,proof of insurance for Worker's Compensation and Comprehensive General Liability(Bodily Injuty-$500,000 each person, $1,000,000 each occurrence($2.,000,000 aggregate limit);Property Damage-$250,000 each occurrence). The City reserves the right to request any other insurance coverages as may be required by each individual project. 9. ADDITIONAL INSURANCE REQUIREMENTS: a. The City,its officers,employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers'compensation insurance policy. 10/27/04 2 OW IM b. Certificates of insurance shall be delivered to the City of Fort Worth,contract administrator in the r respective department as specified in the bid documents, 1000 Throclunorton Street,Fort Worth,TX 76102,prior to commencement of work on the contracted project. c. Any failure on part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein. d. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation,non-renewal,and/or material change in policy terms or coverage. A ten days notice shall be acceptable in the event of non-payment of premium. •� e. Insurers must be authorized to do business in the State of Texas and have a current A.M. Best rating of A:VIl or equivalent measure of financial strength and solvency. .. f. Deductible limits,or self-funded retention limits,on each policy must not exceed$10,000.00 per occurrence unless otherwise approved by the City. g Other than worker's compensation insurance,in lieu of traditional insurance,City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups.The City must approve in writing any alternative coverage, h. Workers'compensation insurance policy(s)covering employees employed on the project shall be endorsed with a waiver of subrogation providing rights of recovery in favor of the City. L City shall not be responsible for the direct payment of insurance premium costs for contractor's p" insurance. j. Contractor's insurance policies shall each be endorsed to provide that such insurance is primary F` protection and any self funded or commercial coverage maintained by City shall not be called upon to contribute to loss recovery, k_ In the course of the project,Contractor shall report,in a timely manner,to City's officially we designated contract administrator any known loss occurrence which could give rise to a liability claim or lawsuit or which could result in a property loss. Contractor's liability shall not be limited to the specified amounts of insurance required herein. m. Upon the request of City,Contractor shall provide complete copies of all insurance policies required by these contract documents. 10. NUNRESTDENT BIDDERS: Pursuant to Article 601g,Texas Revised Civil Statutes,the City of Fort .. Worth will not award this contract to a non resident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. "Nonresident bidder"means a bidder whose principal place of business is not in this state,but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this 0% state. "Texas resident bidder"means a bidder whose principal place of business is in this state, and includes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. 10/27/04 3 r This provision doses not apply if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all non resident bidders in order for its bid PIT to meet specifications. The failure of nonresident contractor to do so will automatically disqualify that bidder. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In a accord with City of Fart Worth Ordinance No. 15534, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, and/or the GOOD FAITH EFFORT FORM ("with Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:04 p.m.,five(5)City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City_ Failure to comply shall render the bid non-responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a minority business enterprise (MBE) and/or women business enterprise (WBE)on the contract and payment thereof. Contractor further agrees to permit any audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation)and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal, State or local laws or ordinances relating to false statements. Further, any such misrepresentation facts (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less that three(3)years. 12. AWARD OF CONTRACT:Contract will be awarded to the lowest responsive bidder.The City reserves the right to reject any and/or all bids and waive any and/or all irregularities. No bid may be withdrawn until the expiration of ninety(94)days from the date the NVW13E UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM,GOOD FAITH EFFORT FORM,and/or the JOINT VENTURE FORM("Documentation")as appropriate is received by the City. The award of contract, if made,will be within ninety(90)days after this documentation its received,but in no case will the award be made until all the responsibility of the bidder to whom it is proposed to award the contract has been verified.. 13. PAYMENT:The Contractor will receive fullretains ayment(minus e) from the City for all work for p g each pay period. Payment of the remaining amount shall be made with the final payment,and upon acceptance of the project. 14. ADDENDA: Bidders are responsible for obtaining all addenda to the contract documents prior to the bid receipt time and acknowledging them at the time of bid receipt. Information regarding the status of addenda may be obtained by contacting the plans desk of the Department of Engineering Construction Division at(817)871-7910.Bids that so not acknowledge all applicable addenda may be rejected as non-responsive. 15. CONTRACTOR COMPLIANCE WITH WORICER'S COMPENSATION LAW: rA.Workers Compensation insurance Coverage a. Definitions: r 10/27/04 4 r 0. Certain of coverage("certificate").A copy of a certificate of insurance,a certificate of authority to self-insure issued by the commission,or a coverage agreement(TWCC-81, TWCC-82,TWCC-83,orTWCC-84),showing statutory worker's compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. OW Duration of the project-includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity, Persons providing services on the project("subcontractor" in §406.096)-includes all persons or entities performing al or part of the services the contractor has undertaken to perform on the project,regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes,without limitation, independent contractors,subcontractors,leasing companies,motor carriers,owner-operators, employees of any such entity,or employees of any entity which furnishes persons to provide services on the project. "Services" include,without limitation,providing,hauling,or delivering equipment or materials,or providing labor,transportation,or toner services related to a project."Services"does not include activities unrelated to the project,such as food/beverage vendors,office supply deliveries,and delivery of portable toilets. b. The contractor shall provided coverage,based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements,which meets the statutory requirements of Texas Labor Code,Section 401.011 (44)or all employees of the contractor providing services on the project,for the duration of the project. c. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract_ d. If the coverage period shown on the contractor's current certificate of coverage ends ^` during the duration of the project,the contractor must,prior to the end of the coverage ' period,file a new certificate of coverage with the governmental entity showing that coverage has been extended. e. The contractor shall obtain from each person providing services on a project,and provide: to the governmental entity: (1) a certificate of coverage,prior to that person beginning work on the project,so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project;and (2) no later than seven days after receipt by the contractor,a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. f. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter g, The contractor shall notify the governmental entity in writing by certified mail or personal delivery,within ten(10)days after the contractor knew or should have known,of any - = change that materially affects the provision of coverage of any person providing services on the project. 10127/04 5 h. The contractor shall post on each project site a notice,in the text, form and manner prescribed)by the Texas Worker's Compensation Commission, informing all persons — providing services on the project that they are required to be covered,and stating how a person may verify coverage and report lack of coverage. 1. The contractor shall contractually require each person with whom it contracts to provide services on a project,to: (I) provide coverage,based on proper reporting on classification codes and payroll +� amounts and filing of any coverage agreements,which meets the statutory requirements of Texas labor Code,Section 401.011 (44)for all of its employees providing services on the project,far the duration of the project; (2) provide to the contractor,prior to that person beginning work on the project,a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project,for the duration of the project; (3) provide the contractor,prior to the end of the coverage period,a new certificate of coverage showing extension of coverage, if the coverage period shown on the current PM certificate of coverage ends during the duration of the project; (4) obtain from each other person with whom it contracts,and provide to the contractor: R` (a) a certificate of coverage,prior to the other person beginning work on the project;and .. (b) a new certificate of coverage showing extension of coverage,prior to the end of the coverage period,if the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retain ail required certificates of coverage on file for the duration of the project and for one year thereafter. (b) notify the governmental entity in wiring by certified mail or personal delivery,within ten(10)days after the person knew or should have known,of any change that materially affects the provision of coverage of any person providing services on the Pam project;and (7) contractually require each person with whom it contracts,to perform as required by paragraphs(1)-(7),with the certificates of coverage to be provided to the person for whom they are providing services. j. By signing this contract or providing or causing to be provided a certificate of coverage. PR the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the project,that the coverage will be based on proper reporting of classification codes and payroll amounts,and that all coverage +' agreements will be filed with the appropriate insurance carrier or, in the case ofe self insured,with the commission's Division of Self-Insurance Regulation_ Providing false or misleading information may subject the contractor to administrative,criminal,civil penalties or other civil actions. ,, 10127104 6 k. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor does not remedy the breach within ten days after receipt of notice of breach r- from the governmental entity, B. The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered,and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules.This notice must be printed with a title in at least 34 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text,without any additional words or changes: P "REQUIRED WORKER'S COMPENSATION COVERAGE" The law requires that each person working on this site or providing services related to this construction project must be covered by worker"compensation insurance,This includes persons providing,hauling or delivering equipment or materials,or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee". Call the Texas Worker's Compensation Commission at 512-440-3789 to receive information on the legal requirement for coverage,to verify whether your employer has provided the required coverage,or to report an employer's failure to provide coverage". 16. NON DISCRIMINATION: The contractor shall not discriminate against any person or persons because of sex,race,religion,color,or national origin and shall comply with the provisions of City Ordinance 7278,as amended by City Ordinance 7404(Fort Worth City Code Sections 13A-21 through .� 13A-29),prohibiting discrimination in employment practices. 17. AGE DISCRIMINATION: In accordance with the policy("Policy")of the Executive Branch of the federal government,contractor covenants that neither it nor any of its officers,members, agents,or employees,will engage in performing this contract,shall,in connection with the employment, advancement or discharge of employees or in connection with the terms,conditions or privileges of their employment,discriminate against person because of their age except on the basis of a bona fide occupational qualification,retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers,members,agents,or employees,or person acting on their behalf,shall specify, in solicitations or advertisements for employees to work on this Contract,a maximum age limit For such employment unless the specified maximum age limit is based upon a bona fide occupational qualification,retirement plan or statutory requirement. Contractor warrants it will fully comply with the Policy and will defend, indemnify and hold City harmless against any and all claims or allegations asserted by third parties against City arising out of Contractor's alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this Contract. 18. DISCRIMINATION DISE TO DISABILITY: fn accordance with the provisions of the Americans with Disabilities Act of 1990("ADA"),Contractor warrants that it will not unlawfully discriminate on the basis of disability in the provision of services to the general public,nor in the availability, terms and/or conditions of employment for applicants for employment with,or current employees of Contractor.Contractor warrants it will fully comply with ADA's provisions and any other applicable federal state and local laws concerning disability and will defend indemnify and hold City harmless against any claims or allegations asserted by third parties against City arising out of Contractor's alleged failure to comply with the above-referenced laws concerning disability discrimination in the performance of this Contract. 10!27104 7 lg_ PROGRESS PAYMENTS,FINAL PAYMCNTPROJE,CT ACCEPTANCE AND WARRANTY: -. a. The contractor will receive tall payment(less retainage)from the city for each pay period. b. Payment of the retainage will be included witif the final payment after acceptance of the project as being complete. c. The project shall be deemed complete and accepted by the City as of the date the final punch list has been completed,as evidenced by a written statement signed by the contractor and the City. d. The warranty period shall begin as of the date that the finai punch list has been completed. e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable. F. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding(i)final quantities,or(ii)liquidated damages, city shall make a progress payment in the amount that city deems due and payable. g. In the event of a dispute regarding either final quantities or liquidated damages,the parties shall attempt to resolve the differences within 30 calendar days. 10/D/04 8 PREVAILING WAGE RATES CITY OF FORT WORTH HIGHWAY CONSTRUCTION PREVAILING WAGE RATE FOR 2000 CLASSIFICATION HOURLY RATE Asphalt Raker $10-32 Asphalt Shoveler $9.75 Batching Plant Weigher $9.65 Carpenter(Rough) $13.64 Concrete f=inisher-Paving $10.16 Concrete Finisher Helper(Paving) $9,70 Concrete Finisher-Structures $13.44 Flagger $7.00 Form Builder-Structures $13.44 Farm Setter-Paving & Curbs $10.25 Form Setter-Structures $3.75 Laborer-Common $7.64 Laborer-Utility $8.64 Mechanic $13.25 Servicer $10.13 Pipe Layer $7.35 Pipe Layer(Helper $6.75 Asphalt Distributor Operator $11.45 Asphalt Paving Machine Operator $11.09 Concrete Paving Saw $10.53 Crane, Clamsheli, Backhoe, Derrick, Dragline, Shovel (< 1 112 CY) $10.00 Crane, Clamsheil, Backhoe, Derrick, Dragline, Shovel (> 1 112 CY) $11.52 Front End Loader(2 112 CY & less) $9.94 Front End loader(over 2 112 CY) $9.32 Milling Machine Operator $8.00 Mixer $11.00 Motor Grader Operator(Fine Grade) $12,31 Motor Grader Operator $13.75 Pavement Marking Machine $11.00 Roller, Steel Wheel Plant-Mix Pavements $9.88 Roller, Steel Wheel Other Fiatwheel or Tamping $12.12 Roller, Pneumatic, Self-Propelled Scraper $8.02 Traveling Mixer $10.00 Reinforcing Steel Setter(Paving) $9.75 Truck Driver-Single Axle(Light) $8.00 Truck Driver-Tandem Axle Sergi-Trailer $10.22 Truck Driver-Lowboy/Float $10.54 Truck Driver-Transit Mix $10.63 Truck Driver-Winch $9.80 r" PART R - PROPOSAL. TO: CHARLES R. BOSWELL CITY MANAGER FOR: 2004 CAPITAL IMPROVE,MENTS PROTECT MINDENow STREET(FROM I.H.35 SERVICE ROAD TO COLE STREET) Unit I —Water Improvements ON Water Project No. P264-541200-64917-0006083 D.O.E. NO. 4401 re Unit 2--Paving Improvements TIPW Project No. C200-541200-20940-0006083 D.O.E. NO. 4401 Pursuant to the foregoing "Notice to Bidders", the undersigned has thoroughly examined the Contract Documents, including plans, Special Contract Documents, and the General Contract Documents and General Specifications for Water Department Projects and Specifications for Public Works Construction, and the site of the Project, understands the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work and furnish all labor, equipment and materials, except as specified to be famished by the City, which is necessary to fully complete all the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the Department of Engineering, City of Fort Worth, Texas, The Contractor must be pre-qualified in accordance with the Water Department of the City of Fort Worth requirements. Upon acceptance of this Proposal by the City Council, the bidder is hound to execute a contract and furnish an approved Performance Bond, Payment rBond, Maintenance Bond and such other bonds, if any, as may be required by the Contractor Documents for the performance and completion of the said work. Contractor proposes to do the work within the time stated and for the following sums, to wit; r Page B-I Unit 1 -Water Improvements PAY APPROX. DESCRIPTION OF ITEMS WITH BiD PRICES UNIT PRICE AMOUNT BID ITEM QUANTITY WRITTEN IN WORDS (Furnish and install complete in place, including all appurtenant work, the following items.) 1 44 L.F. 6-inch Water Pipe in Place* Iw�..�r`� dryer Dollars r-L o Cents $ Z1 $ C I Z 1,643 L.F. 8-inch Wate Pipe in Place* Dollars Cents $ 3 $ 39� 3 4 EA, 6-inch Gate Valve and Box Ftv } �,rrva F�FY'� Dollars aer tro tAti Cents $ 550 $ z� FP 4 7 EA. 8-inch Gate Valve and Bax I F 'A-T ~ u►• o;L Dollars I ,-A 10 ;vents $ r 00 $ - 5 2 TON Ductile Iron Fittings 5► ,r _ Dollars 4 Ce,nts $ 3 0DL1 a` ..+Z-00` 6 47 EA. 1" Tap, Saadle, Corporation Stop and Fittings from Tap to Main _f�w 4�A A o¢.E_p Dollars r1� Cents $ *Contractor must complete City of Fort Worth Approved Product Form on Page B-8 Page B-2 Unit 1 -Water lmprov4ments PAY APPROX. DESCRIPTION OF ITEIViaS WITH BID PRICES UNIT PRICE AMOUNT BID ITEM QUANTITY WRITTEN IN WORDS (Furnish and install complete in place, including all appurtenant work, the following items.) 7 30 L.F. Additional Depth of Water Main (over 4') 8" ID Nt Dollars t.1 a Cents $ 1 $ 0 8 723 L.F. I" Domestic Type "K" Copper Service _i14�g-:TP.F Dollars 010 s-�a Certs $ ` $ 9 5 EA_ Install 1" Assessment Service a Dollars IA11 Cents $ -zoo $ 1" er Q 10 41 EA. Furnish and Set Class "A"° Meter Boxes (for single services) Dollars Cents $ ss 11 3 EA. Furnish and Set Class "B" Meter Boxes (for double services) Dollars 00 rao Cents $ $ x.55 R 12 4 EA. Standard Fire Hydrant Assembly (T-6") S�we7rJDollars Cents $ _� �' $ $D� Page B-3 ~ Unit 1 -Water Improvements ., PAY APPROX. DESCRIPTION OF ITEMS WIT" UID PRICES UNIT PRICE AMOUNT BID ITEM QUANTITY WRITTEN IN WORDS (Furnish and install complete in place, including all appurtenant work, the fallowing items.) 13 12 V.F. Barrel Extension for Fire Hydrant OW N E Dollars 00 , Cents $ 1 $ 2- 14 4 EA. Remove and Salvage Existing Fire Hydrant Dollars t c� Cents $ 3 $k. 15 1,687 L.F- Trench Safety System For DepW-s Greater Than 8 Feet t�1 Dollars F- v e- Cents $ $ '%4 116 20 L.F. Concrete Encasement (Misc. Placement) F•v Dollars afo Cents $ _ $ 1,00 17 2,161 L.F. Temporary HMAC Pavement Repair (Z" HMAC -s V e-r-A Dollars Cents $ �$ 1 18 2 EA. Connect to Existing 8" Water Line Dollars Cents $ 3 C) $ Page H-4 Unit 9 -Water Improvements PAY APPROX. DESCRIPTION OF ITEMS WITH UID PRICES UNIT PRICE AMOUNT BID ITEM QUANTITY WRITTEN IN WORDS (Furnish and install complete in place, including all appurtenant work:, the following items.) 26 1 L.S. Furnish and Lay 2" Pipe and Fittings for Temporary Water Service -' Dollars Cents $ 5, C) $ 5 � 21 64 S.Y. Replacement of Concrete Panels on IH-35W Frontage Road to TxDOT Standard, a-�,c`r-Y Dollars TO— Cents OCents $ tc d $ 3&140 22 5 C.Y Class E (1500#-) Concrete for Misc. Placement rDr Dollars ea a Cents $ l� $ 23 5 C.Y. Class B (25009) Concrete for Misc. Placement ,^1E Dollars o Cents $ _ $ 24 5 C.Y. Crushed limestone as directed by Engineer Dollars 00 Cents $ y $ Page Q-5 Unit `I - Water improvements PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES UNIT PRICE AMOUNT BID ITEM QUANTITY WRITTEN IN WORDS (Furnish and install complete in place, including all appurtenant work, the following items.) 25 5 C.Y. Ballast Stone as directed by Engineer C] " - Dollars Gents $ Unit 'I - Water Improvements Subtotal: $ (VOTE: FORWARD SUBTOTAL TO BID SUMMARY PAGE B-14 r Page D-G LIST OF CAST IRON FITTINGS AS REQUIRED BY E2-7.11A TO BE SUBMITTED WITH BID NO. OF FITTINGS SIZE OF FITTING TYPE OF 'FITTING WEIGHT EACH TOTAL WEIGHT (Inches) FITTING (lbs) (lbs) 4 8x6 Tee 241 964 1 Bx8 Cross 335 335 Contractor shall fill in blanks for "Weight per Fitting" and "Total Weight" as a part of bid (Weight should be based on M.J. Fittings.) Page B-7 2044 Capital Improvements Project Minden Street (from I.H. 35 Service Road to Cale Street) Unit 1 -Water Improvements CITY APPROVED PRODUCT FORM "CONTRACTOR SHALL SELECT TYPE OF PIPE TO BE USED: STANDARD SPEC NO. SIZE E1-24 4" thru 12" (PVC, AWWA C-900) E1-6 4" thru 16" (ID.I.P., Class 51) Consult the"City of Fort Worth Standard Product List"to obtain the Genenc/Trade Number and the Manufacturer for the pipes listed above. Failure to provide the information required above may result in rejection of laid as non- responsive. Only products of methods listed above will be allowed for use in this project. Any substitution shall result in rejection of bid as non-responsive. r r r I Page B-8 Unit 2 -Paving Improvements Base Bid PAY APPROX. DESCRIPTION OF ITEMS WITH BID PRICES UNIT PRICE AMOUNT ITEM! QUANTITY WRITTEN IN WORDS BID (Furnish and install complete in place, including all appurtenant work, the Fallowing iterns.) 1 300 LF Remove and Replace Fence Dollars t-7r Y Cents $ ��� $ , In5 O 2 2,500 C.Y. Unclassified Street Excavation F t V E Dollars o0 ►�o Cents $ 1Z $ 3!c] u0 3 40 C.Y. Borrow Excavation Compacted in Place F Dollars oa 1�2 _ Cents $ 10 �$ 4 718 LF. Remove Existing 6-inch Concrete Curb and Gutter r-� Dollars o Cents $ $ 1 5 4,900 S.F. Remove Reinforced Concrete Driveway, Sidewalk, Leadwalk, Steps,Wheelchair Ramp ►.�E Dollars � 40 Cents $ $ 4,�Dd 6 4,000 S.F. 6-inch Reinforced Concrete Driveway Dollars o� a� [-Ao Cents $ �a $ 000 7 100 S.F. Replace Reinforced Concrete Steps 1�.t Et-"/E Dollars � pO f'A0 Cents $ t r $ 8 10 EA, Concrete Wheelchair Access Ramp Page B-A Unit 2 -Paving Improvements Base Bid PAY APPRD?C_ DESCRIPTION OF ITEMS WITF 311)PRICES UNIT PRICE AMOUNT ITEM QUANTITY WRITTEN IN WORDS BID (Furnish and install complete in place, including all apf:+}tenant wor(, the following items.) r. F 1�Nx T k p akc:) —Dollars o� ao too Cents $ 400 9 700 CY Topsoil Eleven Dollars No Cents $ 11,00 $ 7,700.00 r. 10 2 EA, Project Sign Three Hundred Dollars No Cents $ 300,00 $ 600.00 11 350 LF Full Depth Sawcut for Asphalt or C increte _ ti„Jt o Dollars er t'\Q Cents $ $ 12 1 LS Provide Traffic Control r _Dollars �? as ro --Cents Cents $ Q.Coo�$ $ ©aa 13 1 LS Miscellaneous Utility Adjustment Four Thousand Five Hundred Dollars No Y Cents $ 4,500.00 $_4,500,0[} '14 1 LS Erosion Control(SWPPP) 1 +FI T r~ Dollars ao00 s �e Cents $ 6�0r $ isoo Is 47 EA. Adjust Water Meter Boxes PM ThriU five Dollars .. No Gents $ 35.00 $ 1,645.00 _ 16 }1 EA. Adjust Water VaRl 9s, t Unit 2- Paving ImprovHnents Base Bid PAY APPROX. DESCRIPTION OF ITEMS WITV 3ID PRICES UNIT PRICE AMOUNT ITEM QUANTITY WRITTEN IN WORE.3 BID [Fur-nish and install complete lri place, including all app.,tenant work,the fallowing items y Two Hundred Fifty DiDilars No ,Cents $ 2.50.00 $ 2,750.00 17 60 TN I-IMAC Transition Pavement DOE }�ua�s�-�� Dollars 2�2- gp IA _Cents $ lQ() $�o'Dfl Unit 2 -Paving Improvements BaseBid �' Pavement Suhtott":l: $ NOTE: FORWARD SUBTOTAL.TO BID .­JMMARY PAGE B-15 i 1 i Paye tr-tr Unit 2 -Paving Improvements Alternative Bid A - H.M.A.C. Pavement PAY APPROX. DESCRIPTION OF ITEMS WITH BIC] PRICES UNIT PRICE AMOUNT ITEM QUANTITY WRITTEN IN WORDS BID (Furnish and install complete in place, including all appurtenant work, the fallowing items.) 1A 4,800 SY 6-inch HMAC Pavement 1�k[. 1 c—) Cents $ 1)C) $ (_ 2A 5,600 SY 8-inch Lime Stabilized Subgrade(40#1SY) t� Dollars Cents $ ot, $ t)i c) 3A 120 TN Lime for Stabilized Subgrade Dollars Cents $ ?-Iv + $ o t Q 4A 3,200 L.F. Standard 7-inch Concrete Curb and Gutter 'ttiL� ] ► 4-] Dollars Cents $ �� _$ o i 5A 1,485 SF 7-inch Reinforced Concrete valley Gutter 8' Wide Dollars Cents $ { +0 $ Unit 2 - Paving Improvements Alternative Bid A - 1 , H.M.A.C. Pavement Subtotal: $ �0 ! -- NOTE; FORWARD SUBTOTAL TO BID SUMMARY PAGE B-15 Poge B-12 Unit 2-Pawing Improvements Alternative Bid B-Concrete Pavement PAY APPRO][_ DESCRIPTION OF ITEMS WITH BID PRICES UNIT PRICE AMOUNT ITEM QUANTITY WRITTEN IN WORDS BID (Furnish and install complete in place, including all appurtenant work,the following items.) 1B 5,300 S.Y. 6-inch Concrete Pavement Installation T Dollars 12- con Cents $ Z.Z~ $ 2B 5,600 SY 6-inch Lime Stabilized Subgrade 0 Dollars � wv t-� -Cents $ l $ �'t�_ 313 80 TOM Lime for Stabilized Subgrade(28#per SY) dollars _ t 0 Cents $D $ 'B000- 413 3,200 L.F. Install 7-inch Reinforced Integral CL.rb - \,-A r7 Dollars as 11\0 -- Cents $ � $ 10 59 110 S.Y. Install 7-inch Reinforced Concrete Valley Gutter Dollars tv E- Cents $ Z $Z,'�' � 88 6,500 L.F. Silicone Joint Sealant Q+h-i � �Dollars po no o Cents $ l01 5 too Unit 2-Paving Improvements � Alternative Bid B- Concrete Pavement Subtotal: $L --� 9 b NOTE= FORWARD SUBTOTAL TO BID SUMMARY PAGE IB-'15 Frage 8-13 Unit 2- Paving Improvements Alternative Bid C -Sidewalk PAY APPROX. DESCRIPTION OF !TENS WITH BID PRICES UNIT PRICE AMOUNT ITEM QUANTITY WRITTEN IN WORDS BID (Furnish and install complete in place,including all appurtenant work, the following items.) 1C 11,000 SF Install 4-inch Reinforced Concrete SldeVvalk Tti,A-o Dollars X1'4 r-- Cents $ Z— $ Unit 2C -Sidewalk Improvements Alternative Bid C - a� Sidewalk Subtotal: $ NOTE: FORWARD SUBTOTAL TO BID SUMMARY PAGE BA5 Page 8-N BIC SUMMARY 2004 Capital Improvements Project Minden Street from I.H. 35 Service Road to Cole Street TOTAL ALTERNATE"A"Water Improvements Unit 1 $ tAC� ( b Paving Base Bid Unit 2 $A �� HMAC Pavement Alt."A" $ I-V-' TOTAL BILI AMOUNT $—AC) TOTAL ALTERNATE"B"Water improvements Unit 1 $�4 4a Paving: Base Bid Unit 2 $ -tao Concrete Pavement Aft."B" $ �' q� oS TOTAL Blit AMOUNT $ �a'ib TOTAL ALTERNATE"C"Concrete Sidewalks $ � Z,au GRAND TOTAL OF BID SUMMARY: ALTERNATE"A" $ b ALTERNATE "A" &"C" $ ALTERNATE"B" $ 5 ao �_ ©5' ALTERNATE"B" & "C" $ 339 15 Page fi-i5 r This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.44 (F)of the Texas Limited Sales, Excise and Use Tax Act. Taxes, All equipment and materials not consumed by or incorporated into the project construction are subject to State sales taxes under House Bill 11, enacted August 15, 1991. The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Cade Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. ps The undersigned agrees to begin construction within 10 calendar days after issue of the work order, and to complete all work covered by these contract documents within seventy five (75} Working Days from and after the date for commencing work as set forth in the Written Work order to be issued by the Owner, and to pay not less than the "Prevailing Wage Rates for Street, Drainage and Utility Construction" as established by the City of Fort Worth, Texas. Within ten(10) days of receipt of notice of acceptance of this bid, the undersigned will execute the formal contract and will deliver an approved Surety Bond and other such bonds as required by the Contract Documents, for the faithful performance of this contract. The attached bid security in the amount of 5% is • to become the property of the City of Fort Worth, Texas, or the attached Bidder's Bond is to be forfeited in the event the contract and bond or bonds are not executed and delivered within the time above set forth as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certifies that he has obtained at least one set of the General Contract Documents and General Specifications for Water Department Projects dated .January 1, 1978 and that he has read and thoroughly understands all the requirements and conditions of those General Documents, and the specific Contract Documents and appurtenant plans. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Nonresident bidders in the State of , out principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. Page B-16 ta MLR ti. I (We), acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration in preparation of the foregoing bid: Addendum No. l (Initial) Addendum No. 3 (Initial) Addendum No. 2 (Initial) Addendum No. 4 (Initial) Respectfully Submitted, )V'X C. Company me ew B w ?'Q, Qo 3190 -}C-,Ir•lr� –F)e- ice (SEAL) r Date; _ �..�a.% ZOO r Page 8-17 PART C GENERAL. CONDITIONS PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER, 1, 1987 TABLE OF CONTENTS Cl-1 DEFINITIONS C1-1. 1 Definition of Terms Cl-1 (1) Cl-1. 2 Contract Documents C1-1 (1 ) C1-1. 3 Notice to Bidders Cl-1 ( 2 ) C1-1. 4 Proposal C1-1 (2 ) C1-1. 5 Bidder Cl-1 (2 ) C1-1. 6 General -Conditions Cl-1 (2 ) C1-1.7 Special Conditions Cl-1 ( 2) C1-1. 8 Specifications Cl-1 ( 2 ) C1-1. 9 Bond Cl-1 (2 ) C1-1. 10 Contract Cl-1 (3 ) CI-1. 11 Plans Cl-1 (3 ) C1-1. 12 City Cl-1 ( 3 ) C1-1.13 City Council Cl-1 (3 ) C1-1. 14 Mayor Cl-1 (3 ) C1-1. 15 City Manager C1-1 (3 ) C1-1. 15 City Attorney Cl-1 ( 3 ) C1-1. 17 Director of Public Works Cl-1 (4 ) C1--1 . 18 Director, City Water Department Cl-1 (4 ) Cl-1. 19 Engineer C1--1 (4 ) C1-1. 24 Contractor C1-1 (4 ) Cl-1. 21 Sureties Cl-1 ( 4 ) C1-1. 22 The Work or Project Cl-1 (4 ) C1-1. 23 Working Day CI--1 (4 ) C1-1. 24 Calendar Day Cl-1 ( 4 ) C1-1. 25 Legal Holiday C1-1 ( 4 ) C1-1. 26 Abbreviations Cl-1 (5 ) C1--1. 27 Change Order C1-1 (6 ) C1-1. 28 Paved Streets and Alleys Cl-1 (6 ) C1--1. 23 Unpaved Streets and Alleys Cl-1 (5 ) C1-1. 30 City Streets Cl-1 (6) C1-1. 31 Roadway Cl-1 (6 ) C1-1. 32 Gravel Street C1-1 (6 ) C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2 . 1 Proposal Form C2-2 ( 1 ) C2-2 . 2 Interpretation of Quantities C2-2 (1) C2-2. 3 Examination of Contract Documents and Site C2--2 ( 2) r C2-2. 4 Submitting of Proposal C2-2 ( 3 ) C2-2. 5 Rejection of Proposals C2-2 (3 ) C2-2. 6 Bid Security C2-2 (3 ) (1 ) C2-2 . 7 Delivery of Proposal C2-2 ( 4 ) C2-2. 8 Withdrawing Proposals C2-2 ( 4 ) C2-2. 9 Telegraphic Modification of Proposals C2-2 ( 4 ) C2-2 . 10 Public Opening of Proposal C2-2 ( 4 ) C2-2 . 11 Irregular Proposals C2--2 (4 ) ^! C2-2.12 Disqualification of Bidders C2-2 (5 ) C3-3 AWARD AND EXECUTION OF DOCUMENTS C3-3 .1 Consideration of Proposals C3-3 (1 ) C3-3 . 2 Minority Business Enterpise Women-Owned Business Enterprise compliance C3-3 (1 ) C3-3 . 3 Equal Employment Provisions C3-3 ( 1 ) C3--3 . 4 Withdrawal of Proposals C3-3 (2 ) C3-3 .5 Award of Contract C3-3 (2 ) C3-3 .6 Return of Proposal Securities C3-3 (2 ) l C3-3.7 BoieuS C3-3 ( 2) C3-3 .8 Execution of Contract C3--3 (4 ) C3--3 . 9 Failure to Execute Contract C3-3 (4 ) , C3-3 .10 Beginning Work C3-3 (4 ) l� C3-3 .11 Insurance C3-3 (4 ) C3-3 . 12 Contractor 's Obligations C3-3 (7 ) C3-3 .13 Weekly Payroll C3-3 (7 ) C3-3. 14 Contractor ' s Contract Administration C3-3 (7 ) C3-3.15 Venue C3-3 (8 ) C4-4 SCOPE OF WORK C4-4. 1 Intent of Contract Documents C4-4 ( 1 ) C4-4, 2 Special Provisions C4-4 ( 1 ) 1 � C4-4. 3 Increased or Decreased Quantities C4-4 ( 1 ) C4-4.4 Alteration of Contract Documents C4--4 (2 ) C4-4 . 5 Extra Work C4-4 (2 ) C4-4. 6 Schedule of Operations C4-4 ( 3 ) C4-4. 7 Progress Schedules for Water and Sewer Plant Facilities C4-4 ( 4 ) � fl� C5-5 CONTROL OF WORK AND MATERIALS ` C5-5.1 Authority of Engineer C5-5 (1 ) C5-5 . 2 Conformity with Plans C5-5 ( 1) C5-5. 3 Coordination of Contract Documents C5-5 ( 2) , C5-5. 4 Cooperation of Contractor C5-5 ( 2 ) C5-5 . 5 Emergency and/or Rectification Work C5-5 ( 3 ) C5-5. 6 Field Office C5-5 ( 3 ) C5-5 .7 Construction Stakes C5--5 ( 3 ) C5-5 , 8 Authority and Duties of Inspectors C5-5 ( 4 ) C5--5 .9 Inspection C5-5 (5 ) C5-5.10 Removal of Defective and Unauthorized Work C5-5 (5 ) CS-5. 11 Substitute Materials or Equipment C55 ( 5 ) C5--5 . 12 Samples and Tests of Materials C5-5 ( 6 ) C5-5 . 13 Storage of Materials C5-5 ( 6 ) C5-5 . 14 Existing Structures and Utilities C5--5 (7) C5-5 . 15 Interruption of Service C5-5 (7 ) C5-5. 16 Mutual Responsibility of Contractors C5-5 ( 8 ) C5-5 . 17 Cleanuo CS-5 ( B ) C5-5 . 18 Final Inspection C5-5 ( 9 ) (2 ) �� C6--6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6 .1 Laws to be observed C6-6 (1 ) C6-6. 2 Permits and Licenses C6-6 (1 ) C6-6 . 3 Patented Devices , Materials and Processes C6--6 (1 ) C6-6. 4 Sanitary Provisions C6--6 ( 2) C6-6 . 5 Public Safety and Convenience C6-6 ( 2 ) C6-6. 6 Privileges of Contractor in Streets, PW Alleys, and Right-of-Way C6-6 ( 3 ) C6-6. 7 Railway Crossings C6-6 (4 ) C6-6.8 Barricades, Warnings and Watchmen C6-6 ( 4 ) PM C6-6.9 Use of Explosives, Drop Weight, etc. C6-6 ( 5) C6-6.10 Work Within Easements C6-6 ( 6 ) C6-6.11 Independent Contractor C6-6 ( 8 ) C6-6 .12 Contractor ' s Responsibility for ■0 Damage Claims C6-6 (8 ) C6-6. 13 Contractor ' s Claim for Damages C6-6 (10) C6-6. 14 Adjustment of Relocation of Public Utilities, etc. C6-6 ( 10 ) C6--6. 15 Temporary Sewer Drain Connections C6-6 (10 ) C6-6,16 Arrangement and Charges of Water Furnished by City C6-6 (11 ) C6-6. 17 Use of a Section of Portion of the Work C6-6 (11 ) C6--6. 18 Contractor ' s Responsibility for Work C6-6 ( 11 ) C6-6. 19 No Waiver of Legal Rights C6-6 ( 12) C6-6 . 20 Personal Liability of Public Officials C6-6 (12) C6-6. 21 State Sales Tax C6-6 ( 12 ) C7-7 PROSECUTION AND PROGRESS C7-7. 1 Subletting C7-7 (1 ) C7-7. 2 Assignment of Contract C7-7 ( 1 ) C7-7. 3 Prosecution of the Work C7-7 (1) C7-7. 4 Limitations of operations C7-7 ( 2) C7-7 . 5 Character of Workman and Equipment C7-7 (2 ) C7-7. 6 Work Schedule C7-7 ( 3 ) •. C7--7 . 7 Time of Commencement and Completion C7-7 (4 ) C7-7. 8 Extension of time of Completion C7-7 ( 4 ) C7-7 . 9 Delays C7-7 ( 4 ) C7-7 . 10 Time of Completion C7-7 ( 5 ) C7-7, 11. Suspension by Court Order C7-7 (6 ) C7-7 . 12 Temporary Suspension C7-7 (6 ) C7--7.13 Termination of Contract due to National Emergency C7-7 (7 ) C7-7. 14 Suspension of Abandonment of the Work and Annulment of Contract C7-7 (7 ) C7--7. 15 Fulfillment of Contract C7--7 ( 9 ) C7-7-.16 Termination for Convenience of the Onwer C7-7 (10 ) C7-7.17 Safety Methods and Practices C7-7 (13 ) C8-8 MEASUREMENT AND PAYMENT CB-B. 1 Measurement of Quantities C8-8 ( 1 ) C8-8 . 2 Unit Prices C8-B (1 ) (3 ) C8-8 . 3 Lump Sunt C8-8 ( 1 ) uI C8-8 . 4 Scope of Payment C8-8 (1 ) C8-8 . 5 Partial Estimates and. Retainage C8-8 ( 2 ) C8--8. 6 Withholding Payment C8-8 (3 ) C8-8 . 7 Final Acceptance C8-8 ( 3 ) C8-8 . 8 Final Payment C8-8 ( 3 ) C8-8 . 9 Adquacy of Design C8-8 ( 4 ) ` C8--8 . 10 General Guaranty C8-8 ( 4 ) C8-8 . 11 Subsidiary Work C8-8 ( 5 ) C8-8 . 12 Miscellaneous Placement of Material C$--8 (5 ) C8-8 . 13 Record Documents C8-8 ( 5 ) 1i i ( 4 ) FART C - GENERAL CONDITIONS C1-1 DEFINITIONS SECTION Cl-1 DEFINI'T'IONS C1-1 . 1 DEFINITIONS OF TERMS : Whenever in these Contract Documents the following terms or pronouns in place of them are used , the intent and meaning shall be understood and interpreted as follows : C1-1 . 2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents , such as specifications , bonds , addenda , plans , etc . , which govern the terms and performance of the contract . These are contained in the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS : The General Contract Documents govern all Water Department Projects and include the following items : PART A -- NOTICE' TO BIDDERS ( Sample) White PART B - PROPOSAL ( Sample) White i PART C - GENERAL CONDITIONS (CITY) Canary Yellow ( Developer ) 'Brown PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATIONS El-White E2--Golden Rod E2A-White PERMITS/EASEMENTS Blue PART F - BONDS ( Sample) White PART G - CONTRACT ( Sample ) White b. SPECIAL CONTRACT DOCUMENTS : The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A - NOTICE TO BIDDERS (Advertisement) Same as above C PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS f PART E -- SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT PART H - PLANS (Usually bound separately) h C1-1 ( 1 ) C1--1 . 3 NOTICE TO BIDDERS : All of the legal publications either actually published in public advertising mediums or j furnished direct to interested parties pertaining t❑ the work contemplated under the Contract Documents constitutes the notice to bidders . I � k C1-1 . 4 PROPOSAL: The completed written and signed offer or II tender of a bidder to perform the work which the Owner desires { to have done, together with the bid security, constitutes the ! � Proposal , which becomes binding upon the Bidder when it is officially received by the owner , has been publicly opened and read and not rejected by the owner. C1-1 . 5 BIDDER : Any person , persons , firm , partnership , company, association, corporation, acting directly or through f a duly authorized representative , submitting a proposal for performing the work contemplated under the Contract Documents , constitutes a bidder. C1-1 . 6 GENERAL CONDITIONS : The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure , the local statutes , and requirements of the City of fort Worth ' s charter and promulgated ordinances . � - Wherever there may be a conflict between the General Conditions and Special Conditions , the latter shall take precedence and shall govern. r _7 7 gP_RrTAT. rOMTITTTnNC • nrni ai ^^ r i i n�nc � rr� the specific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions . When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1 . 8 SPECIFICATIONS : The Specifications is that section or part of the Contract Documents which sets forth in detail the requirements which must be met by all materials, construction, workmanship , equipment and services in order to render a completed and useful project . Whenever reference is made to standard specifications , regulations , requirements , statutes , I. etc . , such referred to documents shall become a part of the Contract Documents just as though they were embodied therein . C1-1 . 9 BOND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and CI-1 ( 2 ) F faithful performance of the contract and include the following : a. performance Band (see paragraph C3-3 . 7 ) b. Payment Bond (see paragraph C3-3 . 7 ) C. Maintenance Bond (see paragraph C3-3 .7 ) d. Proposal or Bid Security (see Special Instructions to Bidders, Part A and C2--2. 6 ) C1-1 . 10 CONTRACT: The Contract is the formal signed agreement between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents . C1-1. 11 PLANS : The plans are the drawings or reproductions therefrom made by the Owner' s representative showing in detail the location , dimension and position of the various elements of the project , including such profiles , typical cross-sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as the owner may issue to clarify Cather drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner . The plans are usually bound separately from other parts of the Contract Documents , but they are a part of the Contract Documents just as though they were bound therein. C1--1 . 1.2 CITY : The City of Fort Worth , Texas , a municipal corporation , authorized and chartered under the Texas State Statutes , acting by and through its governing body or its City Manger , each of which is required by charter to perform specific duties . Responsibility for final enforcement of e Contracts involving the City of Fort Worth is by Charter vested in the City Manager . The terms City and owner are synonymous. CI- 1 . 13 CITY COUNCIL : The duly elected and qualified governing body of the City of Font Worth, Texas . Cl-1 . 14 MAYOR : The officially elected Mayor , or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. C1--1 . 15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth , Texas , or his duly authorized representative. C1-1 . 16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth , Texas , or his duly authorized representative. r Cl-1 ( 3 ) � P 1i 1 ! C1-1 . 17 DIRECTOR OF PUBLIC WORKS: The duly appointed official 4 of the City of Fort Worth , referred to in the Charter as the City Engineer , or his duly authorized representative. C1--1 . 18 DIRECTOR , CITY WATER DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort Worth , Texas , or his duly authorized representative , � - assistant, or agents. C1-1 . 19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department , or their duly authorized assistants , agents , engineers , inspectors , or superintendents , acting witiiitt the scope of the particular duties entrusted to them. ,. Cl--1 . 20 CONTRACTOR : The person , persons , partnership , company, firm, association , or corporation , entering into a contract with the Owner for the execution of the work, acting directly or through a duly authorized representative . A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor , supplying labor and materials or only labor, for work at the site of the project. C1- 1 . 21 SURETIES : The Corporate bodies which are bound by such bonds are required with and for the Contractor . The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therein. IIL . L L THE Wunri OR PROJECT: The completed work contemplated in and covered by the Contract Documents , including but not limited to the furnishing of all labor , materials , tools , equipment , and incidentals necessary to produce a completed and serviceable project. C1-1 . 23 WORKING DAY : A working day is defined as a calendar day, not including jaturdays , Sundays , and legal holidays , in which the weather or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven ( 7 ) hours between 7 : 00 a . m. and 6 : 00 p . m . , with exceptions as permitted in paragraph C7-7 . 6 . C1-1 . 24 CALENDAR DAYS : A calendar day is any day of the week or month , no days being excepted. Cl-1 . 25 LEGAL HOLIDAYS : Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City employees as follows : f� Cl-1 ( 4 ) �� OR w 1. New Year 's Day January 1 2. M. L. King, Jr. Birthday Third Monday in January 3. Memorial Day Last Monday---in May 4 . Independence Day July 4 5. Labor Day First Monday in September 5. Thanksgiving Day Fourth Thursday in November 7. Thanksgiving Friday Fourth Friday in November 8. Christmas Day December 25 9. Such other days in lieu of holidays as the City Council may determine When one of the above named holidays or a special holiday is declared by the City Council , falls on Saturday, the holiday shall be observed on the preceding Friday or if it falls on Sunday, it shall be observed on the following Monday , by those employees working on working day operations . Employees working calendar day operations will consider the calendar holiday as the holiday. C1-1 . 25 ABBREVIATIONS : Wherever the abbreviations defined herein appear in Contract. Documents , the intent and meaning shall be as follows: AASHTO -- American Association of MGD - Million Gallons Per •� State Highway Transportation Day officials ASCE - American Society of Civil CFS - Cubic Foot per - Engineers Second LAW In Accordance With ASTM - American Society of Min. -- Minimum Testing Materials Mono.-- Monolithic AWWA - American Water Works % - Percentum Association R - Radius ASA - American Standards Association I .D. - Inside Diameter HI - Hydraulic Institute D . D . - Outside Diameter Asph. -- Asphalt Elev. - Elevation Ave. - Avenue F - Fahrenheit Blvd. Boulevard C - Centigrade CI Cast Iron In . - Inch CL - Center Line Ft. - Foot GI Galvanized Iron St. - Street Lin. Linear or Lineal CY - Cubic Yard lb. Pound Yd. - Yard MH _ Manhole SY -- Square Yard Max. Maximum L.F. - Linear Foot D. I. - Ductile Iron Cl-1 (5 ) � I C1 - 1 . 27 CHANGE ORDER : A " Change Order " is a written 11 supplemental agreement between the Owner and the Contractor } covering some added or deducted item or feature which may be t � found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase .- in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is I more than 25% of the amount of the particular item or items in the original proposal. 4 � All " Change Orders " shall be prepared by the City from information as necessary furnished by the Contractors 4 ,1� Ci-1 . 28 PAVED STREETS AND ALLEYS : A paved street or alley 1 }I shall be defined as a street or alley having one of the i following types of wearing surfaces applied over the natural unimproved surface: 1 . Any type of asphaltic concrete with or without �� separate base material . 2. Any type of asphalt surface treatment , not including an oiled surface , with or withou. -- I� separate base material. 3 . Brick, with or without separate base material. 4 . Concrete, with or without separate base material. p 5. Any combination of the above. C1-1 . 29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, � roadway or other surface is any area except those defined � above for "Paved Streets and Alleys . " C1--1 . 30 CITY STREETS : A city street is defined as that area � - between the right--of-way lines as the street is dedicated. C1-1 . 31 ROADWAY: The roadway is defined as the area between parallel lines two ( 21 ) feet back of the curb lines or foul ( 4 ' ) feet back of the average edge of pavement where no curb exists. n C1-1 . 32 GRAVEL STREET : A gravel street is any unpaved street to which has been added one or more applications of gravel or similar material other than the natural material found on the 4 street surface before any improvement was made . Cl-1 (6 ) 1� i`' SECTION C - GENERAL CONDITIONS C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2 . 1 PROPOSAL FORM: The Owner will furnish bidders with proposal form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder ' s general understanding of the project to be completed, provide a space for furnishing the amount of bid security , and state the basis for entering into a formal contract . The Owner will furnish forms for the Bidder ' s "Experience Record , " "Equipment Schedule , " and "Financial Statement, " all of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for opening of bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency , and shall have been so prepared as to reflect the current financial status . This statement must be current and not more than one ( 1 ) year old . In the case that a bidding date falls within the time a new statement is being prepared , the previous statement shall be updated by proper verification . Liquid assets in the amount of ten ( 10% ) percent of the estimated project cost will be required. For an experience record to be considered to be acceptable for a given project , it must reflect the experience of the firm seeping qualification in work of both the same nature and magnitude as that of the project for which bids are to be received , and such experience must have been on projects completed not more than five ( 5 ) years prior to the date on which are to be received . The Director of the Water department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. C2-2 . 2 INTERPRETATION OF (QUANTITIES : The quantities of work and materials to be furnished as may be listed in the proposal C2-2 (l ) � I forsns or other parts of the Contract Documents will ba considered as approximate only and will be used for the purpose of comparing bids on a uniform basis . Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans . The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided , without in any way invalidating the unit prices bid or any other requirements of i lot the Contract Documents. C2-2 . 3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that th? rnntract Documents on Fi i c :gI th the Owner shall constitute all of the information which the Owner will furnish. All additional information and data which j the owner will supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just ` as though such addenda were actually written into the original Contract Documents . Bidders are required, prior to the fading of proposal, to read f and become familiar with the Contract Documents , to visit the site of the project and examine carefully all local conditions , to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project . They must judge for themselves the difficulties of the work and all attending circumstances a f f=nti "g the cost of 3 i n the v-r r+rlr nr the +- 4 -a its completion, and obtain all information, required to make an intelligent proposal . No information given by the Droner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda thereto , shall be binding upon the Owner. Bidders shall rely � ! exclusively and solely upon their own estimates , investigation , research , tests , explorations , and other data which are necessary for full and complete information upon which the proposal is to be based. It is mutually agreed that the submission of a proposal is prima-facie evidence that the bidder has made the investigations , examinations and tests �- herein required . Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed.. The logs of Soil Borings , if any, showing on the plans are for general information only and may not be correct . Neither the f- C2-2 ( 21 i_ w Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. C2-2. 4 SUBMITTING OF PROPOSAL. - The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the form shall be +� correctly filled in and the Bidder shall state the price✓ , written in ink in both words and numerals , for which he proposes to do the work contemplated or furnishe the materials ,. required . All such prices shall be written legibly. In case of discrepancy between the price written in words and the price written in -numerals, the price most advantageous to the r■ City shall govern. If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent. • If a proposal is submitted by a firm, association , or partnership, the name and address of each member must be given , and the proposal must be signed by a member of the 40 firm, association , or partnership , or by a person duly authorized . If a proposal is submitted by a company or corporation , the company or corporate name and business address must be given , and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed . Power of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. C2-2 . 5 REJECTION OF PROPOSALS : Proposals may be rejected if they show any alteration of words or figures , additions not called for , conditional or uncalled for alternate bids , incomplete bids, erasures , or irregularities of any kind, or contain unbalance value of any items . Proposal tendered or +" delivered after the official time designated for receipt of proposal shall bre returned to the Bidder unopened. C2-2 . 5 BID SECURITY: No proposal will be considered unless it is accompanied by a "Proposal Security" of the character and in the amount indicated in the "Notice to Birders " and the "Proposal . " The Bid Security is required by the Owner as evidence of good faith on the part of the Bidden and by way of a guaranty that if awarded the contract , the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds . The bid security of the three Lowest bidders will be retained until the contract is awarded or other disposition is made thereof . The bid security of all other bidders may be returned promptly after the canvass of bids. r rC2-2( 3 ) r I _ I C2--2 . 7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered , accompanied by its proper Bid Security , to the City Manager or his representative in the official place of business as set forth in the " Notice to Bidders . " It is the Bidder ' s sole responsibility to deliver 1 the proposal at the proper time to the proper place . The mere Ij fact that a proposal was dispatched will not be considered. The Bidder must have the proposal actually delivered . Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL, " and the nacre or description of the project as designated in the " Notice to Bidders. " The envelope shall be T addressed to the City Manager, City Hall , Fort Worth, Texas . C2-2 . 8 WITHDRAWING PROPOSALS . Proposals actually filed with the City Manager cannot be withdrawn prior to the time set for opening proposals . A request for non-consideration of a I. proposal must be made in writing , addressed to the City Manager , and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner , be returned unopened . iF C2-2 . 9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals , provided such telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly , e L. f .�U L , i_ J d41L1-1L'11L1t cl U ! V111 L114184 RV11 Vi 5tll 41 4CLCL rr� 3i1LL 4 Ulil!llllilli_;C1k-i1lIl over the signature of the bidder was mailed prior to the I� proposal opening time . If such confirmation is not received `I within forty-eight ( 48 ) hours after the proposal opening time , no further consideration will be given to the proposal . i C2-2 . 10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly filed and for which no " Non-consideration Request" has been received will be publicly opened and read aloud by the City Manager or his authorized representative at the time and place indicated in the "Notice to Bidders. " All proposals which have been opened and read will remain on file with the Owner until the contract has been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids . �- C2- 2 . 11 IRREGULAR PROPOSALS: Proposals shall be considered as being " Irregular" if they show any omissions , alterations of form, additions , or conditions not called for , unauthorized alternate bids, or irregularities of any kind . however , the 1� C2-2( 4 ) L am Owner reserves the right to waive any and all irregularities and to snake the award of the contract to the best interest of PM the City. Tendering a proposal after the closing hour is an irregularity which cannot be waived. ^, C2 - 2 . 12 DISQUALIFICATION OF BIDDERS : Bidders may be disqualified and their proposals not considered for any of , but not limited to, the following reason : as a. Reasons for believing that collusion exists among bidders . b. Reasonable grounds for believing that any bidder is PM interested in more than one proposal for work contemplated. C. The bidder being interested in any litigation oft against the owner or where the Owner may have a claim against or be engaged in litigation against the bidder. d. The budder being in arrears on any existing contract or having defaulted on a previous contract. e. The bidder having performed a prior contract in an unsatisfactory manner. f . back of competency as revealed by the financial statement , experience record, equipment schedule , and such inquiries as the Owner may see fit to make. g. Uncompleted work which , in the judgment of the Owner, will, prevent or hinder the prompt completion of additional work if awarded. h. The bidder not filing with the owner , one week in advance of the hour of the opening of proposals the following: 1. Financial Statement showing the financial condition of the bidder as specified in part "A" - Special Instructions. 2 . A current experience record showing especially the projects of a nature similar to the one under consideration , which have been successfully completed by the Bidder. 3. An equipment schedule showing the equipment the bidder has available for use on the project . The gid Proposal of a bidder who , in the judgment of the Engineer , is disqualified under the requirements stated herein, shall be set aside and not opened. C2-2f53 r PART C -- GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3 . 1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of the quoted prices , the quantities shown in the proposal , and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents . The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plats any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. V Until the award of the contract is made by the owner , the right will be reserved to reject any or all proposals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for the best interest of the Owner. C3-3 . 2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner , upon request , complete and accurate information regarding actual work performed by a Minority Business Enterprise ( MBE ) and or a a Woman-owned Business Enterprise (WBE ) on the contract and the payment therefor. Contractor further agrees , upon request by Owner , to allow and audit and/or an examination of any books, records, or fibs in the possession of Contractor that will substantiate the actual work performed by the MBE or WBE. Any material misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal , state or local laws and ordinances relating to false statements ; further , any such misrepresentation may be grounds for disqualification of Contractor at Owner ' s discretion for bidding on future Contracts with the Owner for a period of time of not less than six ( 6 ) months. C3-3 . 3 EQUAL EMPLOYMENT PROVISIONS : The Contractor shall comply with Current City Ordinance prohibiting discrimination in employment practices . r g* C3-3 (1 ) r � i 1 The Contractor shall post the required notice to that effect on the project site , and , at his request , will be provided li assistance by the City of Fart north ' s Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. C3-3 . 4 WITHDRAWAL OF PROPOSALS : After a proposal has been read by the Owner it cannot be withdrawn by the Bidder within forty-five ( 45 ) days after the date on which the proposals were opened. nWenxrI Ur., �.=, v LvidiRAiri: The owner reserves the right to withholdfinal action on the proposals for a reasonable time , not to exceed forty-five ( 45 ) days after the date of opening IIF proposals, and in no event will an award be made until after investigations have been made as to the responsibility of the proposed awardee. . y The award of the contract, if an award is made, will be to the lowest and best responsible bidder. The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. V C3--3 . 6 RETURN OF PROPOSAL SECURITIES : As soon as proposed ! price totals have been determined for comparison of bids , the Owner may , at its discretion , return the proposal security f which accompanied the proposals which , in its judgment , would II� not be considered for the award , All other proposal securities , usually those of the three lowest bidders , will be retained by the Owner until the required contract has been { ` executed and bond furnished or the Owner has otherwise disposed of the bids, after which they will, be returned by the City Secretary. C3---3 . 7 BONDS : With the execution and delivery of the Contract Documents, the Contractor shall furnish to , and file with the Owner in the amounts herein required, the following 'bonds : a. PERFORMANCE BOND : A good and sufficient ` performance bond in an amount not less than ICJ ') percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise , guaranteeing the full and faithful execution of the work and performance of the contract , and for the protection of the Owner and all other persons against damage by reason of negligence of the I_ Contractor , or improper execution of the work ur the use of inferior materials . This performance i C3-3 ( 2 ) bond shall guarantee the payment for all labor , materials, equipment , supplies , and services used in the construction of the work , and shall remain in full force and effect until provisions as above stipulated are accomplished and final payment is made on the project by the City. b. MAINTENANCE_ BOND : A good and sufficient maintenance Fond , in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise , guaranteeing the prompt , full and faithful performance of the general guaranty which is set forth in paragraph C8-8 . 14. C. PAYMENT BOND: A good and sufficient payment bond, in an amount not less than 108 percent of the amount of the contract , as evidenced by the proposal tabulation or otherwise , guaranteeing the prompt, full and faithful payment of all claimants as defined in Article 5150 , Revised Civil Statutes of Texas , 1925 , as amended by House Bill 344 Acts 56th Legislature, Regular Session , 1954 , effective April 27 , 1959 , and/or the latest version thereof , supplying labor and materials in the prosecution of the work provided for in the contract being constructed under these specifications . Payment Bond shall remain in force until all payments as above stipulated are made. d, OTHER BONDS : Such other bonds as may be required by these Contract Documents shall be furnished by the Contractor . No suretics will be acceptcd by the Owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the owner . All bonds shall be made on the forms furnished by the owner and shall be executed by an approved surety company doing business in the City of Fort Worth , Texas , and which is acceptable to the owner . In order to be acceptable , the name of the surety shall be included on the current U . S . Treasury list of acceptable sureties , and the amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury list for that company . Each bond shall be properly executed by both the Contractor and Surety Company. Should any surety on the contract be determined unsatisfactory at any time by the Owner , notice will be given the Contractor to that effect and the Contractor shall immediately provide a C3-3 43y new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties , as required , have qualified and have been accepted by the Owner. The contract shall not be operative nor will any payments be due or paid until approval of the bonds by the Owner. C3-3 . 8 EXECUTION OF CONTRACT: Within ten (10 ) days after the Owner has by appropriate resolution, or otherwise, awarded the contract , the Contractor shall execute and file with the Owner the Contract and such bonds as may be required in the Contract Documents . No crnnf.eacrt shall be binding upon the owner until it has been attested by the City Secretary , approved as to form and legality by the City Attorney, and executed for the Owner by either the Mayor or City Manager. C3 -3 . 9 FAILURE TO EXECUTE CONTRACT : The failure of the Awardee to execute the required band or bonds or to sign the required contract within ten ( 10 ) days after the contract is awarded shall be considered by the Owner as an abandonment of his proposal , and the Owner may annul the Award. By reason of - the uncertainty of the market prices of material and labor , f and it being impracticable and difficult to accurately I determine the amount of damages occuring to the Owner by reason of said awardee ' s failure to execute said bands and contract within ten ( 10 ) days , the proposal security accompanying the proposal shall be the agreed amount of damages which Owner will suffer by reason of such failure on the part of the Awardee and shall thereupon immediately be 1-G14C11 t 4SiG Vnia'.""i . The filing of a proposal will be considered as an acceptance I � of this provision by the Bidder , C3 -3 . 10 BEGINNING WORK: The Contractor shall not commence work until authorized in writing to do so by the Owner . Should the Contractor fail to commence work at the site of the project within the time stipulated in the written V authorization usually termed the " Work Order " or " Proceed V Order" , it is agreed that the Surety Company will , within ten ( 10 ) days after the commencement date set forth in such ` written authorization, commence the physical execution of the PP contract. C3-3 . 11 INSURANCE : The Contractor shall not commence work under this contract until he has obtained all the insurance required under the Contract Documents , and such insurance has been approved by the Owner . The prime Contractor shall be responsible for delivering to the Owner the sub-contractors ' I C3-3 ( 4 ) r certificate of insurance for approval . The prime contractor shall indicate on the certificate of insurance included in the documents for execution whether or not his insurance covers ?" sub--contractors . It is the intention of the owner that the insurance coverage required herein shall include the coverage of all sub-contractors . a. COMPENSATION INSURANCE : The Contractor shall maintain, during the life of this contract , Workers ` Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub-contractors. in case any class of employees engaged in hazardous work on the project under this contract is not protected under the Workers ' Compensation Statute, the Contractor shall provide adequate employer ' s general liability insurance for the protection of such of his employees not so protected. b. COMPREHENSIVE GENERAL LIABILITY INSURANCE : The Contractor shall procure and shall maintain during the life of. this contract Contractor ' s Comprehensive General Liability Insurance ( Public Liability and Property Damage Insurance ) in an amount not less than $ 500 , 000 covering each occurrence on account of bodily injury, including death , and in an amount not less than $ 500 , 000 covering each occurrence on account of property damage with $2, 000, 000 umbrella policy coverage. C. ADDITIONAL LIABILITY : The Contractor shall furnish insurance as separate policies or by additional endorsement to one of the above-mentioned policies , and in the amount as set forth for public liability and property damage, the following insurance: 1. Contingent Liability ( covers General Contractor ' s Liability ,for acts of sub-contractors ) . 2. Blasting, prior to any blasting being done. 3 . Collapse of buildings or structures adjacent to excavation ( if excavations are to be performed adjacent to same) . 4 . Damage to underground utilities for $500, 000 . C3-3 ( 5) 5 . Builder 's risk [where above-ground structures are involved) . 6. Contractual Liability ( covers all indemnification requirements of Contract) . d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY DAMAGE: The Contractor shall, procure and maintain , during the life of this Contract, Comprehensive 4 _. Automobile Liability insurance in an amount not less than $ 250 , 000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $ 500 , 000 on account of one accident , aFid automobile property damage insurance in an amount not less than $100,000. �- e. SCOPE OF INSURANCE AND SPECIAL HAZARD : The insurance required under the above paragraphs shall provide adequate protection for the Contractor and his sub--contractors , respectively, against damage claims which may arise from operations under this contract, whether such operations be by the insured or by anyone directly or indirectly employed by d � him, and also against any of the following special hazards which may be encountered in the performance f ..� of the Contract. Ih f . PROOF OF CARRIAGE OF INSURANCE : The Contractor shall furnish the owner with satisfactory proof of coverage by insurance required in these Contract. Documents in amounts and by carriers satisfactory to the Owner . ( Sample attached. ) All insuranc.2 requirements made upon the Contractor shall apply to the sub-- contractor , should the Prime Contractor ' s insurance not cover the sub-contractor ' s work operations . g. LOCAL AGENT FOR INSURANCE AND BONDING : The insurance and bonding companies wath whom the Contractor ' s insurance and performance , payment , maintenance and all such other bonds are written shall be represented by an agent or agents having an office located within the city limits of the C3-3 ( 6 ) City of Fort Worth , Tarrant County, Texas . Each such agent shall be a duly qualified, one upon whom service of process may be had , and mast have authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth , or any other claimant, any claims that the City of Fort Worth or other claimant or any property owner who has been damaged , may have against the Contractor , insurance, and/or bonding company . If the local insurance representative is not so empowered by the insurance or bonding companies, then such authority must be vested in a local agent or claims officer residing in the Metroplex , the Fort Worth--Dallas area. The name of the agent or agents shall be set forth on all of such bonds and certificates of insurance. C3--3. 12 CONTRACTOR ' S OBLIGATIONS: Under the Contract, the Contractor shall pay for all materials , labor and services when due. C3-3 . 13 WEEKLY PAYROLL: A certified copy of each payroll covering payment of wages to all person engaged in work on the project at the site of the project shall be furnished to the Owner' s representative within seven ( 7 ) days after the close of each payroll period . A copy or copies of the applicable minimum wage rates as set forth in the Contract Documents shall be kept posted in a conspicuous place at the site of the project at all times during the course of the Contract . Copies of the wage rates will be furnished the Contractor, by the Owner; however, posting and protection of the wage rates shall be the responsibility of the Contractor . C3-3 . 14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor, whether a person , parsons , partnership , company , firm , association , corporation or other who is approved to do business with and enters into a contract with the City for construction of water and/or sanitary sewer facilities, will have or shall establish a fully operational business office within the Fort Worth-Dallas metropolitan area . The Contractor shall charge, delegate , or assign this office for he may delegate his Project Superintendent ) with full authority to transact all business actions required in the performance of the Contract . This local authority shall be made responsible to act for the Contractor in all matters pertaining to the work governed by the Contract whether it be administrative or otherwise and as such shall be empowered , thus delegated and directed, to settle all material , labor or other expenditures, all claims against the work or any other C3-3 ( 7 ) I matter associated such as maintaining adequate and appropriate insurance or security coverage for the project . Such local authority for administration of the work under the Contract shall be maintained until all business transactions executed as part of the Contract are complete. L- I Should the Contractor ' s principal base of operations be other than in the Fort Worth-Dallas metropolitan area, notification of the Contractor ' s assignment of local authority shall be � made in writing to the Engineer in advance of any work on the project , all appropriately signed and sealed, as applicable, by the Contractor ' s responsible officers with the understanding that this written assignment of authority to a k local representative shall become part of the project Contract as though bound directly into the project documents . The intent of these requirements is that all matters associated with the Contractor ' s administration , whether it be oriented in furthering the work, or other, be governed direct by local authority . This same requirement is imposed on insurance and surety coverage. Should the Contractor ' s local representative fail to perform to the satisfaction of Engineer, the Engineer, at his sole discretion , may demand that such local 11 representative be replaced and the Engineer may, at his sol- discretion , stop all work until a new local authority satisfactory to the Engineer is assigned . No credit of working time will be for periods in which work stoppages are in effect for this reason. C3 --3 . 15 VENUE : Venue of - any action hereinunder shall be � exclusively in Tarrant County, Texas . I _ I 1 t C3-3 ( 8f _ I I PART C - GENERAL CONDITIONS C4-4 SCOPE OF WORK SECTION C4-4 SCOPE OF WORK FM C4-4 . 1 INTENT OF CONTRACT DOCUMENTS : It is the definite intention of these Contract Documents to provide for a complete, useful project which the Contractor undertakes to construct or furnish , all in full compliance with the requirements and - intent of the Contract Documents . It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents , shall do all extra or special work as may be considered by the Owner as necessary to complete the project in a satisfactory and acceptable manner. The Contractor shall , unless otherwise specifically stated in these Contract Documents, furnish all labor, tools, materials, machinery , equipment , special services , and incidentals rnecessary to the prosecution and completion of the project. C4-4 . 2 SPECIAL PROVISIONS: Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional proposed work which is not covered by 'these Contract Documents. then "Special Provisions" covering all such work will be prepared by the Owner previous to the time of receiving bids or proposals for such work and furnished to the Bidder in the form of Addenda. All such "Special Provisions" shall be considered to be a part of the Contract Documents just as though they were originally written therein. C4-4 . 3 INCREASED OR DECREASED QUANTITIES: The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items. When such changes increase or decrease the original quantity of any item or items of work to be done or materials to be furnished by the 25 percent or more, then either party to the contract shall upon written request to the other party be entitled to a revised consideration upon that portion of the work above or below the 25 percent of the original quantity stated in the proposal ; such revised consideration to be determined by special agreement or as hereinafter provided for "Extra Work . " No allowance will be made for any changes in anticipated profits nor shall such changes be considered as rC4-4 ( 1 ) I waiving or invalidating any conditions or provisions of the 1 Contract Documents . variations in quantities of sanitary sewer pipes in depth l categories , shall be interpreted herein as applying to the overall quantities or sanitary sewer pipe in each pipe size, but not to the various depth categories. ` C4-4 . 4 ALTERATION OF CONTRACT DOCUMENTS : By Change order , the Owner reserves the right to make such changes in the Contract Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner , provided such changes do not materially alter the original Contract Documents or change. the general nature of the project as a whole. Such changes shall not be considered as waiving or invalidating any condition or provision of the Contract Documents . C4-4 . 5 EXTRA WORK: Additional work made necessary by changes fly and alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents , shall be defined as "Extra Work" and shall be performed by the Contractor in accordance with these Contract Documents or approved additions thereto ; provided , however , that before any extra work is begun a "Change Order" shall be executed or written order issued by the owner to do the work for payments or credits as shall be determined by one or more combination of the following methods : a_ unit bid price oreviously approved. b. An agreed lump sum, C. The actual reasonable cost of ( 1 ) labor, ( 2 ) rental of equipment used on the extra work for the time s,_a used at Associated General Contractors of America. current equipment rental. rates ; ( 3 ) materials entering permanently into the project , and ( 4 ) actual cost of insurance , bonds , and social security as determined by the owner , plus a fixed fee to be agreed upon but not to exceed 10% of the _ actual cost of such extra work . The fixed fee is ` not to include any additional profit to the Contractor for rental of equipment owned by him and used for the extra work. The fee shall be full and complete compensation to cover the cost of superintendence , overhead , other profit , general and all other expense_ not included in ( 1 ) , ( 2 ) , f ( 3 ) , and ( 4 ) above . The Contractor stall keep accurate cost records on the form and in the method L C4-4 ( 2 ) i suggested by the Owner and shall give the owner access to all accounts , bills , vouchers , and records relating to the Extra Work. No "Change Order" shall become effective until it has been approved and signed by each of the Contracting parties . No claim for Extra Work of any kind will be allowed unless ordered in writing by the Owner . In case any orders or instructions , either oral or written, appear to the Contractor to involve Extra work for which he should receive compensation , he shall make written request to the Engineer for written orders authorizing such Extra work , prior to beginning such work . Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof , and the Engineer insists upon its performance , the Contractor shall proceed with the work after making written request for written orders and shall keep an accurate account of the actual reasonable cost thereof as provided under method ( Item C ) . Claims for extra work will not be paid unless the Contractor shall file his claim with the Owner within five ( 5 ) days before the time for making the first estimate after such work is done and unless the claim is supported by satisfactory vouchers and certified payrolls covering all labor and materials expended upon the said Extra Work. The Contractor shall furnish the Owner such installation records of all deviations from the original Contract Documents as may be necessary to enable the Owner to prepare for permanent record a corrected set of plans showing the actual installation. The compensation aqreed upon for ' extra work ' whether or not iniitiated by a ' change order ' shall be a full , complete and final payment for all costs Contractor incurs as a result or relating to the change or extra work , whether said costs are known , unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay , extended overhead , ripple or impact cost , or any other effect on changed or unchanged work as a result or the change or extra work. C4 - 4 . 6 SCHEDULE OF OPERATIONS : Before commencing any work under this contract, the Contractor shall submit to the Owner and receive the Owner ' s approval thereof , a "Schedule of Operations , " showing by a straight line method the date of commencing and finishing each of the major elements of the contract . There shall be also shown the estimated monthly cost of work for which estimates are to be expected. There C4-4 ( 3 ) F shall be presented also a composite graph showing the anticipated progress of construction with the time being platted horizontally and the percentage of completion plotted vertically. The progress charts shall be prepared on 8-1/211 x 11 " sheets and at. least five black or blue line prints shall be furnished to the Owner. J C4 -4 . 7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES : Within ten ( 10 ) days prior to submission of (- first monthly progress payment , the Contractor shall prepare and submit -to the Owner for approval six copies of the schedule in which the Contractor proposes to carry on the work, the date of which he will start the several major activities ( including procurement of materials , plans , and equipment ) and the contemplated dates for completing the - same . The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses , the Contractor shall enter on the diagram the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer . The Contractor shall also rev-ise the schedule to reflect any adjustments in contract time approved by the Engineer . Three copies of the updated schedule shall be delivered at 1 such intervals as directed by the Owner. As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technical specifications . Prior to the final drafting of the detailed construction schedule , the rContract -,r cIi I I rari csiq f-b A -F f- hA 1 with the Engineer to ensure the Contractor ' s understanding I . of the contract requirements . The following guidelines shall be adhered to in preparing � T the construction schedule: a. Milestone dates and final project completion dates shall be developed to conform to time constraints , sequencing requirements and completion time. b. - The construction process shall be divided into � r activities with time durations of approximately fourteen ( 14 ) days and construction values not to exceed $ 50 , 000 . Fabrication , delivery and � ! submittal activities are exceptions to this guideline. 1� C4-4 ( 4 ) c. durations shall be in calendar days and normal holidays and weather conditions over the duration of the contract shall be accounted for within the duration of each activity. d. One critical path shall be shown on the P. construction schedule. e. Float time is defined as the amount of time between the earliest start date and the latest 'M start date of a chair of activities of the CPM construction schedule. Float time is not for the exclusive use or benefit of either the Contractor on or the Owner. f. Thirty days shall be used for submittal review ¢ft unless otherwise specified. The construction schedule shall as a minimum be divided into general categories as indicated in the Proposal and "" Technical. Specifications and each general category shall be broken down into activities in enough detail to achieve activities of approximately fourteen (14 ) days duration. OM For each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that follow the guidelines of this Section. For each of the trades or subcontracts , the construction schedule shall indicate the following procurements , construction and preacceptance activities and events in their logical sequence for equipment and materials . k 1 . Preparation and transmittal of submittals . 2. submittal review periods. 3 . Shop fabrication and delivery. 4 . Erection or installation . 5 . Transmittal of manufacturer ' s operation and maintenance instructions. 6. Installed equipment and materials testing. 7 . Owner ' s operator instruction ( if applicable ) . B . Final inspection. C4-4 (5 ) 9 . operational testing. 10 . Final inspection. I . If , in the opinion of the Owner , work accomplished falls I ' behind that scheduled , the Contractor shall take such action as necessary to improve his progress. In addition, the Owner may require the Contractor to submit a revised schedule demonstrating his program and proposed plan to make up lag in sch6duled progress and to insure completion of the work within the contract time . If the Owner finds the proposed plan not acceptable . he may require they Contractor to increase the work force , the construction plant and equipment , the number of work shifts or the overtime operations without additional cost to the Owner . Failure of the Contractor to comply with these requirements shall be considered grounds for determination by the Owner that the Contractor is failing to prosecute the work with such diligence as will insure its completion within the time specified. I 4 .. I _ I 1 - 1 1- I I_ L C4—a ( 6 ) L r PE PART C - GENERAL CONDITIONS C5-5 CONTROL OF WORK AND MATERIALS ,. SECTION C5-5 CONTROL OF WORK AND MATERIALS C5--5 . 1 AUTHORITY OF ENGINEER. The work shall be performed to the satisfaction of the Engineer and in strict compliance with the Contract Documents . He shall decide all questions which arise as to the quality and acceptability of materials furnished , work performed, rate of progress of the work , overall sequence of the construction , interpretation of the Contract Documents , acceptable fulfillment of the contract, compensation, mutual rights between Contractor and owner under these Contract Documents , supervision of the work, resumption of operations, and all other questions or disputes which may arise . Engineer will not be responsible for Contractor ' s means , methods , techniques , sequences or procedures of r' construction , or the safety precaution and programs incident thereto, and he will not be responsible for Contractor ' s failure to perform the work in accordance with the contract re documents . He shall determine the amount and quality of the work completed and materials furnished , and his decisions and estimates shall be final . His estimates in such event shall be a condition to the right of the Contractor to receive money due him under the Contract . The Owner shall have executive OM authority to enforce and make effective such necessary decisions and orders as the Contractor Fails to carry out promptly. In the event of any dispute between the Engineer and Contractor over the decision of the Engineer on any such matters , the Engineer must , within a reasonable time , upon written request of the Contractor , render and deliver to both the Owner and. Contractor , a written decision on the matter in controversy. rC5-5 . 2 CONFORMITY WITH PLANS : The finished project in all cases shall conform with lines , grades , cross--sections , finish , and dimensions shown on the plans or any other requirements otherwise described in the Contract Documents . Any deviation from the approved Contract Documents required by the Engineer during construction will in all cases be determined by the Engineer and authorized by the owner by Change Order. r rC5-5 tlf r C5 --5 . 3 COORDINATION OF CONTRACT DOCUMENTS : The Contract Documents are made up of several sections , which , taken together , are intended to describe and provide for a complete and useful project, and any requirements appearing in one of the sections is as binding as though it occurred in all ; sections . In case of discrepancies , figured dimension shall, govern over scaled dimensions , plans shall govern over specifications, special conditions shall govern over general conditions and standard specifications, and quantities shown on the plans shall govern over those shown in the proposal . The Contractor shall not take advantage of any apparent error or omission in the Contract Documents , and the Owner shall be �P1'f177 ttAc� r� rTTa1Cc? �sir }, rnrrc+rti nnc Cr .�'�'rpr .t- be deemed necessary for the fulfillment of the intent of the Contract Documents . In the event the Contractor discovers an ` apparent error or discrepancy, he shall immediately call this condition to the attention of the Engineer . In the event of a conflict in the drawings, specifications , or other portions of the Contract Documents which were not reported prior to the. award of Contract , the Contractor shall be deemed to have quoted the most expensive ' resolution of the conflict. C5 - 5 . 4 COOPERATION OF CONTRACTOR : The Contractor will be furnished with three sets of the Contract Documents and shall have available on the site of the project at all times one set of such Contract Documents . ` The Contract shall give to the work the constant attention necessary to facilitate the progress thereof and shall cooperate with the Engineer , his inspector , and other I..UI;LLci4tUis iit E�v�c;��' poaaiui� way.. The Contractor shall at all tines have competent, personnel ! F available to the project site for proper performance of the work. The Contractor shall provide and maintain at all times � at the site of the project a competent , English-speaking superintendent and an assistant who are fully authorized to act as the Contractor ' s agent on the work . Such superintendent and his assistant shall be capable of reading IT and understanding the Contract Documents and shall receive and fulfill instructions from the Owner , the Engineer , or his authorized representatives . Pursuant to this responsibility of the Contractor , the Contractor shall designate in writing to the project superintendent , to act as the Contractor ' s agent on the work . Such assistant project superintendent shall be a resident of 'Tarrant County , Texas and shall be subject to call , as is the project Superintendent, at any time of the day or night on any day of the week. on which the _ Engineer determines that circumstances require the presence on the project site of a representative of the Contractor to C5-5 ( 2 ) PE PM adequately provide for the safety or convenience of the traveling public or the owners of property across which the ,n project extends or the safety of property contiguous to the project routing. The Contractor shall provide all facilities to enable the Engineer and his inspector to examine and inspect the workmanship and materials entering into the work. C5-5 . 5 EMERGENCY AND/OR RECTIFICATION WORK; When , in the opinion of the Owner or Engineer, a condition of emergency exists related to any part of the work, the Contractor, or the Contractor through his designated representative , shall respond with dispatch to a verbal request made by the Owner or Engineer to alleviate the emergency condition . Such a response shall occur day or night, whether the project is scheduled on a calendar--day or on a working-day basis . Should the Contractor fail to respond to a request from the Engineer to rectify any discrepancies , omissions , or corrections necessary to conform with the requirements of the. project specifications or plans , the Engineer shall, give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition . In the event the r Contractor does not take positive steps to fulfill this written request , or does not show just cause for not taking the proper action , within 24 hours , the City may take such �. remedial action with City forces or by contract . The City shall then deduct an amount equal to the entire costs for such remedial action, plus 25% , from any funds due the Contractor on the project. r_5-5 . 5 FIELD OFFICE : The Contractor shall provide , at no extra compensation , an adequate field office for use of the Engineer , if specifically called for . The field office shall be not less than 14 by 14 feet in floor area , substantially constructed , well heated , air conditioned , lighted , and weather-proof , so that documents will not be damaged by the elements. 05-5 . 7 CONSTRUCTION STAKES: The City, through its Engineer, will furnish theContractor- with all lines , grades , and measurements necessary to the proper prosecution and control of the work contracted for under these Contract Documents , and lines , grades and measurements will be established by means of stakes or other customary method of marking as may be found consistent with good practice. C5-5 ( 3 ) C These stakes or markings shall be set sufficiently in advance of construction operations to avoid delay . Such stakes or markings as may be established ,for the Contractor ' s use or guidance shall be preserved by the Contractor until he is authorized by the Engineer to remove them. Whenever, in the opinion of the Engineer , any stakes or markings have been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees , the full cost of ! replacing such stakes or marks plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. C5 -- 5 . 8 AUTHORITY AND DUTIES 4F CITY INSPEC'T'ORS : City Inspectors will be authorized to inspect all work done and to be done and all materials furnished. Such inspection may extend to all or any part of the work, and the preparation or manufacturing of the materials to be used or equipment to be installed. A City Inspector may be stationed on the work to � - report to the Engineer as to the progress of the work and the manner in which it is being performed , to report any evidence that the materials being furnished or the work being performed by the Contractor fails to fulfill the requirements of the 1 Contract Documents , and to call the attention of the Contractor to any such failure or other infringements . Such inspection or lack of inspection will not relieve the Contractor from any obligation to perform the work in accordance with the requirements of the Contract Documents . In case of any dispute arising between the Contractor and the City Inspector as to the materials or equipment furnished or the manner of performinq the work , the Citv Inspector will have aut`.icrity to reject materials or equipment to suspend work until the question at issue can be referred to and be decided by the Engineer . The City Inspector will not , however, be authorized to revoke , alter , enlarge , or release any requirement of these Contract Documents , nor to approve or accept any portion or section of the work , nor to issue any instructions contrary to the requirements of the Contract Documents . He will in no case act as superintendent or foreman or perform any other duties for the Contractor , or interfere with the management or operation of the work. . He will not accept from the Contractor any compensation in any form for performing any duties . The Contractor shall regard and obey the directions and instructions of the City Inspector or Engineer when the same are consistent with the obligations of the Contract Documents , provided , however , should the Contractor object to any orders or instructions of the City Inspector , the Contractor may within six days make written appeal to the Engineer for his decision on the matter in controversy . 9� CS-5 ( 4 ) PW C5-5 . 9 INSPECTION: The Contractor shall furnish the Engineer with every reasonable facility for ascertaining whether or not the work as performed is in accordance with the requirements of the Contract Documents . If the Engineer so requests , the Contractor shall , at any time before acceptance of the work, remove or uncover such portion of the finished work as may be directed . After examination , the Contractor shall restore said portions of the work to the standard required by the Contract Documents. Should the work exposed or examined prove acceptable , the uncovering or removing and replacing of the covering or making good of the parts removed shall be paid for as extra work, but should be work so exposed or examined prove to be unacceptable, the uncovering or removing and the replacing of all adjacent defective or damaged parts shall be at the Contractor ' s expense. No work shall be done or materials used without suitable supervision or inspection. �• C5-5 . 10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK: All work, materials , or equipment which has been rejected shall be remedied or removed and replaced in an acceptable manner by the Contractor at his own expense. Work done beyond the lines and grades given or as shown on the plans , except as herein specifically provided, or any Extra Work done without written authority, will be considered as unauthorized and done at the Pa expense of the Contractor and will not be paid for by the Owner . Work so done may be ordered removed at the Contractor ' s expense . Upon the failure on the part of the ,. Contractor' to comply with any order of the Engineer made under the provisions of this paragraph , the Engineer will have the authority to cause defective work to be remedied or removed and replaced and unauthorized work to be removed, and the cost thereof may be deducted from any money due or to become due to the Contractor . Failure to require the removal of any defective or unauthorized work shall not constitute acceptance of such works. C5 - 5 . 11 SUBSTITUTE MATERIALS OR EQUIPMENT : If the Specifications , law, ordinance, codes or regulations permit Contractor to furnish or use a substitute that is equal to any material or equipment specified, and if Contractor wishes to furnish or use a proposed substitute , he shall, prior to the preconstruction conference , make written application to ENGINEER for approval of such substitute certifying in writing that the proposed substitute will perform adequately the functions called for by the general design, be similar and of equal substance to that specified and be suited to the same use and capable of performing the same function as that 1 specified; and identifying all variations of the proposed rC5-5 f5l r 1i I substitute from that specified and indicating available maintenance service . No substitute shall be ordered or I'~ installed without the written approval of Engineer who will be the judge of the equality and may require Contractor to furnish such other data about the proposed substitute as he considers pertinent . No substitute shall be ordered or installed without such performance guarantee and bonds as Owner may require which shall be furnished at Contractor ' s expense . Contractor shall indemnify and hold harmless Owner 1I� and Engineer and anyone directly or indirectly employed by either of them from and against the claims , damages, losses and expenses (including attorneys fees) arising out of the use of substltutpd mAt'?ri is or equi nmert � 05--5 . 12 SAMPLES AND TESTS OR MATERIALS: Where, in the opinion of the Engineer, or as called for in the Contract Documents , tests of materials or equipment are necessary, such tests will be made at the expense of and paid for direct to the testing agency by the owner unless otherwise specifically provided. The failure of the Owner to make any tests of materials shall be in no way relieve the - Contractor of his responsibility of furnishing materials and equipment fully conforming to the requirements of the Contract Documents . Tests and sampling of materials , unless otherwise specified , will be made in accordance with the latest methods prescribed by the American � - Society for Testing Materials or specific requirements of the Owner . The Contractor shall provide such facilities as the Engineer may require for collecting and forwarding samples and shall not , without specific written permission of the Engineer, use the materials represented by the samples until Lem " S1 GZVG UGGJl 1f6C1 l.4 A.tJ U. l�.Al tliR L{vL 1c2A� gJJL41VGLA 1'411 vac.. i.ta4 Contractor will furnish adequate samples without charge to the Owner. In case of concrete , the aggregates , design minimum, and the mixing and transporting equipment shall be approved by the Engineer before any concrete is placed , and the Contactor shall be responsible for replacing any concrete which does not meet the requirements of the Contract Documents . Tests shall be made at least 9 days prior to the placing of concrete , using samples from the same aggregate, cement , and mortar which are to be used later in the concrete . Should the source of supply change , new tests shall be made prior to the use of the new materials. C5-5 . 13 STORAGE OF MATERIALS : All materials which are to be used in the construction operation shall be stored so as to insure the preservation of the quality and fitness of the work. when directed by the Engineer , they shall ba placed on wooden platforms ar other hard, clean durable surfaces and not on the C5-5 (5 ) ground, and shall be placed under cover when directed. Stored materials shall be placed and Located so as to facilitate prompt inspection. C5-5 . 14 EXISTING STRUCTURES AND UTILITIES: The location and dimensions shown on the Plans relative to existing utilities are based on the best information available. Omission from, or the inclusion of utility locations on the Plans is not to be considered as the nonexistence of, or a definite location of, existing underground utilities . The location of many gas mains, water mains , conduits , sewer lines and service lines for all utilities , etc . , is unknown to the Owner , and the Owner assumes no responsibility for failure to show any or all such structures and utilities on the pians or to show them in their exact location. It is mutually agreed that such failure will not be considered sufficient basis for claims for r' additional compensation for Extra Work or for increasing the pay quantities in any manner whatsoever, unless an obstruction encountered is such as to necessitate changes in the lines and grades of considerable magnitude or requires the building of special works, provision for which is not made in the. Contract Documents , in which case. the provision in these Contract Documents for Extra Work shall apply. It shall be the Contractors responsibility to verify locations of adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as necessary in the construction process to provide adequate clearances . The Contractor shall take all necessary precautions in order to protect all existing utilities , structures and service lines . Verification of existing utilities , structures and service lines shall include notification of all utility companies at least forty eight P" (48) hours in advance of construction including exploratory excavation if necessary . All verification of existing utilities and their adjustment shall be considered as subsidiary work.. C5-5. 15 INTERRUPTION OF SERVICE: a. Normal Prosecution : In the normal prosectuion of work where the interruption of service is necessary , the Contractor , at least 24 hours in advance, shall PM be required to: _ 1 . Notify the Water Department ' s Distribution Division as to location , time , and schedule of service interruption. C5-5 (7 ) pi Z . Notify each customer personally through responsible personnel as to time and schedule of the interruption of their service, or 3 . In the event that personal notification of a customer cannot be made, a prepared tag form shall be attached to the customer ' s entrance door knob . The tag shall be durable in , composition, and in large bold type shall say: , "NOTICE" Due to Utility Improvement in your neighborhood, your (water ) (sewer) service will be inter- rupted on between the hours of and This inconvenience will be as short as possible. Thank you, I � Contractor Address Phone b. Emergency : In the event that an unforeseen service interruption occurs , notice shall be as above , but immediate. i C5 -5 . 16 MUTUAL RESPONSIBILITY OF CONTRACTORS : If , through acts or .neglect on the part of the Contractor , any other Contractor or any sub---contractor shall suffer loss or damage on the work, the Contractor agrees to settle with such other Contractor or sub-contractor by agreement or arbitration . If such other Contractor or sub-contractor shall assert any claim against the owner on account of any damage alleged to have been sustained ■ the owner will notify the Contractor , who shall indemnify and save harmless the Cwner against any such claim. C5- 5 . 17 CLEAN-UP : Clean-up of surplus and/or waste materials accumulated on the job site during the prosecution of the work under these Contract Documents shall be accomplished in keeping with a daily routine established to the the satisfaction of the Engineer. . Twenty-fours fours after written notice is given to the Contractor that the clean-up on the job si.ta is proceeding in a manner unsatisfactory to the `- Engineer , if the Contractor fails to correct the CS-5 ( 8 ) l OM unsatisfactory procedure, the City may take such direct action as the Engineer deems appropriate to correct the clean-up WE deficiencies cited to the Contractor in the written notice, and the costs of such direct action , plus 25% of such costs , shall be deducted from monies due or to become due to the Contractor. P0 Upon the completion of the project as a whole as covered by these Contract documents , and before final acceptance and .. final payment will be made , the Contractor shall clean and remove from the site of the project all surplus and discarded materials , temporary structures, and debris of every kind. He 4P shall leave the site of all work in a neat and orderly condition equal to that which originally existed. Surplus and waste materials removed from the site of the work shall be disposed of at locations satisfactory to the Engineer. The Contractor shall thoroughly clean all equipment and materials installed by him and shall deliver over such materials and equipment in a bright, clean , polished and naw appearing ,. condition . No extra compensation will be made to the Contractor for any clean-up required on the project . C5-5 . 18 FINAL INSPECTION . Whenever the work provided for in and contemplated under the Contract Documents has been satisfactorily completed and final cleanup performed , the Engineer will notify the proper officials of the Owner and request that the Final inspection be made. Such inspection will be made within 10 days after such notification . After such final inspection, if the work and materials and equipment are found satisfactory, the Contractor will be notified in writing of the acceptance of the same after the proper resolution has been passed by the City Council . No time charge will be made against the Contractor between said date of notification of the Engineer and the date of final inspection of the work. r F r r C5-5 493 r PART C - GENERAL, CONDITIONS C6-6 LEGAL RELATIONS AND PUBLIC ,M RESPONSIBILITY SECTION C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6. 1 LAWS TO BE OBSERVED: The Contractor shall at all times observe and comply with all Federal and State Laws and City ordinances and regulations which in any way affect the conduct of the work or his operations , and shall observe and comply with all orders, laws, ordinances and regulations which exist or which may be enacted later by bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof will be considered. The Contractor and his Sureties shall indemnify and save harmless the City and all of its officers , agents, and employees against any and all claims or liability arising from or based on the violation of any such law, ordinance, regulation , or order , whether it be by .. himself or his employees. C6-6 . 2 PERMITS AND LICENSES: The Contractor shall procure all permits and licenses, pay all charges , costs and fees , and give all notices necessary and incident to the due and lawful prosecution of the work. C6-6 . 3 PATENTED DEVICES , MATERIALS AND _PROCESSES : If the Contractor is required or desires to use any design , device , material , or process covered by letter, patent, or copyright, he shall provide for such use by suitable legal agreement with the patentee or owner of such patent , letter, or copyrighted design . It is mutually agreed and understood that without exception the contract prices shall include all royalties or cost arising from patents, trade-marks , and copy rights in any way involved in the work . The Contractor and his sureties shall indemnify and save harmless the owner from any and all claims for infringement by reason of the use of any such patented design , device , material or process , or any trade-mask or copy right in connection with the work agreed to �. be performed under these Contract Documents , and shall indemnify the Owner for any cost, expense, or damage which it may be obliged to pay by reason of such infringement at any time during the prosecution of the work or after completion of the work, provided , however , that the Owner will assume the responsibility to defend any and all suits brought for the infringement of any patent claimed to be infringed upon by the design , type of construction or material or equipment specified in the Contract Documents furnished the Contractor by the Owner, and to hold the Contractor harmless on account of such suits. C6-6 ( l ) C6-6 . 4 SANITARY PROVISIONS : The Contractor shall establish 9 and enforce among his employees such regulations in regard to cleanliness and disposal of garbage and waste as will tend to prevent the inception and spread of infectious or contagious j diseases and to effectively prevent the creation of a nuisance f about the work on any property either public or private, and such regulations as are required by Law shall be put into _ immediate force and effect by the Contractor . The necessary sanitary conveniences for use of laborers on the work , properly secluded from public observation , shall be constructed and maintained by the Contractor and their use cell hr ctrir l �� anforced by the Contractor . A 1 eiuch facilities shall be kept in a clean and sanitary condition, free from objectionable odors so as not to cause a nuisance . } All sanitary laws and regulations of the State of Texas and II the City shall be strictly complied with. C6-6 . 5 PUBLIC SAFETY AND CONVENIENCE: Materials or equipment stored about the work shall be so placed and used , and the work shall at all times be so conducted , as to cause no greater obstruction or inconvenience to the public than is considered to be absolutely necessary by the Engineer. The Contractor is required to maintain at all times all phases of his work in such a manner as not to impair the safety or convenience of the public , including, but not limited to , safe f � and convenient ingress and egress to property contiguous to } the work area. The Contractor shall make adequate provisions to render reasonable ingress and egress for normal vehicular traffic, except during actual trenching or pipe installation operations , at all driveway cLo�slliy-1� . 7LUufl PLUVib1.U3'1� ittay include bridging, placement of crushed stone or gravel or such 1 � other means of providing proper ingress and egress for the property served by the driveway as the Engineer may approve as appropriate . Such other means may include the diversion of driveway traffic, with specific approval by the Engineer . If 1 diversion of traffic is approved by the Engineer at any location, the Contractor shall make arrangements satisfactory to the Engineer at any location , the Contractor shall make 1 - arrangements satisfactory to the Engineer for the diversion of traffic , and shall , at his own expense, provide all materials and perform all work necessary for the construction and maintenance of roadways and bridges for such diversion of traffic. Sidewalks must not be obstructed except by special permission of the Engineer . The materials excavated and the construction materials such as pipe used in the construction of the work shall be placed so as not to endanger the work or prevent free access to all fire 4 hydrants, fire alarm boxes , police call boxes , water valves , C6-6 ( 2 ) f- gas valves , or manholes in the vicinity. The Owner reserves the right to remedy any neglect on the part of the Contractor as regards to public convenience and safety which may come to its attention , after twenty- Four hours notice in writing to the Contractor , save in cases of emergency when it shall have the right to remedy any neglect without notice , and in either case , the cost of such work done or materials furnished by the Owner or by the City shall be deducted from monies due or to become due to the Contractor. The Contractor , after approval of the Engineer, shall notify the Fire Department Headquarters, Traffic Engineer , and Police Department , when any street or alley is requested to be closed or obstructed or any fire hydrant is to be made inaccessible , and , when so directed by the Engineer, shall keep any street, streets , or highways in condition for unobstructed use by fire apparatus , The Contractor shall promptly notify the Fire Department Headquarters when all such obstructed streets , alleys, or hydrants are again placed back in service. Where the Contractor is required to construct temporary bridges or make other arrangements for crossing over ditches or streams , his responsibility for accidents in connection with such crossings shall include the roadway approaches as well as the structures of such crossings . The Contractor shall at all times conduct his operation and the use of construction machinery so as not to damage or destroy trees and shrubs located in close proximity to or on the site of the work. Wherever any such damage may be done , the Contractor shall immediately satisfy all claims of property owners, and no payment will be made by the Owner in settlement of such claims. The Contractor shall file with the Engineer a written statement showing all such claims adjusted. C6--6 . 6 PRIVILEGES OF CONTRACTOR IN STREETS , ALLEYS , AND RIGHT-OF-WAY : For the performance of the contract , the Contractor will be permitted to use and occupy such portions of the public streets and alleys , or other public places or other rights-of-way as provided for in the ordinances of the City , as shown in the Contract Documents , or as may be specifically authorized in writing by the Engineer . A reasonable amount of tools , materials , and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations . Excavated and waste materials shall be piled or stacked in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property . It the street is occupied by railway tracks , the work shall be r C6--6 (3 ) E I carried on in such manner as not to interfere with the � - operation of trains , loading or unloading of cars , etc . Other contractors of the Owner may, for all purposes required by the contract , enter upop the work and premises used by the Contractor and shall be provided all reasonable facilities and assistance for the completion of adjoining work . Any additional grounds desired by the Contractor for his use shall be provided by hits at his own cost and expense. C6-6 . 7 RAILWAY CROSSINGS : When the work encroaches upon any I� right-of --way of any railway , the City will secure the necessary easement for the work. where the railway tracks are to be crossed , the Contractor shall observe. all the regulations and instructions of the railway company as to the methods of performing the work and take all precautions for safety of property and the public . Negotiations with the railway companies for permits shall be done by and through the City . The Contractor shall give the City notice not less than five days prior to the time of his intentions to begin work on that portion of the project which is related to the railway properties . The Contractor will not be given extra or additional compensation for such railway crossings unless specifically set forth in the Contract Documents . C6-6 . 8 BARRICADES , WARNINGS AND WATCHMEN: Where the work is , carried on in or adjacent to any street , alley , or public ` place, the Contractor shall at his own expense furnish, erect, IN and maintain such barricades , fences , lights and danger signals , shall provide such watchmen, and shall take all such other precautionary measures for the protection of persons or nr-nnpr''l-v anti of f-ha wnrk aG aYa nc�racc�Yer R�rrir•ari�c an � fences shall be painted in a color that lwill Ybe visible ~at IIS night . From sunset to sunrise the Contractor shall furnish and maintain at least one easily visible burning light at each barricade . A sufficient number of barricades shall be erected and maintained to keep pedestrians away from, and vehicles from being driven on or into , any work under construction or being maintained. The Contractor shall furnish watchmen and keep them at their respective assignments in sufficient numbers to protect the work and prevent accident or damage. All installations and procedures shall be consistent with the provisions set forth in the " 1980 Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the. " State of Texas Uniform Act Regulating Traffic on Highways " , codified as Article 67014 Veron ' s Civil Statutes , pertinent sections being Section Nos . 27 , 29 , 30 and 31. ` C6-6 ( 4 ) The Contractor will not remove any regulatory sign , instructional sign, street name sign , or other sign which has been erected by the City. If it is determined that a sign must be removed to permit required construction , the Contractor shall contact the Transportation and Public Works department , Signs and Markings Division ( phone number 8760-8075 ) , to remove the sign . In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications , the permanent sign shall be left in place until the temporary sign requirements are met . When construction work is completed to the extent that the permanent sign can be re-installed, the Contractor shall again contact the Signs and Markings Division to re-install the permanent sign and shall leave his temporary sign in place until such re-installation is completed. The Contractor will be held responsible for all damage to the work or the public due to failure of barricades , signs , { fences , lights , or watchmen to protect them . Whenever evidence is found of such damage to the work the Engineer may order the damaged portion immediately removed and replaced by the Contractor at the Contractor ' s own expense . The Contractor ' s responsibility for the maintenance of barricades , signs, Fences and lights , and for providing watchmen shall not cease until the project shall have been completed and accepted by the Owner . No compensation , except as specifically provided in these Contract Documents , will be paid to the Contractor for the work and materials involved in the constructing , providing , and maintaining of barricades , signs , fences , and lights or for salaries of watchmen , for the subsequent removal and disposal of such barricades , signs , or for any other incidentals necessary for the proper protection , safety, and convenience of the public during the contract period , as this work is considered to be subsidiary to the several items for which unit or lump sum prices are requested in the Proposal . 2-6- 6 . 9 USE OF EXPLOSIVES , DROP WEIGHT , ETC . ;. Should the Contractor elect to -use explosives , drop weight , etc . , in the prosecution of the work, the utmost care shall be exercised at all times so as not to endanger life or property . The Contractor shall notify the proper representative of any public service corporation , any company , individual , or utility, and the Owner , not less than twenty--four hours in C6-6 ( 5 ] I I advance of the use of any activity which might damage or endanger their or his property along or adjacent to the work. Where the use of explosives is to be permitted on the project, as specified in the Special. Contract Documents , or the use of explosives is requested, the Contractor shall submit notice to l the Engineer in writing twenty-four hours prior to commencing 1 and shall furnish evidence that he has insurance coverage to protect against any damages and/or injuries arising out of � I.. such use of explosives. All claims arising out of the use of explosives shall be investigated and a written report made by the Contractor ' s r insurers to the Engineer within ten (10 ) days after receipt of written notice of the claim to the Contractor from either the City or the claimant . The City shall proceed to give notice 1 to the Contractor of any such claim. The use of explosives 1 may be suspended by the Engineer if any complaint is received and such use shall not be resumed until the cause of the i complaint has been addressed. Whenever explosives are stored or kept, they shall be stored � ! in a safe and secure manner and all storage places sha-11 be plainly marked "DANGEROUS EXPLOSIVES" and shall be under the care of a competent watchman at all times . All vehicles in which explosives are being transported shall be plainly marked as mentioned above and shall , insofar as possible, not use heavy traffic routes . C6-6 . 11 WORK WITHIN EASEMENTS ; Where the work passes over, 4 � through , or into private property, the towner will provide such right-of-way or easement privileges as the City may deem necessary for the prosecution of the work . A.ny additional 1c rights-of-way or work area considered necessary by the Contractor shall be provided by him at his own expense. Such additional rights-of-way or work area shall be acquired for the benefit of the City . The City shall be notified in I writing as to the rights so acquired before work begins in the affected area . The Contractor shall not enter upon private { property for any purpose without having previously obtained permission from the owner of such property . The Contractor will not be allowed to store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by the Contractor and a copy furnished to the Engineer . unless specifically provided otherwise , the Contractor shall clear all rights-of-way or easements of obstructions which must be removed to make possible proper prosecution of the work as a part of the project construction operations . The Contractor shall be responsible for the preservation of and shall use l 1� C6-6 (5 ) FM every precaution to prevent damage to all trees , shrubbery, plants, lawns, fences, culverts, curbing , and all other types .. of structures or improvements , to all water , sewer, and gas lines , to all conduits, overhead pole lines , or appurtenances thereof , including the construction of temporary fences , and to all other public or private property along adjacent to the work. The Contractor shall notify the proper representatives of owners or occupants of public or private lands or interest in lands which might be affected by the work. Such notice shall be made at least 48 hours in advance of the beginning of the work. Notices shall be applicable to both public and private utility companies or any corporation, company , individual , or other, either as owners or occupants , whose land or interest in land might affected by the work. The Contractor shall be responsible for all damage or injury to property of any character resulting from any act , omission , neglect , or misconduct in the manner or method or execution of the work, or at any time due to defective work, material, or equipment. When and where any direct or indirect or injury is done to public or private property on account of any act , omission , neglect, or misconduct in the execution of the work , or in consequence of the non-execution thereof on the part of the Contractor , he shall restore or have restored at his own cost and expense such property to a condition at least equal to that existing before such damage or injury was done, by repairing, rebuilding, or otherwise replacing and restoring as may be directed by the owner , or he shall make good such damages or injury in a manner acceptable to the owner of the property and the Engineer, All fences encountered and removed during construction of this project shall be restored to the original or a better than original condition upon completion of this project. When wire fencing, either wire mesh or barbed wire is to be crossed, the Contractor shall set cross braced posts on either side of permanent easement before the fence is cut . Should additional fence cuts be necessary, the Contractor shall provide cross braced posts at point of the proposed cut in addition to the cross braced posts provided at the permanent easements limits , before the fence is cut. Temporary fencing shall be erected in place of the fencing removed whenever the work is not in progress and when the site is vacated overnight , and/or at all times to prevent livestock from entering the construction area. The cost for fence removal, temporary closures and replacement shall be subsidiary to the various items bid in the project C6--6 c 7 f 1 proposal . Therefore , no separate payment shall be allowed for any service associated with this work. In case of failure on the part of the Contractor to restore � I such property to make good such damage or injury , the Owner may , upon 48 hour written notice under ordinary circumstances, and without notice when a nuisance or hazardous condition results , proceed to repair , rebuild, or otherwise restore such } property as may be determined by the Owner to be necessary, and the cost thereby will be deducted from any monies due or to become due to the Contractor under this Contract. Ccm-G 7 7 T I7 'c,P JE*'i n r-+N T 4, �.�. is.TD�uru�rut-.LrJ,, ivV1V"ltCf'il.:".l'lJt[: It 1S understood and agree by the parties hereto that Contractor shall perform all work and services hereunder as an independent contractor , and not as an officer , agent , servant or employee of the Owner . Contractor shall have exclusive control of and the exclusive right to control the details of all the work and services performed hereunder , and all persons performing same , and shall be solely responsible for the acts and omissions of its officers , agents , servants , employees , contractors , subcontractors , licensees and invitees . The doctrine of respondeat superior shall not apply as between Owner and Contractor, its officers , agents , employees , contractors and subcontractors , and nothing herein shall be construed as � i- creating a partnership or joint enterprise between Owner and Contractor , l C6 - 6 . 12 CONTRACTOR ' S RESPONSIBILITY FOR DAMAGE CLAIMS : Contractor covenants and agrees to, and does hereby indemnify, hold harmless and defend Owner , its officers , agents , servants , and employees from and against any an all claims or suits for property damage or loss and/or personal injury, including death, to any and all persons , of whatsoever kind or character , whether real or asserted , arising out of or in M4 connection with, directly or indirectly, the work and services to be performed hereunder by Contractor , its officers, agents, employees, contractors , subcontractors , licensees or invitees , whether or not caused , in whole or in part , by alleged negligence on the part of officers , agents , servants , employees , contractors, subcontractors , licensees and invitees of the owner ; and said Contractor does hereby covenant and agree to assume all liability and responsibility of Owner, its officers agents , servants and employees for property damage or loss , and/or personal injuries , including death , to any and all persons of whatsoever kind or character , whether real or asserted , arising out of or in connection with , directly or indirectly, the work and services to be performed hereunder by Contractor , its officers , agents employees , contractors , subcontractors, licensees and invitees , whether or not caused , i- C6-6 ( 8 ) f__ in whole or in part , by alleged negligence of officers , agents , servants , employees , contractors , subcontractors , licensees or invitees of the Owner . Contractor likewise covenants and agrees to, and does hereby, indemnify and hold harmless Owner from and against any and all injuries, loss or damages to property of the Owner during the performance of any of the terms and conditions of this Contract , whether arising out of or in connection with or resulting from, in whole or in part , any and all alleged acts or omissions of officers , agents , servants , employees , contractors , subcontractors , licenses, or invitees of the Owner. In the event a written claim for damages against the contractor or its subcontractors remains unsettled at the time all work on the project has been completed to the satisfaction of the Director of the Water Department , as evidenced by a final inspection, final payment to the Contractor shall not be recommended by the Director of the Water Department for a period of 30 days after the date of such final inspection , unless the Contractor shall submit written evidence satisfactory to the Director that the claim has been settled and a release has been obtained from the claimant involved. If the claim concerned remains unsettled as of the expiration of the above 30-day period, the Contractor may be deemed to be entitled to a semi-final payment for work completed , such semi-final payment to be in an amount equal to the total dollar amount then due less the dollar value of any written claims pending against the Contractor arising out of the performance of such work, and such semi--final payment may then be recommended by the Director. The Director shall not recommend final payment to a Contractor against whom such a claim for damages is outstanding for a period of six months following the date of the acceptance of the work performed unless the Contractor submits evidence in writing satisfactory to the Director that : 1 . The claim has been settled and a release has been obtained from the claimant involved, or 2. Good faith efforts have been made to settle such outstanding claims , and such- good faith efforts have failed. If condition (1 ) above is met at any time within the six month period, the Director shall recommend that the final payment to the Contractor be made . If condition ( 2 ) above is met at any time within the six month period , the Director may recommend that the final payment to the Contractor be made . At the C6-6 ( 9 ) expiration of the six month period the Director may recoma end that f inal payment be made if all other work has been performed and all other obligations of the Contractor have been met to the satisfaction of the Director . The Director may, if he deems it appropriate, refuse to accept bids on other Water Department Contract work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City contract. C6-5 . 13 CONTRACTOR' S CLAIM FOR DAMAGES: Should the Contractor claim compensation for any alleged damage by reason of the acts or omissions of the Owner , he shall within three days after the actual sustaining of such alleged damage , make a written statement to the Engineer , setting out in detail the nature of the alleged damage, and on or before the 25th day of the month succeeding that in which any such damage is claimed to have been sustained , the Contractor shall file with the Engineer an itemized statement of the details and amount of such alleged damage and, upon request, shall give the Engineer access to all books of account , receipts, vouchers , bills of lading, and other books or papers containing any evidence as �� to the amount of such alleged damage. Unless such statements shall be filed as hereinabove required, the Contractor ' s claim for compensation shall be waived, and he shall not be entitled to payment on account of such damages. ` C6-6 . 14 ADJUSTMENT OR RELOCATION OF PUBLIC UTILITIES , ETC. : ` In case it is necessary to change , move , or altar in any manner the property of a public utility or others , the said not be moved ni r.l-ar � mr -rl t,71 th 11 �r.: 4r�'Y' shall not r'I � T l C7rC1PT'-c; thereupon have been issued by the Engineer . The right is reserved to the owners of public utilities to enter the geographical limits of the Contract for the purpose of making ' such changes or repairs to their property that may be 44 necessary by the performance of this contract. C6-6 . 15 TEMPORARY SEWER AND DRAIN CONNECTIONS: When existing sewer lines have to be taken up or removed , the Contractor shall , at his own expense and cost , provide and maintain temporary outlets and connections for all private or public drains and sewers. The Contractor shall also take care of all sewage and drainage which will be received from these drains and sewers , and for this purpose he shall provide and maintain, at his own cost and expense , adequate pumping facilities and temporacy outlets or diversions, �~ The Contractor , at his own cost and expense, shall construct such troughs , pipes , or other structures necessary , and be prepared at all Limes to dispose of drainage and sewage �R C6-6 ( 1D ) received from these temporary connections until such times as the permanent connections are 'built and are in service. The existing sewers and connections shall be kept in service and maintained under the Contract , except when specified or ordered to be abandoned by the Engineer . All water, sewage, and other waste shall be disposed of in a satisfactory manner so that no nuisance is created and so that the work under construction will be adequately protected. C6-6 . 16 ARRANGEMENT AND CHARGES FOR. WATER FURNISHED BY THE CITY: when the Contractor desires to use City water in connection with any construction work, he shall make complete and satisfactory arrangements with the Fort Worth City Water Department for so doing. City water furnished to the Contractor shall be delivered to the Contractor from a connection on an existing City main . All piping required beyond the point of delivery shall be installed by the Contractor at his own expense. The Contractor ' s responsibility in the use of all existing fire hydrant and/or valves- is detailed in Section E2-1 . 2 USE OF FIRE HYDRANTS AND VALVES in these General Contract Documents . When meters are used to measure the water , the charges , if any, for water will be at the regular established rates . When meters are not used , the charges , if any , will be as prescribed by the City Ordinance , or where no ordinance applies , payment shall be made on estimates and rates established by the Director of the Fort Worth Water Department. C6-6 . 17 USE OF A SECTION OR PORTION OF THE WORK: Whenever, in the opinion of the Engineer , any section or portion of the work or any structure is in suitable condition, it may be put into use upon the written order of the Engineer , and such usage shall not be held to be in any way an acceptance of said work or structure or any part thereof or as a waiver of any of the provisions of these Contract Documents . All necessary repairs and removals of any section of the work so put into use , due to defective materials or workmanship, equipment , or to deficient operations on the part of the Contractor , shall be performed by the-Contractor at his own expense. C5- 6 . 18 CONTRACTOR ' S RESPONSIBILITY FOR THE WORK: Until written acceptance by the Owner as provided for in these Contract Documents , the work shall be under the charge and care of the Contractor , and he shall take every necessary precaution to prevent injury or damage to the work or any part C6--6 ( 11 ) thereof by action of the elements or from any cause whatsoever , whether arising from the execution or nonexecution I of the work . The Contractor shall rebuild, repair, restore, II and make good at his own expense all injuries or damage to any portion of the work occasioned by any of the hereinabove causes. i C6-6 . 19 NO WAIVER OF LEGAL RIGHTS: Inspection by the Engineer or any order by the Owner by payment of money or any payment , for or acceptance of any work, or any extension of time, or any possession taken by the City shall not operate as a waiver of any provision of the Contract Documents . Any waiver of any hraar-h n r-nntrar chi 11 not hgz h P I a f-n ha a wA i vpr of n n_v other or subsequent breach. The Owner reserves the right to correct any error that may be discovered in any estimate that may have been paid and to adjust the same to meet the requirements of the Contract Documents . C6-6 . 20 PERSONAL LIABILITY OF PUBLIC OFFICIALS: In carrying out the provisions of these Contract Documents or in I '� exercising any power of authority granted thereunder , there shall be no liability upon the authorized representatives of the Owner , either personally or otherwise as they are agents and representatives of the City. ` C6-6 . 21 STATE SALES TAX: On a contract awarded by the City of Fort Worth , an organization which qualifies for exemption pursuant the provisions of Article 20 . 04 ( H ) of the Texas LimiL-�-_u .Sales , ttxuise , dilU Use Tax Act , thle Contractor may purchase, rent or lease all materials , supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax , said exemption certificate to comply with State { Comptroller ' s Ruling . 007 . Any such exemption certificate II issued by the Contractor in lieu of the tax shall be subject f to and shall comply with the provisions of State Comptroller ' s Ruling . 011. , and any other applicable State Comptroller rulings pertaining to the Texas Limited Sales , Excise, and Use Tax Act. - On a contract awarded by a developer for the construction of a publicly--owned improvement in a street right-cif- way or other easement which has been dedicated to the public and the City •, of Fort Worth , an organization which qualifies for exemption pursuant to the provisions of Article 20 . 04 ( H) of the Texas limited Sales , Excise , and Use Tax Act , the Contractor can probably be exempted in the same manner stated above . I C6-6 ( 12 ) II(+ 1 � .. 40 Limited Sale, Excise and Use Tax permits and information can be obtained from. an Comptroller of Public Accounts Sale Tax Division Capitol Station Austin, TK C6--6 t 131 PW PW PART C -- GENERAL CONDITIONS C7-7 PROSECUTION AND PROGRESS ON an SECTION C7-7 PROSECUTION AND PROGRESS: C7-7 . 1 SUBLETTING: The Contractor shall perform with his own organization , and with the assistance of workman under his immediate superintendance , work of a value of not less than fifty (50% ) percent of the value embraced in the contract. If the Contractor sublets any part of the work to be done under these Contract Documents , he will not under any circumstances be relieved of the responsibility and obligation assumed under these Contract Documents . All transactions of the Engineer will be with the Contractor . Subcontractors will be considered only in the capacity of employees or workmen of the Contractor and shall be subject to the same requirements as to character and competency. The owner will not recognize any subcontractor on the work. The Contractor shall at all times, when the work is in operation , be represented either in person or by a superintendent or other designated representatives. C7-7 . 2 ASSIGNMENT OF CONTRACT : The Contractor shall not assign, transfer, sublet, convey, or otherwise dispose of the contract or his rights , title, or interest in or to the same or any part thereof without the previous consent of the owner expressed by resolution of the City Council and concurred in by the Sureties. If the Contractor does, without such previous consent, assign, transfer, sublet, convey, or otherwise dispose of the contract PM or his right , title , or interest therein or any part thereof, to any person or persons , partnership , company , firm , or corporation, or does by bankruptcy, voluntary or involuntary, or by assignment under the insolvency laws of any state , attempt to dispose of the contract may, at the option of the owner be revoked and annulled , unless the Sureties shall successfully complete said contract , and in the event of any P" such revocation or annulment, any monies due or to become due under or by virtue of said contract shall be retained by the Owner as liquidated damages for the reason that it would be on impracticable and extremely difficult to fix the actual damages . do C7-7 . 3 PROSECUTION OF THE WORK; Prior to beginning any construction operation , the Contractor shall submit to the Engineer in five or more copies, if requested by the Engineer, a progress schedule preferably in chart or diagram form, or a "" brief outlining in detail and step by step the manner of C7-7 (1 ) �- It prosecuting the work and ordering materials and equipment which he expects to follow in order to complete the project in the scheduled time. There shall also be submitted a table of estimated amounts to be earned by the Contractor during each monthly estimate period. The Contractor shall commence the work to be performed under this contract within the time limit stated in these Contract Documents and shall conduct the work in a continuous manner and with sufficient equipment , materials , and labor as is necessary to insure its completion within the time limit. rnL L 1 -1 L LLI2 sequence requested or alcons"k-ruction operations Slid-L.L 0e at all times as specified, in the Special Contract Documents . Any deviation from scuh sequencing shall be submitted to the Engineer for his approval . Contractor shall not proceed with any deviation until he has received written approval from the Engineer . Such specification or approval by the Engineer , shall not relieve the Contractor from the full responsibility of the complete performance of the Contract. The contract time may be changed only as set forth in Section C7--7 .8 "Extension of Time of Completion" of this Agreement, and a progress schedule shall not constitute a change in the contract time, I C7-7 . 4 LIMITATIONS OF OPERATIONS : The working operations shall at all 'times be conducted by the Contractor so as to create a minimum amount of inconvenience to the public. At any time when, in the judgment of the Engineer, the Contractor has obstructed or closed or is carrying on operations in a portion of a street or public way greater than is necessary � - for the proper execution of the work, the Engineer may require the Contractor to finish the section on which operations are in progress before the work is commenced on any additional f section or street. 07-7 . 5 CHARACTER OF WORKMEN AND EQUIPMENT: Local labor shall be used by the Contractor is available . The Contractor may bring in from outside the City of Fort Worth his key men and his superintendent. All other workmen , including equipment operators , may be imported only after the local supply is 4 ` exhausted . The Contractor shall employ only such superintendents , foremen , and workmen who are careful , competent, and fully qualified to perform the duties or tasks �- assigned to them, and the Engineer may demand and secure the summary dismissal of any person or persons employed by the Contractor in or about or on the work who, in the opinion of _ the Owner , shall misconduct himself or be found to be incompetent , disrespectful , intemperate , dishonest , or R_ C7-7 ( 2 ) h otherwise objectionable or neglectful in the proper performance of his or their duties , or who neglects or refuses to comply with or carry out the directions of the Owner, and such person or persons shall not be employed again thereon without written consent of the Engineer. All workmen shall have sufficient skill , ability , and experience to properly perform the work assigned to them and operate any equipment necessary to properly carry out the performance of the assigned duties. The Contractor shall furnish and maintain on the work all such equipment as is considered to be necessary for prosecution of the work in an acceptable manner and at a satisfactory rate of progress . All equipment , tools , and machinery used for handling materials and executing any part of the work shall be subject to the approval of the Engineer and shall be maintained in a satisfactory , safe and efficient working condition. Equipment on any portion of the work shall be such that no injury to the work , workmen or adjacent property will result from its use. C7-7 . 6 WORK SCHEDULE : Elapsed working days shall be computed starting with the first day of work completed as defined in Cl-1 . 23 " WORKING DAY" or the date stipulated in the "WORK ORDER" for beginning work, whichever comes first. Nothing in these Contract Documents shall be construed as prohibiting the Contractor from working on Saturday, Sunday or Legal Holidays , providing that the following requirements are met: a. A request to work on a specific Saturday, Sunday or Legal Holiday must be made to the Engineer no later than the proceeding Thursday. b. Any work to be done on the project on such a specific Saturday, Sunday or Legal Holiday must be , in the opinion of the Engineer , essential to the timely completion of the project . The Engineer ' s decision shall be final in response to such a request for approval to work on a specific Saturday , Sunday or Legal Holiday, and no extra compensation shall be allowed to the Contractor for any work performed on such a specific Saturday, Sunday or Legal Holiday. Calendar Days shall be defined in C1-1 . 24 and the Contractor may work as he so desires . C7-7 ( 3 ) 1 C7-7 . 7 TIME OF COMMENCEMENT AND COMPLETION: The Contractor shall commence the working operations within the time V specified in the Contract Documents and set forth in the Work ` Order. Failure to do so shall be considered by the Owner as abandonment of the Contract by the Contractor and the Owner may proceed as he sees fit. i. The Contractor shall maintain a rate of progress such as will insure that the whole work will be performed and the premises 11 cleaned up in accordance with the Contract Documents and within the time established in such documents and such extension of time as may be properly authorized by the Owner . 07--7 . 8 EXTENSION OF TIME COMPLETION: The Contractor ' s request for an extension of time of completion shall be considered only when the request for such extension is submitted in writing to the Engineer within seven days from and after the time alleged cause of delay shall have occurred. Should an extension of the time of completion be requested such request will be forwarded to the City Council for approval In adjusting the contract time for completion of work , l ,r consideration will be given to unforseeable causes beyond the control, of and without the fault or negligence of the Contractor, including but limited to acts of the public enemy , acts of the owner , fire , flood , tornadoes , epidemics , quarantine restrictions, strikes , freight embargoes , or delays of sub-contractors due to such causes. When the date of completion is based on a calendar day bid, a 4 f x t L ; ., o f t1m2 bec_=use ref i n f-I arnPrit weather will not be considered . A request for extension of time due 6 to inability to obtain supplies and materials will be I considered only when a review of the Contractor ' s purchase order dates and other pertinent data as requested by the ( . Engineer indicates that the Contractor has made a bonafide attempt to secure delivery on schedule . This shall include efforts to obtain the supplies and materials from alternate sources in case the first source cannot make delivery. { If satisfactory execution and completion of the contract should require worn and materials in greater amounts or, quantities than those set forth in the approved Contract Documents , then the contract time may be increased by Change Order . C7-7 . 9 DELAYS : The Contractor shall. receive no compensation for delays or hindrances to the work , except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material , if I� C7-7 ( 4 ) any, which is to be furnished by the City . When such extra compensation is claimed a written statement thereof small be presented by the Contractor to the Engineer and if by him found correct shall be approved and referred by him to the Council for final approval or disapproval ; and the action thereon by the Council shall be final and binding . If delay is caused by specific orders given by the Engineers to stop work, or by the performance of extra work , or by the failure of the City to provide material or necessary instructions for carrying on the work , then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall , however , be subject to the approval of the City Council ; and no such extension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. C7--7 . 10 TIME OF COMPLETION: The time of completion is an essential element of the contract. Each bidder shall indicate in the appropriate place on the last page of the Proposal the number of working days or calendar days that he will require to fully complete this contract or the time of completion will be specified by the City in the Proposal section of the contract documents . The number of days indicated shall be a realistic estimate of the time required to complete the work covered by the specific contract being bid upon . The amount of time so stated by the successful bidder or the City will become the time of completion specified in the Contract Documents . + For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents , or the increased time granted by the owner , or as automatically increased by additional work or materials ordered after the contract is signed, the sum per day given in the following schedule , unless otherwise specified in other parts of the Contract Documents , will be deducted from monies due the Contractor , not as a penalty , but as liquidated damages suffered by the owner . AMOUNT OF CONTRACT Less than $ 5 , 000 inclusive $ 35 . 00 $ 5, 001 to $ 15 , 000 inclusive $ 45 .00 p $ 15 , 001 to $ 25 , 000 inclusive $ 63.00 $ 25 , 001 to $ 50 , 000 inclusive $ 105 . 00 $ 50 , 001 to $ 100 ,000 inclusive $ 154 . 00 $ 100 ,001 to $ 500 , 000 inclusive $ 210 . 00 C7-7 ( 5 ) $ 506 ,001 to $1,000,000 inclusive $ 315. 00 $1 , 000, 001 to $2, 000 ,000 inclusive $ 424. 00 $2, 060, 001 and over $ 630. 60 The parties hereto understand and agree that any harm to the f `� City caused by the Contractor ' s delay in completing the work k ' hereunder in the time specified by the Contract Documents would be incapable or very difficult of accurate estimation , •� and that the "Amount of Liquidated Damages Per Day" , as set out above , is a reasonable forecast of just compensation due the City for harm caused by any delay. k 7_-7 = 11 SUSPENSION COURIT nnitnEnt_ mL t' shall OR a�x . lac �.c� 1 i.1•-rx C:r�tJL suspend operations on such part or parts of the work ordered by any court , and will not be entitled to additional j compensation by virtue of such court order . Neither will he I � be liable to the City in the event the work is suspended by a Court Order . Neither will the owner be liable to the Contractor by virtue of any Court order or action for which the Owner is not solely responsible. C7-7 . 12 TEMPORARY SUSPENSION; The Owner shall have the right to suspend the work operation wholly or in part for such period or periods of time as he may deem necessary due to unsuitable weather conditions or any other unfavorable conditions which in the opinion of the owner or Engineer cause further prosecution of the work to be unsatisfactory or detrimental to the interest of the project. During temporary suspension of work covered by this contract , for any reason , the Owner will make no extra payment for stand-by time of UQ1)8LruUL1, un equipment and/or construction crews . If it should become necessary to suspend work for an indefinite period, the Contractor shall store all materials in such manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. � Should the Contractor not be able to complete a portion of the i project due to causes beyond the control of and without the €atilt or negligence of the Contractor as set forth in Paragraph C7-7 . 8 EXTENSION OF THE TIME OF COMPLETION ■ and should it be determined by mutual consent of the Contractor 1 and the Engineer that a solution to allow construction to proceed is not available within a reasonable period of time, then the Contractor may be reimbursed for the cost of moving ' his equipment off the job and returning the necessary equipment to the job when it is determined by the Engineer 1 C7-7 { 6 ? that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. No reimbursement shall be allowed if the equipment is moved to another construction project for the City of fort Worth. The Contractor shall not suspend work without written notice from the Engineer and shall proceed with the work operations promptly when notified by the Engineer to so resume operations. C7--7 . 13 TERMINATION OF CONTRACT DUE To NATIONAL EMERGENCY: whenever, because of National Emergency , so declared by the President of the United States or other lawful authority, it becomes impossible for the Contractor to obtain all of the necessary labor , materials, and equipment for the prosecution of the work with reasonable continuity for a period of two months , the Contractor shall within seven days notify the City in writing, giving a detailed statement of the efforts which have been made and listing all necessary items of labor , materials , and equipment not obtainable . If , after investigations , the Owner finds that such conditions existing and that the inability of the Contractor to proceed is not I attributable in whole or in part to the fault or neglect of the Contract, then if the Owner cannot after reasonable effort assist the Contractor in procuring and making available the necessary labor, materials and equipment within thirty days , the Contractor may request the Owner to terminate the contract and the Owner may comply with the request, and the termination shall be conditioned and based upon a final settlement mutually acceptable to both the Owner and the Contractor and final payment shall be made in accordance with the teras of the agreed settlement, which shall include, but not be limited to , the payment for all work executed but no anticipated profits on work which has not been performed. C7-7. 14 SUSPENSION OR ABANDONMENT OF THE WORK AND ANNULMENT OF CONTRACT : The work operations on all or any portion or section of the work under Contract shall be suspended immediately on written order of the Engineer or the Contract may be declared cancelled by the City Council for any good and sufficient cause. The following , by way of example , but not of limitation , may be considered grounds for suspension or cancellation: a . failure of the Contractor to commence work operations within the time specified in the Work Order issued by the Owner . C7-7 ( 7 ) b. Substantial evidence that progress of the work operations by Contractor is insufficient t ❑ complete the work within the specified time. c. Failure of the Contractor to provide and maintain sufficient labor and equipment to properly execute the working operations. d. Substantial evidence that the Contractor has abandoned the work. e. Substantial evidence that the Contractor has become insolvent or bankrupt , or otherwise financially unable to carry on the work satisfactorily. f. Failure on the part of the Contractor to observe � �- any requirements of the. Contract Documents or to comply with any orders given by the Engineer or owner provided for in these Contract Documents. I g. Failure of the •Contractor promptly to make good any defect in materials or workmanship , or any defects of any nature the correction of which has been directed in writing by the Engineer or the owner. � p h. Substantial evidence of collusion for the purpose of illegally procuring a contract or perpetrating fraud an the City in the construction of work under contract. i _ A substantial indication that the Contractor has made an unauthorized assignment of the contract or any funds due therefrom for the benefit of any creditor or for any other purpose. j . If the Contractor shall for any cause whatsoever , not carry on the working operation in an acceptable manner . k. If the Contractor commences legal action against the owner . A copy of the suspension order or action of the City Council shall be served on the Contractor ' s Sureties . When work is suspended for any cause or causes , or when the contract is cancelled, the Contractor shall discontinue the work or such part thereof as the owner shall designate , whereupon the Sureties may , at their option , assume the contract or that portion thereof which the Owner has ordered the Contractor to discontinue , and may perform the same or may , with the written j C7-7 ( 8 ) I consent of the Owner , sublet the work or that portion of the work as taken over, provided however, that the Sureties shall exercise their option , if at all. , within two weeks after the written notice to discontinue the work has been served upon the Contractor and upon the Sureties or their authorized agents . The Sureties , in such event shall assume the Contractor ' s place in all respects , and shall be paid by the owner for all work performed by them in accordance with the terms of the Contract Documents. All monies remaining due the .i Contractor at the time of this default shall thereupon become due and payable to the Sureties as the work progresses , subject to all of the terms of the Contract Documents. In case the Sureties do not, within the hereinabove specified time, exercise their right and option to assume the contract responsibilities , or that portion thereof which the Owner has ordered by the Contractor to discontinue, then the Owner shall have the power to complete , by contract or otherwise, as it may determine, the work herein described or such part thereof as it may deem necessary, and the Contractor hereto agrees that the owner shall have the right to take possession of and use any materials , plants , tools , equipment, supplies , and property of any kind provided by the Contractor for the purpose of carrying on the work and to procure other tools, equipment, materials, labor and property for the completion of the work, and to charge to the account of the Contractor of said contract expense for labor, materials , tools , equipment , and all expenses incidental thereto . The expense so charged shall be deducted by the owner from such monies as may be due or may become due at any time thereafter to the Contractor under and by virtue of the Contract or any part thereof . The Owner shall not be required to obtain the lowest bid for the work completing the contract , but the expense to be deducted shall be the actual cost of the owner of such work . In case such expenses shall exceed the amount which would have been payable under the Contract if the same had been completed by the Contractor , then the Contractor and his Sureties shall pay the amount of such excess to the City on notice from the ©wner of the excess due. When any particular part of the work is being carried on by the Owner by contract or otherwise under the provisions of this section, the Contractor shall continue the remainder of the work in conformity with the terms of the Contract Documents and in such a manner as to not hinder or interfere with performance of the work by the Owner. C7 -7 . 15 FULFILLMENT OF CONTRACT : The Contract will be considered as having been fulfilled, save as provided in any bond or bonds or by law, when all the work and all sections or parts of the project covered by the Contract Documents have rC7-7 ( 9) I l� been finished and completed, the final inspection made by the Engineer, and the final acceptance and final payment made by II the Owner. 1 C7-7 . 15 TERMINATION FOR CONVENIENCE OF THE OWNER: A. NOTICE OF TERMINATION: The performance of the work ` under this contract may be terminated by the Owner in whole , or from time to time in part , in accordance with this section , whenever the Owner shall determine that such termination is in the best interest of the owner . Anv such termination 5 , shall be effected by mailing a notice of termination to the Contractor specifying the extent to which performance of work under the contract is 1 terminated , and the date upon w'h ich such termination becomes effective . Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Mail by the Owner . Further , it shall be deemed conclusively presumed and established that such termination is made with just cause as therein t stated ; and no proof in any claim, demand or suit shall be required of the Owner regarding such discretionary action. H. CONTRACTOR ACTION: After receipt of a notice of termination , and except as otherwise directed by the Engineer, the Contractor shall : 1. Stop work under the contract on the date and to the extent specified in the notice of termination; 2 . place no further orders or subcontracts for materials , services or facilities except as may be necessary for completion of such portion of the work under the contract as is � not terminated; 3 . terminate all orders and subcontracts to the f. extent that they relate to the performance of ` work terminated by the notice of termination ;. 4 . transfer title to the Owner and deliver in the manner , at the times , and to the extent , if any, directed by the Engineer: C7--7 (la ) ON ON a. the fabricated or unfabricated parts , work in process , completed work , *. supplies and ether material produced as a part of , or acquired in connection with the performance of , the worn terminated by the notice of termination; and b. the completed, or partially completed plans, drawings , information and other property which , if the contract had been completed , would have been required to be furnished to the Owner. 5. complete performance of such part of the work as shall not have been terminated by the notice of termination; and 6 . take such action as may be necessary, or as the Engineer may direct , for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the Engineer a list , certified as to quantity and quality , of any or all items of termination .• inventory not previously disposed of , exclusive of items the disposition of which has been directed or authorized by the Engineer. Not later than 15 days thereafter, the owner shall accept title to such items provided , that the list submitted shall be subject to verification by the Engineer upon removal of the items or , if the items are stored , oft within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final 4M settlement. C. TERMINATION CLAIM: Within 60 days after notice of on termination , the Contractor shall submit his termination claim to the Engineer in the form and with the certification prescribed by the 'Engineer . Unless one or more extensions in writing are granted by the owner upon request of the Contractor , made in writing within such 60-day period or authorized extension thereof , any and all F such claims shall be conclusively deemed waived. PM C7--7 ( 11 ) PM D. AMOUNTS : Subject to the provisions of Item C7--7 . 16(C ) , the Contractor and Owner may agree upon the whole or any part of the amount or amounts to be paid to the Contractor by reason of the total or I �, partial termination of work pursuant hereto ; i provided, that such agreed amount or amounts shall 1 never exceed the total contract price as reduced by the amount of payments otherwise made and as �" further reduced by the contract price of work not terminated . The contract shall be amended accordingly , and the Contractor shall be paid the agreed amount . No amount shall be due for lost or anticipated profits . Nothing in C7 - 7 . 16 ( E ) hereafter , prescribing the amount to be paid to the Contractor in the event of failure of the Contractor by reason of the termination of work pursuant to this section, shall be deemed to limit, restrict or otherwise determine or affect the 1 �MI! amount or amounts which may be agreed upon to be { paid to the Contractor pursuant to this paragraph . E. FAILURE TO AGREE : In the event of the failure of the Contractor and the Owner to agree as provided in C7-7 . 15 ( D ) upon the whole amount to be paid, to the Contractor by reason of the termination of work pursuant to this section the Owner shall determine, on the basis of information available to it , the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined . No amount shall be due for lost or anticipated profits . F. DEDUCTIONS : In arriving at the amount due the contractor under this section , there shall be deducted ( a ) all unliquidated advance or other. I� payments on account theretofore made to the Contractor , applicable to the terminated portion of this contract ; ( b ) any claim which the Owner may �- have against the Contractor in connection with this contract ; and ( c ) the agreed price for , or the proceeds of sale of , any materials , supplies or R other things kept by the Contractor or sold , pursuant to the provisions of this clause, and not otherwise recovered by or credited to the Owner . G . ADJUSTMENT : If the termination hereunder b partial, prior to the settlement of the terminated portion of this contract , the Contractor may fit's L with the Engineer a request in writing for an C7-7 ( 12 ) 1 to an equitable adjustment of the price or prices specified in the contract relating to the continued portion of the contract (the portion not terminated by the notice of termination ) , such equitable adjustment as may be agreed upon shall be made in such price or prices ; nothing contained herein , however , shall limit the right of the Owner and the Contractor to agree upon the amount or amounts to be paid to the Contractor for the completion of the continued portion of the contract when said contract does not contain an established contract price for such continued portion. H. NO LIMITATION OF RIGHTS: Nothing contained in this section shall limit or alter the rights which the Owner may have for termination of this contract under C7-7 . 14 hereof entitled " Suspension of Abandonment of the work and Amendment of Contract" or any other right which owner may have for default or breach of contract by Contractor. C7-7 . 17 SAFETY METHODS AND PRACTICES: The Contractor shall be responsible for initiating , maintaining, and supervising all safety precautions and programs in connection with the work at all times and shall assume all responsibilities for their enforcement. The Contractor shall comply with federal , state, and local laws, ordinance-s, and regulations so as to protect person and property from injury, including death, or damage in connection with the work. r r F rC7-7 (13 ) r PART C - GENERAL CONDITIONS C8-8 MEASUREMENT AND PAYMENT SECTION C8-8 MEASUREMENT AND PAYMENT C8 -8 . 1 ,MEASUREMENT OF QUANTITIES : The determination of quantities of work performed by the Contractor and authorized by the Contract. Documents acceptably completed under the terms of the Contract Documents shall be made by the Engineer , based on measurements made by the Engineer. These measurements will be made according to the United States Standard Measurements used in common practice, and will be the actual length, area, solid contents , numbers , and weights of the materials and items installed. C8-8 . 2 UNIT PRICES : When in the Proposal a "Unit Price" is set forth, the said "Unit Price" shall include the furnishing by the Contractor of all labor , tools , materials , machinery, equipment , appliances and appurtenances necessary for the construction of and the completion in a manner acceptable to the Engineer of all work -to be done under these Contract Documents . I The "Unit Price" shall include all permanent and temporary protection of overhead, surface, and underground structures , cleanup, finished , overhead expense , bond, insurance, patent fees , royalties , risk due to the elements and other causes , delays , profits , injuries , damages claims , taxes , and all other items not specifically mentioned that may be required to fully construct each item of the work complete in place and in a satisfactory condition for operation . C8 -8 . 3 LUMP SUM: When in the Proposal a " Lump Sum" is set forth, the said "Lump Sum" shall represent the: total cost for the Contractor to furnish all labor , tools , materials , machinery, equipment , appurtenances , and all subsidary work necessary for the construction and completion of all the work to provide a complete and functional item as detailed in the Special Contract Documents and/or Plans . C8 - 8 . 4 SCOPE OF PAYMENT: The Contractor shall receive and accept the compensation, as herein provided , in full payment for furnishing all labor , tools , materials , and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements , for any unforeseen defects or obstructions which may arise or be encountered during the prosecution of the work at any time r CB-8 ( I ] I � before its final. acceptance by the Owner, (except as provided in paragraph C5-5 . 14 ) for all risks of whatever description � I connected with the prosecution of the work, for all expense incurred by or in consequence of suspension or discontinuance of such prosecution of the working operations as herein specified. , or any and all infringements of patents , trademarks , copyrights , or other legal reservations, and for completeing the work in an acceptable manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to final acceptance of the work by the owner shall in no way constitute an ar.-knowl-rirrmarst r%F the mr--tancea Of the :Tork, ;,^mt¢ri 31 Sr ur equipment, nor in any way prejudice or affect the obligations of the Contractor to repair , correct, renew, or replace at his own and proper expense any defects or imperfections in the construction or in the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract and its appurtenances, k ' or any damage due or attributed to such defects , which defects , imperfection, or ' damage shall have been discovered on or before the final inspection and acceptance of work or a during the one year guaranty period after final acceptance. The Owner shall be the sole judge of such defects , imperfections, or damage , and the Contractor shall be liable to the Owner for failure to correct the same as provided herein . C8-8 . 5 PARTIAL, ESTIMATES AND RETAINAGE: Between the 1st and M 5th day of each month the Contractor shall submit to the s a_lY_ Value 4 5...-. Y',i1C� .ilieErL a .4s' I..aLI~4il!a'EI�L. �IYCJNII.LSL� ctll CtiL.lYltcltdr 6JL t � �+:k_f �-+«= work done during the previous month , or estimate period under the Contract Documents . Not later than the 10th day of the month the Engineer shall verify such estimate , and if it is found to be acceptable and the value of work performed since the last partial payment was made exceeds one hundred dollars ( $100 . 00 ) in amount, 90% of such estimated sum will be paid to the Contractor if the total contract amount is less than $ 400 , 000 , or 95% of such estimated sum will be paid to the Contractor if the total contract amount is $400 ,000 or greater within twenty-five (25 ) days after the regular estimate period. The City will have the option of preparing estimates on forms j furnished by the City . The partial estimate may include 1 acceptable nonperishable materials delivered to the work which are to be incorporated into the work as a permanent part thereof , but which at the the time of the estimate have not been installed . ( such payment will be allowed on a basis of 85% of the net invoice value thereof . ) The Contractor shall furnish the Engineer such information as he may request to aid C8--8 ( 2 ) q. . i him as a guide in the verification or the preparation of partial estimates. It is understood that the partial estimate from month to month will be approximate only , and all partial monthly estimates and payment will be subject to correction in the estimate '" rendered following the discovery of an error in any previous estimate,and such estimate shall not, in any respect, be taken as an admission of the Owner of the amount of work done or of on its quality of sufficiency, or as an acceptance of the work done or the release of the Contractor of any of his responsibilities under the Contract Documents. ON The City reserves the right to withhold the payment of any monthly estimate if the contractor fails to perform the work strictly in accordance with the specifications or provisions 1 of this contract. C8-8 . 6 WITHHOLDING PAYMENT : Payment on any estimate or estimates may be held in abeyance if the performance of the construction operations is not in accordance with the requirements of the Contract Documents. 0 d C8--8 . 7 FINAL ACCEPTANCE: Whenever the improvements provided for by the Contract Documents shall have been completed and all requirements of the Contract Documents shall have been fulfilled on the part of the Contra--tar , the Contractor shall notify the Engineer in writing that the improvements are ready for the final inspection . The Engineer shall notify the PF appropriate officials of the owner, will within a reasonable time make such final inspe-ction , and if the work is satisfactory , in an acceptable condition , and has been PM completed in accordance with the terms of the Contract Documents and all approved modifications thereof , the Engineer will initiate the processing of the final estimate and recommend final acceptance of the project and final payment rtherefor as outlined in C8-8 . 8 below.. C8--8. 8 FINAL PAYMENT: Whenever all the improvements provided for by the Contract Documents and all approved modifications thereof shall have been completed and all requirements of the Contract Documents have been fulfilled on the part of the Contractor , a final estimate showing the value of the work will be prepared by the Engineer as soon as the necessary measurements, computations, and checks can be made. All prior estimates upon which payment has been made are subject to necessary corrections or revisions in the final payment. r oft C8-8 (3 ) r ! J � I I The amount of the final estimate, less previous payments and any sum that have been deducted or retained under the provisions of the Contract Documents , will be paid to the Contractor within 60 days after final acceptance by the Owner on a proper resolution of the City Council. , provided the Contractor has furnished to the owner satisfactory evidence of payment as follows: Prior to submission of the final estimate for payment , the Contractor shall execute an affidavit , as ` furnished by the City , certifying that all persons , firms , f associations, corporations, or other organizations furnishing labor and/or materials have been paid in full, that the wage scale established by the City Council in the City of Fort Worth has been paid , and that there are no claims pending for personal injury and/or property damages. The acceptance by the Contractor of the last or final payment ` as aforesaid shall operate as and shall release the Owner from all claims or liabilities under the Contract for anything done or furnished or relating to the work under Contract Documents or any act or neglect of said City relating to or connected with the Contract. The making of the final payment by the. Owner shall not relieve � the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. C8-8 . 9 ADEQUACY OF DESIGN: It is understood that the Owner believes it has employed competent Engineers and designers to prepare the Contract Documents and all modifications of the approved Contract Documents . It is , therefore , agreed that F hw tlwnpr -,ha 1 1 be respons ible for the adPgnArry of its own design features , sufficiency of the Contract Documents , the safety of the structure , and the practicability of the operations of the completed project , provided the Contractor has complied with the requirements of the said Contract Documents, all approved modifications thereof , and additions 1 and alterations thereto approved in writing by the Owner . The burden of proof of such compliance shall be upon the Contractor to show that fie has complied with the saici f requirements of the Contract Documents, approved modifications thereof, and all approved additions and alterations thereto. CE-8 . 10 GENERAL GUARANTY: Neither the final certificate of payment nor any provisTon in the Contract Documents nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of work not done in f accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship . The �^ Contractor shall remedy any defects or damages in the work and C8-$ { 4 } A I_ W .o pay for any damage to other work resulting therefrom which shall appear within a period of one year from the date of AM final acceptance of the work unless a longer period is specified andshall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the general guaranty as above outline . The Owner will give notice of observed defects with reasonable promptness . C8-8 . 11 SUBSIDIARY WORK : Any and all work specifically governed by documentary requirements for the project , such as conditions imposed by the Plans , the General Contract Documents or these Special Contract Documents , in which no specific item for bid has been provided for in the Proposal, shall be considered as a subsidiary item of work, the cast of which shall be included in the price bid in the Proposal, for each bid item. Surface restoration , rock excavation and cleanup are general items of work which fall in the category of subsidiary work. C8-8 . 12 MISCELLANEOUS PLACEMENT OF MATERIAL: Material may be allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material . These materials shall be used only when directed by the Engineer , depending on field conditions . Payment for miscellaneous placement of material will be made for only that amount of material used , measured to the nearest one--tenth unit . Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. C8--8 . 13 RECORD DOCUMENTS : Contractor shall keep on record a copy of all specifications , plans , addenda , modifications , shop drawings and samples at the site , in good order and annotated to show all changes made during the construction process . These shall be delivered to Engineer upon completion rof the work. r r - CB-8 (5 ) PART C-'1 SUPPLEMENTARY CONDITIONS TO PART C- GENERAL CONDITIONS SECTION Cl: SUPPLEMENTARY CONDITIONS TO PART C - GENERAL CONDITIONS A, General These Supplementary Conditions amend or supplement the General Conditions of the Contract and other provisions of the Contract Documents as indicated below. Provisions which are not so amended or supplemented remain in frill force and affect. B. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Page C8-8 (2), should be deleted in its entirety and replaced with the following: Partial pay estimates shall be submitted by the Contractor or prepared by the City on the 5th day and 20th day of each month that the work is in progress. The estimate shall be proceeded by the City on the I6th day and 25th day respectively. Estimates will be paid within 25 days following the end of the estimate period, less the appropriate retainage as set out below, Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to be incorporated into the work as a permanent part thereof, but which at the time of the pay estimate have not been so installed. If such materials are included within a pay estimate, payment shall be based upon 85% of the net voice value thereof. The Contractor will furnish the Engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate. For contracts of less than $400,000 at the time of execution, retainage shalt be ten per cent(10%). For contracts of$400,000 or more at the time of execution, retainage shall be five percent (5%). Contractor shall pay subcontractors in accord with the subcontract agreement within five (5) business days after receipt by Contractor of the payment by City. Contractor's failure to make the required payments to subcontractors will authorize the City to withhold future payments from the Contractor until compliance with this paragraph is accomplished. It is understood that the partial pay estimates will be approximate only, and all partial pay estimates and payment of same wiil be subject to correction in the estimate rendered following the discovery of the mistake in any previous estimate. Partial payment by Owner for the amount of work done or of its quality or sufficiency or acceptance of the work done; shall not release the Contractor of any of its responsibilities under the Contract Documents. The City reserves the right to witNiold the payment of any partial estimate if the Contractor fails to perforin the work in strict accordance with the specifications or other provisions of this contract. C. Part C - General Conditions: Paragraph C3-3.11 of the General Conditions is deleted and replaced with D-3 of Part D - Special Conditions. D. C3-3.11 INSURANCE: Page C3-3 (b): Delete subparagraph `°g. LOCAL AGENT FOR INSURANCE AND BONDING" Revised Pg. 1 10/24/02 4 E. C6-6.12 CONTRACTOR'S RESPONSIBLITY FOR DAMAGE CLAIMS: Page C6-6 (8), is deleted in its entirety and replaced with the following: Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, fi•om and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such injury, damage or death is caused, in whole or in trar7, by the negligence or alleged nee ence of Owner, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harrnless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or F destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not any such itrjrrry or damake is calrsed in whole or in part hy the negligence or alleged ne fi ence of Ojvner its officers, servants or employees. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refii-se to accept bids on other City of)roxt � Worth public work from a Contractor against whom a claim for damages is outstanding as d 1c3L11C U1 woSR PULU 111CU IMIU01 a lcity (Conaaaaet. F. INCREASED OR DECREASED QUANTITIES: Part C - General Conditions, Section C4-4 SCOPE OF WORD.,Page C 4-4 (1), revise paragraph 0:44.3 INCREASED OR _ DECREASED QUANTITIES to read as follows: `The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices as established in the contract documents. No allowance will be made for any changes in lost or anticipated profits nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. I Variations in quantities of sanitary sewer pipes in depth categories shall be interpreted he-rein as applying to the overall quantities of sanitary sewer pipe in each pipe size but not to the various depth categories. Revised Pg. 2 10/24/02 G. C3-3.11 INSURANCE: Page C3-3 (7): Add subparagraph "h. ADDITIONAL INSURANCE REQUIREMENTS" a. The City, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers' compensation insurance policy. b. Certificates of insurance shall be delivered to the City of Fort Worth, contract administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on the contracted project. c. Any failure on part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein. d. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation, non-renewal, and/or material change in policy terns or coverage. A ten days notice shall be acceptable in the event of non-payment of premium. e. Insurers must be authorized to do business in the State of Texas and have a current A.M. Best rating of A: VII or equivalent measure of financial strength and solvency. f. Deductible limits, or self-funded retention limits, on each policy must not exceed $10,000.0 0 per occurrence unless otherwise approved by the City. g, Other than worker's compensation insurance, in lieu of traditional insurance, City may consider alternative coverage or risk treatment measures through insurance pools or risk retention.groups. The City must approve in writing any alternative coverage. h. Workers' compensation insurance policy(s) covering employees employed on the project shall be endorsed with a waiver of subrogation providing rights of recovery in favor of the City. i. City shall not be responsible for the direct payment of insurance premium costs for contractor's insurance. j. Contractor's insurance policies shall each be endorsed to provide that such insurance is primary protection and any self-funded or commercial coverage maintained by City shall not be called upon to contribute to loss recovery. k. In the course of the project, Contractor shall report, in a timely manner, to City's offic_ally designated contract administrator any known loss occuaTence wlli ell could give rise to a liability claim or lawsuit or which could result in a property loss. Revised Pg. 3 10/24/02 1. Contractor's liability shall not be limited to the specified amounts of insurance required herein. i m. Upon the request of City, Contractor shall provide complete copies of all insurance policies required by these contract documents. H. C8-8.4 SCOPE Or PAYMENT_ Delete C8-8.4, Scope of Payment at page C8-8(1) is deleted in its entirety and replaced with the following: The Contractor shall receive and accept the compensation as Herein provided, in full payment for furnishing all labor, tools, materials, and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements, for any unforeseen defects or obstructions which may arise or be encountered during the prosecution which may arise or be encountered during the prosecution of the work at any time before its final acceptance by the Owner, (except as provided in paragraph C5-5.14) for all risks of whatever description connected with the prosecution of the work, for all expenses incurred by or in consequence of the suspension or discontinuance of such prosecution of the working Operations as Herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, and for completing the work in an acceptable manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to the final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or equipment, nor in any way prejudice or affect the obligations of the F Contractor to repair, correct, renew, or replace at his own and proper expense any defects c.n.: +1 #..,,.+:.,., r„- the L,+:1rr+l1 rilinlify of thr tnnf-rinl ilcari nr U1 1r11pC'rJ.l1 LBOI—Is lft LlkL VVt;.S L;act..., t„r1 nt,•ta n-­J equipment or machinery furnished in or abort the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects, which defects, imperfections, or damage shall have been discovered on or before the final inspection and _ acceptance of the work or during the two (2) year guaranty period after the final acceptance. The Owner shall be the sole judge of such defects, imperfections, or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein. ` I. C8-8.10 GENERAL GUARANTY: Delete C8-8.10, General Guaranty at page C8-8(4) is deleted in its entirety and replaced with the following: Neither the final certificate of payment nor any provision in the Contract Documents, nor partial � or entire occupancy or use of the premises by the Owner shall constitute an acceptance of work not clone in accordance with the Contract Documents or relieve the Contractor of 1 iabil ity in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor snail remedy any defects or damages in the work and pay for any damage to other work or property resulting tlier�from which shall appear within a period of two(2) years from the date of final acceptance of the work unless a longer period is specified and shall furnish a good and sufficient maintenance bond in the amount of 100 percent of the annount of the contract Revised Pg. 4 10/24/02 i which shall assure the performance of the general guaranty as above outlined. The Owner will give notice of observed defects with reasonable promptness. Any reference to any shorterP eriod of time of warranty contained elsewhere within the specifications shall be resolved in favor of this specifications, it being the City's intent that the Contractor guarantee its work for a period of two (2) years following the date of acceptance of the project. In the Special Instructions to Bidders, TPW contracts place the following in lieu of the existing paragraph 2. J. Part C - General Conditions, Section C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL,Page C2-2 (4) exchange paragraphs C2-2.7, C2-2.8 and C2-2.9 with the following: C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is owl delivered, accompanied by its proper Bid Security, to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders." It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. Tile Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the Purchasing Manager, City of Fort Worth Purchasing Division, P.O. Box 17027, Fort Worth,Texas 76102. r' C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawal prior to the time set for opening proposals. A request for non-consideration of a proposal must be made in writing, addressed to the City Manager, ¢ and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner, be returned unopened, C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the rproposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal K. C3-3.7 BONDS (CITY LET PROJECTS): Reference Part C, General Conditions, dated November 1, 1987; (City let projects) make the following revisions: r Revised Pg. 5 r10124/02 1. Page C3-3(3), the paragraph after paragraph C3-3.7d Other Bonds should be revised to read: In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority from the United States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request, The City, in its sole discretion, will determine the adequacy of the proof required herein. 2. Pg. C3-3(5) Paragraph C3-3.11 INSURANCE delete subparagraph"a. COMPENSATION INSURANCE'. 3. Pg. C3-3(6), Paragraph C3-3.11 INSURANCE delete subparagraph"g. LOCAL AGENT FOR INSURANCE AND BONDING". L. RIGHT TO AUDI`: Part C - General Conditions, Section C8-8 MEASUREMENT AND PAYMENT, Page C8-8 (5),add the following; C8-8.14 RIGHT TO AUDIT., (a) Contractor agrees that the City shall, until the expiration of three (3) years after final. payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the Contractor involving transactions relating to this contract. Contractor agrees that the City shall have access during normai working hours to all necessary Contractor facilities and shall be provided adequate and appropriate work spare in order to conduct audits in compliance with the provisions of this section. The City shall give contractor reasonable advance notice of intended audits. (b) Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents,papers and records of such subcontractor, involving transactions to the subcontract, and further, that City shall have access during normal working hours to all subcontractor facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article. City shall give subcontractor reasonable advance notice of intended audits. (c) Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse the Contractor for the cost of copies as follows: Revised Pg, 6 10/24/112 P0 1. 513 copies and under- 10 cents per page ON 2, More than 50 copies - 85 cents for the first page plus fifteen cents for each page thereafter M. SITE PREPARATION: The Contractor shall clear rights-of-way or easements of obstruction which must be removed to make possible proper prosecution of the work as a part of this project construction operations. The contractor's attention is directed to paragraph C6-6.10 work within easements, page C6-6(4), part C -General Conditions of the Water Department General Contract Document and General Specifications. Clearing and restoration shall be considered as incidental to construction and all costs incurred will be considered to be included in the Linear Foot price of the pipe. N. Reference Part C - General Conditions, Section C6-6.8 BARRICADES,WARNINGS AND WATCHMEN: 1. Wherever the word Watchmen appears in this paragraph, it shall be changed to the word flagmen. 2. In the first paragraph,lines five(5) and six(6),change the phrase take all such other precautionary measures to take all reasonable necessary measures. rO. MINORITY/WOMEN BUSINESS ENTERPRISE COMPLIANCE: rReference Part C (General Conditions), Section C3-3.2 Entitled "MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE" shall be deleted in its entirety and replaced with the following: Upon request, Contractor agrees to provide to Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or a Woman Business Enterprise(`h1BE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books, retards or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for tenxiination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements, further, any such misrepresentation (other than negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred frons participating in City work for a period of time of not less than thee (3)years. r Revised Pg. 7 r10/24/02 P. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: (a) The contractor shall comply with all requirements of Chapter 2258, Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Foil Worth to be the prevailing wage rates in accordance with Chapter 2258, Texas Government Code. Such prevailing wage rates are included in these contract documents. (b)The contractor shall, for a period of three(3) years following the date of acceptance of the work, maintain records that show(i)the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and (ii) the actual per diem wages paid to each worker. These records shall be open at all reasonable fours for inspection by the City. The provisions of Section C-1, L. Right to �^ Audit (Rev. 9130/02)pertain to this inspection. (c)The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a) and (b) above. (d) With each partial payment estimate or payroll period,whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258,Texas Government Code. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all tunes. I� f Revised Pg. 8 10/24/02 PART D SPECIAL CONDITIONS PART D - SPECIAL.CONDITIONS D-1 GENERAL..........................................................................................................................3 D-2 COORDINATION MEETING..............................................................................................4 D-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW.....................4 D- 4 COORDINATION WI FH FORT WORTH WATER DEPARTMENT .........7 D- 5 CROSSING OF EXISTING UTILITIES...............................................................................7 D- 6 EXISTING UTILITIES AND IMPROVEMENTS ..................................................................7 D- 7 CONSTRUCTION TRAFFIC OVER PIPELINES................................................................8 Q-8 TRAFFIC CONTROL.........................................................................................................8 D- 9 DETOURS ........................................................................................................................9 �. D- 10 EXAMINATION OF SITE. ..............................................................................................9 D- 11 ZONING COMPLIANCE.................................................................................................9 D- 12 WATER FOR CONSTRUCTION. ..................................................................................9 D- 13 WASTE MATERIAL ............:.......................................................................................10 A D- 14 PROJECT CLEANUP AND I=1NAL ACCEPTANCE......................................................10 0- 15 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK.................................10 D- 16 SAFETY RESTRICTIONS -WORK NEAR HIGH VOLTAGE LINES............................10 D- 17 BID QUANTITIES.. ......................11 5-- l-8 CUTTING OF CONCRETE..........................................................................................I'I D- 19 PROJECT DESIGNATION SIGN..............--..............................................................11 D-20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT......................................'11 D- 21 MISCELLANEOUS PLACEMENT OF MATERIAL........................................................12 D- 22 CRUSHED LIMESTONE BACKFILL ............................................,...............................'12 D- 23 2:27 CONCRETE...................................... ..12 D- 24 TRENCH EXCAVATION, BACKFILL, AND COMPACTION .........................................12 D- 25 TRENCH PAVEMENT (PERMANENT) REPAIR (E2-19) FOR UTILITY CUTS............14 D- 26 SITE SPECIFIC TRENCH SAFETY_ SYSTEM (COVERS ALL PROJECTS) ................14 D- 27 SANITARY SEWER MANHOLES .................................................... ......,.........,15 D- 28 SANITARY SEWER SERVICES................................................... ...... ........18 D- 29 REMOVAL. SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES................20 D- 30 DETECTABLE WARNING TAPES...............................................................................22 6- 31 PIPE CLEANING....................................-....................................................................22 D- 32 DISPOSAL OF SPOiLIFILL MATERIAL.......................................................................22 D- 33 MECHANICS AND MATERIALMEN'S LIEN.................................................................22 D- 34 SUBSTITUTIONS .......................................................................................................23 D- 35 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER.............23 6- 36 VACUUM TESTING OF SANITARY SEWER MANHOLES...... ....26 D- 37 BYPASS PUMPING ....................................................................................................27 D- 38 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER .,........27 D- 39 SAMPLES AND QUALITY CONTROL TESTING.........................................................29 D- 40 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL (FOR DISTURBED AREAS LESS THAN 1 ACRE)................................................................29 .� D- 41 INGRESS AND EGRESSIOBSTRUCTION OF ACCESS TO DRIVES ........................30 5- 4-2 PROTECTION OF TREES-PLANTS AND SOIL..........................................................31 D-43 SITE RESTORATION ............................................................,.......................,............31 D- 44 CITY OF FORT WORTH STANDARD PRODUCT LIST..............................................31 D- 45 TOPSOIL, SODDING, SEEDING & HYDROMULCHING.............................................31 D-46 CONFINED SPACE ENTRY PROGRAM.......................................... ...,............37 5---47 SUBSTANTIAL COMPLETION INSPECTIONIFINAL INSPECTION............................37 D- 48 EXCAVATION NEAR TREES (WHERE IDENTIFIED_ON THE PLANS)......................37 D-49 CONCRETE ENCASEMENT OF SEWER PIPE ........................................................38 D- 50 CLAY DAM. .................................................................................................................38 D- 51 EXPLORATORY EXCAVATION (D-HOLE)......................--........................................38 10127/04 SC-1 PART D - SPECIAL CONDITIONS D- 52 INSTALLATION OF WATER FACILITIES................................. ...,.........................39 521 Polyvinyl Chloride PVC Water Pipe. ....................................... ..............................39 52.2 Blocking.......................................................................................................................39 52.3 Type of Casing Piiee. ...................................................................................................39 52.4 TiB-Ins. ........:......................................................................,........................................39 52.5 Connection of Existing Mains ......................................................................................4D 52.6 Valve Cut-Ins ..............................................................................................................40 52.7 Water Services.............................................................................................................40 52.8 2-Inch Tem ora Service Line ...................................................................................42 52.9 Purcj4ng and Sterilization of Water Lines .....................................................................43 52.10 Work Near Pressure Plane Boundaries................................. ...............,...44 52.11 Water Sample Station .................................................................................................44 52.12 Ductile Iron and Gray Iron Fittings................................................................................44 D- 53 SPRINKLING FOR DUST CONTROL..........................................................................45 D- 54 DLWATERING. ......................................................,....................................................45 D- 55 TRENCH EXCAVATION ON DEEP TRENCHES.........................................................45 0- 56 TREE PRUNING.................. .......................................................................................45 D- 57 TREE REMOVAL. .......................................................................................................46 D- 58 TEST HOLES. .............................................................................................................46 D- 59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NNOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION ...................,.......................................................,...........................47 D-60 TRAFFIC BUTTONS........................ ...........................................................................47 D- 61 SANITARY SEWER SERVICE CLEANOUTS................... D- 62 TEMPORARY PAVEMENT REPAIR D- 63 CONSTRUCTION STAKES ........................................................................................48 D-64 EASEMENTS AND PERMITS...................... ........48 D- 65 PRE-CONSTRUCTION NEIGHBORHOOD MEETING ................................................49 D- 66 WAGE RATES........ ..................................................................................................49 D- 67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE......................................49 D-68 STORM WATER POLLUTION PREVENTION FOR DISTURBED AREAS GREATER THAN1 ACRE). ...................................,.........................................,............................56 D-69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS.......... D-70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD..,..............................................52 D-71 EARLY WARNING SYSTEM FOR CONSTRUCTION .....................................................53 D-72 AIR POLLUTION WATCH DAYS.....................................................................................53 D-73 FEE FOR STREET USE PERMITS AND RE-INSPECTIONS..........................................54 If If .� 10127104 SC-2 PAIN D - SPECIAL CONDITIONS This Part D — Special Conditions is complimentary to Part C —General Conditions and Part C1 -- Supplementary Conditions to Part C of the Contract. Anything contained in this Part D that is additive to any provision in Part C — General Conditions and part C1 — Supplementary Conditions ry to Part C of the Contract are to be read together. Any conflict between Part C — General Conditions and Part C1 -- Supplementary Conditions of the Contract and this Part D, Part D shall control. FOR: 2004 CAPITAL IMPROVEMENTS PROJECT MINDEN STREET(FROM T.H.35 SERVICE ROAD TO COLE STREET) Unit 1 —Water Improvements,Water Project No.PW53-4605341777$0,D.O.E. NO. 4141 Unit 2—Paving Improvements,TIPW Project No.#### D-1 GENERAL The order or precedence in case of conflicts or discrepancies between various parts of the Contract Documents subject to the ruling of the Engineer shall generally, but not necessarily, follow the guidelines listed below: 1. Plans 2. Contract Documents 3. Special Conditions The following Special Conditions small be applicable to this project under the provisions stated above. The Contractor shall be responsible for defects in this project due to faulty materials and workmanship, or both, for a period of two (2) years from date of final acceptance of this project by the City of Fort Worth and will be required to replace at his expense any part or all of this project which becomes defective due to these causes. Subject to modifications as herein contained, the Fort Worth Water Department's General Contract Documents and General Specifications, with latest revisions, are made a part of the General Contract Documents for this project. The Pians, these Special Contract Documents and the rules, regulations, requirements, instructions, drawings or details referred to by manufacturers name, or identification include therein as specifying, referring or implying product control, performance, quality, or other shall be binding upon the contractor. The specifications and drawings shall be considered cooperative; therefore, work or material called for by one and not shown or mentioned in the other shall be accomplished or furnished in a faithful manner as though required by ail. a Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre- qualified with the Water Department to perform such work in accordance with procedures described in the current Fort Worth Water Department General Specifications, which general specifications shall govern performance of all such work. This contract and project, where applicable, may also be governed by the two fallowing published specifications, except as modified by these Special Provisions: 1. STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH 2. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH y, CENTRAL TEXAS 10127104 SC-3 - PART D - SPECIAL CONDITIONS Any conflict between these contract documents and the above 2 publications shall be resolved in favor of these contract documents.. A copy of either of these specifications may be purchased at the office of the Transportation and T Public Works Director, 1000 Throckmorton Street, 2nd Floor, Municipal Building, (Fort Worth, Texas 76102. The specifications applicable to each pay item are indicated by the call-out for the pay item by the designer. If not shown, then applicable published specifications in either of these ` documents may be followed at the discretion of the Contractor. General Provisions shall be those of the Fort Worth document rather than Division 1 of the North Central Texas document. l Bidders shall not separate, detach,or remove any portion, segment or sheets from the contract document at any time. Failure to bid or fully execute contract without retaining contract documents intact may be grounds for designating bids as "non-responsive" and 1 V rejecting bids or voiding contract as appropriate as determined by the City Engineer. INTERPRETATION AND PREPARATION OF PROPOSAL: A. DELIVERY OF PROPOSAL No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the Purchasing Manager or his representative at E. the official location and stated time set forth in the "Notice to Bidders". It is the Bidder's sole 4 responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal �— actually delivered, Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL", and the name or description of the project as designated in the "Notice to Bidders". The envelope shall be addressed to the Purchasing Manager, City of Fort Worth Purchasing Division, PO Box 17027, Fort Worth, Texas 76102. B. WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for opening proposals. A request for non-consideration of a I~ proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non- consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C. TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written -} and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be -- given to the proposal. D-2 COORDINATION MEETING For coordination purposes, weekly meetings at the job site may be required to maintain the project on the desired schedule. The contractor shall be present at all meetings. D-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW A. Definitions: 10/27/04 SC-4 - PART D - SPECIAL CONDITIONS 1. Certification of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. 2. Duration of the project- includes the time from the begir.ning of the work on the project until the contractor'slperson's work on the project has been completed and accepted by the governmental entity. 3. Persons providing services on the project ("subcontractor" in §406.096)- includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This inclUdes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, r or other services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) or all employees of the Contractor providing services on the prosect, for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being T awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide the governmental entity: 1. A certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and 2. No later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. F. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known„ of any change hoe27104 SC-5 PART D - SPECIAL CONDITIONS that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice, in the text, form and manner -- prescribed by the Texas Worker's Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. .� I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: _ 1. Provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project. far the duration of the project; 2. Provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; 3. Provide the Contractor, prior to the end of the coverage period, a new certificate of �— coverage showing extension of coverage, if the coverage period shown on the current. certificate of coverage ends during the duration of the project; I— 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a.) A certificate of coverage, prior to the other persons beginning work on the project; and b.) A new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage j ends during the duration of the project. 5. Retain all required certificates of coverage on file for the duration of the project and for one year thereafter. 6. Notify the governmental entity in writing by certified mail or personal delivery, within ten — (10) days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and 7. Contractually require each person with whom it contracts, to perform as required by paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom they are providing services. 8. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by worker's — compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self- insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the contractor to administrative, criminal, civil penalties or other civil actions. 10127104 SC-6 PART D - SPECIAL CONDITIONS 9. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the governmental entity to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. J. The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage, This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: "REQUIRED WORKER'S COMPENSATION COVERAGE The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee," Call the Texas Worker's Compensation Commission at (512)449-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage". D-4 COORDINATION WITH FORT WORTH WATER DEPARTMENT During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. D- 5 CROSSING OF EXISTING UTILITIES Where a proposed water line crosses over a sanitary sewer or sanitary sewer service line and/or proposed sewer line crosses over a water line and the clear vertical distance is less than 9 feet barrel to barrel, the sanitary sewer or sanitary sewer service line shall be made watertight or be constructed of ductile iron pipe. The Engineer shall determine the required length of replacement. The material for sanitary sewer mains and sanitary sewer laterals shall be Class 51 Ductile Iron Pipe with polyethylene wrapping, The material for sanitary sewer service lines shall be extra strength cast iron soil pipe with polyethylene wrapping. Adapter fittings shall be a urethane or neoprene coupling ASTM C-42.5 with series 300 stainless steel compression straps. Backfill, fittings, tie-ins and all other associated appurtenances required are deemed subsidiary work, the cost of which shall be included in the price bid in the Proposal for each bid item. A D- 6 EXISTING UTILITIES AND IMPROVEMENTS The plans show the locations of all known surface and subsurface structures. However, the - Owner assumes no responsibility for failure to show any or all of these structures on the Plans, or to show them in their exact location. It is mutually agreed that such failure shall not be considered sufficient basis for claims for additional compensation for extra work or for increasing - the pay quantities in any manner whatsoever. 10127/04 � SC-7 PART D - SPECIAL CONDITIONS � s The Contractor shall be responsible for verifying the locations of and protecting all existing utilities, service lines, or other property exposed by his construction operations. Contractor shall make all necessary provisions (as approved or authorized by the applicable utility company) for the support, protection or relocation, and/or temporary relocation of all utility poles, gas lines, telephone cables, utility services, water mains, sanitary sewer lines, electrical cables, drainage pipes, and all other utilities and structures both above and 'below ground during construction. The Contractor is liable for all damages done to such existing facilities as a result of his operations and any and all cost incurred for the protection and/or temporary relocation of such facilities are deemed subsidiary work and the cost of same and shall be included in the cost bid per linear foot of pipe installed. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. Where existing utilities or service lines are cut, broken or damaged the Contractor shall replace or repair the utilities or service lines with the same type of original material and construction, or better, unless otherwise shown or noted on the plans, at his own cost and expense. The Contractor shall immediately notify the Owner of the damaged utility or service line, He shall cooperate with the Owners of all utilities to locate existing underground facilities and notify the Engineer of any conflicts in grades and alignment. 11 d� In case it is necessary to change or move the property of any owner of a public utility, such property shall not be moved or interfered with until ordered to do so by the Engineer. The right is reserved to the owner of public utilities to enter upon the limits of the project for the purpose of making such changes or repairs of their property that may be made necessary by performance of this contract. The utility lines and conduits shown on the plans are for information only and are not guaranteed by the City of the Engineer to be accurate as to extent, location, and depth; they are shown on the plans as the best information available at the time of design, from the owners of the utilities involved and from evidences found on the ground, D- 7 CONSTRUCTION TRAFFIC OVER PIPELINES I. 'is apparent t+ eLI hIla/.c ntnic�n!�c rnlilvrr-nan! Oho ar.. ar Inri hp An _.ity of the nine 1♦, cal LGM VV19a]LI La VLfvl vV1114+ ri o •y, --r -J under shallow bury conditions. It will be the responsibility of the Contractor to protect both the new line and the existing fines from these possibly excessive loads. The Contractor shall not, at any time, cross the existing or new pipe with a truck delivering new pipe to the site, Any damage to the existing or new pipe will be repaired or replaced by the Contractor, at the Contractor's expense, to the satisfaction of the City. In locations where it is not permissibie to cross the existing or proposed pipes without additional protection the Contractor may elect to provide additional protection of the pipes so that more frequent crossings of the pipes are allowed. It still is, however, the responsibility of the Contractor to repair any damage to the existing or proposed lines, if the damage results from any phase of his construction operation. D-8 TRAFFIC CONTROL The contractor will be required to obtain a "Street Use Permit" prior to starting work. As part of the "Street Use Permit' a traffic control plan is required. The Contractor shall be responsible for providing traffic control during the construction of this project consistent with the provisions set forth in the "Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on 10127104 SC-8 PART D - SPECIAL CONDITIONS -� Highways," codified as Article 6701d Vernon's Civil Statutes, pertinent sections being Section Nos. 27, 29, 30 and 31. A traffic control plan shall be submitted for review to Mr. Charles R. Burkett City Traffic En sneer at (817) 871-8770, at the pre-construction conference. Although work will not begin until the traffic control plan has been reviewed, the Contractor's time will begin in accordance with the time frame established in the Notice to the Contractor. The Contractor will not remove any regulatory sign, instructional sign, street name sign or other sign, which has been erected by the City. if it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works Department, Signs and Markings Division, (Phone Number 871-7738) to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above-referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place until such reinstallation is completed. Work shall not be performed on certain locationststreets during "peak traffic periods" as determination by the City Traffic Engineer and in accordance with the applicable provision of the "City of Fort Worth Traffic Control Handbook for Construction and Maintenance Worm Areas." The cost of the traffic control is subsidiary work and the cost of same shall be included in the price bid for pipe complete in place as bid in the Proposal, and no other compensation will be allowed. D- 9 DETOURS The contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project area. D- 10 EXAMINATION OF SITE It shall be the responsibility of the prospective bidder to visit the project site and make suc examinations and explorations as may be necessary to determine all conditions, which may affect construction of this project. Particular attention should be given to methods of providing ingress and egress to adjacent private and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper consideration should be given to these details during the preparation of the Proposal and all unusual conditions, which may give, rise to later contingencies should be brought to the attention of the Owner prior to the submission of the Proposal. D- 11 ZONING COMPLIANCE During the construction of this project, the Contractor shall comply with present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes. D- 12 WATER FOR CONSTRUCTION 10127104 � _� SC-9 -- PART D - SPECIAL CONDITIONS The Contractor at his own expense will furnish water for construction. JJ I � D- 13 WASTE MATERIAL All waste material shall become the property of the Contractor and shall be disposed of by the Contractor at locations approved by the Engineer. All materiai shall be disposed of in such a manner as to present a neat appearance and to not obstruct proper drainage or to cause injury to street improvements or to abutting property. D- 14 PROJECT CLEANUP AND FINAL ACCEPTANCE The Contractor shall be aware that keeping the project site in a neat and orderly condition is f considered an integral part of the contracted work and as such shall be considered subsidiary to the appropriate bid items. Clean up work shall be done as directed by the Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is necessary, clean.-up shall be done on a daily basis. Clean up work shall include,but not be limited to 0 Sweeping the street clean of dirt or debris • Storing excess material in appropriate and organized manner a Keeping trash of any kind off of residents' property If the Engineer does not feel that the jobsite has been kept in an orderly condition, on the next estimate payment (and all subsequent payments until completed) of the appropriate bid item(s)will be reduced by 25%. Final cleanup work shall be done for this project as soon as all construction has been completed. No more than seven days shall elapse after completion of construction before the roadway, right- of-way, or easement is cleaned up to the satisfaction of the 'Engineer. The Contractor shall make a final cleanup of all parts of the work before acceptance by the City of Fort Worth or its representative. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrele and a0hut wnsii uulon ri'l 3terlals, ai-ld II l gel llel all prepdrli g the cite of the -work 11-1 aiii orderly manner and appearance. The City of Fort Worth Department of Engineering shall give - final acceptance of the completed project work. D- 15 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK Prior to executing the Contract, it shall be the responsibility of the Contractor to furnish a schedule outlining the anticipated time for each phase of construction with starting and completion dates, including sufficient time being allowed for cleanup. The Contractor shall not commence with water andlor sanitary sewer installation until such time that the survey cut-sheets have been received from the City inspector. D- 16 SAFETY RESTRICTIONS -WORK NEAR HIGH VOLTAGE LINES The following procedures will be followed regarding the subject item on this contract: -� 1. A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet shall be piaced inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. The warning sign shall read as follows, "WARNING - UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." 10/21104 SC-10 PART D _ SPECIAL CONDITIONS 2. Equipment that may be operated within ten feet of high voltage lines shall have insulating cage-type of guard about the boom or arm, except back hoes or dippers, and insulator links on the lift hook connections. 3. When necessary to work within six feet of high voltage electric lines, notification shall be given the power company (ONCORE) who will erect temporary mechanical barriers, de- energize the lines, or raise or lower the lines. The work done by the power company shall not be at the expense of the City of Fort Worth. The notifying department shall maintain an accurate log of all such calls to ONCORE, and shall record action taken in each case. 4. The Contractor is required to make arrangements with the ONCORE company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and expense. 5. No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph (3). D- 17 BID QUANTITIES Did quantities of the various items in the proposal are for comparison only and may not reflect the actual quantities. There is no limit to which a bid item can be increased or decreased. Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities. To the extent that 0443 conflicts with this provision, this provision controls. No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. D- '18 CUTTING OF CONCRETE When existing concrete is cut, such cuts shall be made with a concrete saw. All sawing shall be subsidiary to the unit cost of the respective item. D- 19 PROJECT DESIGNATION SIGN Project signs are required at all locations. It shall be in accordance with the attached Figure 30 (dated 9-18-98). The signs may be mounted on skids or posts. The Engineer shall approve the exact locations and methods of mounting. In addition to the 4' x 8' project signs, project signs shall be attached to barricades used where manhole rehabilitation or replacement is being conducted. Signs suspended from barricading shall be placed in such a way that signs do not interfere with reflective paint or coloring on the barricades. Barricade signs shall be in -' accordance with Figure 30, except that they shall be 1'-0" by 2'-0" in size. The information box shall have the following information: For Questions on this Project Call: (8 17) 871-8398 M-F 7:30 am to 4:30 p,m. or (817)871-8300 blights and Weekends Any and all cost for the required materials, labor, and equipment necessary for the furnishing of Project Signs shall be considered : as a subsidiary cost of the project and no additional compensation will be allowed. D-20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT 10127104 SC-'I 1 - PART D - SPECIAL CONDITIONS At locations in the project where mains are required to be placed under existing sidewalks and/or driveways, such sidewalks and/or driveways shall be completely replaced for the full existing width, between existing construction or expansion joints with 3000 psi concrete with reinforcing steel on a sand cushion in accordance with City of Fork Worth Transportation/Public Works Department Standard Specifications for Construction, Item 544. At locations where mains are required to be placed under existing curb and gutter, such curb and gutter shall be replaced to match type and geometry of the removed curb and gutter shall be installed in accordance with City of Fort Worth Public Works Department Standard Specification for Construction, Item 502. Payment for cutting, backfill, concrete, forming materials and all other associated appurtenances required, shall be included in the square yard price of the bid item for concrete sidewalk or driveway repair. D- 21 MiSCELLANEOUS PLACEMENT OF MATERIAL Material has been allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer, depending on field conditions. Payment for miscellaneous placement of material will be made for only that amount of material used, measured to the nearest one-tenth unit. Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. D- 22 CRUSHED LIMESTONE BACKFILL Where specified on the plans or directed by the Engineer, Crushed Limestone shall be used for trench backfill on this project. The material shall conform to Public Works Standard Specifications for Street and Storm Drain Construction Division 2 Item 208.2 - Materials and Division 2 Item 208.3 - Materials Sources. Trench backfill and compaction shall meet the T requirements of E2-2 Excavation and Backfill, Construction Specifications, General Contract Documents. Payment for crushed limestone backfill in place shall be made at the unit price bid in the Proposal multiplied by the quantity of material used measured in accordance with E2-2.16 Measurement of Backfill Materials, Construction Specifications, and General Contract Documents. D-23 2:27 CONCRETE Transportation and Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts Figures 1 through 5 refer to using 2:27 Concrete as base repair. Since this call- out includes the word "concrete", the consistent interpretation of the Transportation and Public Works Department is that this ratio specifies two (2) sacks of cement per cubic yard of concrete. D- 24 TRENCH EXCAVATION, BACKFILL, AND COMPACTION Trench excavation and backfill under parking lots, driveways, gravel surfaced roads, within easements, and within existing or future R.O.W. shall be in accordance with Sections E3-2 j Backfill and E2-2 Excavation and Backfill of the General Contract 1 Documents and Specifications except as specified herein. 1. TRENCH EXCAVATION: In accordance with Section E2-2 Excavation and Backfill, if the stated maximum trench widths are exceeded, either through accident or otherwise, and if the Engineer determines that the design loadings of the pipe will be exceeded, the Contractor will be required to support the pipe with an improved trench bottom. The expense of such remedial 10127104 SC-12 PART D - SPECIAL CONDITIONS measures shall be entirely the Contractor's own. All trenching operations shall be confined to the width of permanent rights-of-way, permanent easements, and any temporary construction easements. All excavation shall be in strict compliance with the Trench Safety Systems Special Condition of this document. 2. TRENCH BACKFILL: Trenches which lie outside of existing or future pavement shall be �- backfilled above the top of the embedment material with Type "C" backfill material. Excavated material used for Type "C" backfill must be mechanically compacted unless the Contractor can furnish the Engineer with satisfactory evidence that the P.I, of the excavated material is less than 8. Such evidence shall be a test report from an independent testing laboratory and must include representative samples of soils in all involved areas, with a map showing the location and depth of the various test holes. If excavated material is obviously granular in nature, containing little or no plastic material, the Engineer may waive the test report requirement. See E1-2.3, Type "C" or "D" Backfill, and E2-2.11 Trench Backfill for additional requirements. When Type "C" back-fill material is not suitable, at the direction.of the Engineer, Type "B" backfill material shall be used. In general, all backfill material for trenches in existing paved streets shall be in accordance with Figure A. Sand material specified in Figure A shall be obtainers from an approved source and shall consist of durable particles free of thin or elongated pieces, lumps of clay, soil, loam or vegetable matter and shall meet the following gradation: i e Less than 10% passing the#200 sieve • P.I. r 10 or less Additionally, the crushed limestone embedment gradation specified in Section E1-3 Crushed Limestone for Embedment of the General Contract Documents and Specifications shall be replaced with the following: Sieve Size % Retained 1"" 0-10 112" 40-75 318" 55-90 #4 90-100 #8 95-100 T All other provisions of this section shall remain the same. li 3. TRENCH COMPACTION: All trench backfill shall be placed in lifts per E2-2.9 Backfill. Trenches which lie outside existing or future pavements shall be compacted to a minimum of 90% Standard Proctor Density (A.S.T.M. D698) by mechanical devices specifically designed for compaction or a combination of methods subject to approval by the Engineer. Trenches which lie Under existing or future pavement shall be backfilled per Figure A with 95% Standard Proctor Density by mechanical devices specifically designed for compaction or a combination of methods subject to approval by the Engineer. Backfill material to be compacted as described above must be within +-46A of its optimum moisture content. The top two (2) feet of sewer line trenches and the top eighteen (18) inches of water line may be rolled in with 'heavy equipment tires, provided it is placed in lifts appropriate to the material being used and the operation can be performed without damage to the installed pipe. 1 The City, at its own expense, will perform trench compaction tests per A.S.T.M. standards on all trench backfill. Any retesting required as a result of failure to compact the backfill material to 90127104 SC-13 r PART D - SPECIAL CONDITIONS meet the standards will be at the expense of the Contractor and will be billed at the commercial rates as determined by the City. These soil density tests shall be performed at two (2) foot vertical intervals beginning at a level two (2) feet above the top of the installed pipe and continuing to the top of the completed backfill at intervals along the trench not to exceed 300 -- linear feet. The Contractor will be responsible for providing access and trench safety system to the level of trench backfill to be tested. No extra compensation will be allowed for exposing the backfill layer to be tested or providing trench safety system for tests conducted by the City. 4. MEASUREMENT AND PAYMENT: All material, with the exception of Type "B" backfill, and labor costs of excavation and backfill will be included in the price bid per linear foot of water and sewer pipe. Type "B° backfill shall be paid for at a pre-bid unit price of$15.00 per cubic yard. D- 25 TRENCH PAVEMENT (PERMANENT) REPAIR(E2-19) FOR UTILITY CUTS The unit price bid under the appropriate bid item of the proposal shall cover all cost for providing pavement repair equal to or superior in composition, thickness, etc., to existing pavement as detailed in the Public Works Department typical sections for Pavement and French Repair for Utility Cuts, Figures 2000-1 through 2000-3. !� The results of the street cores that were conducted on the project streets, to determine HMAC ! depths on existing streets, are provided in these specifications and contract documents. ` All required paving cuts shall be made with a concrete saw in a true and straight line on both sides of the trench, a minimum of twelve (12) inches outside the trench walls. The trench shall be backfilled and the top nine (9) inches shall be filled with required materials as shown on paving details, compacted and level with the finished street surface. This finished grade shall be maintained in a serviceable condition until the paving has been replaced. All residential * driveways shall be accessible at night and over weekends. It has been determined by the Transportation and Public Works Department that the strip of existing HMAC pavement between the existing gutter and the edge of the trench pavement repair i-ill nmf hnlA i in if Qiiirh CIrin of CVICtIriq nauam�nt iG hun (71 feat or less in width. Therefore, at the locations in the project where the trench wall is three (3) feet or less from the lip of the existing gutter, the Contractor shall be required to remove the existing paving to such gutter. The pavement repair shall then be made from a minimum distance of twelve (12) inches outside the trench wall nearest the center of the street to the gutter line. The pavement shall be replaced within a maximum of five (5) working days, providing job placement conditions will permit repaving, If paving conditions are not suitable for repaving, in the opinion of the Owner, the repaving-shall be done at the earliest possible date. A permit must be obtained from the Department of Engineering Construction Services Section by the Contractor in conformance with Ordinance No. 3449 and/or Ordinance No. 792 to make utility cuts in the street. The Department of Engineering will inspect the paving repair after construction. This permit requirement may be waived if work is being done under a Performance Bond and — inspected by the Department of Engineering. D- 26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS) A. GENERAL: This specification covers the trench safety requirements for all trench excavations exceeding depth of five (5) feet in order to protect workers from cave-ins. The requirements of this item govern all trenches for mains, manholes, vaults, service lines, and 10127104 SC-14 PANT D - SPECIAL CONDITIONS all other appurtenances. The design for the trench safety shall be signed and sealed by a Registered Professional Engineer licensed in Texas. The trench safety plan shall be specific for each water and/or sanitary sewer line included in the project. B. STANDARDS: The latest version of the U.S. Department of Labor, Occupational Safety and Health Administration Standards, 29 CFR Part 1926, Sub-Part P - Excavations, are hereby made a part of this specification and shall be the minimum governing requirements for trench safety. C. DEFINITIONS: 1. TRENCHES - A trench is referred to as a narrow excavation made below the surface of the ground in which the depth is greater than the width, where the width measured at the bottom is not greater than fifteen (15) feet. 2. BENCHING SYSTEM - Beaching means excavating the sides of a trench to form one or a series of horizontal level or steps, usually with vertical or near-vertical surfaces between levels. 3. SLOPING SYSTEM - Sloping means excavating to form sides of a trench that are inclined i away from the excavation. 4, SHIELD SYSTEM- Shields used in trenches are generally referred to as "trench boxes" or "trench shields". Shield means a structure that is able to withstand the forces imposed on it by a cave-in and protect workers within the structure. Shields can be permanent structures or can be designed to be portable and move along as the work progresses.. Shields can be either pre-manufactured or job-built in accordance with OSHA standards. 5. SHORING SYSTEM - Shoring means a structure such as a metal hydraulic, mechanical or timber system that supports the sides of a trench and which is designed to prevent cave-ins. Shoring systems are generally comprised of cross-braces, vertical rails, (uprights), horizontal rams (wales) and/or sheeting. D. MEASUREMENT - Trench depth is the vertical measurement from the top of the existing ground to the bottom of embedment or bottom of excavation. The quantity of trench safety systems shall be based on the linear foot amount of trench depth greater than five (5) feet. E. PAYMENT - Payment shall be full compensation for safety system design, labor, tools, materials, equipment and incidentals necessary for the installation and removal of trench safety systems. D- 27 SANITARY SEWER MANHOLES A. GENERAL: The installation, replacement, and/or rehabilitation of sanitary sewer manholes will be required as shown on the plans, and/or as described in these Special Contract Documents in addition to those,located in the field and identified by the Engineer. All manholes shall be in accordance with sections E1-14 Materials for Sanitary Sewer Manholes, Valve Vaults, Etc., and E2-14 Vault and Manhole Construction of the General Contract Documents and Specifications, unless amended or superseded by requirements of this Special Condition, For new sewer line installations, the Contractor shall temporarily plug all lines at every open manhole under construction in order to keep debris out of the dry sewer r lines. The plugs shall not be removed until the applicable manhole complete with cone 10/27104 SC-15 r PART D SPECIAL CONDITIONS section has been constructed and the lid installed to keep out debris as a result of additional - construction. 1. CONCRETE COLLARS: Concrete collars will be required on all manholes specified as per Figure 121. 2. WATERTIGHT MANHOLE INSERTS: Watertight gasket manhole inserts shall be installed in all sanitary sewer manholes. Inserts shall be constructed in accordance with Fort Worth Water Department Standard E100-4 and shall be fitted and installed according to the manufacturer's recommendations. Stainless Steel manhole inserts shall be required for all pipe diameters 18" and greater. I 3. LIFT HOLES: All lift holes shall be plugged with a pre-cast concrete plug. The lift hole I shall be sealed on the outside of the manhole with Ram-Nek or an approved equal sealant. The lift hole shall be sealed on the inside of the manhole with quick setting cement grout. 4. FINAL RIM ELEVATIONS: Manhole rims in parkways, lawns and other improved lands shall be at an elevation not more than one (1) nor less than one-half (112) inch above the surrounding ground. Backfill shall provide a uniform slope from the top of manhole �— casting for not less than three (3) feet each direction to existing finish grade of the ground. The grade of all surfaces shall be checked for proper slope and grade by string lining the entire area regarded near the manhole. Manholes in open fields, unimproved land, or drainage courses shall be at an elevation shown on the drawings or minimum of 6 inches above grade. 5. MANHOLE COVERS: All lids shall have pick slots in lieu of pick holes. Manhole frames and covers shall be McKinley, Type N, with indented top design, or equal, with pick slots. Covers shall set flush with the rim of the frame and shall have no larger than 118-inch gap between the frame and cover. Bearing surfaces shall be machine finished. 'Locking manhole lids and frames will be restricted to locations within the 100-year floodplain and areas specifically designated on the plans. Certain teed Ductile Iron Manhole Lids and Frames are acceptable for use where locking lids are specified. 6. SHALLOW CONE= MANHOLES: Shallow manhole construction will be used when �- manhole depth is four (4) feet or less. All shallow cone manholes shall be built in accordance with Figure 105. All shallow cone manholes shall have a cast iron lid and frame with pick slots. NOTE: MANHOLES PER FIGURE 106 WILL NOT BE ALLOWED. 7. MANHOLE STEPS: No manhole steps are to be installed on any sanitary sewer manhole. 8. EXTERIOR SURFACE COATING: Exterior surfaces of all manholes shall be coated with two mop coats of coal tar epoxy, Koppers "Bitumastic Super Service Black" Tnemec "46- 450 Heavy Tnemecol," or equal,to, a minimum or 14 mils dry film thickness. 9. MANHOLE JOINT SEALING: All interior and/or exterior joints on concrete manhole sections constructed for the City of Fort Worth Water Department, excluding only the joints using a trapped type performed O-ring rubber gasket shall require Bitumastic joint sealants as per Figure M. 10127/04 ,_� SC-16 PART D - SPECIAL CONDITIONS This sealant shall be pre-formed and trowelable Bitumastic as manufactured by Kent- Sea], Ram-Nek, E-Z Stick, or equal. The joint sealer shall be supplied in either extruded pipe form or suitable cross-sectional area or flat-tape and shall be sized as recommended by the manufacturer and approved by the Engineer. The joint sealer shall be protected by a suitable removable wrapper and shall not in any way depend on oxidation, evaporation, or any other chemical action for either its adhesive properties or cohesive strength. The Joint sealer shall remain totally flexible without shrinking, hardening, or oxidizing regardless of the length of time it is exposed to the elements. The manufacturer shall furnish an affidavit attesting to the successful use of the product as a pre-formed flexible joint sealant on concrete pipe and manhole sections for a period of at least five years, B. EXECUTION: `i. INSTALLATION OF JOINT SEALANT: Each grade adjustment ring and manhole frame shall be sealed with the above-specified materials. All surfaces to be in contact with the joint sealant shall be thoroughly cleaned of dirt, sand, mud, or other foreign matter. The manufacturer shall apply a primer to all surfaces prior to installing the joint sealant in accordance with the recommendations. The protective wrapper shall remain on the joint sealant until immediately prior to the placement of the pipe in the trench. After removal of the protective wrapper, the joint sealant shall be kept clan. Install frames and cover over manhole opening with the bottom of the rings resting on Bitumastic joint sealer. Frames and grade rings shall rest on two (2) rows (inside and outside) of Bitumastic joint sealer. 2. SEALING AND/OR ADJUSTING EXISTING MANHOLES: Excavate (rectangular full depth saw cut if in pavement) adjacent to the manhole to expose the entire manhole frame and a minimum of 6 inches of the manhole wall keeping the sides of the trench nearly vertical. Remove manhole frame from the manhole structure and observe the condition of the frame and grade rings. Any frame or grade ring that is not suitable for use as determined by the Engineer shall be replaced. Grade rings that are constructed of brick, block materials other than pre-cast concrete rings, or where necessary and approved by the Engineer, shall be replaced with a pre-cast flattop section. Pre-cast concrete rings, or a pre-cast concrete flattop section will be the only adjustments allowed. In brick or block manholes, replace the upper portion of the manhole to a point 24 inches below the frame. If the walls or cone section below this level are structurally unsound, notify the Engineer prior to replacement of the grade rings and manhole frame, Existing brickwork, if damaged by the Contractor, shall be replaced at the Contractor's expense. Wire brush manhole frame and exposed manhole surfaces to remove dirt and loose z debris. Coat exposed manhole surfaces with an approved bonding agent followed by an application of quick setting hydraulic cement to provide a smooth working surface. If the inside diameter of the manhole is too large to safely support new adjustment rings or frames, a flat top section shall be installed. Joint surfaces between the frames, adjustment rings, and cone section shall be free of dirt, stones, debris and voids to ensure a watertight seal. Place flexible gasket joint material along the inside and outside edge of each joint, or use trowelable material in lieu of pre-formed gasket material. Position the butt joint of each length of joint material on opposite sides of the manhole. No steel shims, wood, stones, or any material not 14127144 SC-17 PART D - SPECIAL CONDITIONS specifically accepted by the Engineer may be used to obtain final surface elevation of the manhole frame. In paved areas or future paved areas, castings shall be installed by using a straight edge not less than ten (10) feet long so that the top of the casting will conform to the slope and finish elevation of the paved surface, The top of the casting shall be 1/8 inch below the finished elevation. Allowances for the compression of the joint material shall be made to assure a proper final grade elevation. 3. EXPOSED EXTERIOR SURFACES: All exposed exterior surfaces shall be coated with two mop coats of coal tar epoxy. Kopper "Bitumastic Super Service Black"; Tnemec "46- P_ 450 Heavy Tnemecol", or equal, to a minimum of 14 mils dry film thickness. 4. The exterior surface of all pre-cast section joints shall be thoroughly cleaned with a wire brush and then waterproofed with a 112-inch thick coat of trowelable bitumastic joint sealant from 6-inches below to 6-inches above the joint. The coated joint shall then be wrapped with 6 mil plastic to protect the sealant from damage during backfilling. C. MEASUREMENT AND PAYMENT: The price bid for new manhole installations shall include all labor, equipment, and materials necessary for construction of the manhole including, but not limited to, joint sealing, lift hole sealing and exterior surface coating. Payment shall not include pavement replacement, which if required, shall be paid separately. The price bid for reconstruction of existing manholes shall include all labor equipment and materials necessary for construction of new manhole, including, but not limited to, excavation, backfill, disposal of materials, joint sealing, lift hole sealing and exterior surface coating. Payment shall not include pavement replacement, which if required, shall be paid separately. The price bid for adjusting and/or sealing of existing manholes shall include all labor, .- equipment and materials necessary for adjusting and/or sealing the manhole, including but not limited to, joint sealing, lift hole sealing, and exterior surface coating. Payment for concrete collars will be made per each. Payment for manhole inserts will be made per each. D- 28 SANITARY SEWER SERVICES Any reconnection, relocation, re-routes, replacement, or new sanitary sewer service shall be required as shown on the pians, and/or as described in these Special Contact Documents in addition to those located in the field and identified by the Engineer as active sewer taps. The service connections shall be constructed by the Contractor utilizing standard factory manufactured tees. City approved factory manufactured saddle taps may be used, but only as directed by the Engineer. The decision to use saddle taps as opposed to tees shall be made on a case-by-case basis. The Contractor shall be responsible for coordinating the scheduling of tapping crews with building owners and the Engineer in order that the work be performed in an expeditious manner. A minimum of 24 hours advance notice shall be given when taps will be required. Severed service connections shall be maintained as specified in section C6-6.15. D. SEWER SERVICE RECONNECTION: When sewer service reconnection is called for the Contractor shall vertically adjust the existing sewer service line as required for reconnection and furnish a new tap. The fittings used for vertical adjustment shall consist of a maximum bend of 45 degrees. The tap shall be located so as to line up with the service line and avoid 10127104 SC-1 8 PART D -- SPECIAL CONDITIONS any horizontal adjustment. For open cut applications, all sanitary sewer service lines shall be replaced to the property or easement line, or as directed by the Engineer. Sanitary sewer services on sewers being rehabilitated using pipe enlargement methods shall be replaced to r, the property or easement line or as directed by the Engineer. Procedures listed below for Sewer Service Replacement shall be adhered to for the installation of any sewer service line including the incidental four (4) feet of service fine which is included in the price bid for Sanitary Sewer Taps. Payment for work such as backfill, saddles, tees, fittings incidental four (4) feet of service line and all other associated appurtenances required shall be included in the price bid for Sanitary Sewer Taps. E. SEWER SERVICE REPLACEMENT: All building sewer services encountered during construction shall be adjusted and/or replaced by the Contractor as directed by the Engineer as required for the connection of the sewer service line. If the sewer service line is in such condition or adjustment necessitates the replacement of the sewer service line, all work shall be performed by a licensed plumber. The Engineer shall determine the length of the replacement. All sewer services shall be installed at a minimum of two (2) percent slope or as ` approved by the Engineer. For situations involving sewer service re-routing, whether on public or private property, the City shall provide line and grade for the sewer service lines as shown on the project plans. Prior to installing the applicable sewer main or lateral and the necessary service lines, the Contractor shall verify (by de-holing at the building clean-out) the elevations (shown on the plans) at the building clean-out and compare the data with the elevation at the proposed connection point on the sewer main, in order to ensure that the two (2) percent minimum slope (or as specified by the Engineer) requirement is satisfied. Elevations shall also be verified at all bend locations on the service re-route. All applicable sewer mains, laterals and affected service fines that are installed without pre-construction de- holing at the affected residences (to verify design elevations) shall be removed and replaced as necessary at the Contractor's expense in the event grade conflicts are brought to light after de-holing is conducted. All elevation information obtained by the Contractor shall be submitted to the Inspector. The Engineer shall be immediately notified in the event that the two (2) percent minimum slope is not satisfied. If the Contractor determines that a different alignment for the re-route is more beneficial than shown on the plans, the Contractor shall obtain and submit all relevant elevation information for the new alignment to the Inspector and shall be responsible for ensuring that the two (2) percent minimum grade (or as approved by the Engineer) is satisfied, Prior to backfilling, the Contractor shall doubte check the grade of the installed service line and submit signed documentation verifying that the line has been installed as designed to the Engineer. The Contractor, at its sole expense, shall be required to uncover any sewer service for which no grade verification has been submitted. All re- routes that are not installed as designed or fail to meet the City code shall be reinstalled at the Contractor's expense. The Contractor shall ensure that the service line is backfilled and compacted in accordance with the City Plumbing Code. Connection to the existing sewer service line shall be made with appropriate adapter fittings, The fitting small be a urethane or neoprene coupling A.S.T.M. C-425 with series 340 stainless steel compression straps. The Contractor shall remove the existing clean-out and plug the abandoned sewer service line. The contractor shall utilize schedule 40 PVC for all sanitary sewer service re-routes or relocations located on private property. Furthermore, the contractor shall utilize the services of a licensed plumber for all service line work on private property. Permit(s) must be obtained from the City of Fort Worth Development Department for all service line work on private property and all work related to the service line must be approved by a City of Fort Worth Plumbing Inspector. A copy of the plumbing permit shall be provided to the Engineer prior to beginning work on the sanitary sewer service re-route and proof of final acceptance by the 10/27/04 SC-19 PART D - SPECIAL CONDITIONS Plumbing Inspector shall be provided to the Engineer upon completion of the sanitary sewer re-route. f Payment for work and materials such as backfill, removal of existing clean-outs, plugging the abandoned sewer service line, double checking the grade of the installed service line, pipe K fittings, surface restoration on private property (to match existing), and all other associated work for service replacements in excess of four (4) linear feet shall be included in the linear foot price bid for sanitary sewer service line replacement on private property or public right of 4 way. Payment for all work and material involving the "tap" shall be included in the price bid for sanitary sewer service taps. D- 29 REMOVAL, SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES !� Any removal, salvaging and/or abandonment of existing facilities will necessarily be required as shown on the plans, and/or described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. This work shall be done in accordance with Section E2-1.5 Salvaging of Material and E2-2.7 Removing Pipe, of the General Contract Documents and Specifications, unless amended or superseded by requirements of this Special Condition. A. SALVAGE OF EXISTING WATER METED AND METER BOX. Existing water meter and meter box shall be removed and returned to the 'Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. i` B. SALVAGE OF EXISTING WATER METER AND CONCRETE VAULT LID: Existing water meter and concrete vault lid shall he removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The concrete vault shall be demolished in place to a point not less than 18 inches below final grade. The concrete vault shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated -- material approved by the Engineer. Surface restoration shall be compatible with existing s urrnundinn eF irfzf-;n and rirnrlo C. SALVAGE OF EXISTING FIRE HYDRANTS: Existing fire hydrants shall be removed and �~ returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. D. SALVAGE OF EXISTING GATE VALVE: Existing gate valve and valve box and lid shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void area caused by the valve removal shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated' material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. If the valve is in a concrete vault, the vault shalt be demolished in place to a point no less than 18" below final grade. E. ABANDONMENT OF EXISTING GATE VALVE: Existing gate valve and box lid shall be abandoned by first closing the valve to the fully closed position and demolishing the valve box in place to a point not less than 18 inches below final grade. Concrete shall then be used as backfill material to match existing grade. 10127104 ------ --- SG-20 PART D m SPECIAL CONDITIONS F. ABANDONMENT OF EXISTING VAULTS: Vaults to be demolished in place shall have top slab and lid removed and vault walls demolished to a point not less than 18" below final grade. The void area caused shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the 'Engineer. Surface restoration shall be compatible with the existing surrounding grade. G. ABANDONMENT OF MANHOLES: Manholes to be abandoned in place shall have all pipes entering or exiting the structure plugged with lean concrete. Manhole top or cone section shall be removed to the top of the full barrel diameter section, or to point not less than 18 inches below final grade. The structure shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be either clean washed sand of clean, suitable excavated material approved by the Engineer. Surface restoration shall be compatible with surrounding service surface. Payment for work involved in backfilling, plugging of pipe(s) and all other appurtenances required, shall be included in the appropriate bid item -Abandon Existing Sewer Manhole. H. REMOVAL OF MANHOLES: Manholes to be removed shall have all pipes entering or exiting the structure disconnected. The complete manhole, including top or cone section, all full barrel diameter section, and base section shall be removed. The excavation shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be with Type C Backfill or Type B Backfili, as approved by the Engineer. Surface restoration shall be compatible with surrounding surface. 1. CUTTING AND PLUGGING EXISTING MAINS: At various locations on this project, it may be required to cut, plug, and block existing water mains/services or sanitary sewer mains/services in order to abandon these lines. Cutting and plugging existing mains and/or services shall be considered as incidental and all costs incurred will be considered to be included in the linear foot bid price of the pipe, unless separate trenching is required. J. REMOVAL OF EXISTING PIPE: Where removal of the existing pipe is required, it shall be the Contractor's responsibility to properly dispose of all removed pipe. All removed valves, fire hydrants and meter boxes shall be delivered to Water Department Field Operation, Storage Yard. C. PAYMENT: Payment for all work and material involved in salvaging, abandoning and/or removing existing facilities shall be included in the linear foot bid price of the pipe, except as follows: separate payment will be made for removal of all fire hydrants, gate valves, 16 inch and larger, and sanitary sewer manholes, regardless of location. Payment will be made for salvaging, abandoning and/or removing all other existing facilities when said facility is not being replaced in the same trench (i.e., when removal requires a separate trench). L. ABANDONMENT OF EXISTING SEWER LINES: Where ,plans call for abandonment of existing sewer mains after the construction of a new sewer main, the Contractor shall be responsible for TV inspection of 199°/ of the existing sewer main to be abandoned to make a final determination that all existing service connections have been relocated to the new main. Once this determination has been made, the existing main will be abandoned as indicated above in Item 1. 10/27104 v SC-21 - T - PART D - SPECIAL CONDITIONS D- 30 DETECTABLE WARNING TAPES Detectable underground utility warning tapes which can be located from the surface by a pipe detector shall be installed directly above nonmetallic water and sanitary sewer pipe. The detectable tape shall be "Detect Tape" manufactured by Alien Systems, Inc. or approved equal, and shall consist of a minimum thickness 0.35 mils solid aluminum foil encased in a protective inert plastic jacket that is impervious�to all known alkalis, acids, chemical reagents and solvents found in the soil. The minimum overall thickness of the tape shall be 5.5 mils, and the width shall f not be less than two inches with a minimum unit weight of 2°t poundsll inchl100'. The tape shall I be color coded and imprinted with the message as follows; LIAe 8f Ufllit Color Code Le gen •y Water Safety Blue Caution! Buried Water Line Below Sewer Safety Green Caution! Buried Sewer Line Below — Installation of detectable tapes shall be per manufacturer's recommendations and shall be as close to the grade as is practical for optimum protection and detectability. Allow a minimum of 18 inches between the tape and the pipe. Payment for work such as backfill, bedding, blocking, detectable tapes, and all other associated appurtenances required shall be included in the unit j price bid for the appropriate bid item(s). { D- 31 PIPE CLEANING , Joints shall be wiped and then inspected for proper installation by the inspectors. Each joint shall be swept daily and kept clean during installation. A temporary night plug shall be installed on all exposed pipe ends during any period of work stoppage. D- 32 DISPOSAL OF SPOILIFiLL MATERIAL Prior to the disposing of any spoil/fill material, the Contractor shall advise the Director of Envineering Department, acting as: the City of Fort Worth's Flood Plain. Administrator ("Administrator"), of the location of all sites where the Contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinances of the l City of Fort Worth (Ordinance No. 10056). All disposal sites must be approved by the Administrator to ensure that filling is not occurring within a floodplain without a permit. A floodplain permit can be issued upon approval of necessary Engineering studies. No fill permit is 1 required if disposal sites are not in a floodplain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, including any necessary Engineering studies, shall be at the Contractor's expense. In the event that the Contractor disposes of spoil/fill material at a site without a fill permit or a letter from the administrator approving the disposal site, upon notification by the Director of Engineering Department, Contractor shall remove the spoillfill material at its expense and dispose of such materials in accordance with the Ordinances of the City and this section. D- 33 MECHANICS AND MATERIALMEN'S LIEN The Contractor shall be required to execute a release of mechanics and material men's liens upon receipt of payment. !0127104 SC-22 ' PART D - SPECIAL CONDITIONS — D-34 SUBSTITUTIONS The specifications for materials set out the minimum standard of quality, which the City believes necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a substitution for the material, which has been specified. Where the term "or equal", or "or approved equal" is used, it is understood that if a material, product, or piece of equipment bearing the name so used is furnished, it will be approvable, as the particular trade name was used for the purpose of establishing a standard of quality acceptable to the City. If a product of any other name is proposed for use, the Engineer's approval thereof must be obtained before the Contractor procures the proposed substitute. . . Where the term "or equal", or "or approved equal" is not used in the specifications, this does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose. However, the Contractor shall have the full responsibility of proving that the proposed substitution is, in fact, equal, and the Engineer, as the representative of the City, shall be the sole judge of the acceptability of substitutions. The provisions of this sub-section as related to "substitutions" shall be applicable to all sections of these specifications. D-35 PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER A. GENERAL; Prior to the reconstruction, ALL sections of existing sanitary sewer lines to be abandoned, removed (except where being replaced in the same location), or rehabilitated (pipe enlargement, cured-in-piace pipe, fold and form pipe, slip-line, etc.), shall be cleaned, and a television inspection performed to identify any active sewer service taps, other sewer laterals and their location. Work shall consist of furnishing all labor, material, and equipment necessary for the cleaning and inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. 1. HIGH 'VELOCITY JET (HYDROCLEANING) EQUIPMENT: The high-velocity sewer line cleaning equipment shall be constructed for easy and safe operation. The equipment shall also have a selection of two or more high-velocity nozzles. The nozzles shall be capable of producing a scouring action from 15 to 45 degrees in all size lines designate.1 to be cleaned. Equipment shall also include a high-velocity gun for washing and scouring -� manhole walls and floor. The g.un shall be capable of producing flows from a fine spray to a solid stream. The equipment shall carry its own water tank, auxiliary engines, pumps, and hydraulically driven hose reel. Hydraulically Propelled Equipment shall be of a movable dam type and be constructed in such a way that a portion of the dam may be collapsed at any time during the cieanin'] operation to protect against flooding of the sewer. The movable dam shall be equal i, diameter around the outer periphery to ensure removal of grease. If sewer cleaning balls or other equipment, which cannot be collapsed, is used, special precautions to prevent flooding of the sewers and public or private property shall be taken. The flow of sewage present in the sewer lines shall be utilized to provide necessary fluid for hydraulic cleaning devices whenever possible. 2. CLEANING PROCEDURES: The designated sewer manholes shall be cleaned using high-velocity jet equipment. The equipment shall be capable of removing dirt, grease, rocks, sand, and other materials and obstructions from the sewer lines and manholes. If cleaning of an entire section cannot be successfully performed from one manhole, the equipment shall be set up on the other manhole and cleaning again attempted. If, again, successful cleaning cannot be performed or equipment fails to traverse the entire .� manhole section, it will be assumed that a major blockage exists, and the cleaning effort 10/27/04 SC-23 PART D - SPECIAL CONDITIONS -- shall be abandoned. When additional quantities of water from fire hydrants are necessary to avoid delay in normal working procedures, the water shall be conserved and not used unnecessarily. No fire hydrant shall be obstructed in case of a fire in the area served by the hydrant. Before using any water from the City Water Distribution System, the Contractor shall apply for and receive permission from the Water Department. The Contractor shall be responsible for the water meter and related charges for the setup, including the water usage bill, All expenses shall be considered incidental to cleaning. 3, DEBRIS REMOVAL AND DISPOSAL; All sludge, dirt, sand, rock, grease, and other solid or semisolid material resulting from the cleaning operation shall be removed at the downstream manhole of the•section being cleaned. Passing material from manhole i section to manhole section, which could cause line stoppages, accumulations of sand in wet wells, or damage pumping equipment, shall not be permitted. 4. All solids or semisolid resulting from the cleaning operations shall be removed from the site and disposed of at a site designated by the Engineer. All materials shall be removed from the site no less often than at the end of each workday and disposed of at no additional cost to the City. 5. UNDER NO CIRCUMSTANCE SHALL SEWAGE OR SOLIDS REMOVED THEREFROM BE DUMPED ONTO STREETS OR INTO DITCHES, CATCH BASINS, STORM DRAINS OR SANITARY SEWER MANHOLES. 6. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The camera shall be operative in 10-0% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. B. EXECUTION: 1. TELEVISION INSPECTION: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of F any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be Used to move the camera through the sewer line. When manually operated winches are used to pull the television camera through the line, telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. The importance of accurate distance measurements is__emphasized, All television inspection videotapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. 10/27104 SC-24 -- PART D - SPECIAL CONDITIONS The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor. The cost of retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service taps observed during inspection. In addition, other points of significance such as locations of unusual conditions, roots, storm sewer connections, broken pipe, presence of scale and corrosion, and other discernible features will be recorded, and a copy of such records will be supplied to the City. 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. The Engineer will return tapes to the Contractor upon completion of review. Tapes shall not be erased without the permission of the Engineer. If the tapes are of such poor quality that the Engineer is unable to evaluate the condition of the sewer line or to locate service connections, the Contractor shall be required to re-televise and provide a good tape of the line at no additional cost to the City. If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made. Also, no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the television camera. THE TAPES SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO CONSTRUCTION FOR REVIEW AND DETERMINATION OF SAGS. Upon completion of review of the tapes by the Engineer, the Contractor will be notified as to which sections of the sanitary r sewer are to be corrected.. The Engineer will return tapes to the Contractor upon completion of review. All costs associated with this work shall be incidental to unit prices bid for items under Television Inspection of the Proposal. C. PAYMENT OF CLEANING AND PRE-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER& The cost for Pre-Construction Cleaning and Television Inspection of sanitary sewers shall be per linear foot of sewer actually televised. The Contractor shall provide the Engineer with tapes of a quality that the particular piece of sewer can be readily evaluated as to existing sewer conditions and for providing appropriate means for review of the tapes by the Engineer including collection and removal, transportation and disposal of sand and debris from the sewers to a legal dump site. 10127104 -__^! SC-25 PART D - SPECIAL CONDITIONS Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The primary purpose of cleaning is for television inspection and rehabilitation; when a portion of a line is not or cannot be televised or rehabilitated, the cleaning of that portion of line shall be incidental and no payment shall be made. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at ' the option of the Contractor, and the costs must be included in the bid price for TV Inspections. The cost of retrieving the TV Camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to TV Inspection. The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. D- 36 VACUUM TESTING OF SANITARY SEWER MANHOLES D. GENERAL: This item shall govern the vacuum testing of all newly constructed sanitary sewer manholes. B. EXECUTION: 1, TEST PROCEDURE: Manholes shall be vacuum tested prior to any interior grouting with all connections in place. Lift holes shall be plugged, and all drop-connections and gas sealing connections shall be installed prior to testing. The sewer lines entering the manhole shall be }Mugged and braced to prevent the plugs from being drawn into the manhole. The plugs shall be installed in the lines beyond the --- drop-connections, gas sealing connections, etc. The test head shall be placed inside the �ru at th- to- of the manhole and inflated in nne nrrianrp with thp-- runt ifart1 1rPr'g N recommendations. A vacuum of ten inches of mercury {1 D"Hg} shall be drawn and the vacuum pump will be turned off. With the valve closed, the level of vacuum shall be read after the required test time. The required test time shall be determined from the Table I below in accordance with ASTM C1244-93: Table I MINIMUM TIME REQUIRED FOR VACUUM DROP A OF 132+.Hg (10"Hg -g"lig) (SEC) Depth of MH. 48-Inch Dia. 60-Inch Dia. (FT.) Manhole Manhole 9 to 16' 40 sec. 52 sec. 18' 45 sec. 59 sec. 20' 50 sec. 65 sec. 22' '55 sec. 72 sec. 24' 59 sec. 78 sec. 26' 64 sec. 85 sec. 28' 69 sec. 91 sec. '!0127104 _ SC-26 PART D - SPECIAL CONDITIONS 30' 74 sec. 98 sec. For Each 5 sec. 6 sec. Additional 2' 1. ACCEPTANCE: The manhole shall be considered acceptable, if the drop in the level of vacuum is less than one-inch of mercury (1" Hg) after the required test time. Any manhole, which fails to pass the initial test, must be repaired by either pressure grouting through the manhole wall or digging to expose the exterior wall of the manhole in order to locate the leak and seal it with an epoxy sealant. The manhole shall be retested as described above until it has successfully passed the test. Following completion of a successful test, the manhole shall be restored to its normal condition, all temporary plugs shall be removed, all braces, equipment, and debris shall be removed and disposed of in a manner satisfactory to the Engineer. C. PAYMENT: Payment for vacuum testing of sanitary sewer manholes shall be paid at the contract price per each vacuum test. This price shall include all material, labor, equipment, and all incidentals, including all bypass pumping, required to complete the test as specified herein. D- 37 BYPASS PUMPING The Contractor shall bypass the sewage around the section or sections of sewer to be rehabilitated and/or replaced. The bypass shall be made by plugging existing upstream manhole and pumping the sewage into a downstream manhole or adjacent system or other method as may be approved by the Engineer. The pump and bypass lines shall be of adequate capacity and size to handle the flow without sewage backup occurring to facilities connected to the sewer. Provisions shall be made at driveways and street crossings to permit safe vehicular travel without interrupting flow in the bypass system. Under no circumstances will the Contractor be permitted to discharge sewage into the trenches. Payment shall be incidental to rehabilitation or replacement of the sewer line. D- 38 POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEINER A. GENERAL: After construction, ALL sections of sanitary sewer lines shall have a television °- inspection performed by an independent sub-Contractor hired by the prime Contractor. Work shall consist of furnishing all labor, material, and equipment necessary for inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer fines from damage that might be inflicted by the improper use of cleaning equipment. B. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be operative in 100% humidity conditions. The camera, television monitor, and x other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer, and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. C. EXECUTION: 1. TELEVISION INSPECTION: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of 10/27/04 SC-27 �^ PART D - SPECIAL CONDITIONS any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches„ TV cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. No more than " 2000 linear feet of pipe will be televised at one time for review by the Engineer. When manually operated winches are used to pull the television camera through the line, -- telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. The importance of accurate distance measurements is emphasized. All television inspection video tapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll-a-tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. (! The City makes no guarantee that all of the sanitary sewers to be entered are clear for the f passage of a camera, The methods used for securing passage of the camera are to be at i— the option of the Contractor.' The cost or retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. Sanity sewer mains must be laced with enough water to fill all low pints. The television Sanitary g inspection must be done immediately following the lacing of the main with no water flow. If sewer is active, flow must be restricted to provide a clear image of sewer being inspected. 2. DOCUMENTATION: Television Inspection logs: Printed location records shall be Dept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service tap observed during inspection. All television logs shall be referenced to stationing as shown on the plans, A copy of these television logs will be supplied to the City. 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard-size photographs of the television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. Tapes will be returned to the Contractor upon completion of review by the Engineer. Tapes small not be erased without the permission of the Engineer. If the tapes are of such poor quality that the Engineer is unable to evaluate the condition of the sewer line or to locate service connections, the Contractor small be required to re televise and provide a good tate of the line at no additional cost to the City_ If a good YW 7104 SC-28 PART D - SPECIAL CONDMONS tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made. Also, no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the " television camera. D. PAYMENT OF POST-CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for post-construction Television Inspection of sanitary sewers shall be per linear foot of sewer televised. The Contractor shall provide the Engineer with tapes of a quality that the particular piece of sewer can be readily evaluated as to sewer conditions and for providing appropriate means for review of the tapes by the Engineer.. Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The quantity of TV inspection shall be measured as the total length of new pipe installed. All costs associated with this work shall be included in the appropriate bid item - Post-Construction Television Inspection. The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. D- 39 SAMPLES AND QUALITY CONTROL TESTING A. The Contractor shall furnish, at its own expense, certifications by a private laboratory for all materials proposed to be used on the project, including a mix design for any asphaltic and/or Portland cement concrete to be used, and gradation analysis for sand and crushed stone to be used along with the name of the pit from which the material was taken. The contractor shall provide manufacturer's certifications for all manufactured items to be used in the project and will bear any expense related thereto. B. Tests of the design concrete mix shall be made by the contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate, cement, and mortar which are to be used later in the concrete_ The Contractor shall provide a certified copy of the test - results to the City. C. Quality control testing of in-place material on this project will be performed by the city at its own expense, Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the contractor and will be billed at commercial rates as determined by the City. The failure of the City to make any tests of materials shall in no way relieve the contractor of its responsibility to furnish materials and equipment conforming to the requirements of the contract. D. Not less than 24 hours notice shall be provided to the City by the Contractor for operations requiring testing. The Contractor shall provide access and trench safety system (if required) for the site to be tested, and any work effort involved is deemed to be included in the unit price for the item being tested. E. The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to the job site. The ticket shall specify the name of the pit supplying the fill material. D-40 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL (PDR DISTURBED AREAS LESS THAN 1 ACRE) a A. DESCRIPTION: This item shall consist of temporary soil erosion sediment and water pollution control measures deemed necessary by the Engineer for the duration of the 10127104 - SC-29 PART D - SPECIAL CONDITIONS contract. These control measures shall at no time be used as a substitute for the permanent control measures unless otherwise directed by the Engineer and they shall not include measures taken by the CONTRACTOR to control conditions created by his construction operations. The temporary measures shall include dikes, dams, berms, sediment basins, ` '- fiber mats, jute netting, temporary seeding, straw mulch, asphalt mulch, plastic liners, rubble f liners, baled-hay retards, dikes, slope drains and other devices. B. CONSTRUCTION REQUIREMENTS; The Engineer has the authority to dune erodible earth and the authority to limit the surface area of erodible-earth material exposed by preparing right-of-way, clearing and grubbing, the surface area of erodible-earth material exposed by excavation, borrow and to direct the CONTRACTOR to provide temporary pollution-control measures to prevent contamination of adjacent streams, other water courses, lakes, ponds or other areas of water impoundment. Such work may involve the construction of temporary berms, dikes, dams, sediment basins, slope drains and use of temporary mulches, mats, seeding, or other control devices or methods directed by the Engineer as necessary to control soil erosion. Temporary pollution-control measures shall be used to prevent or correct erosion that may develop during construction prior to installation of permanent pollution control features, but are not associated with permanent control features on the project. The Engineer will limit the area of preparing right-of-way, clearing and grubbing, excavation and borrow to be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading, mulching, seeding, and other such permanent pollution-control measures current in accordance with the accepted schedule. Should seasonal conditions make such limitations unrealistic, temporary soil-erosion-control measures shall be performed as directed by the Engineer. 2. Waste or disposal areas and' construction roads shall be located and constructed in a manner that will minimize the amount of sediment entering streams. 3. Frequent fordings of live streams will not be permitted; therefore, temporary bridges or other structures shall be used wherever an appreciable number of stream crossings are necessary. Unless otherwise approved in writing by the Engineer, mechanized equipment shali not be operated in live streams. 4. When work areas or materiai sources are located in or adjacent to live streams, such areas shall be separated from the stream by a dike or other barrier to keep sediment from entering a flowing stream. Care shall be taken during the construction and removal of such barriers to minimize the muddying of a stream. 5. All waterways shall be cleared as soon as practicable of false work, piling, debris or other obstructions placed during construction operations that are not a part of the finished work. 1 6. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes and reservoirs with fuels, oils, bitumen, calcium chloride or other harmful materials, He shall conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes and reservoirs and to avoid interference with movement of migratory fish. C. MEASUREMENT AND PAYMENT; All work, materials and equipment necessary to provide temporary erosion control shall be considered subsidiary to the contract and no extra pay will be given for this work. D-41 INGRESS AND EGRESIOBStRUCTION Op ACCESS TO DRIVES 10127104 SC-36 PART D A SPECIAL CONDITIONS The Contractor shall provide ingress and egress to the property being crossed by this construction and adjacent property when construction is not in progress and at night. Drives shall be left accessible at night, on weekends, and during holidays. The Contractor shall conduct his activities to minimize obstruction of access to drives and property during the progress of construction. Notification shall be made to an owner prior to his driveway being removed and/or rebuilt. D-42 PROTECTION OF TREES, PLANTS AND SOIL All property along and adjacent to the Contractors' operations including lawns, yards, shrubs, trees, etc., shall be preserved or restored after completion of the work, to a condition equal to or better than existed prior to start of work. Any trees or other landscape features scarred or damaged by the Contractor's operations shall be restored or replaced at the Contractor's expense. Trimming or pruning to facilitate the work will be permitted only by experienced workmen in an approved manner (No trimming or pruning without the property owners' consent). Pruned limbs of 1" diameter or larger shall be thoroughly treated as soon as possible with a tree wound dressing. By ordinance, the Contractor must obtain a permit from the City Forester before any work (trimming, removal, or root pruning) can be done on trees or shrubs growing on public property including street Rights-of-Ways and designated alleys. This permit can be obtained by calling the Forestry Office at 871-5738. All tree work shall be in compliance with pruning standards for Class 11 Pruning as described by the National Arborist Association. A copy of these standards can be provided by calling the above number. Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the International Society of Arboriculture. Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due the Contractor by the City. To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red Oak trees shall be immediately sealed using a commercial pruning paint. No separate payment will be made for any of the work involved for this item and all costs incurred will be considered a subsidiary cost of the project. D-43 SITE RESTORATION The contractor shall be responsible for restoring the site to original grade and condition after completion of his operations subject to approval of the Engineer, The basis for approval by the Engineer will be grade restoration to plus minus one-tenth (0.1) of a foot. D-44 CITY OF FORT WORTH STANDARD PRODUCT LIST Proposed products submitted in the bid documents must appear in the latest "City of Fort Worth Standard Product List, for the bid to be considered responsive. Products and processes listed in the "City of Fort Worth Standard Product List shall be considered to meet City of Fort Worth minimum technical requirements. D- 45 TOPSOIL, SODDING, SEEDING & HYDROMUI_CHING This item shall be performed in accordance with the City of Fort Worth Parks and Community Services Department Specifications for Topsoil, Sodding and Seeding. 10127104 SC-31 PART Q - SPECIAL CONDITIONS 1. TOPSOIL DESCRIPTION: This item will consist of furnishing and placing a minimum of six (6) inches of topsoil, free from rock and foreign material, in all parkways and medians to the Imes and grades as established by the Engineer. CONSTRUCTION METHODS: Topsoil will be secured from borrow sources as required to s supplement material secured front street excavation. All excavated materials from streets which is suitable for topsoil will be" used in the parkways and medians before any topsoil is obtained from a borrow source. Topsoil material secured from street excavation shall be 1 stockpiled at locations approved by the Engineer, and at completion of grading and paving 1 operations, topsoil shall be placed on parkway areas so as to provide a minimum six (6) inches of compacted depth of topsoil parkways. 2. SODDING DESCRIPTION: Sodding will consist of furnishing and planting Bermuda, Buffalo or St. Augustine grass in the areas betvVeen the curbs and walks, on terraces, in median strips, on embankments or cut slopes, or in such areas as designated on the Drawings and in accordance with the requirements of this Specification. Recommended Buffalo grass varieties for sodding are Prairie and 609. MATERIALS: Sod shall consist of live and growing Bermuda, Buffalo or St. Augustine grass secured from sources where the soil is fertile. Sod to be placed during the dormant state of rt these grasses shall be alive and acceptable. Bermuda and Buffalo grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a two (2) inch minimum thickness of native soil attached to the roots. St. Augustine grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a one (1) inch minimum thickness of native soil attached to the roots. The sod shall be free from obnoxious weeds or other grasses and shall not contain any matter deleterious to its growth or which might affect its subsistence or hardiness when transplanted, Sod to be placed between curb and walk and ort terraces shall be the same type grass as adjacent grass or existing lawn. Care shall be taken at ail times to!retain native soil on the roots of the sod during the process of excavating, hauling, and planting. Sod material shall be kept moist from the time it is dug until planted. When so directed by the Engineer, the sod existing at the source shall be �. watered to the extent required prior to excavating. Sod material shall be planted within three days after it is excavated. CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross-sections shown on the Drawings and as provided for in other items of the contract, sodding of the type specified shall be performed in accordance with the Y requirements hereinafter described. Sodding shall be either "spot" or "block"; either Bermuda, Buffalo or St. Augustine grass. a. Spot Sodding Furrows parallel to the curb line or sidewalk lines, twelve (12) inches on centers or to the dimensions shown on the Drawings, shall be opened on areas to be sodded. In all 10127104 SC-32 PART D - SPECIAL CONDITIONS furrows, sod approximately three (3) inches square shall be placed on twelve (12) inch centers at proper depth so that the top of the sod shall not be more than one-half (1 12) inch below the finished grade. Holes of equivalent depth and spacing may be used instead of furrows. The soil shall be firm around each block and then the entire sodded area shall be carefully rolled with a heavy, hand roller developing fifteen (15) to twenty-five (25) pounds per square inch compression. Hand tamping may be required on terraces. b. Block Sodding. At locations on the Drawings or where directed, sod blocks shall be carefully placed on the prepared areas. The sod shall be so placed that the entire designated area shall be covered, and any voids left in the block sodding shall be filled with additional sod and tamped. The entire sodded area shall be rolled and tamped to form a thoroughly compact solid mass. 'Surfaces of block sod, which, in the opinion of the Engineer, may slide due to the height or slope of the surface or nature of the soil, shall,. upon direction of the Engineer, be pegged with wooden pegs driven through the sod block to the firm earth, sufficiently close to hold the block sod firmly in place. When necessary, the sodded areas shall be smoothed after planting has been completed and shaped to conform to the cross-section previously provided and existing at the time sodding operations were begun. Any excess dirt from planting operations shall be spread uniformly over the adjacent areas or disposed of as directed by the Engineer so that the ^- completed surface will present a sightly appearance. The sodded areas shall be thoroughly watered immediately after they are planted and shall be subsequently watered at such times and in a manner and quantity directed by the Engineer until completion and final acceptance of the project by the City of 'Fort Worth. 3. SEEDING DESCRIPTION: "Seeding" will consist of preparing ground, providing and planting seed or a mixture of seed of the kind specified along and across such areas as may be designated on the Drawings and in accordance with these Specifications. MATERIALS: a. General. All seed used must carry a Texas Testing Seed label showing purity and germination, name, type of seed, and that the seed meets all requirements of the Texas Seed Law. Seed furnished shall be of the previous season's crop and the date of analysis shown on each tag shall be within nine (9) months of time of delivery to the project. Each variety of seed shall be furnished and delivered in separate bags or containers. A sample of each variety of seed shall be furnished for analysis and testing when directed by the Engineer. The specified seed shall equal or exceed the following percentages of Purity and germination: Common NamePurity Germination Common Bermuda Gress 95% 9011/0 Annual Rye Grass 95% 95% Tall Fescue 95% 90% AM Western Wheatgrass 95%s 90% 10127/04 SC-33 - PART D - SPECIAL CONDITIONS Buffalo Grass Varieties Top Gun 95% 90%4 Cody 95% 90%v R. Table 120.2.(2)a. I URBAN AREA WARM-SEASON SEEDING RATE (lbs.); Pure Live Seed (PLS) Mixture for Clay or Tight Soils Mixture for �! Sandy Soils Dates (Eastern Sections) (Western Sections) (All Sections) Feb 1 Bermudagrass 40 Buffalograss 80 Bermudagrass 60 to Buffalograss 60 Bermudagrass 20 Buffalograss 40 May 1 Total: 100 Total: 100 Total: 100 Table, 120.2.(2)b TEMPORARY COOL-SEASON SEEDING RATE; (lb.) Pure Live Seed (PLS) Dates (All Sections) Aug 15 Tall Fescue 50 to Western Wheatgrass 54 { May 1 Annual Rye 50 " Total: 100 i CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross-sections shown on the Drawings and as provided for in other items of this Contract, seeding of the type specified shall be performed in accordance with the requirements hereinafter described. a. Watering. Seeded areas shall be watered as directed by the Engineer so as to prevent washing of the slopes or dislodgment of the seed. b. Finishing. Where applicable, the shoulders, slopes, and ditches shall be smoothed after seed bed preparation has been completed and shaped to conform to the cross-section previously provided and existing at the time planting operations were begun. BROADCAST SEEDING: The seed or seed mixture in the quantity specified shall be uniformly distributed over the areas shown on the Drawings and where directed'. If the sowing of seed is by hand, rather than by mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer shall be distributed at the same time provided the specified uniform rate of application for both is obtained. "Finishing" as specified in Section ❑-45, Construction Methods, is not applicable since no seed bed — preparation is required. DISCED SEEDING: Soil over the area shown on the Drawings as directed to be seeded shall be loosened to a minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter or they shall be removed. The area shail then be finished to line and grade as specified under "Finishing" in Section D-45, Construction Methods. The seed, or seed mixture, specified shall then be planted at the rate required and the application shall be made uniformly, If the sowing of seed is by hand rather than by — 10127104 SC-34 PART D - SPECIAL .CONDITIONS ` mechanical methods, seed shall be raked or harrowed into the soil to a depth of approximately one-eight (1/8) inch, The planted area shalt be rolled with a corrugated roller of the "Cultipacker" type, All rolling of the slope areas shall be on the contour. ASPHALT MULCH SEEDING: The soil over the area shown on the Drawings, or as directed to be seeded, shall be loosened to the minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter, or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section D- 45, Construction Methods. Water shall then be applied to the cultivated area of the seed bed until a minimum depth of six (6) inches is thoroughly moistened. After the watering, when the ground has become sufficiently dry to be loose and pliable, the seed, or seed mixture specified, shall then be planted at the rate required and the application shall be made uniformly. If the sowing of seed is by hand, rather than mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer may be distributed at the same time, provided the specified uniform rate of application for both is obtained. After planting, the seed shall be raked or harrowed into the soil to a depth of approximately one-quarter (114) inch. The planted surface area and giving a smooth surface without ruts or tracks. In between the time compacting is completed and the asphalt is applied, the planted area shall be,watered sufficiently to assure uniform moisture from the surface to a minimum of six (6) incl es in depth. The application of asphalt shall follow the last watering as rapidly as possible. Asphalt shall be of the type and grade as shown on the Drawings and shall conform to the requirements of the item 300, "Asphalts, Oils and Emulsions". If the type of asphalt to be used is not shown on the Drawings, or if Drawings are not included, then MS-2 shall be used. Applications of the asphalt shall be at a rate of three-tenths (0,3) gallons per square yard, It shall be applied � to the area in such a manner so that a complete film is obtained and the finished surface shall be comparatively smooth. RE-SEEDING OF AREAS PLANTED WITH COOL SEASONS SPECIES: Areas where temporary cool season species have been planted may be roplanted beginning February 1 with warm season species as listed in Table 120.2(2)a. The re-seeding will be achieved in the following manner, The cool season species shall be mowed down to a height of one (1) inch to insure that slit-seeding equipment will be able to cut through the turf and achieve adequate soil penetration, * Slit-seeding, is achieved through the use of an implement which cuts a furrow (slit) in the soil and places the seed in the slit which is then pressed close with a cult packer wheel. 4. HYDROMULCH SEEDING: If hydra mulch seeding is provided, seed mix shall have 95% purity of Bermuda grass and have a germination rate of 90"/o. Contractor shall ensure that the grass establishes. 5. CONSTRUCTION WITHIN PARK AREAS TURF RESTORATION OF PARK AREAS: FERTILIZER 1012MO4 SC-35 PART D - SPECIAL CONDITIONS DESCRIPTION: "Fertilizer" will consist of providing and distributing fertilizer over such areas as are designated on the Drawings and in accordance with these Specifications. MATERIALS: All fertilizer used shall be delivered in bags or containers clearly labeled A showing the analysis. The fertilizer is subject to testing by the City of Fort Worth in accordance with the Texas Fertilizer Law. A pelleted or granulated fertilizer shall be used with an analysis of 18-20-0 or 16-5-8 or having the analysis shown on the Drawings. The figures in the analysis represent the percent of nitrogen, phosphoric acid, and potash nutrients respectively as determined by the methods of the Association of Official Agricultural Chemists. In the event it is necessary to substitute a fertilizer of a different analysis, it shall be a pelleted or granulated fertilizer with a lower concentration. Total amount of nutrients furnished and applied per acre shall equal or exceed that specified for each nutrient. CONSTRUCTION METHODS: When an item for fertilizer is included in the Drawings and proposal, pelleted or granulated fertilizer shall be applied uniformly over the area specified to be fertilized and in the manner directed for the particular item of work. Fertilizer shah be dry and in good physical condition. � Fertilizer that is powdered to caked will be rejected. Distribution of fertilizer as a particular item of work shall meet the approval of the Engineer. Unless otherwise indicated on the Drawings, fertilizer shall be applied uniformly at the average rate of three hundred (300) pounds per acre for all types of "Sodding" and four hundred (400) pounds per acre for all types of"Seeding". MEASUREMENT: Topsoil secured from borrow sources will be measured by the square yard in place on the project site- Measurement will be made only on topsoils secured from borrow sources. Acceptable material for"Seeding"will be measured by the linear foot, complete in place. Acceptable material for"Sodding"will be measured by the linear foot, complete in place. Acceptable material for "Fertilizer' shall be subsidiary to the price of sodding cr seeding. PAYMENT: All work performed as ordered and measured shall be subsidiary to the contract unless and otherwise noted in the plans and bid documents to be paid for at the unit price bid for each item of work. Its price shall be full compensation for excavating (except as noted below), loading, hauling, placing and furnishing all labor, equipment, tools, supplies, and incidentals necessary to complete work, All labor, equipment, tools and incidentals necessary to supply, transport, stockpile and place topsoil or salvage topsoil as specified shall be included in "Seeding" or "Sodding" fold items and will not be paid for directly. "Spot sodding" or "block sodding",as the case may be, will be paid for at the contract unit price per square yard, complete in place, as provided in the proposal and contract. The contract unit price shall be the total compensation for furnishing and placing all sod; for all rolling and tamping; for all watering; for disposal of all surplus materials; and for all materials, ^' labor, equipment, tools and incidentals necessary to complete the work, all in accordance with the Drawings and these Specifications. r0127104 SC-36 PART D - SF'ECiAL CCNDMONS The work performed and materials furnished and measured as provided under "Measurement" shall be paid for at the unit price for "Seeding", or "Sodding", of the type specified, as the case may be, which price shall each be full compensation for furnishing all materials and for performing all operations necessary to complete the work accepted as follows: Fertilizer material and application will not be measured or paid for directly, but is considered subsidiary to Sodding and Seeding, D-46 CONFINED SPACE ENTRY PROGRAM It shall be the responsibility of the contractor to implement and maintain a variable "CONFINED SPACE ENTRY PROGRAM" which must meet OSHA requirements for all its employees and subcontractors at all times during construction. All active sewer manholes, regardless of depth, are defined by OSHA, as "permit required confined spaces". Contractors shall submit an acceptable "CONFINED SPACE ENTRY PROGRAM" for all applicable manholes and maintain an active file for these manholes. The cost of complying with this program shall be subsidiary to the pay items involving work in confined spaces. �. D- 47 SUBSTANTIAL COMPLETION INSPECTIONIFINAL INSPECTION 7. Prior to the final inspection being conducted for the project, the contractor shall contact the city inspector in writing when the entire project or a designated portion of the project is substantially complete. 8. The inspector along with appropriate City staff and the City's consultant shall make an - inspection of the substantially completed work and prepare and submit to the contractor a list of items needing to be completed or corrected. 9. The contractor shall take immediate steps to rectify the listed deficiencies and notify the owner in writing when all the items have been completed or corrected. 10. Payment for substantial completion inspection as well as final inspection shall be subsidiary to the project price. Contractor shall still be required to address all other deficiencies, which are discovered at the time of final inspection, 11. Final inspection shall be in conformance with general condition item "C5-5.18 Final Inspection" of FART C - GENERAL CONDITIONS. D-48 EXCAVATION NEAR TREES (INHERE IDENTIFIED ON THE PLANS) 1. The Contractor shall be responsible for taking measures to minimize damage to tree limbs, tree trunks, and tree. roots at each work site. All such measures shall be considered as incidental work included in the Contract Unit Price bid for applicable pipe or structure installation except for short tunneling/tree augering. 2. Any and all trees located within the equipment operating area at each work site shall, at the direction of the Engineer, be protected by erecting a "snow fence" along the drip line or edge of the tree root system between tree and the construction area. 3. Contractor shall inspect each work site in advance and arrange to have any tree limbs pruned that might be damaged by equipment operations. The Engineer shall be notified 10/27/04 SC-37 PART D - SPECIAL CONDITIONS at least 24 hours ;prior to any tree trimming work. No trimming work will be permitted within private property without written permission of the Owner. 4. Nothing shall be stored over the tree root system within the drip line area of any tree. 5. Before excavation (off the roadway) within the drip line area of any tree, the earth shall be sawcut for a minimum depth of 2 feet. 6. At designated locations shown on the drawings, the "short tunnel" method using Class 51 D.I. pipe shall be utilized. ¢ 7. Except in areas where clearing is allowed, all trees up to 8" in diameter damaged during I construction shall be removed and replaced with the same type and diameter tree at the .., contractor's expense. S. Contractor shall employ a qualified landscaper for all the worn required for tree care to ensure utilization of the best agricultural practices and procedures. 9. Short tunneling shall consist of power augering or hand excavation. The tunnel diameter shall not be larger than 1-1l2 times the outside pipe diameter. Voids remaining after pipe installation shall be pressure grouted. D- 49 CONCRETE ENCASEMENT OF SEWER PIPE a Concrete encasement of sewers shall be paid for at the Contract Unit Price per linear foot of concrete encasement as measured in place along the centerline of the pipe for each pipe diameter indicated. The Contract Unit Price shall include all costs associated with installation and I reinforcement of the concrete encasement. D- 50 CLAY DAM Clay dam construction shall be performed in accordance with the Wastewater Clay Dam Construction, figure in the Drawings in these 'Specifications, at locations indicated on the Drawings or as directed by the City. Clay dams shall be keyed into undisturbed soil to make an impervious barrier to reduce groundwater percolation through the pipeline trench. Construction material shall consist of compacted bentonite clay or 2:27 concrete. Payment for work such as forming, placing and finishing shall be subsidiary to the price 'bid for pipe installation. D- 51 EXPLORATORY EXCAVATION (D-HOLE) The Contractor shall be responsible for verifying the locations of all existing utilities prior to construction, in accordance with item D-6. At locations identified on the drawings, contractor shall conduct an exploratory excavation (D-Hole), to locate and verify the location and elevation of the existing underground utility where it may be in potential conflict with a proposed facility alignment. The exploratory excavation shall be conducted prior to construction of the entire project only at locations denoted on the plans or as directed by the engineer. Contractor shall submit a report of findings (including surveyed elevations of existing conflicting utilities) to the City prior to the start of construction of the entire project. If the contractor determines an existing utility is in conflict with the proposed facility, the contractor shall contact the engineer immediately for appropriate design modifications. The contractor shall make the necessary repairs at the exploratory excavation (D-Hole) to obtain a safe and proper driving surface to ensure the safety of the general public and to meet the 90127/04 SC-38 PART D - SPECIAL CONDITIONS approval of the City inspector. The contractor shall be liable for any and all damages incurred due to the exploratory excavation (D-Hole). Payment shall not be made for verification of existing utilities per item D-O. Payment for exploratory excavation (D-Hole), at locations identified on the plans or as directed by the Engineer, shall include full compensation for all materials, excavation, surface restoration, field surveys, and all incidentals necessary to complete the work, shall be the unit price bid. No payment shall be made for exploratory excavation(s) conducted after construction has begun. 13- 52 INSTALLATION OF WATER FACILITIES 52.1 Polyvinyl Chloride (PVC) Water Pipe POLYVINYL Chloride Plastic Water Pipe and fittings on this Project shall be in accordance with the material standard contained in the General Contract Documents. Payment for work such as backfill, Bedding, blocking, detectable tapes and all other associated appurtenant required, shall be included in the linear foot price bid of the appropriate BID ITEMS). 52.2 Blocking Concrete blocking on this Project will necessarily be required as shown on the Plans and a shall be installed in accordance with the General Contract documents. All valves shall have concrete blocking ;provided for supporting. No separate payment will be made for any of the work involved for the item and all costs incurred will be considered to be included in the linear foot bid price of the pipe or the bid price of the valve. 52.3 Type of Casing Pipe 1. WATER: The casing pipe for open cut and bored or tunneled section shall be AV\fWA C-200 Fabricated Electrically Welded Steel Water Pipe, and shall conform to the provisions of EI-15, E1-5 and E1-9 in Material Specifications of General Contract documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as follows: For the inside and outside of casing pipe, coal-tar protective coating in accordance with the requirements of Sec. 2,2 and related sections in AWIf,+A C-203. Touch-up after field welds shall provide coating equal to those specified above, C. Minimum thickness for casing pipe used shall be 0.375 inch. Stainless Steel Casing Spacers (centering style) such as manufactured by Cascade Waterworks Manufacturing Company or an approved equal shall be used on all non- concrete pipes when installed in casing. Installation shall be as recommended by the Manufacturer. 2. SEWER. Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. 3. PAYMENT: Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and incidental work shall be included in the unit price bid per foot. 52.4 Tie-Ins 10127104 _ SC-39 PART D - SPECIAL CONDITIONS The Contractor shall be responsible for making tie-ins to the existing water mains. It shall be the responsibility of the Contractor to verify the exact location and elevation of the f existing line tie-ins. And any differences in locations and elevation of existing line tie-ins between the contract drawings and what may be encountered in the field snail be " considered as incidental to construction. The cost of making tie-ins to existing water or sanitary sewer mains shall be included in the linear foot bid price of the pipe. 52.5 Connection of Existing Mains The Contractor shall determine the exact location, elevation, configuration and angulation of existing water or sanitary sewer lines prior to manufacturing of the connecting piece. Any differences in locations, elevation, configuration, and or angulation of existing Nines P between the contract drawings and what may be encountered in the said work shall be considered as incidental to construction. Where it is required to shut down existing mains in order to make proposed connections, such down time small be coordinated with the Engineer, and all efforts shall be made to keep this down. time to a minimum. In case of shutting down an existing main, the Contractor shall notify the Manager, Construction Services, Phone 871-7813, at least 48-hours prior to the required shut down time. The Contractor's attention is directed to Paragraph C5-5.15 INTERRUPTION OF SERVICE, i Page C5-5(5), PART C - GENERAL CONDITIONS OF THE WATER DEPARTMENT GENERAL CONTRACT DOCUMENTS AND GENERAL SPECIFICATIONS. The I� Contractor shall notify the customer both personally and in writing as to the location, time, and schedule of the service interruption. The cost of removing any existing concrete blocking shall be included in the cost of I� connection. Unless bid separately all cost incurred shall be included in the linear foot price bid for the appropriate pipe size. i 52.5 Valve Cut-Ins It may be necessary to cut-in gate valves to isolate the water main from which the extension and/or replacement is to be connected. This may require closing valves in other lines and patting consumers out of service for that period of time necessary to cut in the new valve; the worts must be expedited to the utmost and all such cutins must be coordinated with the engineer in charge of inspection. All consumers shall be individually advised prior to the shut out and advised of the approximate length of time they may be without service. Payment for work such as backfill, bedding, fittings, blocking and all other associated appurtenants required, shall be included in the price of the appropriate bid items.. 52.7 Water Services The relocation, replacement, or reconnection of water services will be required as shown on the plans, and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. All service's shall be constructed by the contractor utilizing approved factory manufactured -- tap saddles (when required) and corporation stops, type K copper water tubing, curb stops with lock wings, meter boxes, and if required approved manufactured service branches. All materials used shall be as specified in the Material Standards (E1- 17 & E1-18) contained in the General Contract Documents. Ali water services to be replaced shall be installed at a minimum depth of 36 inches below final grade. 10127/04 SC-40 ---- - PART D - SPECIAL CONDITIONS All existing 314-inch water service lines which are to be replaced shall be replaced with 1- inch Type K copper, 1-inch diameter tap saddle when required, and 1-inch corporation from the main line to the meter box. All services which are to be replaced or relocated shall be installed with the service main .- tap and service line being in line with the service meter unless otherwise directed by the Engineer. A minimum of 24 hours advance notice shall be given when service interruption will be required as specified in Section C5-5.15 INTERRUPTION OF SERVICE. All water service meters shall be removed, tagged, and collected by the contractor for pickup by the Water Department for reconditioning or replacement. After installation of the water service in the proposed location and receipt of a meter from the project inspector the contractor shall install the meter. The meter box shall be reset as necessary to be flush with existing ground or as otherwise directed by the Engineer. All such work on the outlet side of the service meter shall be performed by a licensed plumber. A` 1. WATER SERVICE REPLACEMENTS: Water service replacement or relocation is required when the existing service is lead or is too shallow to avoid breakage during street reconstruction. The contractor shall replace the existing service line with Type K copper from the main to the meter, curb stop with lock wings, and corporation stop. Payment for all work and materials such as backfill, fittings, type K copper tubing, curb stop with lock wings, service line adjustment, and any relocation of up to 12-inches from center line existing meter location to center line proposed meter location shall be included in the Linear Foot price bid for Copper Service Line from Main to five (5) feet behind Meter. Any vertical adjustment of customer service line within the 5 foot area shall be subsidiary to the service installation. Payment for all work and materials such as tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. 1. WATER SERVICE RECONNECTION; Water service reconnection is required when the existing service is copper and at adequate depth to avoid breakage during street reconstruction, The contractor shall adjust the existing water service line as required for reconnection and furnish a new tap with corporation stop. The contractor will be paid for one (1) Service Tap to Main for each service reconnected plus for any copper service line used in excess of five (5) feet from Main to five (5) feet behind the Meter. ., 2. WATER SERVICE METER AND METER SOX RELOCATIONS, When the replacement and relocation of a water service and meter box is required and the location of the meter and meter box is moved more than twelve (12) inches, as measured from the center line of the existing meter to location to the center line of the proposed meter location, separate payment will be allowed for the relocation of service meter and meter box, Centerline is defined by a line extended from the service tap through the meter. Only relocations made perpendicular to this centerline will be paid for separately. Relocations made along the centerline will be paid of in feet of copper service line. When relocation of service meter and meter box is required, payment for all work and materials such as backfill, fittings, five (5) feet of type K copper service and all materials, 10127104 ------ SC-41 PART D -- SPECIAL CONDITIONS labor, and equipment used by and for the licensed plumber shall be included in the price bid for the service meter relocation. All other costs will be included in other appropriate bid item(s). This item will also be used to, pay for all service meter and meter box relocations as required by the Engineer when the service line is not being replaced. Adjustment of only the meter box and customer service line within 5 feet distance behind the meter will not _ justify separate payment at any time. Locations with multiple service branches will be paid for as one service meter and meter box relocation. 4. NEW SERVICE: When new services are required the contractor shall install tap saddle (when required), corporation strop, type K copper service line, curb stop with lock wings, and meter box. Reinforced plastic meter boxes with cast iron lid shall be provided for all 2 inch water meters or smaller. The reinforced plastic water meter boxes shall comply with I section E1-18A— Reinforced Plastic Water Meter Boxes. Payment for all work and materials such as backfill, fittings, type K copper tubing, and curb step with lock wings shall be included in the Linear Foot price bid for Service Line from Main to Meter five (5) feet behind the meter. Payment for all work and materials such as tap saddle, corporation stops, and fittings shall be included in the price bid for Service Taps to Mains. Payment for all work and materials such as furnishing and setting new meter box shall be included in the price bid for furnish and set meter box. } i 1. MULTIPLE SERVICE BRANCHES: When multiple service branches are required the contractor shall furnish approved factory manufactured branches. Payment for multiple service branches will include furnishing and installing the multiple service branch only and all other cost will be included in other appropriate bid item(s). nnaL l ,L TIR E STREET SEERVI E t INES ` O SINGLE E SERV!C-E MPTf7P• Anv miittinla L. IY1lJ1 ii La_ service lines with taps servicing a single service meter encountered during construction. shall be replaced with one service line that is applicable for the size of the existing service meter and approved by the Engineer. Payment shall be made at the unit bid price in the appropriate bid item(s). 52.8 2-1 nch Temporary Service Line _ A. The 2-inch temporary service main and 314-inch service lines shall be installed to provide temporary water service to all buildings that will necessarily be required to have severed water service during said work. The contractor shall be responsible for coordinating the schedule of the temporary service connections and permanent service reconnections with the building owners and the Engineer In order that the work be performed in an expeditious manner. Severed water service must be reconnected within 2 hours of discontinuance of service. A 2-inch tapping saddle and 2-inch corporation stop or 2-inch gate valve with an appropriate fire hydrant adapter fitting shall be required at the temporary service point of - connection to the City water supply. The 2-inch temporary service main and 311-inch service lines shall be installed in accordance to the attached figures 1, 2 and 3. 2" temporary service line shall be cleaned and sterilized by using chlorine gas or chlorinated line (HTH) prior to installation. 10/27/04 _ SC-42 r PART D - SPECIAL CONDITIONS The out-of-service meters shall be removed, tagged and collected by the Contractor for delivery to the Water Department Meter Shop for reconditioning or replacement. Upon restoring permanent service, the Contractor shall re-install the meters at the correct location. The meter box shall be reset as necessary to be flush with the existing around or as otherwise directed by the. EDgineer. The temporary service layout shali have a minimum available flow rate of 5 GPM at a dynamic pressure of 35 PSI per service tap. This criteria shall be used by the Contractor to determine the length of temporary service allowed, number of service taps and number of feed points. When the temporary service is required for more than one location the 2--inch temporary service pipes, 314-inch service dines and the 2-inch meter shall be moved to the next successive project location. Payment for work such as fittings, 314-inch service lines, asphalt, barricades, all service connections, removal of temporary services and all other associated appurtenants required, shall be included in the appropriate bid item. B. In order to accurately measure the amount of water used during construction, the Contractor will install a fire hydrant meter for all temporary service lines. Water used during construction for flushing new mains that cannot be metered from a hydrant will be estimated as accurately as possible. At the pre-construction conference the contractor will advise the inspector of the number of meters that will be needed along with the locations where they will be used. The inspector will deliver the hydrant meters to the locations. After installation, the contractor will take full responsibility for the meters until such time as the contractor returns those meters to the inspector. Any damage to the meters will be the sole responsibility of the contractor. The Water Department Meter Shop will evaluate the condition of the meters upon return and if repairs are needed the contractor will receive an invoice for those repairs. The issued meter is for this specific project and location only. Any water that the contractor may need for personal use will require a separate hydrant meter obtained by the Contractor, at its cost, from the Water Department. 52.9 Purging and Sterilizatian of Water Lines Before being placed into service all newly constructed water lines shall be purged and sterilized in accordance with E2-24 of the General Contract Documents and Specifications except as modified herein. The City will provide all water for INITIAL cleaning and sterilization of water lines. All materials for construction of the project, including appropriately sized "pipe cleaning pigs", chlorine gas or chlorinated lime (HTH) shall be furnished by the Contractor. Chlorinated lime (HTH) shall be used in sufficient quantities to provide a chlorine residual bf fifty (50) PPM. The residual of free chlorine shall be measured after 24 hours and shall not be less than 10 parts per million of free chlorine. -- Chlorinated water shall be disposed of in the sanitary sewer system. Should a sanitary sewer not be available, chlorinated water shall be "de-chlorinated" prior to disposal. The line may not be placed in service until two successive sets of samples, taken 24 hours apart, have met the established standards of parity. Purging and sterilization of the water lines shall be considered as incidental to the project and all costs incurred will be considered to be included in the linear foot bid price of the pipe. 10127104 SC-43 PART D - SPECIAL CONDITIONS 52.10 Work Near Pressure Plane Boundaries Contractor shall take note that the water line to be replaced under this contract may cross or may be in close proximity to an existing pressure plane boundary. Care shall be taken to ensure all "pressure plane" valves instalied are installed closed and no cross connections are made between pressure planes 52.11 Water Sample Station GENERAL: All water sampling station instNllations will be per attached Figure 34 or as required in large water meter vaults as per Figure 33 unless otherwise directed by the Engineer. The appropriate water sampling station will be furnished to the Contractor free of charge; however, the Contractor Wil be required to pick up this item at the Field Operations Warehouse, PAYMENT FOR FIGURE 34! INSTALLATIONS: Payment for all work and materials necessary for the installation of the 3!4 inch type K copper service line will be shall be included in the price bid for copper Service Line from Main to Meter. Payment for all work and materials necessary for the installation tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, concrete support block, curb stop, fittings, and an incidental 5-feet of type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. PAYMENT FOR FIGURE 33 INSTALLATIONS: Payment for all work and materials r_ necessary for the installation tap saddle, gate valve, and fittings shall be included in the price bid for Service Tans to Main. Payment for all work and materials necessary for the installation of the sampling station, modification to the vault, fittings,. and all type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations, 52.12 Ductile Iron and Gray Iron Fittings Reference Part E2 Construction Specifications, Section E2-7 Installing Cast Iron Pipe, fittings, and Specials, Sub section E2-7.11 Cast Iron Fittings: E2-7.11 DUCTILE-IRON AND GRAY-IRON FITTINGS: All ductile-!roil and gray-iron fittings shall be furnished with cement mortar lining as stated in Section E1-7. The price bid per ton of fittings shall be payment in full for all fittings, joint accessories, polyethylene wrapping, horizontal concrete docking, vertical tie-down concrete blocking, and concrete cradle necessary for construction as designed, All ductile-iron and gray-iron fittings, valves and specials shall be wrapped with polyethylene wrapping conforming to Material Specification E1-13 and Construction Specification E2-13, Wrapping shall precede horizontal concrete blocking, vertical tie- down concrete blocking, and concrete cradle. Payment for the polyethylene wrapping, 10127104 SG-44 PART D - SPECIAL CONDITIONS horizontal concrete blocking, vertical tie-down concrete blocking, and concrete cradle shall be included in bid items for vales and fittings and no other payments will be allowed. D-53 SPRINKLING FOR DUST CONTROL All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall apply. However, no direct payment will be made for this item and it shall be considered to this contract. D-54 DEWATERING z The Contractor shall be responsible for determining the method of dewatering operation for the water or sewage flows from the existing mains and ground water. The Contractor shall be responsible for damage of any nature resulting from the dewatering operations. The DISCHARGE from any dewatering operation shall be conducted as approved by the Engineer. Ground water shall not be discharged into sanitary sewers. Dewatering shall be considered as incidental to a construction and all costs incurred will be considered to be included in the project price. D-55 TRENCH EXCAVATION ON DEEP TRENCHES Contractor to prevent any water flowing into open trench during construction. Contractor shall not leave excavated trench open overnight. Contractor shall fill any trench the same day of excavation. No extra payment shall be allowed for this special condition. D- 56 TREE PRUNING A. REFERENCES: National Arborist Association's "Pruning Standards for Shade Trees". B. ROOT PRUNING EQUIPMENT 1. Vibratory Knife 2.. Vermeer V-165ORC Root Pruner C. NATURAL RESOURCES PROTECTION FENCE 3. Steel °T" = Bar stakes, 6 feet long. 4. Smooth Horse-Wire: 14-112 gauge (medium gauge) or 12 gauge (heavy gauge). 5. Surveyor's Plastic Flagging: "Tundra" weight, International fluorescent orange or red color. 6. Combination Fence: Commercially manufactured combination soil separator fabric on wire mesh backing as shown on the Drawings. D. ROOT PRUNING 7. Survey and stake location of root pruning trenches as shown on drawings. 10127104 SC-45 II� PART D - SPECIAL CONDITIONS 1 8. Using the approved specified equipment, make a cut a minimum of 36 inches deep in 1" order to minimize damage to the undisturbed root zone. f 9. Backfill and compact the trench immediately after trenching_ *� 10. Place a 3-foot wide by 4-inch deep cover of mulch over the trench as required by the Engineer. 11. Within 24 hours, prune flush with ground and backfill any exposed roots due to construction activity, Cover with woad chips of mulch in order to equalize soil temperature and minimize water loss due to evaporation, "* 12. Limit any grading work within conservation areas to 3-inch maximum cut or fill, with no rooks over 1-inch diameter being cut unless cut by hand or cut by specified methods, equipment and protection.� I E. {MULCHING; Apply 2-inches to 4-inches of wood chips from trimming or clearing operation on areas designated by the Engineer. F. Tree Pruning shall be considered subsidiary to the project contract price. D- 67 TREE REMOVAL_ Trees to be removed shall be removed using applicable methods, including stump and root ball removal, loading, hauling and dumping. Extra caution shall be taken to not disrupt existing utilities both overhead and buried. The Contractor shall immediately repair or replace any damage to utilities and private property including, but not limited to, water and sewer services, pavement, fences, walls, sprinkler system piping, etc., at no cost to the Owner. All costs for tree removal, including temporary service costs, shall be considered subsidiary to the project contract r�A price and no additional payment will be allowed. j D- S$ TEST HOLES i The matter of subsurface exploration to ascertain the nature of the soils, including the amount of rock, if any, through which this pipeline installation is to be made is the responsibility of any and all prospective bidders, and any bidder on this project shall submit his bid under this condition. Whether prospective bidders perform this subsurface exploration jointly or independently, and whether they make such determination by the use of test holes or other means, shall be left to the discretion of such prospective bidders. If test borings have been made and are provided for bidder's information, at the locations shown on the logs of borings in the appendix of this specification, it is expressly declared that neither the City nor the Engineer guarantees the accuracy for the information or that the material encountered in excavations is the same, either in character, location, or elevation, as shown on the boring logs. It shall be the responsibility of the bidder to make such subsurface investigations, as he deems necessary to determine the nature of the material to be excavated. The Contractor assumes all responsibility for interpretation of these records and for making and maintaining the required excavation and of doing other work affected by the geology of the site. The cost of alt rock removal and other'associated appurtenances, if required, shall be included in the linear foot bid price of the pipe. 10127144 SC-46 T -.r PART D - SPECIAL CONDITIONS -" D-59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION Prior to beginning construction on any block in the project, the contractor shall, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of x each residence or business that will be impacted by construction. The notice shall be prepared as follows: The notification notice or flyer shall be posted seven (7) days prior to beginning any construction activity on each 'block in the project area. The flyer shall be prepared on the Contractor's letterhead and shall include the following information: Name of Project, DOE No., Scope of Project (i.e. type of construction activity), actual construction duration within the block, the name " of the contractor's foreman and his phone number, the name of the City's inspector and his phone number and the City's after-hours phone number. A sample of the `pre-construction notification' flyer is attached. The contractor shall submit a schedule showing the construction start and finish time for each block of the project to the inspector. In addition, a copy of the flyer shall be delivered to the City Inspector for his review prior to being distributed. The contractor will not be allowed to begin construction on any block until the flyer is delivered to all residents of the block. In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, the contractor shall prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. The notice shall be prepared as follows" The notification or flyer shall be posted twenty-four (24) prior to the temporary interruption. The flyer shall be prepared on the contractor's letterhead and shall include the following information: Name of the project, DOE number„ the date of the interruption of service, the period the interruption will take place, the name of the contractor's foreman and his phone number and the name of the City's inspector and his phone number. A sample of the temporary water service interruption notification is attached. A copy of the temporary interruption notification shall be delivered to the inspector for his review prior to being distributed. The contractor shall not be permitted to proceed with interruption of water service until the flyer has been delivered to all affected residents and businesses.. Electronic versions of the sample flyers can be obtained from the Construction office at (817) 871-8306. All work involved with the notification flyers shall be considered subsidiary to the contract price and no additional compensation shall be made. D- 60 TRAFFIC BUTTONS The removal and replacement of traffic buttons is the responsibility of the contractor and shall be considered a subsidiary item. In the event that the contractor prefers for the Signals, Signs and Markings Division (SSMD) of the Transportation/Public Works Department to install the markings, the contractor shall contact SSMD at (817) 871-8770 and shall reimburse SSMD for all costs incurred, both labor and material. No additional compensation shall be made to the contractor for this reimbursement. 10127/04 SC-47 A PART D - SPECIAL CONDITIONS D- 61 SANITARY SEINER SERVICE CLEANOUTS Whenever a sanitary sewer service line is installed or replaced, the Contractor shail install a two- i way service cleanout as shown in the attached detail. Cleanouts are to be installed out of high traffic areas such as driveways, streets, sidewalks, etc. whenever possible. When it is not possible, the cleanout stack and cap shall be cast iron. Payment for all work and materials necessary for the installation of the two-way service cleanout which are required to provide a complete and functional sanitary sewer cleanout shall be included in the price laid for Sanitary Sewer Service Cleanouts. D- 62 TEMPORARY PAVEMENT REPAIR The Contractor shall provide a temporary pavement repair immediately after trench backfill and compaction using a minimum of 2-inches of hot mix asphalt over a minimum of 6-inches of compacted flex base. The existing asphalt shall be saw cut to provide a uniform edge and the entire width and length of the temporary repair shall be rolled with a steel asphalt roller to provide smooth rideability on the street as well as provide a smooth transition between the existing J pavement and the temporary repair. Cost of saw cutting shall be subsidiary to the temporary 1 pavement repair pay item. The contractor shall be responsible for maintaining the temporary pavement until the paving contractor has mobilized. The paving' contractor shall assume maintenance responsibility upon such mobilization. No additional compensation shall be made for maintaining the temporary pavement. D- 63 CONSTRUCTION STAKES The City, through its Surveyor or agent, will provide to the Contractor construction stakes or other customary method of markings as may be found consistent with professional practice, establishing line and grades for roadway and utility construction, and centerlines and benchmarks for bridgework. These stakes shalt be set sufficiently in advance to avoid delay whenever e_G-__ i__ll i__ t r__all x7Y:a.. ar. ctir..., f..�ater, ita,.. dr-mage practical. VISE.' SCl UI uiclkC��? 5!ldll UC ACL iUl dll i.illlEly construction,Y �VrraccY, aaiYtar y av`irvr, .. etc.), and one set of excavation/or stabilization stakes, and one set of stakes for curly and gutterlor paving. It shall be the sole responsibility of the Contractor to preserve, maintain, transfer, etc., all stakes furnished until completion of the construction phase of the project for which they were furnished. If the City or its agent determines that a sufficient number of stakes or markings provided by the City, have been lost, destroyed, or disturbed, to prevent the proper prosecution and control of the _- work contracted for in the Contract Documents, it shall be the Contractor's responsibility, at the Contractor's sole expense, to have such stakes replaced by an individual registered by the Texas Board of Professional Land Surveyor as a Registered Land Surveyor. No claims for delay due to lack of replacement of construction stakes will be accepted, and time will continue to be charged in accordance with the Contract Documents. D-64 EASEMENTS AND PERMITS The performance of this contract requires certain temporary construction, right-of-entry agreements, andlor permits to perform work on private property. The City has attempted to obtain the temporary construction and/or right-of-entry agreements for properties where construction activity is necessary on City owned facilities, such as sewer lines or manholes. For locations where the City was unable to obtain the easement or right-of-entry, it 10/27/04 - SC-48 PART D - SPECIAL CONDITIONS shall be the Contractor's responsibility to obtain the agreement prior to beginning work on subject property. This shall be subsidiary to the contract. The agreements, which the City has obtained, are available to the Contractor for review by contacting the plans desk at the Department of Engineering, City of Fort Worth. Also, it shall be the responsibility of the Contractor to obtain written permission from property owners to perform such work as cleanout repair and sewer service replacement on private property. Contractor shall adhere to all requirements of Paragraph C6-6.10 of the General Contract Documents. The Contractor's attention is directed to the agreement terms along with any special conditions that may have been imposed on these agreements, by the property owners. y The easements and/or private property shall be cleaned up after use and restored to its original condition or better. In event additional work room is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the property owners involved for the use of additional property required. No additional payment will be allowed for this item. The City has obtained the necessary documentation for railroad and/or highway permits required for construction of this project. The Contractor shall be responsible for complying with all provisions of such permits, including obtaining the requisite insurance, and shall pay any and all costs associated with or required by the permits). It is the Contractor's responsibility to provide the required flagmen andlor provide payment to the appropriate railroad/agency for all flagmen during construction in railroad/agency right-of-way. For railroad permits, any and all costs associated with compliance with the permit(s) including payment for flagmen shall be subsidiary -� to the bid item price for boring under the railroad. No additional payment will be allowed for this item. -� D-65 PRE-CONSTRUCTION NEIGHBORHOOD MEETING After the pre-construction conference has been held but before construction is allowed to begin on this project a public meeting will be held at a location to be determined by the Engineer. The �- contractor, inspector, and project manager shall meet with all affected residents and present the projected schedule, including construction start date, and answer any construction related questions. Every effort will be made to schedule the neighborhood meeting within the two weeks following the pre-construction conference but in no case will construction be allowed to begin until this meeting is held. D- 66 WAGE RATES The labor classifications and minimum wage rates set forth herein have been predetermined by the City Council of the City of Fort Worth, Texas, in accordance with statutory requirements, as being the prevailing classifications and rates that shall govern on all work performed by the Contractor or any Subcontractor on the site of the project covered by these Contract Documents. In no event shall less than the following rates of wages be paid. (Attached) D- 67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE A. It is the intent of the City of Fort Worth to comply with the requirements of the Asbestos National Emissions Standards for Hazardous Air Pollutants (NESHAP) found at 40 CFR Part 61, Subpart M. This specification will establish procedures to be used by all Excavators in the removal and disposal of asbestos cement pipe (ACP) in compliance with NESHAP. Nothing in this specification shall be construed to void any provision of a 10127/04 SC-49 PART D - SPECIAL CONDITIONS - contract or other law, ordinance, regulation or policy whose requirements are more stringent. B. ACP is defined under NESHAP as a Category 11, non-friable material in its intact state but which may become friable upon removal, demolition and/or disposal. Consequently, if the removal/ disposal process renders the ACP friable, it is regulated under the disposal requirements of 40 CFR 61.150. A NESHAP notification must be filed with the Texas I Department of Health. The notification must be filed at least ten days prior to removal of the material. If it remains in its non - friable state, as defined by the NESHAP, it can be disposed as a conventional construction waste. The Environmental Protection Agency (EPA) defines friable as material, when dry, which may be crumbled, pulverized or reduced to powder by hand pressures. C. The Generator of the hazardous material is responsible for the identification and proper handling, transportation, and disposal of the material. Therefore, it is the policy of the City of Fort Worth that the Excavator is the Generator regardless of whether the pipe is friable or not. {' D. It is the intent of the City of Fort Worth that all ACP shall be removed in such careful and prudent manner that it remains intact and does not become friable. The Excavator is i responsible to employ those means, methods, techniques and sequences to ensure this result. E. Compliance with all aspects of wormer safety and health regulations including but not limited to the OSHA Asbestos Standard is the responsibility of the Excavator. The City of Fort Worth assumes no responsibility for compliance programs, which are the responsibility of the Excavator. (Copy of forms attached) F. The removal and disposal of ACP shall be subsidiary to the cost of installing the new pipe unless otherwise stated or indicated on the project plans or contract documents. D-fib STORM WATER POLLUTION PREVENTiON (FOR DISTURBED AREAS GREATER THAN 1 ACRE) PERMIT: As defined by Texas Commission on Environmental Quality (TCEQ) regulations, a Texas Pollutant 'Discharge Elimination System (TPDES) General Construction Permit is required for all construction activities that result in the disturbance of one to five acres (Small. Construction Activity) or five or more acres of total land (Large Construction Activity). The contractor is defined as an "operator" by state regulations and is required to obtain a permit. Information concerning the permit can be obtained through the Internet at http://www.tnrcc.state.tx.us/permitting/water perm/wwperm/construct.html. Soil stabilization and structural practices have been selected and designed in accordance with North Central Texas Council of Governments Best Management Practices and Erosion Control Manual for Construction Activities (BMP Manual). This manual can be obtained through the Internet at www.dfwstormwater.com/runoff.html. Not all of the structural controls discussed in the BMP Manual will necessarily apply to this project. Best Management Practices are construction management techniques that, if properly utilized, can minimize the need for physical controls and possible reduce costs. The methods of control shall result in -- minimum sediment retention of not less than 70%. 10127/04 SC-50 _ PART D - SPECIAL CONDITIONS NOTICE OF INTENT (NOl): If the project will result in a total land disturbance equal to or greater than 5 acres, the contractor shall sign at the pre-construction meeting a TCEQ Notice of Intent (NOI) form prepared by the engineer. It serves as a notification to the TCEQ of construction -� activity as well as a commitment that the contractor understands the requirements of the permit for storm water discharges from construction activities and that measures will be taken to implement and maintain storm water pollution prevention at the site. The NOI shall be submitted __. to the TCEQ at least 48 hours prior t&the contractor moving on site and shall include the required $100 application fee. The NOI shall be mailed to: Texas Commission on Environmental Quality Storm Water & General Permits Team; MC-228 P.O. Box 13087 Austin, TX 78711-3087 A copy of the NOI shall be sent to: City of Fort Worth Department of Environmental Management 5000 MLK Freeway �- Fort Worth, TX 76119 NOTICE OF TERMINATION (NOT): For all sites that qualify as Large Construction Activity, the contractor shall sign, prior to final payment, a TCEQ Notice of Termination (NOT) form prepared by the engineer. It serves as a notice that the site is no longer subject to the requirement of the permit. The NOT should be mailed to: Texas Commission on Environmental Quality Storm Water & General Permits Team; MC-228 P.O. Box 13087 Austin, TX 78711-3087 STORM WATER POLLUTION PREVENTION PLAN (SWPPP): A document consisting of an erosion control and toxic waste management plan and a narrative defining site parameters and techniques to be employed to reduce the release of sediment and pollution from the construction site, Five of the project SWPPP's are available for viewing at the plans desk of the Department of Engineering. The selected Contractor shall be provided with three copies of the SWPPP after award of contract, along with unbounded copies of all forms to be submitted to the Texas Commission on Environmental Quality. LARGE CONSTRUCTION ACTIVITY— DISTURBED AREA EQUAL TO OR GREATER THAN 5 ACRES: A Notice of Intent (NOI) form shall be completed and submitted to the TCEQ including payment of the TCEQ required fee. A SWPPP that meets all TCEQ requirements prepared by the Engineer shall be prepared and implemented at least 48 hours before the commencement of construction activities. The SWPPP shall be incorporated into in the contract documents. The contractor shall submit a schedule for implementation of the SWPPP. Deviations from the plan must be submitted to the engineer for approval. The SWPPP is not warranted to meet all the conditions of the permit since the actual construction activities may vary from those anticipated during the preparation of the SWPPP. Modifications may be required to fully conform to the requirements of the Permit. The contractor must keep a copy of the most current SWPPP at the construction site. Any alterations to the SWPPP proposed by the contractor must be prepared and submitted by the contractor to the engineer for review and approval. A Notice of Termination 10127104 �_ � SC-51 PART D - SPECIAL CONDITIONS (NOT) form shall be submitted within 30 days after final stabilization has been achieved on all portions of the site that is the responsibility of the permittee, or, when another permitted operator assumes control over all areas of the site that have not been finally stabilized. r- SMALL CONSTRUCTION ACTIVITY -,DISTURBED AREA EQUAL TO OR GREATER THAN ONE ACRE BUT LESS THAN FIVE ACRES; Submission of a NOI form is not required. However, a TCEQ Site Notice form must be completed and posted at the site. A copy of the completed Site Notice must be sent to the City of Port Worth Department of Environmental Management at the address listed above. A SWPPP, prepared as described above, shall be implemented at least 48 hours before the commencement of construction activities. The SWPPP must include descriptions of control measures necessary to prevent and control soil erosion, sedimentation and water pollution and will be included in the contract documents. The control measures shall be installed and maintained throughout the construction to assure effective and continuous water pollution control. The controls may include, but not be limited to, silt fences, straw bale dikes, rock berms, diversion dikes, interceptor swales, sediment traps and basins, pipe slope drain, inlet protection, stabilized construction entrances, seeding, sodding, mulching, soil retention blankets, OF other structural or non-structural storm water pollution controls. The method of control shall ` result in a minimum sediment retention of 70% as defined by the NCTCOG "BMP Manual." Deviations from the proposed control measures must be submitted to the engineer for approval. PAYMENT FOR SWPPP IMPLEMENTATION: Payment shall be made per lump sum as shown i on the proposal as full compensation for all items contained in the project SWPPP. FOR DISTURBED AREAS LESS THAN 1 ACRE, SPECIAL CONDITION D -40 SHALL BE I� APPLICABLE. • "i D-69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF � EXISTING WATER SYSTEMS 4 It is the Contractor's responsibility to c9ordinate any event that will require connecting to or the c n.-niinn �f un avictlnnit, C�'ifw% tnfar llna- system with the r'io'ts re_nrf-CP_.r1t;4t a-Thn Contractor may obtain a hydrant water meter from the Water Department for use during the life of named project. In the event the Contractor requires that a water valve on an existing live system be turned off and on to accommodate the construction of the project, the Contractor must coordinate this ' activity through the appropriate City representative. The Contractor shall not operate water line valves of existing water system. Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. D-70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD The City reserves the right to require any pre-qualified contractor who is the apparent low bidder(s) for a project to submit such additional information as the City, in sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule, to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information if requested 10127104 SC-52 PART D - SPECIAL CONDITIONS may be grounds for rejecting the apparent low bidder as non-responsive. Affected contractors will be notified in writing of a recommendafion to the City Council. D-71 EARLY WARNING SYSTEM FOR CONSTRUCTION Time is of the essence in the completion of this contract. In order to insure that the contractor is responsive when notified of unsatisfactory performance and/or of failure to maintain the contract schedule, the following process shall be applicable: The work progress on all construction projects will be closely monitored. On a bi-monthly basis the percentage of work completed will be compared to the percentage of time charged to the contract. If the amount of work performed by the contractor is less than the percentage of time allowed by 20% or more (example: 10% of the work completed in 30% of the stated contract time as may be amended by change order), the following proactive measures will be taken: ]. A letter will be malled to the contractor by certified mail, return receipt requested demanding that, within 10 days from the date that the letter is received, it provide sufficient equipment, materials and labor to ensure completion of the work within the contract time. in the event the contractor receives such a letter, the contractor shall provide to the City an updated schedule showing how the project will be completed within the contract time. r 2. The Project Manager and the Directors of the Department of Engineering, Water Department, and Department of Transportation and Public Works will be made aware of the situation. If necessary, the City Manager's Office and the appropriate city council members may also be informed. 3. Any notice that may, in the City's sole discretion, be required to be provided to interested individuals will distributed by the Engineering Department's Public Information Officer. 4. Upon receipt of the contractor's response, the appropriate City departments and directors will be notified. The Engineering Department's Public Information Officer will, if necessary, then forward updated notices to the interested individuals. 5. If the contractor fails to provide an acceptable schedule or fails to perform satisfactorily a second time prior to the completion of the contract, the bonding company will be notified appropriately. r D-72 AIR POLLUTION WATCH DAYS r The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON, within the Metropex area, runs from May 1, through OCTOBER 31, with 6:00 r a.m. - 10:00 a.m. being critical BECAUSE EMISSIONS FROM THIS TIME PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON OZONE FORMATION. . rThe Texas Commission on Environmental Quality (TCEQ), in coordination with the National Weather Service, will issue the Air Pollution Watch by 3:00 p.m. on the afternoon prior to the WATCH day. On designated Air Pollution Watch Days, the Contractor shall bear the 10127/04 SC-53 PANT D - SPECIAL CONDITIONS responsibility of being aware that such days have been designated Air Pollution Watch Days and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1 hour, or if equipment is new and certified by EPA as "Low Emitting", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. - 6:00 p.m., on a designated Air Pollution Watch Day, that day will be considered as a weather day and added onto the allowable weather days of a given month. f D-73 FEE FOR STREET USE PERMITS AND RE-INSPECTIONS A fee for street use permits is in effect. In addition, a separate fee for re-inspections for parkway construction, such as driveways, sidewalks, etc,, will be required. The fees are as follows: `l. The street permit fee is $50.00 per permit with payment due at the time of permit application. 2. A re-Inspection fee of $25.00 will be assessed when work for which an inspection called for is incomplete. Payment is due prior to the City performing re--inspection. I Payment by the contractor for all street use permits and re-inspections shall be considered subsidiary to the contract cost and no additional compensation shall be made. f� 10127104 SC-54 (To be printed on Contractor's Letterhead) Date: DOE No: 3175 PROJECT NA E:Maip CIC4B Sanitary Sewer Drainage Area Part 15 MAPSCO LOCATION: 76L LIMITS OF CONST.: West of 9"`Avenue along FWWR between Rosedale and Oleander Estimated Duration of Construction on your Street : <XX>days THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL REHABILITATE - SEWER LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDEN'T> AT <TELEPHONE NO> OR Mr. <CITY INSPECTOR> AT <TELEPHONE N O> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL 871--7970 PLEASE KEEP THIS FLYER HANDY WHEN YOU FALL. PART D - SPECIAL CONDITIONS 1� CITY OF FORT WORTH HIGHWAY CONSTRUCTION PREVAILING WAGE RATE. FOR 2000 CLASSIFICATION HOURLY RATE Asphalt Raker ! $10.32 +' Asphalt Shoveler $9.75 Batching Plant Weigher $9.65 i- Carpenter (Rough) $13.64 Concrete Finisher-Paving $10.16 ` Concrete Finisher Helper (Paving) $9.70 Concrete Finisher-Structures $13.44 Flagger $7.00 Form Builder-Structures $13.44 Form Setter-Paving & Curbs $10.25 Farm Setter-Structures $9.75 Laborer-Common $7.64 Laborer-Utility $8.64 Mechanic $13.25 I Servicer $10.13 Pipe Layer $7.35 Pipe Layer Helper $6.75 Asphalt Distributor Operator $11.45 Asphalt Paving Machine Operator $11.09 Concrete Paving Saw $10.53 vllrane r•1_. ..hell @].....,I.@.�oa 4 i # tt t. eh ell !r I 1/0 TIn nn �1 c71 IG, 110@ 11x71 IGllf LIQ Ir AI flJ�., UG!1 @l..l\, L/I C3 L�11!I�.r, 4Ji @V Y4..@ 1 •_ W f +•'v •+ CY) -. Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel (> 1 112 $11.52 CY) Front End Loader (2 112 CY & less) $9,94 .� Front End Loader (over 2 112 CY) $9.32 Milling Machine Operator $8.00 Mixer $11,00 Motor Grader Operator(Fine Grade) $12.31 Motor Grader Operator $13.75 Pavement Marking Machine $11.00 Roller, Steel Wheel Plant-Mix Pavements $9.88 Roller, Steel Wheel Other F€atwheel or Tamping $12.12 Roller, Pneumatic, Self-Propelled Scraper $8.02 Traveling Mixer $10.00 Reinforcing Steel Setter(Paving) $9.75 Truck Driver-Single Axle (Light) $8.00 Truck Driver-Tandem Axle Semi-Trailer $10.22 Truck Driver-Lowboy/Float $10.54 Truck Driver-Transit Mix $10.63 Truck Driver-Winch $9.80 10/27/44 SC-56 PART D - SPECIAL CONDITIONS 10127104 5C-57 FORT WORT Date: i DOE HO. XX XX Project Name: i NOTICE OF 'TEMPORARY WATER SERVICE INTERRUPTION DUE. TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON i BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT-OUT, PLEASE. CALL: I� MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER.) i OR T MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ,CONTRACTOR 4 PART D - SPECIAL CONDITIONS F TEXAS DEPARTMENT 0F HEALTH DEMOLITION) RENOVATION NOTIFICATfON FORM r NOTE.CiRGLE ITEMS THAT ARF AMENDED O H NOTIFICATIONA ff t) Abaaerrlr;nt CtSntr?r ter: TDH License Number: t MCre-ss: - Qty _Scale" ZIP: G OifiCO MOM Number:j Job Sl1e Phone:Ntmibc:: a. Sits Sttp¢,r�,'sor; TDH Licawse Nstmber. U SIte Gullorn�-Qr: �TDH License Number- 6 Trained 0.9-Site N ESHAP individual:_�. CerlhScation hate: C D f1it51itlan Contractor.— T_ _OfficeF'f orir Hurrallarf ` _ m Address: 01f: Suets: Zip, —• I 2) Projevt Consultant n;Clperalor:_ TBH Licanso Number. t,4a lien Address: .3 Gky,: S1ete Z.!p: �€ica Picone Nilmbot:f I T A 3j �acllilyC�°hner. H Attanliorl: P Mailing Adri;es%: _.__ A Glty€ _ Slate:_ Zip:------Owner Phono'h"u.mL•or "Note:The lnvoico fur 1ho notlficadfln tea will ba sent to the awrrer of Uin bulldtng and 1150 hilling addrc:;5 for the I nvelco will he obtolited from the Ir+lairliafi on That 1a provided In this section. N 4) Descrlptlon or Facility Narria: _ E Physical AdcrFss: County" city: Zip: s S FaclFly Phone Number; } FacrNty Cnntart Person: H Doscrip.ion of AreafRoom Number- _ A Prfor Llse: _ Filmie Use: _ _ P Ageoi Bisil[11rtR1Far,1ity: Si r;: Number of Fluors: 5r414p1(K-12); F YES CI NO 5) Type of Work; PI Demolition ;i Rrnov,atlon(A17atcmctit) ij Annual Gonsolidated T Work wil!be during: +-1 Day D Evenlmg Fi Night - Ptnmud ProjeO. L] Descfiption rd 1'fork schedule`_T H 5) Is ihisa public auilrfing? -: YES I-1 NO Padorai Faculty?DYES NO Industtiat Site?F!YES (I NO Q NESHAP-Only Facility? n YES n NO Is Btkldinu.Vocllity*Gccupiad7 .1 YES 1 NO L 7) Roli,r,,,itimn Type CHECK ONLY ONE v a 04ginal(II) orking Bays) GaTmallation I-Ametadment n EmorgencyfOrdcred I ° If lltiu ii'Arl ejrn ur:diT Bet,v.hio amenrirrlanl n:lmlierIs ths?_(Enclose copy bf original andfurlast amendment) 11 an emr?r!penry, M)n dId you ZaIR wiftl of TDH? Emprgencyr#: a Date and Houc of Cmarguncy f13H;f°,11.RtDDfYY}: Li DC-sryriUllt}rl of Ilia<udden,unr'_xpecled event ano explonation of haw ilia event tPused unsafe conditions or%Mould cruse n equipment darna�qe(computers.machinery.etc_ 9) Dflscriplion of procedures in he followed In The event that unexpectod asbestas is found or p;sv,anusly non-friable Y asLastos malerlal becem4,C c fun1bliad.pulverized.or redm;ad to powder; D) Was€!n A_ahes:ns slirupy periGrmeo? -1 YES 1- NO 6a:e: f f TDH lnspactor License•No: C ArwdViiral Halhod:7 PLM Ct TC-M f i Assumod TDH Labara'oty License NO: N (ror TAFIPA(public bu€.dime)prajecis:an assumptIon musd be made by a TL)H Licatnsed Inspector) fl) Desceipt.on of pl+rood Cornolit:oo or rancvatiorer4rSrle,t+jpe afm�tzrial, no n�es.ho[i(s]to be used: 111 Dusceipiion of work practices end engireering control to be rased to i3myorlt oir.iGsians of asbeslos at Lite 9[71271(14 � SC-59 PART D - SPECIAL CONDITIONS 1 12) ALL applicable Items in the fcllcwing table must be completed; IF NO ASS ESTOS PRESENT CHECi(HERE Approximate amount of Check tin It of measuromient Asr,estos-Containing Building Material Asbestos TYRa _ .�. � .... F'Ipas Surface-Area Lit Lr1 SQ SGi Cu Cu F1 :4 Ft M Ft 10 - _ RAGNI to tae remriveri I �. RAC10 NOT femoved Interior Qatec pary I noir-IriaVe re(naved Exterior Caiego5!I non-friahie removed - C�to o I rfr�n-frlw3'ile iJOT rer��ovc[C JJ Interior Catopovi II non-friabla removed t � Ext-silo Catagon It non-friahta removes i Cafena fl non•tria�l�hr41'rai7trJaed � --- � RAM Off-Facility Carnpcneni 13) Waste Transpofw Name,. Tr7N Liranse Nt,rrmh�n: Addrass. City. �TSt3;G1 _L(p: Ptwna I` Cuntacl Person; Number: f II 14) 1^la9t#J Dlspo5al Site Noma- Andress; _Cilye State: Zip: Pe aphone;���_ Til FRCC Pe*m:t Nurnber 4 15) For stnacturally unsound facllltlw—,attich a cop}of demaIit'nn carder acrd WentEY 0o»rrAmen1al GMda.I below,. Name: Regi0ralion No: Tule:_ 7 Dale of order(P1l,'efDD"YY) r ; Data arder tG begin I 1 16) Scheduled Dam,3 of Asbe<SWZ Ablate,11001 Start: ! ! Cmrnpleia; ! f 17) Schaduied Dates Dernoiidon,Ren,3vFtian(h11%VD NY) Siva 1 _ _ Complete: i i I•lote:If the start date an Us notifieadom enri not 6c mol,ilia TDH Regional or Local Proara n offiGa Musr be contacted by phone prior to the start date. F3iltlr4[O dD 60 i5 s safcl3Llon In ACG4fr7.rfGd Iv TA1#I'A,$action 295,61, I Iterehy�:t€rilfy i:i 14N lrtiarfrivl:an I haw°G pro'�1rJcsi is CGrrCc[,cArrll74ot4,8r7ri lruca fv Esta best of my ina+r+ledge. t ackn�:'a1r:�gr that I ani rtnpoftble for ill asptris of the notification form,including,but Dol liniitinj.cellent and submission daies. Tic¢ Maximum penalhj is$1 0.00a per da'1 per�:olaticn_ (Signsiure of Mjilding fJ:'.^ned a,efatar (Prfnt(,4 Ka.-no) {Dale}- - (Telephume) or Delegated ConsuttanXoritractor) I fFax Nurnhcr) MAIL TO- AS©CSTCGSNOTIFICATION SECTION TOXIC SLIBSTAKES C014TROL IaIS.'IS[ON TEXAS❑FP,ARTIOMY OI:FIEALTH 'Faxes aro riot adzaptedPO BOX 14110-38 `Faxes arc not acccrarcd' AU31'[N,TY,,78714,3530 PH:612-334-13600.1-8013-572-U-AB Farre ARS 5,dated W129102: 0.apf.9res 7J7f3 form rlafod 07,"1`9X7#.Far assislanca in compi`efing firm,coif 1-800-572-5646 10127/04 SC-60 PART DA ADDITIONAL SPECIAL CONDITIONS PART DA - ADDITIONAL SPECIAL CONDITIONS DA-1 AWARD OF CONTRACT FOR PROJECTS WITH MULTIPLE UNITS ..........................4 DA-2 PIPELINE REHABILITATION CURED-IN-PLACE PIPE (OMIT),...................................4 DA-3 PIPE ENLARGEMENT SYSTEM OMIT DA-4 FOLD AND FORM PIPE (OMIT),.........--.....................................................................4 DA-5 SLIPLINING (OMIT).......... ...........................................................................................4 DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT (OMIT)............................................4 DA-7 TYPE OF CASING PIPE (OMIT).................................................................................. 4 DA-8 SERVICE LINE POINT REPAIR 1 CLEANOUT REPAIR (OMIT) ..................................4 DA-9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION (OMIT)........4 DA-10 MANHOLE REHABILITATION (OMIT).............................................................,...........4 DA-11 SURFACE PREPARATION FOR MANHOLE REHABILITATION (OMIT) ....................4 g. DA-12 INTERIOR MANHOLE COATING - MICROSILICATE MORTAR SYSTEM (OMIT)......4 DA-13 INTERIOR MANHOLE COATING -QUADEX SYSTEM (OMIT)..................,,....,..........4 DA-14 INTERIOR MANHOLE COATING - SPRAY WALL SYSTEM (OMIT)..................,........4 -- DA-15 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM (OMIT).........................4 DA-16 INTERIOR MANHOLE COATING: PERMACAST SYSTEM WITH EPDXYLINER (OMIT)....................................................... .............................4 DA-17 INTERIOR MANHOLE COATING-STRONG-SEAL-SYSTEM (OMIT) ..........................5 DA-18 RIGID FIBERGLASS MANHOLE LINERS (OMIT) .......................................................5 DA-19 PVC LINED CONCRETE WALL RECONSTRUCTION (OMIT).....................................5 -. DA-20 PRESSURE GROUTING (OMIT)..,........---................................................................5 ❑A-21 VACUUM TESTING OF REHABILITATED MANHOLES (OINIIT)..................................5 DA-22 FIBERGLASS MANHOLES (OMIT).......................... .. ........................5 A DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES.......................5 DA-24 REPLACEMENT OF CONCRETE CURB AND GUTTER ..............................................6 DA-25 REPLACEMENT OF 6" CONCRETE DRIVEWAYS ......................................................6 DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE...............................................6 DA-27 GRADED CRUSHED STONES......................................................................................7 DA-28 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE.............................................................7 DA-29 BUTT JOINTS - MILLED .-............................................................................................8 DA-34 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX).......................................................9 DA-31 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER...............................................9 DA-32 NEW 7" CONCRETE VALLEY GUTTER........................,............................................10 DA-33 NEW 4" STANDARD WHEELCHAIR RAMP ...............................................................11 DA-34 8" PAVEMENT PULVERIZATION ...............................................................................11 DA-35 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) .........................."12 DA-36 RAISED PAVEMENT MARKERS ................................... . ...............................13 DA-37 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING (OMIT) ....13 DA-38 LOADING,TRANSPORTATION, AND DISPOSAL OF �. CONTAMINATED SOIL (OMIT),,............. ............................... ..................................13 DA-39 ROCK RIPRAP - GROUT - FlTER FABRIC (OMIT).................................................13 DA-40 CONCRETE RIPRAP (OMIT)..-.........--........................ .................................13 DA-41 CONCRETE CYLINDER PIPE AND FITTINGS OMIT DA-42 CONCRETE PIPE FITTINGS AND SPECIALS (OMIT)...............................................13 DA-43 UNCLASSIFIED STREET EXCAVATION................. ...........................13 DA-44 6" PERFORATED PIPE SUBDRAIN OMIT DA-45 REPLACEMENT OF 4" CONCRETE SIDEWALKS.................. .........14 DA-46 RECOMMENDED SEQUENCE OF CONSTRUCTION ....,...........................................14 99102/04 ASC-1 J � I PAIN DA - ADDITIONAL SPECIAL CONDITIONS DA-47 PAVEMENT REPAIR IN PARKING AREA (OMIT) .....................................................14 i � DA-48 EASEMENTS AND PERMITS............................................. ...14 DA-49 HIGHWAY REQUIREMENTS .....................................................................................15 DA-50 CONCRETE ENCASEMENT ......................................................................................15 DA-51 CONNECTION TO EXISTING STRUCTURES.............................................................15 DA-52 TURBO METER WITH VAULT AND BYPASS INSTALLATION DA-53 OPEN FIRE LINE INSTALLATIONS. ..........................................................................15 DA-54 WATER SAMPLE STATION ......................................................................................16 DA-55 CURB ON CONCRETE PAVEMENT...........................................................................16 - DA-56 SHOP DRAWINGS................................................................... ...,..,,.....................17 DA-57 COST BREAKDOWN ..................................................................................................18 DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C. OVERLAY...................................18 13 DA-59 H.M.A.C. MORE THAN 9 INCHES DEEP....................................................................18 DA-60 ASPHALT DRIVEWAY REPAIR................................. ....,............,...........18 DA-61 TOP SOIL,............................: .,..................,.............,,...................,..............................18 DA-62 WATER METER AND METER BOK RELOCATION AND ADJUSTMENT...................18 DA-63 BID QUANTITIES ..........,.............................................................................................18 DA-64 WORK IN HIGHWAY RIGHT OF WAY.................................................,......................19 - DA-65 CRUSHED LIMESTONE (FLEX-BASE ...................................19 DA-66 OPTION TO RENEW........... ........................................................................ ............. DA-67 NON-EXCLUSIVE CONTRACT...................................................................................19 F DA-68 CONCRETE VALLEY GUTTER................... 19 DA-69 TRAFFIC BUTTONS.......-......................................................................................._20 DA-70 PAVEMENT STRIPING. .....................................................,........................................2D - DA-71 H.M.A.C. TESTING PROCEDURES ...........................................................................20 DA-72 SPECIFICATION REFERENCES................... ............................,.......21 DA-73 RELOCATION OF SPRINKLER SYSTEM BACK-FLOW PREVENTERICONTROL VALVEAND BOX........................................................................................................21 DA-74 RESILIENT-SEATED GATE VALVES .........................................................................21 5A-75 EMERGENCY SITUATION, J013 MOVE-IN.................................................................21 DA-76 1 'h" & 2" COPPER SERVICES. ................................................................................21 5A-77 SCOPE OF WORK (UTIL. CUT). .... .............. ....................,...,,................................,22 DA-78 CONTRACTOR'S RESPONSIBiLTY (UTIL. CUT}. ................................,....................22 DA-79 CONTRACT TIME (UTIL. C.UT) ..... ............................................................................23 DA-80 REQUIRED CREW PERSONNEL & EQUIPMENT UTIL. CUT .................................23 DA-81 TIME ALLOWED FOR UTILI Y CUTS (UTIL, CUT).,... ..............................................23 _ DA-82 LIQUIDATED DAMAGES (UTIL.. CUT)........................................................................23 DA-83 PAVING REPAIR EDGES (UTIL. CUT) .......................................................................24 DA-84 TRENCH BACKFILL (UTIL. CUT1...............................................................................24 DA-85 CLEAN-UP (UTIL. CUT)......°....... 6A-86 PROPERTY ACCESS {UTIL: CUT} ................ ......24 DA-87 SUBMISSION OF BIDS (UTLL. CUT). .........................................................................24 DA-88 STANDARD BASE REPAIR FOR UNIT I (UTIL. CUT DA-89 CONCRETE BASE REPAIR FOR UNIT II & UNIT III (UTIL, CUT) ..............................25 DA-90 2" TO 9" H.M.A.C. PAVEMENT UTIL. CUT ...................... 25 DA-91 ADJUST WATER VALVE BOXES, MANHOLES, AND VAULTS (UTIL.. CUT)............26 DA-92 MAINTENANCE BOND (UTIL. CUT) ..........................................................................26 DA-93 BRICK PAVEMENT (UTIL. CUT).................................................................................26 11/02/04 ASC-2 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-94 LIME STABILIZED SUBGRADE (UTIL. CUT).............................................................27 DA-95 CEMENT STABILIZED SUBGRADE (UTIL. CUT).......................................................27 -------- -- DA-96 REPAIR OF STORM DRAINI STRUCTURES UTIL. CUT 5A-97 "QUICK-SET" CON+CRETE.(UTIL. CUT)..............................-.-.,..-.............,.................28 DA-98 UTILITY ADJUSTMENT (UTIL. CUT)..........................................................................28 DA-99 STANDARD CONCRETE SIDEWALK AND WHEELCHAIR RAMPS (UTIL. CUT)......28 DA-100 LIMITS OF CONCRETE PAVEMENT REPAIR(UTIL. CUTS.......................................29 DA-101 CONCRETE CURB AND GUTTER (UTIL. CUT).,.....,......,........................................,.29 DA-102 PAYMENT (UTIL. CUT). .........,........,..........................................................................29 DA-103 DEHOLES-(MISC. EXT.).............................................................................................30 DA-104 CONSTRUCTION LIMITATIONS MISC. EXT.) ..........................................................31 DA-105 PRESSURE CLEANING AND TESTING (MISC. EXT.)...............................................31 DA-106 BID QUANTITIES MISC. EXT, (OMIT).....................................................................31 DA-107 LIFE OF CONTRACT MISC. EXT. (OMIT)...............................................................31 DA-108 FLOWABLE FILL (MISC. EXT.) (OMIT)................ ............,..................,.......31 DA-109 BRICK PAVEMENT REPAIR (MISC. REPL.) (OMIT).................................................31 DA-110 DETERMINATION AND INITIATION OF WORK (MISC. REPL.) (OMIT)...................31 DA-111 WORK ORDER COMPLETION TIME (MISC. REPL.1 (OMIT) .................................. 31 DA-112 MOVE IN CHARGES [MISC. REPL.) (OMIT).................... ........................................31 DA-113 PROJECT SIGNS (MISC. REPL.),............................................ .................................31 .,, DA-114 LIQUIDATED DAMAGES {MISC. REPL.) .....,.............................................................31 DA-1'15 TRENCH SAFETY SYSTEM DESIGN (MISC. REPL.) (OMIT).,.................................32 DA-116 FIELD OFFICE (OMIT),,......................................................... ................. .......... 32 DA-117 TRAFFIC CONTROL PLAN .................................................................. .....................32 DA-118 COORDINATION OF WORK WITH CONTRACTOR FOR OTHER UNITS (OMIT)....32 y, 11/02/04 ASC-3 f7 r !§PART DA - ADDITIONAL SPECIAL CONDITIONS DA-1 AWARD OF CONTRACT FOR PROJECTS WITH MULTIPLE UNITS The City reserves the right to abandon without obligation to the contractor, any part of the project, 4" or the entire project, at any time before the contractor begins any construction work authorized by l the City. Award, if made, shall be to the lowest responsible bidder. The following shall apply for contract documents with multiple units of work. Each unit represents a separate project, each with an individual MfWBE specification and proposal section. The proposal sections are arranged to allow prospective bidders to submit bids on one unit, some of the units, or all of the units. Award of contract(s), if made, shall be to the lowest responsible bidder for each individual unit. If a contractor is the low bidder on two units or more, a single set of contract documents consisting of all applicable units will be created and one single award of contract shall be made. The Contractor shall comply with the City's MNVBE Ordinance for the applicable unit or combination of units and shall submit monthly M/WBE reports for the applicable unit or combination of units. Construction time on all units will run .concurrently. For situations involving approved contracts with multiple units, the total allowable construction completion time period for all the units shall be the same as the unit with the longest construction time period. I DA-2 PIPELINE REHABILITATION CURED-IN-PLACE PIPE - OMIT DA-3 PIPE ENLARGEMENT SYSTEM -LIMIT DA-4 FOLD AND FORM PIPE -OMIT -- DA-5 SLIPLINING - OMIT DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT -OMIT DA-7 TYPE OF CASING PIPE -OMIT DA-8 SERVICE LINE POINT REPAIR f CLEANOUT REPAIR - OMIT DA-9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION - OMIT * DA-1a MANHOLE REHABILITATION -OMIT DA-11 SURFACE PREPARATION FOR MANHOLE REHABILITATION - OMIT DA-12 INTERIOR MANHOLE COATING - MICROSILICATE MORTAR SYSTEM - OMIT DA-13 INTERIOR MANHOLE COATING - QUADEX SYSTEM - OMIT DA-14 INTERIOR MANHOLE COATING - SPRAY WALL SYSTEM - OMIT DA-15 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM - OMIT — DA-16 INTERIOR MANHOLE COATING: PERMACAST SYSTEM WITH EPDXY LINER - OMIT 11102104 ASC-4 -- PART DA - ADDITIONAL SPECIAL CONDITIONS DA-17 INTERIOR MANHOLE COATING-STRONG-SEAL-SYSTEM - OMIT ` DA-18 RIGID FIBERGLASS MANHOLE LINERS - OMIT DA-19 PVC LINED CONCRETE WALL RECONSTRUCTION - OMIT DA-20 PRESSURE GROUTING -OMIT DA-21 VACUUM TESTING OF REHABILITATED MANHOLES - OMIT DA-22 FIBERGLASS MANHOLES - OMIT DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES The contractor shall be responsible for locating and marking all previously exposed manholes and water valves in each street of this,contract 'before the resurfacing process commences for a particular street, The contractor shall attempt to include the Construction Engineer (if he is available) in the observation and marking activity. In any event a street shall be completely marked a minimum of two (2) working days before resurfacing begins on any street. Marking the curbs with paint is a recommended procedure. It shall be the contractor's responsibility to notify the utility companies that he has commenced work on the project. As the resurfacing is completed (within same day) the contractor shall locate the covered manholes and valves and expose them for later adjustment. Upon completion of a street the contractor shall notify the utilities of this completion and indicate the start of the next one in order for the utilities to adjust facilities accordingly. The following are utility contact persons; Company Telephone Number Contact Person Southwestern Bell Telephone 338-6275 "Hot Line" Texas Utilities 336-9411 Mr, Roy Kruger Ext. 2121 Lone Star 336-8381 Mr. Jim Bennett Ext. 6982 City of Fort Worth, 871-8100 Mr. Jim Bob Wakefield Street Light and Signal Of course, under the terms of this contract, the contractor shall complete adjustment of the storm drain and Water Department facilities, one traffic lane at a time within five (5) working days after completing the laying of proposed H.M;A.C, overlay adjacent to said facilities. Any deviation from the above procedure and allotted working days may result in the shut down of the resurfacing operation by the Construction Engineer. The contractor shall be responsible for all materials, equipment and labor to perform a most accurate job and all costs to the contractor shall be figured subsidiary to this contract. 11/07104 ASC-5 r PART DA - ADDITIONAL SPECIAL CONDITIONS DA-24 REPLACEMENT OF CONCRETE CURB AND GUTTER These provisions require the contractor to remove all failed existing curb and gutter, as designated by the Construction Engineer, and replace with standard concrete curb and guttor, laydown curb and gutter, or in like kind, as governed by the standard City Specifications, Item No. 104 "Removing Old Concrete", Item No. 542 "Concrete Curb and Gutter", and Drawing Nos. S-S2 through S-S4. Pay limits for laydown curb and gutter are shown in Drawing No. S-S5 of the Standard Specifications. Contractor shall saw cut the curb and gutter and pavement prior to removal. Included, and figured subsidiary to this unit price, will be the required sawcut excavation, as per specification Item No. 145 "Unclassified Street Excavation", into the street to aid in the construction of the curb and gutter. T1ne pay limit will be 9" out from the gutter lip, with same day haul-off of the removed material to ,a suitable dump site. The street void shall be filled with H.M.A.C. "Type D" mix as per specification No. 300 "Asphalts, Oils and Emulsions", Item No. 344 I 'Prime Coat" and Item No. 312 "Hot Mix Asphaltic Concrete" and compacted to standard City densities and top soil as per specification item No. 116 "Top Soil", if needed, shall be added and leveled to grade behind the curb. Existing improvements within the parkway such as water meters, sprinkler system, etc. damaged during construction shall be replaced with same or better at no cost to the City. Backfill for curb and gutter shall be completed within fourteen (14) calendar days from the day of demolition to date of completion. If the contractor fails to complete the work within fourteen (14) calendar days, a $100 dollar liquidated damage will be assessed per block per day. The unit price bid per linear foot shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. s DA-25 REPLACEMENT OF 6" CONCRETE DRIVEWAYS This item shall include the removal' and replacement of existing concrete driveways, due to deterioration or in situations where curb and gutter is replaced to adjust grades to eliminate + ponding water with same day haul-off of the removed material to a suitable dump site. For specifications governing this item see Item No. 104 "Removing Old Concrete", Item No. 504" Concrete Sidewalk and Driveways". Pay limits for concrete driveway are as shown in Drawing No. S-S5 of the Standard Specifications, The unit price bid per square yard shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the work. DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE The contractor shall remove all existing deformed H.M.A.C. pavement and/or bad base material -� that shows surface deterioration and/or complete failure. The Engineer will identify these areas upon which time the contractor will begin work. The failed area shall be saw cut, or other similar means, out of the existing pavement in square or rectangular fashion. The side faces shall be cut vertically and all failed and loose material excavated. As a part of the excavation process, all unsatisfactory base material shall be removed', if required, to a depth sufficient to obtain stable sub-base. The total depth of excavation could range from a couple of inches to include the surface-base-some sub-base removal for which the Engineer witl select the necessary depth. The remaining good material shall be leveled and uniformly made ready to accept the fill material. All " excavated material shall be hauled off site, the same day as excavated, to a suitable dump site. 11/02104 ASC-6 PART DA - ADDITIONAL SPECIAL CONDITIONS After satisfactory completion of removal as outlined above, the contractor shall place the permanent pavement patch, with "Type Q"" surface mix. This item will always be used even if no base improvements are required. The proposed H.M.A.C. repair shall match the existing pavement section or the depth of the failed material, whichever is greater. However, the patch thickness shall be a minimum of 2 inches. Generally the existing H.M.A.C. pavement thickness will not exceed 6". Before the patch layers are applied, any loose material, mud and/or water shall be removed. A liquid asphalt tack coat shall be applied to all exposed surfaces. Placement of the surface mix lifts shall not exceed 3 inches with vibrator compactions to follow each lift. Compactions of the mix shall be to standard densities of the City of Fort (North, made in preparation to accept the recycling process. All applicable provisions of Standard Specification Item Nos. 366 "Asphalts, Oils, and Emulsions", 364 "Prime Coat", and 312 "Hot-Mix Asphaltic Concrete" shall govern work. The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-27 GRADED CRUSHED STONES. This item shall be used to repair the failed base material in areas exceed 8" deep as directed by the Engineer. The material shall be graded crushed stones. For specifications governing this item see Item No. 208 "Flexible Base". The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-28 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE i A. Description This item shall consist of milling the existing pavement from the lip of gutter at a depth of 2" and transitioning to match the existing pavement (0" cut) at a minimum width of 5'. The existing pavement to be milled wail either be asphalt, concrete, or brick pavement. The removal and disposal of the milled materials shall be as directed by the Engineer. The milled surface shall provide a smooth surface free from gouges, ridges, oil film, and other imperfections of workmanship and shall have a uniform textured appearance. In all situations where the existing H.M.A.C. surface contacts the curb face the wedge milling shall include the removal of the existing asphalt covering the gutter up to and along th.-3 a face of curb. The wedge milling operations for this project will be performed in a continuous manner •� along bath sides of the street. Details of milling locations are at the back of this document. Contractor is required to begin the overlay, within five (5) calendar days from the date of the wedge milling completion of any one street. Should the contractor fail to meet this condition, the wedge milling will be shut down, and liquidated damage of $500.00 per day per street will be assessed until ail wedge milled streets are overlayed. The overlay, once begun on a street shall continue uninterrupted until complete. 11102144 ASC-7 __ J PART DA - ADDITIONAL SPECIAL CONDITIONS The Contractor shall haul-off the removed material to a suitable dump site. i B. Equipment The equipment for removing,the pavement surface shall be a power operated milling machine or other equal or better mechanical means capable of removing, in either- one pass or two passes, the necessary pavement thickness in a five-foot minimum width. The equipment shall be self-propelled with sufficient power, traction and stability to maintain accurate depth of cut and slope. The machine shall be equipped ed with an integral loading and reclaiming means to q immediately remove material being cut from the surface of the roadway and discharge the cuttings into a truck, all in one operation, Adequate back-up equipment (mechanical street sweepers, loaders, water truck, etc.) and personnel will also be provided to keep flying dust to a minimum and to insure that all cuttings are removed from street surface daily. Stockpiling of planed material will not be permitted on the project site unless designated by the Engineer. The machine shall be equipped with means to control dust created by the cutting action and shall have a manual system providing for uniformly varying the depth of cut while the machine is in motion thereby making it possible to cut flush to all inlets, manholes, or other obstructions within the paved area. The speed of the machine shall be variable in order to leave the desired grid pattern specified under Surface Texture. The unit price bid per linear feet shall be full compensation for all labor, material, equipment, tools, and incidentals necessary to complete the work. DA-29 BUTT JOiNTS - MILLED 4 I A. Description: f ■ This item requires the contractor to mill "butt joints" into the existing surface, in association with the wedge milling operation to the depth and at locations as described below. The butt joint will provide a full width transition section, whereby the new overlay shall maintain constant depth at the point the new overlay is terminated and the new surface elevation matches the existing pavement. The construction activities, performance standards and equipment needed for the butt joints milling operations shall be governed by the special provisions of Pay Item No. 9 - Wedge Milling. The configuration of the butt joints is described in more detail below. General details of butt joint locations - along with ` wedge milling in general - are shown in plan form at the back of this document. B. Construction Details -� ++ Prior to the milling of the butt-joints, the Contractor shall consult with the Construction Engineer for proper location of these joints and verify that the selected limits of the projects' street are correct. The general locations for butt joints are at all beginning and ending points of streets listed in the project and as more graphically detailed at the back of this specification book. The joints are also required on both sides of all railroad tracks and concrete valley gutters, bridge decks and culverts and all other items which transverse the street and end the 11/02/04 ASC-8 PART DA - ADDITIONAL SPECIAL CONDITIONS continuity of the asphalt surFape. Each butt joint shall be 20 feet long and milled out across the full width of the street section to a tapered depth of 2". This milled area shall be A tapered within the 20 feet to a depth from 0" to 2" at a line adjacent to the beginning and ending points or intermediate ,transverse items. This butt joint - when overlayed - will consist of a asphalt section that will transition the new overlay to match the existing pavement elevation. The contractor shall provide a temporary wedge of asphalt at all butt joints to provide a smooth ride over the bump. C. Measurement and Payment Butt joints as prescribed above will be measured by the unit of each 'butt joint milled. The disposal of excess material involved will not be measured for payment. Each butt joint-milled, measured as above, complete-in place-in accordance with these specifications, will be paid for at the unit price shown in the proposal for "Butt Joints". The unit price bid per each shall be full compensation for all milling, including material haul-off, tools, labor, equipment and incidentals necessary to complete the required work. ©A-30 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX) All applicable provisions of Standard Specifications, Item Nos. 312 "Hot-Mix Asphaltic Concrete", 340 "Asphalts, Oils and Emulsions", 304 "Prime Coat", and 313 "Central Plant Recycling-Asphalt Concrete"shall apply to the construction methods for this portion of the project. Standard Specification 312.5 (1) shall be revised as follows: The prime coat, tack coat, or the asphaltic mixture shall not be placed unless the air temperature is fifty (50) degrees Fahrenheit and rising, the temperature 'being taken in the shade and away from artificial heat. Asphaltic material shall also not be placed when the wind conditions are unsuitable in the opinion of the Engineer. The contractor shall furnish batch design of the proposed hot mix asphaltic concrete for City approval 48 hours prior to placing the H.M.A.C. overlay. The City will provide laboratory control as necessary. The unit price bid per square yard of H.M.A.C, complete and in place, shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. DA-31 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER This item shall include the removal and reconstruction of existing concrete valley gutters at locations to be determined in field: Removal of existing concrete valley, asphalt pavement, concrete base, curb and gutter, and necessary excavation to install the concrete valley gutters all shall be subsidiary to this pay item. Furnishing and placing of 2:27 concrete base and crushed limestone to a depth as directed by the Engineer and necessary asphalt transitions as shown in the concrete valley gutter details, shall be subsidiary to this Pay Item. 111OM4 ASC-9 -- PART DA - ADDITIONAL SPECIAL CONDITIONS See standard specification Item No. 314, "Concrete Pavement", Item 312 "Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", Item No. 106, "Unclassified Street Excavation" Item No. 248 "Flexible Base." Measurement for final quantities of valley gutter will be by the square yard of concrete pavement and the curb and gutter section will be included. Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu of Crushed Stone at no -� additional cost. See Item 314" Concrete Pavement". Asphalt base material may be required at times as directed by the Engineer to expedite the work at locations identified in the field. The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch. Contractor shall work on one-half of Valley Gutter at a time, and the other half shall be open to traffic. Work shall be completed on each half within seven (7) calendar days. If the contractor fails to complete the work on each half within seven (7) calendar days, a $100 dollars liquidated damage will be assessed per each half of valley gutter per day. The unit price bid per square yard for Concrete Valley as shown on the proposal will be full T compensation for materials, labor, equipment, tools and incidentals necessary to complete the work. DA-32 NEW 7" CONCRETE VALLEY GUTTER This item shall include the construction of concrete valley gutters at various locations to be -s determined in field. Removal of existing, asphalt pavement, concrete base, curb and gutter, and necessary excavation to install the concrete valley gutters all shall be subsidiary to this pay item. Furnishing and placing of 2:27 concrete base and crushed limestone to a depth as directed by the Engineer and necessary asphalt transitions as shown in the concrete valley gutter details shall be subsidiary to this Pay Item. N " See standard specification item No. 1314", Concrete Pavement", item 312 "Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", Item No, 106, "Unclassified Street Excavation" Item No. 208 "Flexible Base." Measurement for final quantities of valley gutter will be by the square yard of concrete pavement and the curb and gutter section will be included. Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu of Crushed Stone at no additional cost. See Item 314"Concrete Pavement", The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch. Contractor shall work on one-half of Valley gutter at a time, and the other half shall be open to traffic. Work shall be completed on each half within seven (7) calendar days. If the Contractor fails to complete the work on each half within seven (7) calendar days, a $100 dollars liquidated damage will be assessed per each half of valley gutter per day. _ WOM4 ASC-10 PARI` DA - ADDITIONAL SPECIAL CONDITIONS The unit price bid per square yard for Concrete Valley as shown on the proposal will be full compensation for materials, labor, equipment, tools and incidentals necessary to complete the work. DA-33 NEW 4" STANDARD WHEELCHAIR RAMP �. The Contractor shall construct standard concrete wheelchair ramps as shown on the enclosed details, or as directed by the Engineer. The removal of existing substandard wheelchair ramps and sidewalk as required for the installation of new wheelchair ramps shall be subsidiary to this pay item. The removal and replacement of existing curb and gutter as required for the installation of new wheelchair ramps shall be included in Pay Item 5 (Removal and Replacement of Curb and Cutter). Pay limits for laydown curb and gutter are as shown in the Standard Pay Limit Detail (WR-1). The pay limit will extend from 9" outside the lip of gutter to 15" back from the face of curb. Any asphalt tie-in shall be subsidiary to the curb and gutter pay item. Pay limits for ""Standard Wheelchair Ramp" will start 15" back from the face of curb and encompass the remainder of the ramp and sidewalk. All applicable provision of standard Specifications Item 104 "Removing Old Concrete" and Item 504 "Concrete Sidewalk Driveways" shall apply except as herein modified. All concrete glared surfaces shall be colored with LITHOCHROME color hardener as manufactured by L.M. Scofield Company or equal. The color hardener shall be brick red color and dry-shake type, and shall be used in accordance with manufactures instructions. Concrete stain may be applied after concrete is poured (Product sold by BAER). "Contractor shall provide a colored sample concrete panel of one foot by one foot by three inches dimension, or other dimension approved by the Engineer, meeting the aforementioned specification. The sample, upon approval by the Engineer, shall be the acceptable standard to be applied for all construction covered in the scope of this pay item. The method of application shall be by screen, sifter, sieve or other means in order to provide for a uniform color distribution." The unit price bid per square yard for 4" standard wheelchair ramp as shown on the proposal will be full compensation for materials, labor, equipment, tools and incidentals necessary to compete the work, DA-34 8" PAVEMENT PULVERIZAT16N Contractor shall pulverize the existing'pavement to a depth of 8". After pulverization is completed, contractor shall temporarily remove and store the 8" deep pulverized material, then cut the base 2" to provide place for the new 2" H.M.A.C. surface. The 2" base cut shall start at a depth of 8" from the existing pulverized surface. After the undercut operation is completed, contractor shall spread, mix, and compact the pulverized material to a 95% compaction per City's Standard Specifications or as directed by the Engineer in the field. A 3.5% Portland cement shall be used to mix the pulverized material. 1f the existing pavement has a combination of 10" H.M.A.C. and crushed stone/gravel, undercut will not be required, the contractor will pulverize 10" inches, the 2" inch cut will be taken from the 10" pulverized material. (See soil test report.) ru02104 � ASC-11 'I � orf * PART DA - ADDITIONAL SPECIAL CONDITIONS I � Pulverization shall start within ten (10) calendar days after all concrete work has been completed on a street. if the contractor fails to begin the work within ten (10) calendar days, a $200 dollars liquidated damage will be assessed per block per day. After the pulverization material is cured, the contractor shall overlay it with 2" H.M.A.C. surface within five (5) calendar days. If the contractor fails to begin the work within five (5) calendar days, a $200 dollars liquidated damage will be assessed per block per day. The unit price bid per sq. yd. shall be full compensation for all labor, material, equipment, tools, and incidentals necessary to pulverize, remove and store the pulverized material, undercut the base, mixing, compaction, haul off, sweep, and dispose of the undercut material. The 2 H.M.A.C. surface will be paid by separate :tem. DA-35 REINFORCED CONCRETE PAVEMENT OR SASE (UTILITY CUT) The following specifications are for the furnishing and placing of reinforced concrete pavement or base as shown on detail and as directed by the Engineer. A. GENERAL: Reinforced concrete pavement or base shall conform to Specification Item No. 314 herein except for finishing and curing. B. FINISHING: The reinforced concrete shall be brought to a uniform surface by working with a wooden float. The surface shall be flush with the adjacent pavement and shall have a finish similar to the surrounding pavement. The surface shall be even and shall provide a smooth ride. C. CURING: The reinforced concrete pavement surfaces shall be sprayed uniformly with a membrane curing * compound conforming to the requirements of ASTM C-309, Type 2, white-pigmented compound, which shall not produce permanent discoloration of the concrete. Concrete shall be allowed to cure for seven days or test cylinders reach 3000 psi before removal of barricades, D. EXECUTION: Included in this item will be the removal of the existing reinforced concrete pavement. The .4 existing pavement shall be sawed so as to maintain an even, straight pavement cut. The *, existing reinforcing steel at sawed line and construction joints shall be lapped 18 inches with the new reinforced concrete pavement. The existing steel shall be thoroughly cleaned before _ lapping. The following work method will be performed on each utility cut: 1. Place safety signs, barricades and/or other warning devices where necessary and as required. I11OVO4 ASC-12 PART DA - ADDITIONAL SPECIAL CONDITIONS 2. Replace pavement to nearest joint. 3. Mark out the damaged area with keel, chalk line or paint being sure to include all areas requiring repair. 4. Saw cut along marked lines a minimum of two (2) inches deep. 5. Remove existing concrete. 6. Form joints and place reinforcing steel and Dowel Bars (as required) according to standard specifications. 7. Place and finish concrete. 8. Clean up job site, removing all debris. g. Maintain traffic control devices to protect the area until the concrete has cured seven days or concrete reaches 3000 psi compressive strength. E. -PAYMENT: Payment shall be made at the unit price per linear foot as shown on the proposal and shall be full compensation for furnishing all labor, materials, equipment tools and incidentals necessary to complete the work. DA-36 RAISED PAVEMENT MARKERS Ail applicable provisions of Standard Specifications for Roadway Markers (Buttons) shall apply. The Contractor shall install standard roadway markers according to city specifications as shown on plan sheet or as directed by the Engineer. Please refer to"Roadway Markers Specifications DA-37 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING -OMIT DA-38 LOADING, TRANSPORTATION, AND DISPOSAL OF CONTAMINATED SOIL - OMIT DA-39 ROCK RIPRAP - GROUT - FILTER FABRIC -OMIT DA-40 CONCRETE RIPRAP - OMIT DA-41 CONCRETE CYLINDER PIPE AND FITTINGS - OMIT DA-42 CONCRETE PIPE FITTINGS AND SPECIALS -OMIT DA-43 UNCLASSIFIED STREET EXCAVATION This item will be used if additional excavation is needed that is not covered by "8° PAVEMENT PULVERIZATION". Additional Excavation is the removal of the excessive crown and base to -bring the new base to proper grade and City standard specifications for street reconstruction. All 11/02/04 ASC-13 -- PART DA - ADDITIONAL SPECIAL CONDITIONS applicable provisions of Item No. 106 "Unclassified Street 'Excavation" shall apply; work shall be paid per cubic yard. DA-44 6" PERFORATED PIPE SUBDRAIN -OMIT DA-46 REPLACEMENT OF 4" CONCRETE SIDEWALKS This item shall include the removal and replacement of existing concrete sidewalk due to failure or in situation where curb and gutter is replaced to adjust grades to eliminate ponding water with same day haul-off of the removed material to a suitable dumpsite. For specifications governing this item see Item No. 104 'Removing Old Concrete", and Item No. 504 "Concrete Sidewalk and Driveways". The unit price bid per square yard shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the removal and replacement work. DA-46 RECOMMENDED SEQUENCE OF CONSTRUCTION i iIn order to facilitate timely reconstruction of the affected roadway surfaces (subsequent to water/sewer installation) under the City's roadway maintenance program, it is recommended that the proposed water and/or sanitary sewer improvements be conducted on the project streets based upon the fallowing sequence. 1 "A"Street 2. "B" Street 3. "C" Street 4 "D"Street 5. "E" Street After the work start date has been estabiished, the selected contractor shall be required to submit the beginning and ending dates for ail work (inciuding pavemeni iepu i) uti ead i of the piUject streets. Please be advised that the contractor has the option of submitting a different sequence i of construction than stated above. The contractor shall not be allowed to begin work (but time charges will begin on the project) until the preferred sequence of construction and the start and end work dates for each street have been submitted to the City. r DA-47 PAVEMENT REPAIR IN PARKING AREA - OMIT DA-48 EASEMENTS AND PERMITS Easements and permits, both temporary and permanent, have been secured for this project at this time and made a part thereto. Any easements and/or permits, both temporary and permanent, which have not been obtained by the time of publication, shall be securers before construction starts. No work is to be done in areas requiring easements and/or permits until the necessary easements are obtained. The Contractor's attention is directed to the easement description and permit requirements, as contained herein, along with any special conditions that may have been imposed on these easements and permits. Where the pipeline crosses privately owned property, the easements and construction areas are shown on the plans. The easements shall be cleaned up after use and restored to their original 11/02/04 ASC-14 - PART DA - ADDITIONAL SPECIAL CONDITIONS conditions or better. In the event additional work room or access is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the property owners involved for the use of additional property required. No additional payment will be allowed for this item. DA-49 HIGHWAY REQUIREMENTS The Texas Department of Transportation requirements pertaining to the construction of this project are enclosed herein and made part of these specifications, DA-50 CONCRETE ENCASEMENT Concrete encasement shall be Class E (1500 psi) concrete and for sewer line encasements shall conform to Fig. 113; for water line encasements it shall conform to Fig. 20 of the General Contract Documents. Requirements for such encasement are specified in Sections E1-20 and E2-20 of the General Contract Documents. Payment for work such as forming, placing, and finishing including all labor, tools, equipment and material necessary to complete the work shall be included in the linear foot price bid for Concrete Encasement. DA-51 CONNECTION TO EXISTING STRUCTURES All connections between proposed and existing facilities shall consist of a watertight seal. Concrete used in the connection shall be Class A (3000 psi) concrete and meet the requirements of Section E1-20 and E2-20 of the General Contract Documents. Prior to concrete placement, a gasket, RAM-Nek or approved equal shall be installed around penetrating pipe. Payment for such work as connecting to existing facilities including all labor, tools, equipment, and material necessary to complete the work shall be included in the linear foot price of the appropriate pipe BID ITEM, DA-52 TURBO METER WITH VAULT AND BYPASS INSTALLATION ` Ail combination turbo meter installations will be per attached Figure 33 unless otherwise directed by the Engineer. The contractor shall use Bilco Type J-3 Model 30" x 36" Steel Single Leaf Doors or approved equal unless the vault door is subject to vehicular traffic i.e.: in a street, parking lot, or driveway. t_ The appropriate size turbo meter with strainer and check valve if required will be furnished to the Contractor free of charge; however, the Contractor will be required to pick up these item(s) at the Field Operations Warehouse. Payment for all work, materials, and all necessary appurtenances from bypass tee to bypass tee which are required to provide a complete and functional Combination Turbo Meter Installation complete with Bypass and Concrete Vault shall be included in the price bid for each. DA-53 OPEN FIRE LINE INSTALLATIONS 11102144 ASG-15 PART ISA - ADDITIONAL SPECIAL GONDITIONS All open fire line installations will be per attached Figure 32 unless otherwise directed by the Engineer. The appropriate size detector check meter, 3!4-inch meter and class 'B' meter box will be s furnished to the Contractor free of charge; however, the Contractor will be required to pick up the items at the Field Operations Warehouse. Payment for all work, materials, and all necessary appurtenances from the City side flange - coupling adapter to the customer side gate valve and box, including incidental 5 linear feet of pipe, which are required to provide a complete and functional open fire line installation shall be included in the price bid for each. Payment for the City side gate valve or tap valve depending on which is required will be paid for under the appropriate bid item(s). DA-54 WATER SAMPLE STATION GENERAL: All water sampling station installations will be per attached Figure 34 or as required in large water meter vaults as per Figure 33 unless otherwise directed by the Engineer. 1 The appropriate water sampling station will be furnished to the Contractor free of charge; however, the Contractor will be required to pick up this item at the Field Operations Warehouse. PAYMENT FOR FIGURE 34 INSTALLATIONS., Payment for all work and materials necessary for the installation of the 3!4-inch type K copper service line will be shall be included in the price bid for copper Service Line from Main to Meter. Payment for all work and materials necessary for the installation tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, concrete �! support black, curb stop, fittings, and an incidental 5-feet of type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for the water main. -� PAYMENT FOR FIGURE 33 INSTALLATIONS: Payment for all work and materials necessary for the installation tap saddle, gate valve, and fittings shall be included in the price bid for Service Taps to Main. Payment for all work and materials necessary for the installation of the sampling station, modification to the vault, fittings, and all type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid for Water Sample Stations. DA-55 CURB ON CONCRETE PAVEMENT Standard Specification Item 502 shall apply except as herein modified. 11102104 ASC-16 PART DA - ADDITIONAL SPECIAL CONDITIONS INTEGRAL CURB: Integral curb shall be constructed along the edge of the pavement as an integral part of the slab and of the same concrete as the slab. The concrete for the curb shall be deposited not more than thirty (30) minutes after the concrete in the slab. SUPERIMPOSED CURB: Concrete shall have a minimum compressive strength of three thousand (3,000) pounds per square inch at twenty-eight (28) days. The quantity of mixing water shall not exceed seven (7) U.S. gallons per sack (94 lbs.) of Portiand Cement. The slump of the concrete shall not exceed three (3) inches. A minimum cement content of five (5) sacks of cement per cubic yard of concrete is required. PAYMENT: Payment shall be made for cutting and replacing curbs and gutters required in this Project under the appropriate bid item and shall be in compliance with Public Works !Department a standard requirement Item 502. DA-56 SHOP DRAWINGS 1. Submit seven (7) copies of shop drawings, layouts, manufacturer's data and material schedules as may be required by the Engineer for his review. Submittals may be checked by and - stamped with the approval of the Contractor and identified as the Engineer may require. Such review by the Engineer shall include checking for general conformance with the design concept of the project and general compliance with information given in the General Contract Documents. Indicated actions by the Engineer, which may result from his review, shall not constitute concurrence with any deviation from the plans and specifications unless such deviations are specifically identified by the method described below, and further shall not relieve the Contractor of responsibility for errors or omissions in the submitted data. Processed shop drawing submittals are not change orders. The purpose of submittals by the Contractor is to demonstrate that the Contractor understands the design concept, and that he demonstrates his understanding by indicating which equipment and materials he intends to furnish and install, and by detailing the fabrication and installation methods he intends to use. If deviations, discrepancies or conflicts between submittals and the design drawings and/or specifications are discovered, either prior to or after submittals are processed, the design drawings and specifications shall govern. The Contractor shall be responsible for dimensions which are to be confirmed and correlated at the job site, fabrication processes and techniques of constriction, coordination of his work with that of other trades and satisfactory performance his work. The Contractor shall check and verify all measurements and review submittals prior to being submitted, and sign or initial a statement included with the submittal, which signifies compliance with plans and specifications and dimensions suitable for the application, Any deviation from the specified criteria shall be expressly stated in writing in the submittal. Three (3) copies of the approved submittals shall be retained by the Contractor until completion of the project and presented to the City in bound form. 2. Shop drawings shall be submitted for the following items prior to installation: List the required submittals here Additional shop drawing requirements are described in some of the material specifications. 3. Address for Submittals - The submittals shall be addressed to the Project Manager: (Project Manager) City of Fort Worth 11102104 ASC-17 PART DA - ADDITIONAL SPECIAL CONDITIONS i� 1006 Throckrnorton Fork Worth, TX 76102 DA-57 C❑ST BREAKDOWN I In order to establish a basis upon which partial payments to the Contractor may be authorized, f immediately after execution of the contract the Contractor shall furnish a detailed cost breakdown 17 of his contract price arranged and itemized to meet the approval of the Engineer. DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C. OVERLAY All work involving paving and/or drainage shall conform to the two following published I ! specifications, except as modified herein: STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION NORTH CENTRAL TEXAS DA-59 H.M.A.C. MORE THAN 9 INCHES DEEP When H.M.A.C. greater than 9 inches in depth is encountered, it shall be replaced with a combination of H.M.A.C. and 2:27 concrete base, as determined by the Engineer, to achieve the required thickness of pavement. DA-60 ASPHALT DRIVEWAY REPAIR At locations where H.M.A.C. driveways are encountered, such driveways shall be completely A replaced for the full extent of utility cut with H.M.A.C. equal to or better than the existing driveway. DA-61 TOP SOIL Where directed by the Engineer, top soil shall be applied in accordance with the City of Fort Worth Transportation and Public Works Department's Standard Specifications for Street and Storm Drain Construction, Item 116, except as follows: All labor, equipment, tools and incidentals - shall be included in the square yard bid price for the top sol. DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT This item shall include raising or lowering an existing meter box to the parkway grade specified. No payment will be made for adjusting existing boxes which are within 0.001 feet of specified .- parkway grade. The unit price bid shall be full and sufficient payment for all labor, equipment and materials used in the adjustment of the meter box. DA-63 BID QUANTITIES Sid quantities of the various items in the proposal are for comparison only and may not reflect the _ actual quantities. There is no limit to which a bid item can be increased or decreased. 11102104 ASC-18 _ - -- PART DA - ADDITIONAL SPECIAL CONDITIONS Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities. To the extent that C4-4.3 conflicts with this prevision, this provision controls. No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. In particular, the Contractor shall be aware that it is the City's intention that the quantities in Unit be used on an"emergency" basis only. Total quantities given in the bid proposal may not reflect actual quantities; however, they are given for the purpose of bidding and awarding the contract. A contract in the amount of$200,000 (see Options to Renew) small be awarded with final payment based on actual measured quantities and the unit price bid in this proposal. Moreover, there is to be not limit on the variation between the estimated quantities shown and actual quantities performed. It is understood and agreed that the scope of work contemplated in this contract is that which is designated by the City bit will in not case exceed $200,000 (see Options to Renew) including all change orders. DA-64 WORK IN HIGHWAY RIGHT OF WAY r When the Engineer directs the Contractor to perform work in the right-of-way which is under the jurisdiction of the Texas Department of Transportation (Tex-Dot), the Contractor shall obtain approval from the Texas Department of Transportation prior to commencing any work therein. All work performed in the Tex-Dot right-of-way shall be performed in compliance with and subject to approval from the Texas. Department of Transportation and Item E2-29,1 "Construction Within Highway Right-of-Way" of the General Contract Documents and Specifications, effective July 1, 1978, as amended. DA-65 CRUSHED LIMESTONE (FLEX-BASE) Crushed limestone required for use as a flexible (case material shall conform to Specification item No. 208 of the Standard Specifications for Street and Storm Drain Construction for the City of Fort Worth Transportation and Public Works Department. DA-66 OPTION TO RENEW The City has the right to renew this contract for three (3) one year terms/expenditures of $200,000 under the same terms, conditions, and unit prices. The City shall give at least sixty (60) days notice prior to the expiration of one year from the date of execution of this contract or of an option period or a like notice at such time as there is less than $20,040 left unexpended. rDA-67 NON-EXCLUSIVE CONTRACT This contract is non-exclusive. During the term of this contract or any renewal hereof, the City reserves the right to advertise and award another contract for like or similar work. if a second contract is awarded, the City further reserves the right to issue work orders under either contract as it deems in its best interest, without recourse. DA-68 CONCRETE VALLEY GUTTER 11102/04 l-- ASC-19 - N PART DA ADDITIONAL SPECIAL CONDITIONS This item shall include the repair/replacement of existing concrete valley gutters as directed by the Engineer. The proposed valley gutters will be constructed according to the detail included in these documents as well as conforming to Specification Item No. 314 of the Standard Specifications for Street and Storm Drain Construction for the City of Fort Worth Transportation and Public Works Department. The unit price bid for this item shall be full compensation for all materials (including applicable j sub-base), labor, equipment and incidentals necessary to complete the work. I DA-69 TRAFFIC BUTTONS ` The Contractor shall supply all materials and labor necessary to install traffic buttons of the same f type as were previously installed at locations designated by the Engineer. The buttons to be supplied shall be generally, but not limited to Type W-4 and Type 11 C-R4 and installed with a Type III Epoxy. The unit price bid for this item shall be full compensation for all materials, labor, equipment and incidentals necessary-to complete the work. DA-70 PAVEMENT STRIPING I Pavement striping, whenever and wherever encountered, shall be replaced to match the existing ■ striping or as directed by the Engineer. Materials used shall be of 420 Type intersection grade tape (in 18-inch width) such as Stamark as manufactured by 3M Company or approved equal. ■ The unit price bid for this item shall be full compensation for all materials, labor, equipment and i incidentals necessary to complete the work. DA-71 H.M.A.C. TESTING PROCEDURES Ir 7 he contractor is required to submit a Mix Design fur bu6i Type "B° and "'" asphalt 'U Iat 0l, ua used for each project. This should be submitted at the Pre-Construction Conference. This design shall not be more than two (2) years old. Upon submittal of the design mix a Marshal (Proctor) will be calculated, if one has not been previously calculated, for the use during density testing. For type "B" asphalt a maximum of 20% rap may be used. No Rap may be used in type u D": Upon approval of an asphalt mix design and the calculation of the Marshal (proctor) the -. contractor is approved for placement of the asphalt. The contractor shall contact the City Laboratory, through the inspector, at least 24 hours in advance of the asphalt placement to schedule a technician to assist in the monitoring of the number of passes by a roller to establish a rolling pattern that will provide the required densities, The required Density for Type "B" and for Type "D" asphalt will be 91% of the calculated Marshal (proctor). A Troxler Thin Layer Gauge will be used for all asphalt testing. After a rolling pattern is established, densities should be taken at locations not more than 300 feet apart. The above requirement applies to both Type "°B" and "D" asphalt. Densities on type "B" must be done before Type "D" asphalt is applied. 19/02104 ASC-20 FART DA - ADDITIONAL SPECIAL CONDITIONS Cores to determine thickness of Type "B" asphalt must be taken before Type `°D" asphalt is applied, Upon completion of the application of Type "D" asphalt additional cores must be taken to determine the applied thickness. DA-72 SPECIFICATION REFERENCES When reference is made in these specifications to a particular ASTM, AWWA, ANSI or other specification, it shall be understood that the latest revision of such specification, prior to the date - of these general specifications or revisions thereof, shall apply. DA-73 RELOCATION OF SPRINKLER SYSTEM BACK-FLAW PREVENTERICONTROL VALVE AND BOX The relocation and reconnection of sprinkler system control valve and box will be required as shown on the plans, and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. A minimum of twenty-four (24) hours advance notice shall be given when service interruption will -- be required. When the relocation is required, separate payment will be allowed for the relocation of sprinkler back-flow preventer or control valve and box. Payment for all work and material such as back-fill, fittings, five (5) feet of PVC Schedule 40 and all material labor, and equipment used by and for the licensed plumber shall be included in the price bid for the relocation of sprinkler back-flow preventer or control valve and box. All other costs will be included in other appropriate bid item(s). DA-74 RESILIENT-SEATED GATE VALVES Any resilient-seated gate valves supplied for this contract shall conform to Material Standard E1-26, STANDARD SPECIFICATIONS FOR RESILIENT-SEATED GATE VALVES, with the exception of size requirements in sections E-26.1. All resilient-seated gate valves shall be mechanical joints and be approved on the City of Fort Worth Standard Product List, DA-75 EMERGENCY SITUATION, JOB MOVE-IN The Owner or Engineer shall determine when an emergency situation shall exist. When water emergency work is required, the Contractor shall mobilize to the said location within twenty-flour (24) hours after given notification from the Inspector and/or Project Manager. The Contractor shall make all necessary arrangements for bypass pumping, setting up barricades, notifying citizens, etc., while waiting for other utilities to be located as directed by the Engineer. The Contractor shall work continuously until the emergency work order has been completed at a time agreed to by the Project Manager, Inspector, and Contractor. After the emergency work order has been completed, there will be no additional "Job Move-in" charges paid to remobilize back to the previous project location site. DA-76 1 '/z" & 2" COPPER SERVICES The following is an addendum to E1-17, Copper Water Service Lines and Copper Alloy Couplings: 19107104 ASC-21 PART QA - ADDITIONAL SPECIAL CONDITIONS All fittings used for 1 Mz" and 2" water services lines shall be compression fittings of the type produced with an internal "gripper ring" as manufactured by the Ford Meter Box Co., Inc., Mueller Company, or approved equal. Approved equal products shall submit shop drawings and - manufacturer's catalog information for approval. Contractor shall make all cuts to the copper tubing with a copper tubing cutter tool specifically designed for this purpose in order to provide a clean, square cut. The use of hacksaws or any I other type of cutter will not be allowed. I Prior to installing the compression fittings, the copper tubing will be made round by the use of a {� rounding tube" specifically made for that purpose. Payment for all work and materials associated with 1 '/ " and 2" copper services shall be included in the price of the appropriate bid item. DA-77 SCOPE OF WORK(UTIL, CUT) The work covered by these Specifications consists of the paving repair over utility cuts which have been backfilled previously by the City Water Department, as indicated by the details and possible adjacent areas damaged by blowout, etc. Included in this work will be the removal of the existing material in order to insure a paving section in conformity with existing pavement or the appropriate detail shown in this document as directed by the engineer and all other miscellaneous items of construction to be performed as outlined in the specifications, which are necessary to satisfactorily complete the work. Total quantities given in the bid proposal may not reflect actual quantities; however, they are given for the purpose of bidding and awarding the contract. Final payment will be based on actual measured quantities and the unit price bid in this proposal. There will not be a direct payment for saw cutting the existing asphalt or concrete, compacting the existing subgrade CTI ierrt val of ii'Ic tax IStlila,. ail cat Grid i. T IGG a14G11IS ViltI b0o HV1 lvidv,I11u r"wv subsidiary to the contract. The contractor will be required to maintain a capping course of hot " mix-cold lay asphalt in areas where traffic has whipped out washed rock, until the paving repair can be accomplished. These items will be considered as subsidiary to the contract. The Inspector will pick up the repair tickets by 8:00 a.m. Monday through Thursday. The repair tickets will be issued to the contractor early the next day. Each repair ticket that is issued shall be completed within twenty-one (21) calendar days. The twenty-one (21) calendar days for completion of the job begins the day after the contractor receives the ticket. See special condition TIME ALLOWED FOR UTILITY CUTS. The Contractor shall identify to the Engineer possible locations for settlement of repaired pavement due to backfill of ditch by others. As directed by the Engineer, the Contractor shall remove and replace existing backfill with washed ruck. The Water Department will estimate the necessary size of the pavement repair on each ticket. Upon receipt of each ticket the Engineer shall determine, by measurement, the required size of each repair. All repair sizes shall be approved by the Engineer prior to any repair work. DA-78 CONTRACT'OR'S RESPONSIBILTY (UTIL, CUT) 11102104 ASC-22 PART DA - ADDITIONAL SPECIAL CONDITIONS Contractor covenants and agrees to fully perform or cause to be performed, with good faith and T due diligence, and in accordance with standards common to the industry and herein set forth in these Contract Documents which is hereby incorporated and made a part of this contract, pavement repair to be ordered by the City at various times and to be performed at various places by separate repair tickets. The City may designate pavement to be repaired by furnishing to the Contractor a marked drawing, or street addresses contained in a written order or by marking in the filed by paint or other means, or by any or all combinations of said methods of designation. The Contractor agrees that no work will be performed without written authorization from the individual designated in writing by the Director of the Engineering Department. DA-79 CONTRACT TIME (UTIL. CUT) It is understood and agreed that the scope of work contemplated in this contract is that which is designated by the City as the need arises. It is further agreed that the term of this contract is five (5) months from the date of execution of contract work order and no orders will be accepted by the Contractor after the contract has expired. At the end of contract the Contractor will have twenty-one (21) additional calendar days to complete work already ordered and fifteen additional calendar days to bill said work for a total of thirty-six days after contract termination to complete and bill. work,authorized pursuant to this contract. DA-80 REQUIRED CREW PERSONNEL & EQUIPMENT (UTIL. CUT) y The Contractor shall be required to furnish sufficient personnel and equipment capable of completely finishing an average of fifty (50) utility cut tickets with an aggregate average of 750 S.Y. of permanent pavement repair each week. DA-81 TIME ALLOWED FOR UTILITY CUTS (UTIL. CUT) The Contractor shall assist the Engineer in measuring each pavement repair before any work is started. A repair ticket will be issued for each utility cut after measurement and twenty-orae (21) calendar days beginning the day after the ticket is issued will be allowed for final completion of each utility cut. See also SCOPE OF WORK. A calendar day is any day of the week or month, Sundays or legal holidays as defined on Page C1-1 (4) Section Cl-1.24 Calendar Days of Park C General Conditions. DA-82 LIQUIDATED DAMAGES (UTIL. CUT) Failure to complete work on time: The Owner and the Contractor agree that it will be most difficult or impossible to ascertain the amount of damages that will be sustained by the Owner if the Contractor fails to complete the work in the allotted time, but they both agree that the Owner would sustain substantial damages in such event. Accordingly, if the Contractor fails to complete the contract in the calendar days specified, a time charge shall be made for each working day thereafter, not as a penalty but as liquidated damages, 11102104 ASC-23 PART DA - ADDITIONAL SPECIAL CONDITIONS The contractor shall pay liquidated damages of twenty-five dollars ($25.49) per day per ticket for each repair out not completed within twenty-one (21) calendar days and liquidated damages shall end on day that repairs are completed. Should the amount otherwise due the Contractor be less than the amount of such ascertained and liquidated damages, the Contractor and his surety shall be liable to the City of such delivery. DA-83 PAVING REPAIR EDGES (UTIL. CUT) All paving repair edges shall be undamaged neat lines (by sawing or equal) and shall be parallel y or perpendicular to the center line of the street. DA-84 TRENCH BACKFILL (UTIL. CUT) I_ The Water Department shall plane the pipe embedment and backfill with washed rock per the following specification, Washed Rock: All washed rock used for embedment or as otherwise directed by the engineer shall be washed gravel or washed crushed stone or washed crushed gravel and shall meet the following gradation and abrasion: Sieve Size % Retained !� 1 0-10 '/z" 40-75 318" 55-99 #4" 90-100 #S 95-100 Los Angeles abrasion test. 50% Maximum wear per ASTM. DA-85 CLEAN-UP (UTIL. CUT) -- Final clean up work shall be done for this project as soon as the paving and curb and gutter have been constructed. Contractor shaii remove all excess cold mix, washed rock and debris from the -- street in the area of the repair. No more than seven days shall elapse after completion of construction before the roadway and right-of-way is cleaned up to the satisfaction of the Engineer. Refer also to Page C5-5 (8) Section C5-5.17 Clean-Up of Part C General Conditions. DA-86 PROPERTY ACCESS (UTIL. CUT) Access to adjacent property shall be maintained at all times unless otherwise directed by the Engineer. DA-87 SUBMISSION OF BIDS (UTIL.. CUT) The proposal sections of this special contract document is arranged to allow the Owner to make payment based on size of repair. The Contractor is required to submit a bid on all proposals Unit T 1, Unit 11, Unit III and IV. Unit I will generally consist of small patch, less than or equal to 299 square feet. Unit II will generally consist of medium patch, greater than 200 square feet and less 111OVx]4 ASC-24 PART DA - ADDITIONAL SPECIAL CONDITIONS than or equal to 1000 square feet. Unit III will generally consist of large patch, greater than 1000 square feet. Unit IV will generally consist of items necessary for each size Utility Cut Repair. The total low bidder, Units 1, ll, 111 and IV is the apparent successful bidder. If Contractor does not bid all four Units of the proposal, the bid will be considered as "non-responsive" and will be rejected by the Engineering Department. DA-88 STANDARD BASE REPAIR FOR UNIT I (UTIL. CUT) Regardless of the existing pavement type, base repair for Unit i shall be either min. 8" concrete base (see D-23, 2:27 Concrete Base) or min. 6" reinforced concrete base (see DA-35, Reinforced Concrete Pavement or Base) as directed by the Engineer. Any deviation from standard repair shall be approved by the Water Department. DA-89 CONCRETE BASE REPAIR FOR UNIT II & UNIT III (UTIL. CUT) r When concrete base is required for repairs > 200 square feet in area, the base repair shall be either min. 8" concrete base (see D-23, 2:27 concrete base) or as min. 5° reinforced concrete base (see DA-35, Reinforced Concrete Pavement or Base) as directed by the Engineer. Any deviation from standard repair shall be approved by the Water Department. DA-90 2" TO 9" H.M.A.C. PAVEMENT(UTIL. CUT) These items will include the furnishing and placing of H.M.A.C. surface course as directed by the Engineer. For Specifications governing Type "D" H.M.A.C, see the 1982 Texas State Department of Highways and Public Transportation, Spec, Item No. 340 "Hot Mix Asphaltic Concrete Pavement". H.M.A.C. is also covered under Spec. Item No. 312 in the Standard Specifications for Construction, City of'Fort Worth. Subsidiary to the H.M.A.C. pavement shall be sawing, removal of asphaltic material, gravel and excavation as shown on the details or as directed by the Engineer. The removed surfacing shall be loaded into trucks upon removal and hauled away from the job site as directed by the Engineer. In no case shall the removed surface be stockpiled on the job site. The following work method will be performed on each utility cut: 1. Place safety signs, barricades and/or other warning devices where necessary and as required. 2. The existing asphalt pavement shall be saw cut into a square or rectangular shape and cut side faces vertically. The sawed asphalt pavement shall be a minimum of V outside the utility cut area. t 3. Apply liquid asphalt tack to vertical faces and bottom of excavated area in a uniform manner. Do not puddle tack coat on bottom of utility cut area. Do not apply tack coat to washed rock. 4. Place H.M.A.C. surface mix in lifts not to exceed three (3) inches. Last or top lift shall not be less than two (2) inches in thickness. 111OM4 ASC-25 T r PART DA - ADDITIONAL SPECIAL CONDITIONS 5. Each lift shall be thoroughly compacted with a plate compactor or portable vibratory roller. 1 Fifteen to twenty passes will be necessary with a vibratory roller and mix temperature above 250 ..� F (121 C) to ensure a good compaction. Top lift when compacted shall be approximately 1/8 inch 1 above surrounding pavement. 1 6. Apply liquid asphalt around edges of patch along cold joints. +� 7. Clean up surrounding area. Do not leave excess fill or excavated material on the pavement. 1 8. Remove safety signs, barricade and/or warning devices after job is complete. Payment shall be made at the unit price per S.Y. as shown on the proposal and shall be full compensation for furnishing all labor, materials, equipment tools and incidentals necessary to complete the work. DA-91 ADJUST WATER VALVE BOXES, MANHOLES„ AND VAULTS (UTIL. CUT) ,-- Contractor will be responsible for adjusting water valve boxes, manholes and vaults to match new pavement grade. The unit price bid will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. DA-92 MAINTENANCE BOND (UTIL. CUT) A maintenance bond in the amount of one hundredercent 100% of the contract amount shall P 4 � be furnished for a period of two years from the date of final acceptance of the work will be required on this project. DA-93 BRIG PAVEMENT (UTIL. CUT) This item shall include- I. nclude:9. Removal and salvage of existing brick pavers for the purpose of relaying, in suCa i a i i iai zi er that no damage occurs during handling of the brick. 2. Supply additional brick pavers as necessary that meet size, shape and color of existing brick, as approved by engineer. - 3. Mortar bed shall be leveled to the desired elevation, as directed by Engineer and shall not be disturbed in any way. The mortar setting bed shall consist of: a. 1 part Portland cement-ASTM 0150, Type 1 b. 914 part hydrated time by volume -ASTM 0207, Type 5 c. 3 parts damp sand - ASTM C-144 (for high-bond mortar, gradation in accordance with additive manufacturer's recommendation) d. Add water to obtain stiff mix -water shall be potable quality The dry joint filler shall consist of: a. 9 part Portland cement ASTM 0150, Type 1 11/02104 ASC-26 - - PART DA - ADDITIONAL SPECIAL CONDITIONS ry b. 6 parts dry sand -ASTM C-144 c. Do not add water High bond mortar mix shall consist of- a, 1 sack Portland cement-ASTM 0150, Type 1 b. 50 pounds workability additive - "A" Marble Dust by Armco Steel Corp., Piqua Quarries, or Ute Dolomite Limestone by U.S. Lime Division of Flintkote Corp., or Micro Fill No./2 by Pure Stone Co., of Marble Falls, Texas. c. 3 1/4 cubic feet of sand -ASTM C-144 d. 4 gallons of high bond additive - Saraband Liquid Mortar Additive by the Dow Chemical Co. e. Mix with water in accordance with High Bond Additive manufacturer's recommendations Concrete surfaces to receive pavers shall be dry, clean fee of oily or waxy films and firm and level, Pavers with chips, cracks, or voids shall not be used. The setting bed mixture shall be -- spread and screeded to a true plane and shall be limited to that amount that can be covered with pavers before initial set. DA-94 LIME STABILIZED SUBGRADE (UTIL. CUT) Upon the direction of the Engineer, the Contractor shall provide a lime stabilized Subgrade or Mase in conformance with Specification Items 210 and 212 of the City of Fort Worth's Transportation and Public Works Department's Standard Specifications for Street and Storm Drainage Construction. Unless otherwise directed by the Engineer, lime shall be applied at the minimum rate of four pounds (4#) per square yard per inch depth. Payment shall be made by the square yard at the unit price bid for the quantity measured in place and shall include all labor, equipment, material, and incidentals necessary to satisfactorily complete the project. No payment shall be made for the hydrated lime as it shall be considered subsidiary to the bid price for lime stabilization. DA-95 CEMENT STABILIZED S'UBGRADE (UTIL. CUT) At the direction of the Engineer, the Contractor shall stabilize the Subgrade or base material with Portland Cement in conformance with Specification Item 214, Portland Cement Treatment, in the Standard Specifications for Street and Storm Drain Construction of the City of Fort Worth, Texas Transportation and Pubiic Works Department. Unless directed otherwise by the Engineer, y Cement shall be applied at a minimum rate of five pounds (5#) per square yard per inch of depth. DA-9G REPAIR OF STORM DRAIN STRUCTURES (UTIL. CUT) This pay item shall apply to all storm drain structures such as inlets, manholes, headwalls, or other facilities which, in the opinion of the Engineer require repair, The Contractor shall remove and replace the tops of existing drainage structures and a portion of the walls of the structure as directed by the Engineer. The vertical reinforcing steel bars in the walls shall be cleaned of any concrete or dirt and exposed a minimum of twelve (12) inches. New steel shall be used in the reconstruction of the walls and top. I r1o2Jaa ASC-27 PART DA - ADDITIONAL SPECIAL CONDITIONS I � No payment shall be made for manhole frames, lids, steps and other miscellaneous items of construction, as they shall be considered subsidiary to the unit price bid for Repair of Storm Drain Structures. Unless directed otherwise by the Engineer, the existing manhole frames, lids, and other miscellaneous items may be reused, Storm Drain Structure Repair shall be performed in conformance with specification Item 444, "Manholes and Inlets", and Drawing No. S-SD1 through S-SD20 of the City of Fort Worth Transportation and Public Works Department's Standard Specifications for Street and Storm Drain Construction and shall further apply to all storm drainage facilities of a similar design and construction. Payment for Repair of Storm Drain Structures shall be made by the cubic yard of concrete required to reconstruct the structures as well as all steel, etc. in conformance with the appropriate drawings. DA-97 "QUICK-SET" CONCRETE (UTIL. CUT) In high traffic areas where the utility cut repair must be returned to service sooner than a normal cure time will allow, the Contractor shall use concrete admixtures as outlined in Item 422, "Concrete Admixtures" or ready made mixes such as "Rapid Set" concrete mix or approved equal._ Any.and all materials used shah conform to the above mentioned Item 422. Payment for quick set concrete shall be made at the unit price bid per CY as shown on the proposal and shall be full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete the work. DA-98 UTILITY ADJUSTMENT (UTIL, CUT) � This item is included for the basic purpose of establishing a contract price which will be " comparable to the final cost of making necessary adjustments required due to utility cut repairs to water, sanliary sevvet, and liatufal gas ser vll,G lif le] and appul Lei tai ales ii icludii"g rigatilv� (sprinkler systems), etc. where such lines and appurtenances are the property owner's -- responsibility to maintain. An arbitrary figure has been placed in the Proposal; however, this does not guarantee any payment for utility adjustments, neither does it confine utility adjustments to the amount shown in the Proposal. It shall be the Contractor's responsibility to provide the - services of a licensed plumber to make the utility adjustments determined necessary by the Engineer. No payment will be made for utility adjustments except those adjustments determined necessary by the Engineer. Should the Contractor damage service lines due to his negligence, where such lines would not have required adjustment or repair otherwise, the lines shall be repaired and adjusted by the Contractor at the Contractor's expense. The payment to the Contractor for utility adjustments shall be the actual cost of the adjustments plus ten percent (10%) to cover the cost of bond and overhead incurred by the Contractor in handling the utility adjustments. DA-99 STANDARD CONCRETE SIDEWALK AND WHEELCHAIR RAMPS (UTIL. CUT) All applicable provisions of Standard Specification Item 504 "Concrete Sidewalks and Driveways" shall apply. - IV021®4 _ ASC-28 F ~_ PART DA - ADDITIONAL SPECIAL CONDITIONS The Contractor shall construct standard concrete sidewalk and wheelchair ramps as shown in the details or as directed by the Engineer. All concrete flared surfaces (wheelchair ramp wing or curb) shall be colored with LITHOCHROME color hardener or equal. A brick red color, a dry-shake hardener manufactured by L.M. Scofield Company or equal, shall be used in accordance with manufacturer's instructions. Contractor shall provide a colored sample concrete panel of one foot by one foot by three inches dimension, or other dimensions approved by the Engineer, meeting the aforementioned specification if needed. The sample, upon approval by the Engineer shall be the acceptable standard to be s applied for all wheelchair ramp construction. Surface coloring shall be subsidiary to the unit price for this pay item. The method of application shall be by screen, sifter, sieve or other means in order to provide for a uniform color distribution. DA-100 LIMITS OF CONCRETE PAVEMENT REPAIR (UT1L. CUT) The following criteria will be used to determine the limits of concrete pavement repair for this contract-, 1. The minimum size of repair-for concrete shall be 5'x 5'. 2. Whenever the limits of the repair are 8 feet or less from an adjacent joint of any type, the replacement shall be extended to that joint. 3. dummy joints shall be sawed across any panel where a construction joint intersects the panel and a joint does not exist. All new joints (construction or dummy) shall be parallel with existing joints. 4. Depending on the existing longitudinal joint spacing and the limits of the damaged pavement, the contractor may be required to extend the replacement to the halfway point of the panel. The determination shall be made by the inspector on a case by case basis in order to assure uniform joint spacing. Payment for all concrete pavement repairs shall be made at the unit price bid per square yard as shown in the proposal and shall be full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete the work. However, payment for f sawcutting dummy joints in adjacent panels shall be made under the appropriate bid item, DA-101 CONCRETE CURB AND GUTTER (UTiL. CUT) This item shall apply for the placement of concrete curb and gutter on H.M.A.C. paved streets. Specification item no, 502 of the City of Fort Worth Transportation and Public Works Department's Standard Specifications for Street and Storm Drain Construction shall govern this item. DA-102 PAYMENT (UTIL. CUT) 11102104 ASC-29 PART DA ADDITIONAL SPECIAL CONDITION Because of the unique nature of this contract, C8-8.5 PARTIAL ESTIMATES AND RETAINAGE of the General Conditions shall not apply and shall be superseded by the following-. (Please initial below) Whenever the improvements prescribed b an individual Work Order have been completed, the p p y Contractor shall notify the Engineer. The Engineer or other appropriate official of the Owner will, within a reasonable time, perform the inspections. If such inspection reveals that the improvements are in an acceptable condition and have been completed in accordance with the terms of the Contract Documents and all approved modifications thereof, the Engineer will recommend acceptance of the work under that particular Work Order and recommend payment therefore. If the Engineer finds that the work has not been completed as required, he shall so advise the Contractor in writing, furnishing him an itemized list of all known items which have not been completed or which are not in an acceptable condition. When the Contractor has corrected all such items, he shall again notify the Engineer that the improvements are ready for inspection, and the Engineer shall proceed as outlined above. ' { Whenever the improvements prescribed by the individual Work Order have been completed and all requirements of the Contract Documents have been fulfilled on the part of the Contractor, an estimate showing the value of the work will be prepared by the Engineer as soon as-the necessary measurements, computations, and checks can be made. The amount of the estimate wiii be paid to the Contractor after acceptance by the Water Department Director, provided the Contractor has furnished to the Owner satisfactory evidence of payment as follows. Prior to submission of the estimate for payment, the Contractor shall execute an affidavit, as furnished by the City, certifying that all persons, firms, associations, corporations, ! or other organizations furnishing labor and/or materials under that Work Order have been paid in full, that the wage scale established by the City Council in the City of Fort Worth has been paid, and that there are no claims pending for personal injury and/or property damages. The acceptance by the Contractor of the individual payment as aforesaid shall operate as and shall release the Owner from all clams or liabilities under the Contract for anything done or furnished or relating to the work under that Work Order or any act or neglect of said City relating to or connected with the Contract. The making of the payment by the Owner shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. Bidder's Initials DA-103 DEHOI_ES (MISC. EXT.) The Contractor excavates for existing water and/or sanitary sewer main as detailed by work order together with a sketch. The location and dimensions shown on the plans relative to other existing utilities are based on the best information available. Omission from, or the inclusion of utility locations on the Plans is not to be considered as the nonexistence of, or a definite location of, existing underground utilities. It shall be the Contractor's responsibility to verify locations of - adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as necessary in the dehole process to provide adequate 11102104 ASC-30 4 40 PART DA - ADDITIONAL SPECIAL CONDITIONS rclearances, The Contractor shall take all necessary precautions in order to protect all services encountered. Any damage to utilities resulting from the Contractors operations shall be restored at his expense. Payment for work such as backfill and all other associated appurtenants required shall be included in the price of the appropriate bid item. DA-104 CONSTRUCTION LIMITATIONS (MISC. EXT.) The Contractor shall have no more than three (3) locations under construction at any one time, unless approval by the Engineer has been granted in writing. DA-105 PRESSURE CLEANING AND TESTING (MISC. EXT.) Care shall be taken to keep all water extensions clean and free from foreign objects. Chlorinated lime shall be placed in the first joint of pipe of the extension and upon completion of the pipe laying, water shall be introduced slowly for sterilization, after which the extension shall be thoroughly flushed with clean water. Risers shall be installed, as directed by the Engineer, for flushing and for providing sample points for bacteria tests. The water main extensions of the project shall be tested under normal line pressure and any leaks observed shall be immediately repaired. DA-106 BID QUANTITIES (MISC. EXT.) - OMIT DA-107 LIFE OF CONTRACT (MISC. EXT.) -OMIT DA-108 FI_OWABLE FILL (MISC. EXT.) -+OMIT DA-109 BRICK PAVEMENT REPAIR(MISC. REPL.) - OMIT DA-110 DETERMINATION AND INITIATION OF WORK (MISC. REPL.) - OMIT DA-1'11 WORK ORDER COMPLETION TIME (MISC. REPL.) - OMIT DA-112 MOVE IN CHARGES (MISC. REPL.) -OMIT DA-1'13 PROJECT SIGNS (MISC. REPL.) Project Signs are required at all locations which will be under construction for more than thirty (30) calendar days as indicated in Part B Proposal, Project Signs shall be in accordance with Figure 30 (dated 9-18-98) of the General Contract Documents. The signs may be mounted on skids or on posts. The exact locations and methods of mounting shall be approved by the engineer. Any and all costs for the required materials, labor, and equipment necessary for the furnishing of Project Signs shall be considered as a subsidiary cost of the project and no additional compensation will be allowed. r DA-114 LIQUIDATED DAMAGES (MISC. REPL.) 11102104 ASC-31 PART DA - ADDITIONAL SPECIAL CONDITIONS The Contractor shall pay liquidated damages of one hundred dollars ($100.00) per day per Work Order, for failure to begin a Work Order within the seven (7) worming days of the date the Work Order is faxed to the Contractor. Failure to complete project within the stipulated construction time on the Work Order, the Contractor will pay liquidated damages in the amount stipulated in these contract documents, DA-115 TRENCH SAFETY SYSTEM DESIGN (MISC. REPL.) -OMIT DA-116 FIELD OFFICE -OMIT DA-117 TRAFFIC CONTROL PLAN Traffic control shall be in accordance with item D-8 of the Special Conditions with the exception of the Contractor providing the traffic control plan. A traffic control plan has been prepared and is included in the project pians. All other requirements of D-8 shall apply. DA-118 COORDINATION OF WORK WITH CONTRACTOR FOR OTHER UNITS OMIT 11102104 - _ASC-32 PART E SPECIFICATIONS AND DETAILS SPECIAL PROVISIONS FOR STREET AND STORM DRAIN IMPROVEMENTS (Transportation & Public Warks Department) It Rw Ir V. r;= r I. r U L_ SPECIFICATIONS AND DETAILS PART E —SPECIFICATIONS ,JANUARY 1, 1978 All materials, construction methods and procedures used in this project shall conform to Sections E1, E2 and E2A of the Fort Worth }Nater Department General Contract Documents and General Specifications, together with any additional material specifications), construction(s) or later revision(s). (See revisions listed on this sheet). Sections E1, E2 and E2A of the Fort Worth Water Department General Contract Documents and General Specifications are hereby made a part of this contract document by reference for all purposes, the same as if copied verbatim herein, and such Sections are fled and kept in the office of the City Secretary of the City of Fort Worth as an official record of the City of t=ort Worth. INDEX E1 MATERIALS SPECIFICATIONS E2 CONSTRUCTION SPECIFICATIONS E2A GENERAL. DESIGN DETAILS Revisions as of April 20, 1981, follow: E1-2.4 Backfill: (Correct minimum compaction requirement to 95% Proctor density and correct P.I. I values as follows:) C. Additional backfill requirements when approved for use in streets: (1) Type B Backfill (c) Maximum plastic index (Pd) shall be 8. I (2) Type C Backfill (a) Material meeting requirements and having a PI of 8 or less shall be considered as suitable for compaction by jetting. (b) Material meeting requirements and having a PI of 9 or more shall be considered for use only with mechanical compaction. E 1-2.11 Trench Backfill: (Correct minimum compaction requirement wherever it appears in this section to 95% Proctor density except for paragraph a.1, where the "95% modified Proctor density" shall remain unchanged). (a) Material meeting requirements and having a PI of 8 or less shall be considered as suitable for compaction by jetting. (b) Material meeting requirements and having a PI of 9 or more shall be considered for use only with mechanical compaction. E 1-2.11 Trench Backfill: (Correct minimum compaction requirement wherever it appears in this section to 95% Proctor density except for paragraph a.1. where the "95% modified Proctor density" shall remain unchanged). E-1 ,Y Ir Ir f If +I II IT •rt �16t:�llJ1JC'I ��/$!• ld`7CJ G!� Y��. 1 r I „ I ` I b e a�aaa ss�rre a mtiti ��/7J7 C�CIO r1. i I 9YL.Rr��S.'V`.TldllP Bd f �. 1+ � i � !ice �•1 r {�y .r See .0 elell �. ^ll6 L%-rt v~8 rljo f f f I; .i f+ m +i tiw % +T � f � II y � fl +rYvm�c,�a+i -�r.a� 'Y �I II � >:r�ti-xrrrrr�e^a-tom+ � � ILI I II +r If rl f C7ul�t "�r T��r See �fKs:/ fay rsbr�r Sv.�,��y. �' Ir�t�,►,�r��r�i Cr�...sr�p .Crcae :// r I C17Y WATER DEPARTMENT FORT WORTH, TEE AS IC - 1 r46y-AASS L r I w a ��:.;�•• �'�•�.ti'�',*:..r.+�!�•r.. � - �n e�J'r$6�.f'�f'�lF�i�"'L7�i'b�a --"epee by cooeiwerQr. 9 L CITY WATEF DEPARTMENT FORT WORTH TEXAS colvNECrIoN I I f ' t _ CITY WAFER DEPARTMENT FORT WORTH, TEXAS 11'r,o:5—.1RS4EC71CROSSING EXISTING STREET TEMPORARY PAVEMENT" REPAY? SHALL BE HOT MIX ASPHALT, PAVEMENT i ROLLED 2" MINIMUM ❑ ❑ ❑ ❑ ❑ O ❑ ❑ 0 0 ❑ 0 O Q ❑ O 0 ❑ ❑ G ❑ O Q O Q Q O ❑ ❑ Q Q O Q Q �� �� 00000 0 00O00_0„❑ 0 0 6 0 4 0 OO ❑❑ 0❑O O- ❑ / � / f r f� a a nre J / ✓ / / f / / a y ap a a d a a 1AW. 6' COIAPACTCD a ° nEx-BASE VA77RIAL yll 1,. y -EXIST BASE ter, J1 11_11 �1' *4 XCAVATED xuTERIAL SHALL CONSIST OF MATERIAL FREE OF THIN OR ;��� ELONGATED PfE"C&S. ROCKS, LUMPS OF CLAY, SOIL, LaW OR VEGETABLE J,fA7TFR, T —6'JoE4X1AlUAt. SAND MATERIAL OR GRANULAR -� EMBEDMENT J tl r _ 11— � -1r rl FII� �Il r�,�` y 11■ Sly J 1 1 111 *INCLUDED IN LINEAR FOO r BID PRICE OF PIPE ExCA vA nClll, BA CKFI L.L AND PA YEMEN T REPAIR UNDER EXISTING STREETS CASE 3: EXISTING PAVED STREET TO BE RECONSTRUCTED FIGURE A (WATER SIZES UP TO & INCLUDING 12') NTS SHEET r OF' ._ REV MAY 3- _. ..S ! TEMPORARY PAVEMENT REPAIR EXISTING STREET SHALL BE HOT MIX ASPHALT, PAVEMENT ROLLED 2" MINIMUM 0�o�Q aq�0D�Dp60�o 4a D�L©760?02Ob60 a 206 p6?oQpDo�aO d a 4 9 ZoN. 6' COURACTED d - - a�l FLEX-EASE MAMRW EXIST. BASE '!1 *FXCAuaTED MArERW SHaL CONSIST , of AdATERML FREE' of MIV OR ±4 ELONGATED PIECES, ROCKS, LUMPS Or CLAY, SOIL, LOAD OR VEGETABLE UATTER, 1`-6'MAXIMUM. SANG] MATERIAL - l OR GRANULAR EMBEDMENT 111=- jtil r�111 CRUSHED STONE II r � t INCLUDED IN LINEAR FOOT BID PRICE OF PIPE EXCAVATION, BACKFILL ANIS PAVEA111EI1lT REPAIR UNDER EXISTING STREETS E. CASE 3: EXISTING PAVED STREET TO BE RECONSTRUCTED FIGURE B - , (SEWER: ALL SIZES) (WATER: SIZES 15" & LARGER) N TS 5iiEET ? O= l _ REV nrsr s. -_ e � J •r p3 w%J06 3� d F Q J w W s Wto r �ya*f J to• q S i t w a~ dry * 141an LLJ ave am u� a ON uj cr s + Vomit • 4r. a a m Q ® a~ �. ate• 11 y � �� 6iur" • d s m i Q • r u c Q a e e UJ r� c q a� �► d+� ��g F� 'e,M �aA a o m r aL w.� .� l �•r � � •+ U w � .d5. �a�e J��Ct a it r� e e V„I fY a_ a ■ .a�g M cr- • WNW '6�a�" � ,•I ' m J �fd}C R •.0 Q4.. �.. �'a e '�• �• a� i'�u � h ME may u"—` LLJ di q f O N W ~ A 1 d .. $ t y Y ,r ay a f� ei waw a .._ 6 A Ort V F ■77 4 m r- PROJECT SIGN 1 (WATER DEPARTMENT) IL r. F r r L r r 9804400_Specsj SC IPwpd 10 Unit I 41 - 011 LO oft C c� CO) f (D v, c Ma •*� N En coco w • � LO ., 2 ~Cf) cco o �.. � � - cm A CP !i■ �' -- _ 16 m Bo +` W co ~- — � _ � ssA IN cc CL CD in ti CV N L[7 CV C1j d' ko SPECIAL PROVISIONS SPECIAL PROVISIONS FOR STREET AND STORM DRAIN IMPROVEMENTS I Table of Contents 1. SCOPE OF WORK.............................................................. -.,......-......,...............................................SP-4 2. AWARD OF CONTRACT.......................................................................................................................SP-4 3. PRECONSTRUCTION CONFERENCE..................................................................................................SP-4 4, EXAMINATION OF SITE ...........................................................................................I.................... -....SP-4 5. BID SUBMITTAL................... ............................................................................ ...............................SP-5 6. WATER FOR CONSTRUCTION..................................-..........,............................................I...............SP-5 7. SANITARY FACILITIES FOR WORKMERS...........................................................I.-.......I................SP-5 8. PAYMENT..........................................................................................................................................SP-5 9. SUBSIDIARY WORK...............................................................................................................I.............I SP-5 10, LEGAL RELATIONS AND RESPONSIBILITIES TOTHE PUBLIC......................................................................................................................................SP-5 11. WAGE RATES........................................................................................................................................SP-5 12. EXISTING UTILITIES........................................................................................,.......,............................SP-5 13. PARKWAY CONSTRUCTION...............................................................................................................SP-5 M. MA'T'ERIAL STORAGE...........................................................................................................................SP-5 L 15. PROTECTION OF EXISTING UTILITIES ANDIMPROVEMENTS............ ...........................................................................................................SP-6 1 1 G. INCREASE OR DECREASE IN QUANTITIES......................................................................................SP-6 . 17. CONTRACTORS RESPONSIBILITY FOR DAMAGE CLAIMS.................-......................,................SP-6 18, EQUAL EMPLOYMENT PROVISIONS.................. .............. ,....... ......................... ................. ........ ...... SP-6 19. MINORITY AND WOMENS BUSINESS ENTERPRISE (M/WBE)COMPLIANCE.....,.................................................................................................................SP-7 20. FINAL CLEAN UP.... ................................................. ....................................................,.....................SP-8 21. CONTRACTOR'S COMPLIANCE WITH WORKER'S CO ...... .. . . .... ..... .. . .. .,. ... , COMPENSATION LAW. .... .SP-8 22. SUBSTITUTIONS....................................................................................................................................SP-11 23. MECHANICS AND MATERIALSMEN'S LIEN....................................................................................SP-11 24. WORK ORDER DELAY .........................................................................................................................SP-11 25. WORKING DAYS ...................................................................................................................................SP-11 26. RIGHT TO ABANDON ..................................................................................................I........................SP-11 27. CONSTRUCTION SPECIFICATIONS ..........................................................................................................SP-1 1 28. MAINTENANCE STATEMENT . ..SP•11 29. DELAYS ...................................................................................................................................SP-1I 34. DETOURS AND BARRICADES ............................................................................................................SP-12 31. DISPOSAL OF SPOILMLL MATERIAL ..............................................................................................SP-12 32. QUALITY CONTROL TESTING .......................................,...................................................................SP-12 33. PROPERTYACCESS...................................................................................... SP-13 34. SAFETY RESTRICTIONS-WORD NEAR HIGH VOLTAGE LINES ...............................................SP-13 r` 35. WATER DEPARTMENT PRE-QUALIFICATIONS .............................................................................SP-13 35. RIGHT TO AUDIT ............................................................,....................................................................SP-13 ri 37, CONSTRUCTION STAKES ...................................................................................................................SP-14 38. LOCATION OF NEW WALKS AND DRIVEWAYS ..........................................................................SP-14 39. EARLY WARNING SYSTEM FOR CONSTRUCTION.....................,...................................................SP-14 40. AIR POLLUTION WATCH DAYS................... .........................SP-15 10/27104 5P-1 SPECIAL PROVISIONS FOR STREET AND STORM DRAIN IMPROVEMENTS Table of CoWents CONSTRUCTION ITEMS: 41. PAY ITEM-UNCLASSIFIED STREET EXCAVATION......................................................................SP-15 42. PAY ITEM-6"REINFORCED CONCRETE PAVEMENT................................................................_SP-16 43. PAY ITEM-SILICONE JOINT SEALING.............................................................................................SP-I6 44. PAY ITEM-7"CONCRETE CURB........................................................................................................SP-20 45, PAY ITEM-RETAINING WALL............................................................................................................SP-20 46. PAY ITEM-REPLACE EXIST.CURB AND GUTTER.......................................................................SP 20 47. PAY ITEM-HMAC TRANSITION................................. .......................................................................SP-20 48. PAY ITEM-6"PIPE SUBDRAIN...........................................................................................................SP-20 49. PAY ITEM-TRENCH SAFETY............................ ...............................................I...........................SP-20 I. PAY ITEM-8"THICK LIME STABILIZED SUBGRADE AND CEMENT FOR SUBGRADE STABILIZATION..............................................................___..........................................SP-21 51. PAY ITEM-6"HMAC PAVEMENT(THICKNESS TOLERANCES AND HMAC TESTING PROCEDURES)..................................................................................................................SP-21 52. PAY ITEM-CONCRETE FLAT WORK(CURB,CURB&GUTTER, SIDEWALKS, _ LEADWALKS,WHEELCHAIR RAMPS AND DRIVEWAYS).......................................SP-22 53. PAY ITEM-REMOVE EXISTING CONCRETE SIDEWALK,DRIVEWAYS,STEPS, LEADWALKS AND WHEELCHAIR RAMPS..................................................................SP-22 54. PAY ITEM-REMOVE EXISTING CURB AND GUTTER..................................................................SP-22 55. PAY ITEM-REMOVE EXISTING CURB INLET.................................................................................SP-22 56. PAY ITEM-6"REINFORCED CONCRETE DRIVEWAY...................................................................SP-23 57. PAY ITEM-REMOVE AND CONSTRUCT CONCRETE STEPS........................................................SP-23 58. PAY ITEM-4'STANDARD CONCRETE SIDEWALK,LEADWALK AND WHEELCHAIR RAMP.......................................................................................................SP-23 59. PAY ITEM-REMOVE AND REPLACE FENCE...................................................................................SP-23 60. PAY ITEM-STANDARD 7"CURS AND 18"GUTTER.................................................I....................SP-24 63. PAY ITEM-REMOVE AND RECONSTRUCT MAILBOXESIMISCELLANEOUS...........................SP-24 62. PAY ITEM-BORROW ...........................................................................................................................SP-24 63. PAY ITEM CEMENT STABILIZATION..............................................................................................SP-24 64. PAYITEM-CEMENT ...........................................................................................................................SP-24 r 65. PAY ITEM-NEW 7"CONCRETE VALLEY GUTTER........................................................................SP-24 L 66. PAY ITEM-STORM DRAIN INLETS...................................................................................................SP-25 67. PAY ITEM-TRENCH EXCAVATION AND BACKFILL FORSTORM DRAIN.........................................................................................................SP-25 68, PAY ITEM-STORM WATER POLLUTION PREVENTION(FOR DISTURBED AREAS i EQUAL TO OR GREATER THAN I ACRE)....................................................................SP-25 69. PRE BID ITEM-PROJECT DESIGNATION SIGN..............................................................................SP-27 70. PRE SID ITEM-UTILITY ADJUSTMENT..........................,...,............................................................SP-27 71. PRE BID ITEM-TOP SOIL....................................................................................................................SP-27 72. PRE 131D ITEM-ADJUST WATER VALVE BOX................................................................................SP-28 73. PRE BID ITEM-MANHOLE ADJUSTMENT.....................................................................................SP-28 L 74, PRE BID ITEM-ADJUST WATER METER BOX................................................................................SP-28 1 75. NON-PAY ITEM-CLEARING AND GRUBBING................................................................................SP-28 76. NON-PAY ITEM- SPRINKLING FOR DUST CONTROL...................................................................SP-28 77. NON-PAY ITEM- PROTECTION OF TREES,PLANTS AND SOILS................................................SP-28 1 . 78. NON-PAY ITEM-CONCRETE COLORED SURFACE.......................................................................SP-29 10/27104 SP-2 100 SPECIAL PROVISIONS FOR r STREET AND STORM DRAIN IMPROVEMENTS Table of Contents - 79. NON-PAY ITEM-PROJECT CLEAN-UP........................................................,.....................................SP-29 80. NON-PAY ITEM-PROJECT SCHEDULE................................................ ..........................................SP-29 81. NON-PAY ITEM-NOTIFICATION OF RESIDENTS..........................................................................SP-29 82. NON-PAY ITEM-PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION..............SP-29 83. NON-PAY ITEM-PRE-CONSTRUCTION NEIGHBORHOOD MEETING........................................SP-30 84. NON-PAY ITEM-WASHED ROCK......................................................................................................SP-30 85. NON-PAY ITEM-SAWCUT OF EXISTING CONCRETE...................................................................SP-30 86. NON-PAY ITEM- LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES..........................................................................................SP-30 87. NON-PAY I'T'EM- TIE-IN INTO STORM DRAIN STRUCTURE.......................................,................SP-31 89. NON-PAY ITEM- SPRINKLER HEAD ADJUSTMENT......................................................................SP-31 89. NON-PAY ITEM-FEE FOR STREET USE PERMITS AND RE-INSPECTIONS..............................SP-31 �'. 90. NON PAY ITEM-TEMPORARY EROSION,SEDIMENT AND WATER POLLUTION CONTROL(FOR DISTURBED AREAS LESS THAN 1 ACRE)....SP-31 91. NON PAY ITEM-TRAFFIC CONTROL ..............................................................................................SP-32 L. f p 10/27104 SP-3 l i SPECIAL PROVISIONS FOR STREET AND STORM DRAIN IMPROVEMENTS FOR: PAVING RECONSTRUCTION: D.O.E.NO. 1. SCOPE OF WORK: The work covered by these plans and specifications consist of the following: Reconstructlon of and all other miscellaneous items of construction to be performed as outlined In the plans and specifications which are necessary to satisfactorily complete the work. 2. AWARD OF CO!'4TRACT. Submisslon of Bids; Unit 1 and Unit II constitute a package, if the Contractor submits a bid on both Unit I and Unit 11 and has the lowest responsive proposal price, f the Contractor will be the apparent successful bidder for this project, The Contractor can bid either the HMAC alternate and/or the Concrete altem ate. The add-tive alternate must be included in any bid. t Bidders are hereby Informed that the Director of the Department of Engineering reserves the right to evaluate and recommend to the City Council the best bid that is considered to be in the best interest of the City. 3. PRECONSTRucTION CONFERENCE: The successful Contractor, Engineer, and City-City shall meet at the call of the City for a preconstruction conference before any of its work begins on this project. At this time, details of sequencing of the work, contact individuals for each party, request for survey, and pay requests will be covered. Prior to the meeting, the Contractor shall prepare schedules showing the sequencing and progress of their wank and its effect on others. A final composite schedule will be prepared during this conference to allow an orderly sequence of project t#' construction. As used herein, the term "Engineer"shall mean the deslgn engineer who prepared and sealed the pians, specifications and contract documents for this project. 4, E7{AMINATIQIL OF SITE: It shall be the responsibility of the prospective bidder to visit the project site and make such examinations and explorations as may be necessary to determine all conditions that may affect construction of this project. Particular attention should be given to methods of providing Ingress and egress to adjacent private-and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper consideration should be given to these details during preparation of the Proposal and all unusual conditions that may give rise to later contingencies should be brought to the attention of the City prior to the submission of the Proposal. 4_ During the construction of this pro}ect, it is required that all parkways be excavated and shaped Including bar ditches at the same time the roadway is excavated. Excess excavation will be disposed of at locations approved by the Engineer. During construction of this project, the Contractor shall comply with present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes. 5. BID UBMITTAL: Bidders shall not separate,detach or remove any portion, segment or sheets from the contract documents at any time. Failure to bid or fully execute contract without retaining 10127/G4 SP-4 contract documents intact may be grounds for designating bids as"non-responsive" and rejecting bids as appropriate and as determined by the Director of the Department of Engineering. 6. WATER FOR CONSTRUCTION: Water for construction will be furnished by the Contractor at his own expense, 7. SANITARY FACILITIES FOR WORKERS: The Contractor shall provide all necessary conveniences for the use of workers at the project site. Specific attention is directed to this equipment. 8. PAYMENT: The Contractor shall receive full payment from the City for all the work based on unit prices bid on the proposal and specified in the plans and specifications and approved by the Engineer per actual field measurement. 9, SUBSIDIARY WORK: Any and all work specifically governed by documentary requirement for the projects, such as conditions Imposed by the flans, the General Contract Documents or these special Contract Documents, in which no specific item for bid has been provided for In the Proposal, shall be considered as a subsidiary item or work, the cost of which shall be included in the price bld in the Proposal for each bid item, including but not limited to surface restoration cleanup and relocation of mailboxes. All objectionable matter required to be removed from within the right-of-way and not particularly described under these specifications shall be covered by Item No, 102 "Clearing and Grubbing" and shall be subsidiary to the other items of the contract. 10. LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC: The Contractors particular attention is directed to the requirements of Item 7,"Legal Relations and Responsibilities to the Public"of the"Standard Specifications for Street and Storm Drain Construction". 11. WAGE RATES: The labor classifications and minimum wage rates set forth herein have been predetermined by the City Council of the City of Fort Worth, Texas, in accordance with statutory requirements, as being the prevailing classifications and rates that shall govem on all worn performed by the Contractor or any subcontractor on the site of the project covered by these Contract Documents. In no event shall less than the following rates be paid, (Attached at the end of this section.) I 12. EXISTING UTILITIES: The locations and dimensions shown on the pians relative to existing utilities are based on the best Information available, It shall be the Contractors responsibl%to verify location of adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as are necessary in the construction process In order to provide adequate clearance. The Contractor shall take all necessary precautions In order to protect all services encountered. Any damage to utilities and any losses to the utility City due to disruption of service resulting from the Contractor's operations shall be at the Contractor's expense. 13. PARKWAY CONSTRUCTION: During the construction of this,project, it will be required that all parkways be excavated and shaped at the same time the roadway is excavated. Excess excavation w9l be disposed of at locations approved by the Director of the Department of Engi neeri rig, 14. MATERIAL. STORAGE: Material shall not be stored on prlvate property unless the Contractor has obtained permission from the property City. 15. PROTECTION OF EXISTING AND IMPROVEMENTS: The Contractor shall take adequate measures to protect all existing structures, improvements and utilities, which may be 1 O/27/04 SP-5 encountered The utility lines and conduits shown on the plans are for information only and are not guaranteed by the City or the Engineer to be accurate as to extent, location and depth, they are shown on the pians as the best information available at the time of design, from the Owners of the utilities involved and from evidences found on the ground. Ot INCREASE OR DECREASE IN QUANTITIES: The quantities shown In the Proposal are approximate. It is the Contractor's sole responsibility to verify all the minor pay item quantities prior to submitting a bid. No additional compensation shall be paid to Contractor for errors in the quantities. Final payment will be based upon field measurements. The City reserves the right to alter the quantities of the work to be performed or to extend or shorten the Improvements at any flme when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices as established in the contract documents. No allowance will be made for any changes in anticipated profits or shall such changes be considered as waiving or Invalidating any conditions or provisions of the Contract Documents. Variations in quantities of storm drain pipes in depth categories shall be interpreted herein as applying to the overall quantities of storm drain pipe in each pipe size but not to the various depth categories. 0. CONTRACTOR'S RESPONSIBILITYFOR DAMAGE QLAtMS: Contractor Covenants and agrees to indemnify City's Engineer and Architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims or suits for properly loss, property damage, personal injury, Including death, arising 1 out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents,employees, subcontractors, licensees or inv+tees, whether or not any such injury, damage or death Is caused, in whole or In part, by the negligence or alleged negligence of City, Its officers, servants, or employees. Contractor likewise covenants and ' agrees to indemnify and hold harmless the City from and against any and all Injuries to City's officers, servants and employees and any damage, loss or destruction to property of the City arising from the performance of any of the terms and conditions of this Contract, whether or not any such Injury or damage is caused in whole or In part by the negligence or alleged negligence of City, its officers,servants or employees. In the event City receives a written claim for damages against the Contractor or its subcontractors prior to final ,payment, final payment shall not be made until Contractor either(a) submlts to City satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or(b) provides City with a letter from Contractor's liabllity insurance carrier that the claim has been referred to the insurance carrier. The Director may, if deemed appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work perforated under a Clty Contract. 4- EQUAL EMPLOYMENT PROViSiONS: Contractor shall comply with City Ordinance Number 7278 as amended by City Ordinance Number 7400 (Fort Worth City Code Sections 13-A-21 through 12- A-29)prohibiting discrimination in.employments practices. The Contractor shall post the required notice to that effect on the project site, and at his request, wil i be provided by assistance by the City of Fort Worth's Equal Employment Officer who will refer any qualified applicant he may have on File.In his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. 10/27/04 SP-6 �i d. MINORITY AND WOMEN BUSINESS-ENTER PRISE(M/WBE) COMIPILIANCE: In accordance with City of FM Worth Ordinance No. 1553[}, the City has goals for the participation of minority business enterprises and women business enterprises in City contracts. The Ordinance is incorporated in these specifications by reference. A copy of the Ordinance may be obtained from the Office of the City Secretary. Failure to comply with the ordinance shall be a material breach of contract. M/WBE UTILIZATION FORM, MI WBE GOALS WAIVER FORM AND GOOD FAITH EFFORT FORM, as applicable, must be submitted within fine (5) city business days after bid opening. Failure to comply shall render the bid non-responsive. Upon request, Contractor agrees to provide the City complete and accurate information regarding actual work performed by a Minority or Women Business En`erprise(MIWBE) on the contract and payment thereof, Contractor further agrees to permit an audit and/or examination of any books, records or files 1n its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of acts(other than a negligent misrepresentatlon)and For the commission fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal, state, or local laws or ordinances relating to false statement. Further, any such misrepresentation (other than a negligent misrepresentation) and/or commisslon of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time not less than three years I The City will consider the Contractors performance regarding its MANBE program in the evaluation of bids. Failure to comply with the City's MANBE Ordinance, or to demonstrate "good faith effort", shall result in a bid being rendered non-responslve to specifications. Contractor shall provide copies of subcontracts or co-signed tetters of intent with approved M/WBE subcontractors prior to Issuance of the Notice to Proceed. Contractor shall also provide monthly reports on utilization of the subcontractors to the City s MANBE office. The Contractor may count first and second tier subcontractors and/or suppliers toward meeting the goals. The Contractor may count toward its goal a portion of the total dollar amount of the contract with a jolnt venture equal to the percentage of the MANBE participatlon in the joint venture for a clearly defined portion of the work to be performed. All M/WBE Contractors used in meeting the goals must be certified prior to the award of the Contract. The MANBE Contractor(s) must be certified by elther the North Central Texas Regional Certification Agency(NCTRCA) or Texas Department of Transportation (TxDOT), Highway Division and must be located in the nine (9) county marketplace or currently doing business in the rnarketpiace at time of bid. The Contractor shall contact all such M=BE subcontractors or suppliers prior to listing them on the MNMBE utilization or good faith effort forms as applicable. Failure to contact the listed MAMBE subcontractor or supplier prior to bid opening may result in the rejection of bid as non-responsive. Whenever a change order affects the work of an M/WBE subcontractor or supplier, the MlWBE shall be given an opportunity to perform the work. Whenever a change order exceeds 10% of the original contract, the M/WBE coordinator shall determine the goats applicable to the work to be performed under the change order Du�ing the term of the contract the contract shall: j .1. Make no unjustified changes or deletions in its M/WBE participation commitments submitted with or sibsequent to the bid, and, 2. If substantial subcontracting andlor substantial supplier opportunities arise during the term of the contract which the Contractor had represented he would perform with his fords, the Contractor shall notify the City before subcontracts or purchase orders are 10/27/04 SP-7 let, and shall be required to comply with modifications to goals as determined by the City, and, 3. Submit a REQUEST FOR APPROVAL OF CHANGE FORM, if the Contracto r desi re s to change or delete any of the MAA(BE subcontractors or suppliers. Justification for change may be granted for the following; a. Failure of 5jbcontractor to provide evidence of coverage by Workers Compensation Insurance. b. Failure of Subcontractor to provide required general liability of other insurance. c. Failure of Subcontractor to execute a standard subcontract form in the amount of the proposal used by the Contractor in preparing his MfWBE Participation plan, d. Default by the M1WBE subcontractor or supplier in the performance of the subcontractor. Within ten (10)stays after final payment from the City, the Contractor shall provide the MIWBE Office with documentation to reflect final participatlon of each subcontractor and supplier used on the project, inclusive of MPJVBEs, 20. FINAL CLEAN-LIF., Final cleanup work shall be done for this project as soon as the paving and curb and gutter has been completed. No more than seven days shall elapse after comp'.etion of construction before the roadway and R.OW. is cleaned up to the satisfaction of the Engineer. The Contractor shall make a final cleanup of all parts of the work before acceptance by the City or its representative. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. r' 21. CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW: L A. Workers Compensation Insurance Coverage a. DEFINITIONS: b. Certification of coverage ("Certificate"). A copy of a certificate of insurance, a certificate of authority to self-Insure Issued by the commission, or a coverage agreement (TWCC-81, TWCC- 82, TWCC-83, OR TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project. Duration of the project-includes the time from the beginning of the work on the project until the Contractofslperson's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project("subcontractor" in §406.096)-includes all persons or entitles performing all or part of the services the Contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes,without limitation, Independent Contractors, subcontractors, leasing companies, motor carriers, City-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other services related to a project. "Services" does not include activities unrelated to the project, such as food)beverage vendors,office supply deliveries, and delivery of portable toilets. Tne Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and riling of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.041(44) or all employees of the Contractor providing services on the project, for the duration of the project. 10127]04 SP-8 c, The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. d- If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project, the Contractor must, prior to the end of the coverage period, fie a new certificate of coverage with the governmental entity showing that coverage has been extended. e. The Contractor shall obtain from each person providing services on a project, and provide to the governmental entity: (1) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on fife certificates of coverage showing coverage for all persons providing services on the project; and (2) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. E The Contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter_ g. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten (10)days after the Contractor knew or should have known, or any change that materially affects the provision of coverage of any person providing services on the project_ h. The Contractor shall post on each project site a notice, in the text, form and manner prescrlbed by the Texas Worker's Compensation, Informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage- The Contractor shall contractually require each person with whom it contracts to provide services on a project, to: ( (1) provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas tabor Code, Section 401.011(44)for ail of its employees providing services on the project, for the duration of the project; (2) provide to the Contractor, prior to that person beginning work on the project, a t certificate of coverage showing that coverage Is being provided for all employees of the person providing services on the project, for the duration of the project; .i (3) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (4) obtain form each other person with whom it contracts, and provide to the Contractor: G. �. (a) a certificate of coverage, prior to the other person beginning work on the project; and I 10127104 SP-9 (b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (c) retain all required certificates of coverage on Cie for the duration of the project and for one year thereafter. (d) notify the governmental entity in writing by certified mail or personal delivery, within ten (10)days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project, and (e) contractually require each person with whom it contracts, to perform as requlred by paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom they are providing services. j. By signing this contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to the governmental entity that all employees of the Contractor who will provide services on the project will be covered by worker's compensation coverage for the duration of the prosect, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with appropriate insurance carrier or, in the case of a self- insured„with the commission's Division of Seif-Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative, criminal, civil penalties or other civil actions. k. The Contractor's failure to comply with any of these provislons is a breach of contract by the Contractor which entitles the governmental entity to declare the contract void if the Contractor does not remedy the breach within ten day after receipt of notice of breach from the governmental entity. R. The Contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Commission miles. This notice must be printed with a title In at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the Worker population. The text for the notices shall be the following text, without any additional words or changes: ' "REQUIRED WORKER'S COMPENSATION COVERAGE The law requires that each person working on this site or providing services related to this construction project must be covered by worker's compensation insurance. This includes persons providing, hauling, or delivering equipment or materials,or providing labor or transportation or other service related to the project, regardless of the identify of their employer or status as an employee." Call the Texas Worker's Compensation Commission at 512-440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage,or to report an employers failure to provide coverage", 22. suss-rITUTIONS: The specifications for materials set out the minimum standard of quality that the City believes necessary to procure a satisfactory project. No substitutions will be permitted 10/27104 SP-10 until the Contractor has received written permission of the Engineer to make a substitution for the material that has been specified. Where the terra"or equal", or"or approved equal"is used, it is understood that if a material, product, or piece of equipment bearing the name so used is furnished, it will be approvable, as the particular trade name was used for the purpose of establishing a standard of duality acceptable to the City. If a product of any other name is proposed substitutes Is procured by the Contractor. Where the term "or equal", or"approved equal" is not used in the specifications, this does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose, However, the Contractor shall have the full responsibility of providing that the proposed substitution is, in fact, equal, and the Engineer, as the representative of the City, shall be the sole judge of the acceptability of substitutions. The provisions of the sub-section as related to"substitutions"shall be applicable to all, sections of these specifications. 23. MECHANICS AND MATERiALMEN'S LIEN. The Contractor shall be required to execute a release of mechanics and mater almen's liens upon receipt of payment. 24. WORK ORDER DELAY, All utilities and right-of-way are expected to be clear and easements and/or permits obtained on this project within sixty(60) days of advertisement of this project. The work order for subject project will not be issued until all utilities, rlght-of-ways, easements and/or permits are cleared or obtained. The Contractor shall not hold the City of Fort Worth responsible for any delay in issuing the work order for this Contract. 25. WORKING DAYS: The Contractor agrees to complete the Contract within the allotted number of working days. 26. RIGHT TO ABANDON:The City reserves the right to abandon, without obligation to the Contractor, any part of the project or the entire project at any time before the Contractor begins any construction work authorized by the City. 27. COINSTRUQTION SPECIFICATIONS: This contract and project are governed by the two following published specifications, except as modified by these Special Provisions: STANDARD SPECIFICATIONS FOR STREET AND STORM DRAiN CONSTRUCTION CITY OF FORT WORTH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION NORTHCENTRAL TEXAS A copy of either of these specifications may be purchased at the Office of the Department of Engineering, 1000 Throckmorton Street, 2 a Floor, Municlpal Building, Fort Worth, Texas 76102. The spectfications applicable to each pay item are lndlcated in the call-out for the pay item by the Engineer. if not shown, then applicable pubiished specifications in either of these documents may be followed at the discretion of the Contractor. General Provisions shall be those of the Fort Worth document rather than Division 1 of the North Central Texas document. 25. MAINTENANCE STATEMENT: The Contractor shall be responsible for defects in this project due to faulty materials and workmanship, or both, for a period of two(2)years from date of final acceptance of this project and will be required to replace at his expense any part or all of the project which becomes defective due to these causes. 29. DELAYS: The Contractor shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any,which is to be furnished by the City. When such extra compensation is claimer/ a written statement thereof shall be presented by the Contractor to the 10/27/04 SP-11 Vi' Director of the Department of Engineering and if by him found correct shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon by the Council shall be final and binding. if delay is caused by specific orders given by the Engineers to stop work or by the performance of extra work or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall, however, be subject to the approval of the Clty Council; and no such extension of time shall release the Contractor or the surety on his performance bond form all his obligations hereunder which shall remain in full force until the discharge of the contract. 30. DETOURS AND BARRICADES; The Contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian fac lities and to the flow of vehicular and pedestrian traffic within the project area. Contractor shall protect construction as required by Engineer by providing barricades- Barricades, warning and detour signs shall conform to the Standard Specifications"Barriers and Warning and/or Detour Signs," item 524 and/or as shown on the plans. 1 Construction signing and barricades shall conform with"1980 Texas Manual on Uniform Traffic Control Devices, Vol. No- 1." 31. DISPOSAL OF SPOIL/FILL MATERIAL: Prior to the disposing of any spoil/fill material, the Contractor shall advise the Director of the Department of Engineering acting as the City of Fort Worth's flood Plain Administrator("Administrator"), of the location of all sites where the Contractor intends to dispose of such material. Contractor shall not dispose of such material until the I proposed sites have been determined by the Administrator to meet the requirements of the Flood Plaln Ordinance of the City of Fort Worth(Ordinance No. 10056). All disposal sites must be approved by the Administrator to ensure the filling is not occurring within a flood plain without a permit. A flood plain permit can be issued upon approval of necessary engineering studies. No fill permit is required if disposal sites are not in a flood plain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administralor stating that the site Is not in a known flood plain or by a Flood Plaln fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, Including any necessary engineering studies, shall be at the Contractor's expense, In the event that the Contractor disposes of spoil/fill materials at a site without a fill permit or a letter from the administrator approving the disposal site, upon notification by the Director of Engineering, Contractor shall remove the spoillfill material at its expense and dispose of such materlals In accordance with the Ordinance of the Clty and this section- 32, QUALITY CONTROL TESTWGO (a) The Contractor shall furnish, at its own expense, certifications by a private laboratory for all materials proposed to be used on tate project, including a mix design for any asphaltic and/or i Portland cement concrete to be used and gradation analysts for sand and crushed stone to be used along with the name of the pit from which the material was taken. The Contractor shall provide manufacturers certifications for all manufactured items to be used in the project and will bear any expense related thereto. (b) Tests of the deslgn concrete mix shah be made by the Contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate, cement and mortar which are to be used later in the concrete. The Contractor shalt provide a certified copy of the test results to the City. (c) Quality control testing of on site material on this project will be performed by the City at its own expense. Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the Contractor and will be billed at commercial rates as determined by the City, The faliure of the City to make any tests of materials shall in no way 10127104 SP-12 relieve the Contractor of its res onsibil tYto furnish materials and equipment conformin to the requirements of the contract_ (d) Not less than 24 hours notice shall be provided to the City by the Contractor for operatlons requiring testing. The Contractor shall provide access and trench safety system (if required) – For the site to be tested and any work effort involved is deemed to be included in the unit price For the item being tested. (e) The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to the job site. The ticket shall specify the name of the pit supplying the fill material. 33. PROPERTY ACCESS: Access to adjacent property shall be maintained at all times unless otherwise directed by the Engineer. } 34. SAFETY RESTBiCTIONS --WORK NEAR HIGH VOLTAGE LINES: The following procedures will be followed regarding the subject item on this contract: (a) A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. The warning sign shall read as follows: "WARNING—UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH jT VOLTAGE LINES." (a) Equipment that may be operated within ten feet of high voltage lines shall have an insulating _ cage-type of guard about t .e boom or arm, except back hoes or dippers and insulator(inks on the lift hood connections. _ (b) When necessary to work within six fleet of high voltage electric lines, notification shall be given the power company (TU Electric Service Company) which Ml erect temporary mechanical barriers, de-energize the line or raise or lower the line. The work done by the power company shall not be at the expense of the City of Fort Worth. The notifying department shall maintain an accurate log of all such calls to TU Electric Service Company and shall record action taken In each case. (c) The Contractor Is required to make arrangements with the TU Electric Service Company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and expense. (d) No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph (c). 35. WATER DEPARTMENT_PRE-QUALiFICAT)ONS- Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre-qualified with the Water Department to perform such work in accordance with procedures described in the current Fort Worth Water Department General Specifications which general specifications shall govern performance of all such work. 36. RIGHT TO AUDiT"- (a) Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this contract have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the Contractor involving transactions relating to this contract. Contractor agrees that the City shall have access during normal I 10/27104 SP-13 FI working hours to all necessary Contractor facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Contractor reasonable advance notice of intended audits. (b) Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, under the expiration of three (3) years after Final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subcontractor involving transactions to the subcontract and further, that City shall have access during normal working hours to all subcontractor facilities and shall be provided adequate and appropriate work space in order to conduct audits In compliance with the provisions of this article together with subsection (c. ) hereof. City shall give subcontractor reasonable advance notice of intended audits. (c) Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 37. CONSTRUCTION STAKES: The City, through its Surveyor or agent, will provide to the Contractor construction stakes or other customary methods of markings as may be found consistent with professional practice to establish line and grade for roadway and utility construction and centerlines and benchmarks for bridgework. These stakes shall be set sufficiently in advance to avoid delay whenever practical, One set of stakes shall be set for all utility construction (water, sanitary sewer, drainage, etc.), one set of excavatlonfor stabilization stakes, and one set of stakes for curb and gutter and/or paving. It shall be the We responsibility of the Contractor to preserve, maintaln, transfer, etc , all stakes furnished until completion of the construction phase of the project for which they were furnished, If,in the opinion of the Engineer, a sufficient number of stakes or markings provided by the City ` have been lost, destroyed, or disturbed, that the proper prosecution and control of the work contracted for in the Contract Documents cannot take place, then the Contractor shall replace such stakes or markings as required. An individual registered by the Texas Board of Professional Land Surveying as a Registered Professional Land Surveyor shall replace these stakes, at the Contactor's expense. No claims for delay due to a lack of replacement of construction stakes will be accepted, and time will continue to be charged In accordance with the Contract documents. 38. LOCATION OF NEW WALKS AND DRIVEWAYS; The Contractor will make every effort to protect existing trees within the parkway,with the approval of the engineer the Contractor may re-locate proposed new driveways and walks around existing trees to minimize damage to trees. 39. EARLY WARNING SYSTEM FOR CONSTRUCTION; Time is of the essence in the completion of this contract.. In order to insure that the Contractor is responsive when notified of unsatisfactory i' performance and/or of fallure to maintain the contract schedule, the following process shall be applicable_ The work progress on all construction projects will be closely monitored. On a bi-monthly basis the percentage of work completed will be compared to the percentage of time charged to the contract. If the amount of work performed by the Contractor Is fess than the percentage of time allowed by 20% or more (example- 10% of the work completed in 30% of the stated contract time as may be amended by change order), the following proactive measures will be taken: 1. A letter will be mailed to the Contractor by certified mail, return receipt requested demanding that, within 10 days from the date that the letter is received, It provide sufficient equipment, materials and labor to ensure completion of the work within the contract time- In the event the Contractor receives such a letter, the Contractor shall 10/27104 SP-14 provide to the City an updated schedule showing how the project will be completed within the contract time. 2. The Project Manager and the Directors of the Department of Engineering, Water Department, and Department of Transportation and Public Works will be made aware - of the situation. If necessary, the City Manager's Office and the appropriate city council members may also be informed. 3. Any notice that may, in the City's sole discretion, be required to be provided to interested indlviduals will distributed by the Engineering Department's Public. Information Officer. 4. Upon receipt of the Contractor's response, the appropriate City departments and directors will be notified. The Engineering Department's Public Information Officer will, if necessary, then forward updated notices to the interested individuals. 5. If the Contractor fails to provide an acceptable schedule or fails to perform satisfactorily a secpnd time prior to the completion of the contract, the banding company will be notified appropriately. 40. AIR POLLUTION WATCH DAYS. The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as 'AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON, within the Metroplex area, runs from May 1, through OCTOBER 31, with 6:09 a.m. - 10.00 a-m. being critical BECAUSE EMISSIONS FROM `PHIS `GIME PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON OZONE FORMATION. The Texas Commission on Environmental quality (TCEQ), in coordination with the National Weather Service, will issue the Air Pollution Watch by 3=00 p.m. on the afternoon prior to the WATCH day. On designated Air Pollution Watch Days, the Contractor shall bear the responsibility of being aware that such days have been designated Air Pollutlon Watch Days and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1 hour, or if equipment is new and certified by EPA as "Low Emitting", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG. If the Contractor Is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. - 6:00 p.m., on a designated Air Pollution Watch Day, that day will be considered as a weather day and added onto the allowable weather days of a given rnonth, CONSTRUCTION 41. PAY ITEM - UNCLASSIFIED STREET EXCAVATION: See Standard Specifications Item No 106, "Unclassified Street Excavation" for specifications governing this item. Removai of existing penetration or asphalt pavement shall be included in this item. Operations necessary to windrow�existing gravel base In order to lower or raise subgrade shall be _ considered as subsidiary to this item and no additional compensation shall be given as such. During the construction of this project, it is required that all parkways be excavated and shaped at the same time the roadway is excavated. Excess excavation will be disposed of at locations approved by the engineer. 10/27104 SP-15 The Intention of the City is to pay only the plan quantity without measurement. Should either contracting party+ be able to show an error in the quantities exceeding 10 percent, then actual quantities will be paid for at the unit prices bid. The party requesting the payment of actual rather than plan quantities is responsible for bearing any survey and/or measurement costs necessary to verify the actual quantities. 42. PAY ITEM 6" REINFORCED CONCRETE PAVEMENT: (a) .All applicable provisions of standard Specifications Item 314 "Concrete Pavement," shall apply. The Contractor shall use a six (F) sack concrete mix for all hand placement In the intersections, The unit price bid per square yard shall be full payment for all labor, material, equipment and incidentals necessary to complete the work. (b) Once an evaluation of the pavement Is made to determine whether the crack is due to distress L_- or minor shrinkage, the following policy will apply: (1) When the crack is minor and due to shrinkage(cosmetic), then no further treatment will be needed. (2) If the crack is due to distress (structural), the failed pavement must be removed and replaced a minimum of 5 feet. In no case should the remaining portion of the panel be less than 5 feet wide after repairing the failed panel. (3) Any crack within 12 inches of any joint must be removed and replaced a minimum of 5 feet to prevent future'spaHing of the pavement. ry c All concrete pavement t laced b hand shall be laced using a full automated avis [ ) P � p Y p g Y paving U machine as approved by the Construction Engineer. Screeds will not be allowed except if approved by the Construction Engineer. 43. PAY ITEM-SILICONE JOINT SEALING FOR CONCRETE PAVEMENT: CITY OF FORT WORTH, TEXAS TRANSPORTATION AND PUBLIC WORKS DEPARTMENT SPECIFICATION for S)LiCONE JOINT SEALING (Revision 1, October 18, 1939) (Revision 2, May 12, 1994) F_ 1. SCOPE This specification for silicone joint sealing Portland Cement Concrete pavement and curbs shall supersede item 314.2. (11)"Joint Sealing Materials" of STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - FF CITY OF FORT WORTH, and Item 2.210"Joint Sealing"of STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH TEXAS COUNCIL OF GOVERNMENTS. 2. MATERIALS 2.1 The silicone joint sealant shall meet Federal Specification TT-S-001 543A for Class A sealant except as modified by the test requirements of this specification. Before the installat on of the joint sealant, the Contractor shall furnish the Engineer certification by an independent testing laboratory that the silicone joint sealant meet these requirements. 2.2 The manufacturer of the silicone joint sealant shall have a minimum two-year 10127/04 SP-16 �f demonstrated, documented successful field performance with Portland Cement Concrete pavement silicone joint sealant systems. Verifiable documentation shall be submitted to the Englneer, Acetic acid cure sealants shall not be accepted. The silicone sealant shall be cold applied. 2.3 Self-Leveling Silicone Joint Sealant The joint sealant shall be Dow Corning 890-SL self-leveling silicone joint sealant as manufactured by Dow Corning Corporation, Midland, Mi 48686-0994, or an approved equal. Self-Levelinq Slllcone Joint Sealant Fest Method Test Requirement AS SUPPLIED Non Volatile Content, % min. 96 to 99 MIL-S-8802 Extrusion Rate, grams/minute 275 to 550 ASTM D 1475 Specific Gravity 1.206 to 1.340 Skirt-Over Time, minutes max. 60 Cure Time, days 14 to 21 l=ull Adhesion, days 14 to 21 I AS CARED AFTER ASTM D 412, Die C Mod. Elongation, % min. 1400 ASTM D 3583 Modulus @ 150% Elongation, psi max, 9 + (Sect. 14 Mod.) ASTM C 719 Movement, 10 cycles @+1001-50% No Failure ASTM D 3583 Adhesion to Concrete, % Elongation min. 600 (Sect. 14 Mod.) i ASTM D 3563 Adhesion to Asphalt, % Elongation min. 600 (Sect. 14 Mod,) j� 2.4 The joint filler sop shall be of a closed cell expanded polyethylene foam backer rod and polyethylene bond breaker tape of sufficient size to provide a tight seal. The back rod and breaker tape shall be Installed in the saw-cut joint to prevent the joint sealant from flowing to the bottom of the joint. The backer rod and breaker tape shall be compatible with the silicone joint sealant and no band or reaction shall occur between them. Reference is made to the'Construction Detail"sheet for the various jolnt details with thelr respective dimensions. i 3. TIME OF APPLICATION On newly constructed Portland Cement Concrete pavement, the joints shall be initially saw cut to the required depth with the proper joint spacing as shown on + the"Construction Detail" sheet or as directed by the Engineer within 12 hours of the pavement placement. (Note that For the"dummy"joints, the initial 114 inch width"green" saw-cut and the"reservoir" saw cut are identical and should be part of the same saw cutting operation. Immediately after the saw cutting pressure washing shall be:applied to flush the concrete slurry from the freshly �. 10/27104 SPA saw cut joints.) The pavement shall be allowed to cure for a minimum of seven (7) days. Then the saw cuts for the joint sealant reservoir shall be made, the joint cleaned,and the joint sealant installed. During the application of the joint sealant, the weather shall not be inclement and the temperature shall be 40F (4C) and rising. 4. EQUIPMENT 41 All necessary equipment shall be furnished by the Contractor. The Contractor shall keep his equipment In a satisfactory working condition and shall be inspected by the Engineer prior to the beginning of the work. The minimum requirements for construction equipment shall be as follows: 4.2 Concrete Saw: The sawing equipment shall be adequate In size and power to complete the joint sawing to the requires!dimensions. 4.3 Nigh Pressure Water Pump: The high pressure cold water pumping system shall be capable of delivering a sufficient pressure and volume of water to thoroughly flush the concrete slurry from the saw-cut joint. 4.4 Air Compressors; The delivered compressed air shall have a pressure in excess ! of 90 psi and 120 efm. There shall be suitable reaps for the removal of all free water and oil from the compressed air. The blow-tube shall fir Into the saw-cut joint, 4,5 Extrusion Pump:The output shall be capable of supplying a sufficient volume of sealant to the joint. . 4.6 Injection Tool: This mechanical device shall apply the sealant uniformly into the joint. 4.7 Sandblaster: The design, shall be for commercial use with air compressors as t specified in Paragraph 5.4, 4.8 Backer Rod Roller and Tooling Instrument: These devices shall be clean and free of contamination. They shall be compatible with the join depth and width requirements. 5. CONSTRUCTION METHODS 51 General: The joint reservoir saw cutting, cleaning, bond breaker installation, and joint sealant placement shall be performed in a continuous sequence of operations 5.2 Sawing Joints: The joints shall be saw-cut to the width and depth as shown on the'Constructlon Detail"sheet. The faces of the joints shall be uniform In width and depth along the full length of the joint. 5.3 Cleaning ,Joints: Immediately after sawing, the resulting concrete slurry shall be completely removed from the joint and adjacent area by flushing with high pressure water. The water flushing shall be done In one-direction to prevent joint contamination. When the Contractor elects to saw the joint by the dry method, flushing the joint with high pressure water may be deleted. The dust resulting from the sawing shall be removed from the joint by using compressed air, (Paragraph Rev. 1, 10/27104 SP-18 October 18, 1989) After complete drying, the joints shall be sandblasted. The nozzle shall be attached to a mechanical aiming device so that the sand blast will be directed at an angle of 45 degrees and at a distance of one to two inches from the face of the joint. Both joint faces shall be sandblasted in separate, one directional passes. Upon the termination of the sandblasting, the joints shall be blown-out using compressed air. The blow tube shall fit Into the joints. The blown joint shall be checked for residual dust or other contamination. If any dust or contamination is found, the sandblasting and blowing shall be repeated until the joint is cleaned. Solvents will not be permitted to remove stains and contamination. immediately upon cleaning, the bond 'breaker and sealant shall be placed in the Joint. Open, cleaned joints shall not be left unseated overnight. Bond Breaker Rod and 'Tape: The bond breaker rod and tae shall be installed in the cleaned joint prior to the application of the joint sealant In a manner that will produce the required dimensions. 5.4 Joint Sealant: Upon placement of the bond breaker rod and tape, the Joint ° sealant shall be applied using the mechanical Injection tool. The joint sealant application shall not be permitted when the air and pavement temperature is less than 40F (4C). Joints shall not be sealed unless they are clean and dry, E Unsatisfactorily sealed joints shall be refilled. Excess sealant left on the pavement surface shall be removed and discarded and shall not be used to seal the joints, The pavement surface shall present a clean final condition. Traffic shall not be allowed on the fresh sealant untll it becomes tack-free. Approval of Joints: A representative of the sealant manufacturer shall be present at the job site at the beginning of the final cleaning and sealing of the joints. He shall demonstrate to the Contractor and the Engineer the acceptable method for sealant installation. -the manufacturer's representative shall approve the clean, dry joints before the sealing operation commences. 5. WARRANTY The Contractor shall provide the Engineer a manufacturer's written guarantee on all Joint sealing materials. The manufacturer shall agree to provide any replacement material free of charge to the City. Also, the Contractor shall provide the Engineer a written warranty on all sealed joints. The Contractor shall agree to replace any failed joints at no cost to the City. Both warranties shall be for two years after final acceptance of the completed work by the Engineer. 7. BASIS OF PAYMENT Payment will be made at the Contract bid Item unit price bid per linear foot(L,F,) as provided in"MEASUREMENT'for"SILICONE JOINT SEALING°, which price of shalt be full compensation for furnishing all materials and for all preparation, delivery, and application of those sealing materials and for all iabor, equipment, tools and incidentals necessary to complete the silicone joint sealing in conformity with the plans 10127/04 SP-19 and these specifications. 44. PAY ITEM-7" CONCRETE CURB The Contractor may, at his option, construct either Integral or superimposed curb. Standard Specification Item 502 shall apply except as follows: Integral curb shall be constructed along the edge of the pavement as an integral part of the slab and of the same concrete as the slab. The concrete for the curb shall be deposited not more than thirty(30) minutes after the concrete in the slab. If the Contractor fails to backfill behind the curb within seven (7)calendar days of pouring the curb and gutter, the amount pall for the curb shall be reduced by 25% until the backfill operation is complete. 45. PAY ITEM - RETAININQ WALt� This item will consist of placing retaining walls in locations and at heights determined by the engineer in the field. All applicable section of City of Fort Worth Standard Specification item 5,18 shall apply except as follows: Retaining wall shall be constructed per City of t=ort Worth Construction Standard Drawing No. S-M13 "Retaining Wall With Sidewalk"where applicable, t7 All existing brick and/or stone retaining walls not significantly impacted by proposed grade changes will be protected. Replacement of retaining walls not impacted by proposed grade changes will be at the IL expense of the Contractor. 46. PAY ITEM - REPLACE EXIST. CURB AND GUTTER: This item is included for the purpose and removing and replacing existing curb and gutter In transition f areas as determined by the Engineet in the field. The proposed curb and gutter will be of the same dimenslons as the existing curb and gutter to be removed, Quantities for this pay Item are approximate and are given only to establish a unit price for the work The price bid per linear foot for `REPLACE EXIST. CURS AND GUTTER" as shown in the Proposal will be full payment for materials including all labor, equipment, tools and incidentals necessary to F complete the work. i 47. PAY ITEM - HMAC TRANSITION: This item will constst of the furnishing and placing at varying thicknesses an HMAC surface in transition areas where indicated on the plans, as specified in these specifG:ations and at other locations as may L- be directed by the Engineer. This item shall be governed by all applicable provisions of Standard Specifications Item 312 The price bid per ton HMAC Transition as shown in the Proposal will be full payment for materials rincluding all labor, equipment, tools and incidentals necessary to complete the work. 1 48. PAY ITEM- -6" PIPE SQBDRAIN: No specific location for this item is designated on the plans. Subdrain shall be installed only if field conditions indicate ground water at subgrade level after excavation and if deemed necessary by the }� Engineer. 49. PAY ITEM__- TRENCFt_SAFETY;. Description: This item will consist of the basic requirements which the Contractor must comply with in L order to provide for the safety and health of workers in a trench. The Contractor shall develop, design and implement the trench excavation safety protection system. The Contractor shall bear the sole responsibliity for the adequacy of*e trench safety system and providing "a safe place to work" for the workman. r 10/27104 SP-25 The trench excavation safety protection system shall be used for all trench excavations deeper than five (5) feet. The Excavating and Trenching Operation Manual of the Occupational Safety and Health Administration, I.J.S. Department of Labor, shall be the minimum governing requirement of this item and is hereby made a part of this specification. The Contractor small, in addition, comply with all other applicable Federal, State and local rules, regulations and ordinances. Measurement and Payment: All methods used for trench excavation safety protection shall be measured by the linear foot of trench and paid at the unit price in the Proposal,which shall be total compensation for furnishing design, materials, tools, labor, equipment and incidentals necessary, Including removal of the system. Trench depth for payment purposes for Trench Safety Systems is the vertical depth as measured from the top of the existing ground to the bottom of the pipe. 50. PAY ITEM -8" THICK LIME_STABII__IZE_D SUBGRADE &CEMENT FOR SUBGRADE STABILIZATION: See Standard Specifications Item No. 210, "Lime Treatment(Material Manipulation)" and Specification Item No. 212, 'Hydrated Lime and Lime Slurry"for specifications governing this item. Quantities for this pay item are approximate and are given only to establish a unit price for the work. The price bid per square yard for"8"THICK LIME STABILIZED SUBGRADE"as shown in the Proposal will be full payment for all labor, equipment, tools and incidentals necessary to complete the work. The price bid per ton for"LIME FOR SUBGRADE STABILI7ATION" as shown in the Proposal will be full payment for materials necessary to complete the work. 51.!PAY_ITEM -6" H.M.A.C. PAVEIVIENT JInickness Tol?:rances and HMAC Testing Procedures The base course shall be a 3" deep Type "B" course placed in one lift. The surface course shall be a 3"deep Type"D" course placed In one lift. All provisions of Standard Specification No. 312.7 'Construction Tolerance' shall apply except as modified herein: I 1) After completion of each asphalt paving course, core tests will be made to determine compliance withwith the contract specifications. The hot-mix asphaltic concrete pavement will be core drilled by the City of Fort Worth. The thickness of the asphaltic surface will be determined by measurement cores taken at locations determined by the Engineer. The thickness of individual cores will be determined by averaging at least three (3) measurements. If the core measurements indicate a deficiency, the length of #ha area of such deficient thickness shall be determined by additional cores taken along the length of the pavement in each direction until cores are obtained which are at least of specified 'thickness. The width of such area shall not be less than '/ of the roadway width. 2) When the thickness of the base:course (as determined from core samples) is more than 15% deficient of the plan thickness, the Contractor shall remove and replace the deficient area at his own expense. If the thickness is less than 15% deficient, the Contractor shall make up the difference in the base thickness with surface course material. 3) The surface course must be the plan thickness. This does not include surface course material used to make up deficiencies in the base course as described in item 2). 4) The overall thickness of asphaltic concrete pavement must be a minimum of the plan thickness. Deficient areas (as determined in item 1) found to be less than the plan thickness will be removed and replaced at the Contractor's expense. 5) No additional payment over the contract price will be made for any hot-mix asphaltic concrete course of a thickness exceeding that required by the plans and specifications I OJ27104 SP-21 I- 1) HMAC Testing Procedure: The Contractor Is YP required to submit a Mix Design for both Type "B" and °D" asphalt that will be 9 9 used for each project. This should be submitted at the Pre-Construction Conference. This design shall not be more than two(2)years old. Upon submittal of the design mix a Marshal (Proctor)will be calcutated, if one has not been previously calculated, for the use during density testing. For type°8" asphalt a maximum of 20%rap maybe used. No Rap may be used in type "D" - Upon approval of an asphalt mix design and the calculation of the Marshal(proctor) the Contractor Is approved for placement of the asphalt. The Contractor shall contact the City Laboratory, through the Inspector, at least 24 hours in advance of the asphalt placement to schedule a technician to * assist in the monitoring of the number of passes by a roller to establish a roiling pattern that will provide the required densities. The required Density for Type"B" and for Type"D"asphalt will be 91%of the calculated Marshal (proctor). A Troxler Thin Layer Gauge will be used for all asphalt testing. After a rolling pattern is established, densities should be taken at locations not more than 300 feet apart. The above requirement applies to both Type"8"and"D" asphalt. Densities on type "B" must be done before Type°D" asphalt is applied. Cores to determine thickness of Type"i3"asphalt must be taken before Type"D" asphalt Is applied. Upon completion of the application of Type"D"' asphalt additional cores must be taken to determine the applied thickness. 52. PAY ITEM- CDNCRETE FLAT WORK fCURB. CURB & GUTTER, SIDEWALKS. LEADWALKS >r WHEELCHAIR BAMPS AND DRIVEWAYS): Concrete flatwork is defined as curt, curb and gutter, sidewalks, leadwalks, wheelchair ramps and driveways as shown in the plans. This provision governs the sequence of work related to concrete flatwork and shall be considered a supplement to the specifications governing each specific item, rRequired backfilling and finished grading adjacent to flatwork shall be completed in order for the L flatwork to be accepted and measured as completed. No payment will be made for flatwork until the pay item has been completed, which includes backfilling and finished grading. lu 53. PAY ITEM--REMOVE EXISTING CONCRETE SIDEWALK`URN WAD'S STEPS, LEADWALKS AND WHEEL CHAIR RAMPS: This item includes removal of existing concrete sidewalks, driveways, steps, leadwalks and wheelchair ramps at location shown on the plans or as designed by the Engineer. See Item No. 104 "Removing Old Concrete", for Specifications governing this item. 543 PAY ITEM— REMOVE EXISTING CURB AND GUTTER: i Where shown on the plans or where designated by the Engineer,existing curb and or gutter and existing laid down curb shall be removed and disposed of In a manner satisfactory to the Engineer. Measurement will be by the linear foot for curb and gutter, laydown curb removed, and for ail labor, tools, and incidentals necessary to complete the job. M" 55_ PAY ITEM — REMOVE EXISTING CURS INLET: This item shall include ail labor, materials, and equipment necessary to remove and dispose of the existing inlet and removal and connecfion of the existing RCCP lead pipe inlet as shown on the Plans and as directed by the Engineer. 10127/G4 SP-22 56, PAY ITEM—6" THICK REINFORCED CONCRETE DRIVEWAY See Standard Specification Item No. 504,"Concrete Sidewalks and Driveways" for specifications governing this item as well as details S-S5 and S-S5A. The price bid per square foot for'6"THICK REINFORCED CONCRETE DRIVEWAY' as shown in the Proposal will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. 57. PAY ITEMrt REMOVE AND CONSTRUCT CONCRETE STEPS: i See Standard Specification Item No. 516, "Concrete Steps" for specifications governing this item as well as details SM-3- The price bid per each for"REMOVE CONCRETE STEPS"and "CONSTRUCT CONCRETE STEPS" as shown in the Proposal will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the`removal and construction of each set of concrete steps. 58, PAY ITEM—4' STAN DA D CON CRETE_SiDEWALK LEADLdALK AND WHEELCHAIR RAMP: All applicable provisions of standard Specifications Iters 104"Removing Old Concrete"and Item 504 "Concrete Sidewalk Driveways" shall apply except as herein modified. The Contractor shall construct standard concrete wheelchair ramps as shown on the enclosed details, or as directed by the Engineer. The Contractor shall not remove any regulatory sign, instruction sign, street name and sign or other sign which has been erected by the City. The Contractor shall contact Signs and Marking Division, TPW(Phone 871-7738)• All concrete flared surfaces shall be colored with LITHOCHROME color hardener as manufactured by L M. Scofield Company or equal. The color hardener shall be brick red color and dry-shake type, and �. shall be used in accordance with manufacturers instructions. "Contractor shall provide a colored sample concrete panel of one foot by one font by three inches dimension, or other dimension approved by the Engineer, meeting the aforementioned specification. The sample, upon approval by the Englneer, shall be the acceptable standard to be applied for all construction covered In the scope of.this pay item. The method of application shall be by,screen, sifter, sieve or other means in order to provlde for a uniform color distribution." 59. PAY ITEM—REMOVE AND REPLACE FENCE: This item shall include the removal and reconstructionof the existing fence at the locations shown on L the plans or where deemed necessary by the Engineer_ The Contractor shall exercise caution in removing and salvaging the materials to they may be used in reconstructing the fence. Ther constructed fence shall be equal in every way, or superior, to the fence removed. The Contractor shall L be responsible for keeping livestock within the fenced areas during construction operation and while removing and relocating the fence, and for any damage or injury sustained by persons, livestock or property on account of any act of omission, neglect or misconduct of his agents, employees, or subcontractors. The unit price per linear foot shown on the Proposal shall be full compensation for all materials, labor, equipments, tools and incidentals necessary to complete the work. F160, PAY ITEM—STANDARD 7' CURB AND 18" GUTTER: 10/27/04 SP-23 r{ I All provisions of Standard Specification No. 502`Concrete Curb and Gutter shall apply except as modified herein' Subsidiary to the unit price bid per linear foot shall be the following: a A minimum of 5" or greater as required depth of stabilized subgrade properly compacted under the proposed curb and gutter as shown in the construction details.. b, If the Contractor fails to backfill either in from of the gutter or behind the curb within seven (7) calendar days of pouring the curb and gutter, the amount paid for the curb and gutter shall be reduced by 25°x, until the backfill operation is complete. Standard Specifications Item No. 502, shall apply except as herein modified. Concrete shall have minimum compressive strength of three thousand (3,000) pounds per square inch in twenty-eight(28) days. The quantity of mixing water shall not exceed seven (7)gallons per sack (94 lbs.) of Portland Cement. The slump of the concrete shall not exceed three (3) inches. A minimum cement content of five(5) sacks of cement per cubic yard of concrete Is required. - 61. PAY ITEM— REMOVE AND RECONSTRUCT MAILBOXES!MISCELLANEOUS, This item includes the removal and reconstruction of existing mailboxes, brick walls, flowerbed trim and miscellaneous items within the right of way which may be damaged or removed during construction. When possible, the Contractor shall salvage existing materials for reuse In the replacement or repair of damaged or removed items. Items which are to be repaired or reconstructed should look archltecturally the same in material and appearance and should be reconstructed or repaired In a better or new condition. All applicable provisions of Clty of Fort Worth Construction Standards shall apply. 62. PAY ITEM—BORROW: Where shown on the plans or where designated by the Engineer, existing curt, and or gutter and existing laid down curb shall be removed and disposed of in a manner satisfactory to the Engineer. Measurement will be by the linear foot for curb and gutter as shown on the proposal and will be full compensation for the removal and disposition of the curb, curb and gutter, laydown curb removed, and for all labor, tools, and incidentals necessary to complete the)ob. 63. PLkY ITEM—CEMENT STABILZATION: r All applicable provisions of Item 214, `Portland Cement Treatment shall apply. 64. PAY ITEM—CEMENT: All applicable provisions of Item 214, 'Portland Cement Treatment' shall apply 65. PAY ITEM—NEW 7" CONCRETE VALLEY GUTTER-. This item shall include the construction of concrete valley gutters at various locations to be determined IF) field. Removal of existing, asphalt pavement, concrete base, curb and gutter, and necessary excavation to I install the concrete valley gutters all shall be subsidlary to this pay item. Furnishing and placing of 2:27 concrete base and crushed limestone to a depth as directed by the Engineer and necessary asphalt transitions as shown in the concrete valley gutter details shall be subsidiary to this Pay Item, 10/27/04 SP-24 . I See standard specification Item No. 314", Concrete Pavement", Item 312 "Hot-Mix Asphaltic Concrete", Item No. 104, "Removing Old Concrete", Item No 106, "Unclassified Street Excavation" item No. 206 "Flexible Base." Measurement for final quantities of valley gutter will be by the square yard of concrete pavement and the curb and gutter section will be included. Contractor may substitute 5" non-reinforced (2:27) Concrete Base in lieu of Crushed Stone at no additional cost. See item 314"Concrete Pavement". The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch. Contractor shall work on one-half of Valley gutter at a time, and the other half shall be open to traffic. Work shall be completed on each half within seven(7) calendar days. 66. PAY ITEM—STORM DRAIN INLETS: An alternative method of construction for these items will be"Pre-Cast" manholes and Inlets. If the Contractor desires to use this method, he must submit details for the construction to the Transportadon and Public Works Department fore review and approval if said details are acceptable. The Pre-Cast construction must be equal or superior to the strength requirements for this Item as set out In Item 444, "Manholes and Inlets"and said construction shall be in compliance with all other requirements of Item 444 where applicable. 57, PAY ITENL TRENCH EXCAVATION AND BAC KFJLL FOR STORNi DRAIN: Work under this item includes all the proposed excavation and backfill in the project area and the necessary fill area. Payment will be made for the quantity of earth excavated/backfilled, The placing of fill shall be subsidiary to the trench excavationlbackfiit price. Excess material which is obtained from - excavating the trench shall be used for fill placement subject to the provisions of item 114 of the City of Fort Worth Standard Specifications. All excavated material which Is unacceptable as fill material shall become the property of the Contractor to be hauled off the site and disposed of properly. Unacceptable material shall be, but not limited to: rocks, concrete, asphalt, debris, etc. The cost for removal and disposal of unacceptable material shall be subsidiary to the unit prices. 68. PAY ITEM-STORM W61ER POLLI.TIQN PREVENTION (FOR DISTURBED AREAS EQUAL TO OR GREATER Tf-IAN 1 ACRE PERMIT. As defined by Texas Commission on Environmental Quality (TCEQ) regulations, a Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit Is required for all IL construction activities that result in the disturbance of one to five acres (Small Construction Activity) or Five or more acres of total land(Large Construction Activity).The Contractor is defined as an"operator" by state regulations and is required to obtain a permit. Information concerning the permit can be obtained through the Internet at http:YANww.tnrcc.state.tx.us/permItEng/water permlwwpermlconstruct.htrnl. Soil stabilization and structural practices have been selected and designed in accordance with North Central Texas Council of Governments Best Management Practices and Erosion Control Manual for Construction Activities (BMP Manual). This manual can be obtained through the Internet at www.dfwstormwater.comlrunoff.html. Not all of the structural controls discussed in the. BMP Manual will necessarily apply to this project. Best Management Practices are construction management techniques that, if properly utilFzed, can minimize the need for physical controls and possible reduce costs. The methods of control shall result to minimum sediment retention of not less than 70%_ NOTICE OF INTENT (NOi): if the project will result in a total land disturbance equal to or greater than 5 acres, the Contractor shall sign at the pre-construction meeting a TCEQ Notice of Intent (NOI) form prepared by the engineer. it serves as a notification to the TCEQ of construction activity as weii as a commitment that the Contractor understands the requirements of the permit for storm water /0127/04 SP-25 discharges from construction activities and that measures will be taken to implement and maintain storm water pollution prevention at the site. The NOI shall be suomitted to the TCEQ at least 413 hours prior to the Contractor moving on site and shall include the required $100 application fee. The NO shall be mailed toy Texas Commission on Environmental Quality Storm Water&General Permits Team; MC-228 P.O_ Bax 13087 Austin,TX 78711-3087 A copy of the NOI shall be sent to-- City o_City of Fort Worth Department of Environmental Management 5000 MLK Freeway Fort Worth, TX 76719 NOTICE OF TERMINATION (NO T1): For all sites that qualify as Lame Construction Activity, the Contractor shall sign, prior to final pdyment, a TCEQ Notice of Termination (NOT) form prepared by the engineer. It serves as a notice that the site Is no longer subject to the requirement of the permit. The NOT should be mailed to: Texas Commission on Envirohmental quality Storm Water&General Permits Team; MC-228 P.O. Bax 13087 Austin, TX 78711-3087 STORM WATER POLLUTION PREVENTION PLAN (SWPPP]: A document cans€sting of an erosion control and toxic waste management plan and a narrative defining site parameters and techniques to be employed to reduce the release- of sediment and pollution from the construction site. Five of the project SWPPP's are available for viewing at the pians desk of the Department of Engineering. The selected Contractor shall be provided with three copies of the SWPPP after award of contract, along with urbounded copies of all forms to be submitted to the Texas Commission on Environmental Quality. LARGECONSTRUCTIONACTIVITY - DISTURBED AREA EQUAL TO OR GREA7[ER _ H`� AN 5 ACRES: A Notice of Intent (NOI) form shall be completed and submitted to the TCEQ including payment of the TCEQ required fee. A SWPPP that meets all TCEQ requirements prepared by the Engineer shall' be prepared and implemented at least 48 hours before the commencement of construction activities. The SWPPP shall be incorporated into in the contract documents, The Contractor shall submit a schedule for implementation of the SWPPP. Deviations from the plan must be submitted to the engineer for approval. The SWPPP is not warranted to meet all the conditions of the permit since the actual construction activities may vary from those anticipated during the preparation of the SWPPP. Modifications may be required to fully conform to the requirements of the �+ Permit. The Contractor must keep a copy of the most current SWPPP at the construction site. Any alterations to the SWPPP proposed by the Contractor must be prepared and submitted by the Contractor to the engineer for review and approval. A Notice of Termination (NOT) form shall be submitted within 30 days after final stablitabon has been achieved on all portions of the site that is the responsibility of the permittee, or, when another permitted operator assumes control over all areas of l the site that have not been finally stabilized_ SMALL CONSTRUCTION ACTIVITY - DISTURBED AREA EQUAL TO OR GREATER THAN ONE +� ACRE BUT LESS THAN_FRVE ACRES: Submission of a NOI form is not required. However, a TCEQ Site Notice form must be completed and posted at the site. A copy of the completed Site Notice roust be sent to the Clty of Fort Worth Department of Environmental Management at the address listed above. A SWPPP, prepared as described above, shall be implemented at least 48 hours before the commencement of construction activities. The SWPPP must include descriptions of control measures 10/27104 SP-26 �I W necessary to prevent and control soil erosion, sedimentation and water pollution and will be included in I the contract documents- The control measures shall be installed and maintained throughout the construction to assure effective and continuous water poilut'on control. The controls may include, but 0 not be I'mited to, sift fences, straw bale dikes, rock 'berms, diversion duces, Interceptor swales, sediment traps and basins, pipe slope drain, inlet protection, stabilized construction entrances, I seeding, sodding, mulching, sail retention blankets, or other structural or non-structural storm water pollution controls. The method of control shall result in a minimum sediment retention of 70% as defined by the NCTCOG "BMP Manual." Deviations from the proposed control measures must be submitted to the engineer for approval. PAYMENT FOR SWPPP IMPLEMEPjTA ION: Payment shall be made per lump sum as shown on the proposal as full compensation fol all Items contalned in the project SWPPP. FOR DISTURBED AREAS LESS THAN 1 ACRE, SPECIAL PROVISION 23 - 40 SHALL BE APPLiCABLE. �- 69. PRE BID ITEM - PROJECT DESIGNATION SIGN: The Contractor shall construct and install two (2) Project Designation Signs and It will be the responsibility of the Contractor to rrmaintain the signs in a presentable condition at all times on each project under constructlon. Maintenance will include painting and repairs as directed by the Engineer. It will be the responsibility of the Contractor to have the individual project signs lettered and painted in accordance with the enclosed defali. The quality of the paint, painting and lettering on the signs shall ! be approved by the Engineer. The height and arrangement of the lettering shall be In accordance with the enclosed detail, The sign shall be constructed of 3/4" fir plywood, grade A-C (exterior) or better. These s°gns shall be installed on barricades or as directed by the Engineer and in place at the project site upon commencement of constructlon. _7 The work, which includes the painting of the signs, Installing and removing the signs, Furnishing the materlals, supports and connections to the support and maintenance shall be to the satisfaction of the Engineer The unit price bid per each will be full payment for materials Including all labor, equipment, tools and Incidentals necessary to complete the work. 70. PRE BID ITEM- UTILITY ADJUSTMENT: This item is included for the basic purpose of establishing a contract price which will be comparable to the final cost of making necessary adjustments required due to street improvements to water, sanitary sewer and natural gas service lines and appurtenances where such service fines and appurtenances are the property owner's responsibility to maintain. An arbitrary figure has been placed in the Proposal; however, this does not guarantee any payment for utility adjustments, neither does it confine utility adjustments tc the amount shown In the Proposal. It shall be the"Contractor" responsibility to provide the services of a licensed plumber to make the utility adjustments determined necessary by the Engineer. No payment will be made for utility adjustments except those adjustments determined necessary by the Engineer. Should the Contractor damage service lines due to his negligence, where such lines would not have required adjustment or repair otherwise„ the lines shall be repaired and adjusted by the Contractor at the Contractor's expense, The payment to the Contractor for utility adjustments shall be the actual cost of the adjustments plias ten percent (10%) to cover the cost of bond and overhead incurred by the Contractor in handling the utility adjustments. 71. PRE BID ITEM- TOP SOIL: The prcposed quantities shown are calculated to provide topsoil 4 to 6 inches in depth (compacted) over the parkway area and do not include deeper than design depth behind the curb. The pay Item is intended to pay for topsoil that must be imported where suitable material is elther not available an the job or cannot reasonably be stored on,site. Payment will be made on the basis of loose truck volume (full truck with sideboards up)tickets and material must meet City of Fort Worth standards for topsoil. 10127/04 SP-27 Only the volume Imported will be paid for and may be substantially less than the proposal quantities listed. 72—P R $�M - ADJUST WAT R VALVL QQ?�; Contractor will be responsible for adjusting water valve boxes to match new pavement grade The water valves themselves will be adjusted by City of Fort Worth Water Department forces. The unit price bid will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. 73. PRE BID ITEM - MANHOLE ADJUSTMENT: This item shall include adjusting the tops of existing and/or proposed manholes to match proposed grade as shown on the plans or as directed by the Engineer_ Standard Specification Item No. 450 shall apply except as follows: Included as part of thls pay item shall be the application of a cold-applied preformed flexible butyl rubber or plastic sealing compound for sealing interior and/or exterior joints on concrete manhole sections as per current City Water Department Special Conditions. 74. PRE BID ITEM - ADJUST WATER METER BOK This item shall include raising or towering an existing meter box to the parkway grade specified. No payment will be made for existing boxes,which are within 0.V of specified parkway grade. f The unit price bid will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. f 75. NON-PAY ITEM - CLEARING AND GRUBBING: All objectionable items within the limits of this project and not otherwise provided for shall be removed under this item in accordance with Standard Speciftcabori Item 102, "Cteadng and Grubbing." However, no direct payment will be made for this item and it shall be considered incidental to this contract- 7G. NON-PAY ITEM -SPIRINKUNG FOR DUST CONTROL: All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall apply. However, no direct payment will be made for this item and it shall be considered Incidental to this contract. ` 77. NON-PAY ITEM -PROTECTION OF TREES, PLANTS AND SOIL: All property along and adjacent to the Contractor's operations including lawns, yards, shrubs, trees, etc. shall be preserved or restored after completion of the work to a condition equal or better than existed prior to start of work. By ordinance, the Contractor must obtain a permlt from the City Forester before any work (trimming, removal or root pruning) can be done on trees or shrubs graying on public property Including street rights-of-way and designated alleys. This permit can be obtained by calling the Forestry Office at 671- 5738. All tree work shall be In compliance with pruning standards for Class II Pruning as described by the Nasional Arborist Assoclatlon. A copy of these standards can be provided by calling the above number, Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the International Society of Arboriculture, Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due to the Contractor by the City. L To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red Oak trees shall be ri immediately sealed using a commercial pruning paint. This is the only instance when pruning paint is i recommended, 7t3 _NON-PAY ITEM - CONCRETE COLORED SURFACE= 10127/04 SP-28 Concrete wheelchair ramp surfaces, excluding the side slopes and curb, shall be colored with LiTHOCHROME color hardener or equal. A brick red calor, a dry-shake hardener manufactured by L.M. Scofield Company or equal, shall be used In accordance with manufacturers instructions. Contractor shall provide a sample concrete panel of one foot by one foot by three inches dimension, or other dimension approved by the Engineer, meeting the aforementioned specifications. The sample, upon approval of the Engineer, shall be the acceptable standard to be applied for all construction covered In the scope of this Non-Pay Item. No direct payment will be made for this Item and it shall be considered incidental to this contract- The method of application shall be by screen, sifter, sieve, or other means in order to provide for a uniform color distribution. 79. NQN-PAY ITEM - PROJECT CLEAN-UP. The Contractor shall be aware that keeping the project site in a neat and orderly condition is considered an integral part of the contracted work and as such shall be wnsidered subsidiary to the appropriate bid items- Clean up work shall be done as directed by the Engineer as the work progresses or as needed. If, In the opinion of the Engineer It Is necessary, clean up shall be done on a dally basis. Clean up work shall include, but not be limited to: • Sweeping the street clean of dirt or debris • Storing excess materiai in appropriate and organized manner • Keeping trash of any kind off of residents' property If the Engineer does not feel that the jobsite has been kept in an orderly condition, on the next estimate payment(and all subsequent payments untll completed)of the appropriate bid item(s)will be reduced by 25%. Final cleanup work shall be done for this prefect as scion as the paving and curb and gutter has been constructed. No more than seven days shall elapse after completion of construction before the roadway and right-of-way Is cleaned up to the satisfaction of the Engineer. 84. NON-PAY ITEM - PBOJEQ I SCHEDULE; Contractor shall be responsible for producing a project schedule at the pre-construction conference. This schedule shall detail all phases of construction, including project clean up, and allow the *" Contractor to complete the work In the allotted time. Contractor will not move on to the jobsite nor will work begin until said schedule has been received and approval secured from the Construction 1 Engineer. However, contract time will start even if the project schedule has not been turned in. Project schedule will be updated and resubmitted at the end of every estimating period. All costs involved with produc:ng and maintalning the project schedule shag be considered subsidiary to this contract. �- 81. NON-PAY ITEM - NOTiFiCATtON OF RESIQE!9JS: In order to cut down on the number of complaints from residents due to the dust generated when saw- cutting Joints in concrete pavement, the Contractor shall notify residents, in writing, at least 48 hours in advance of saw-cutting joints during the construction of paving projects. All costs involved with providing such written notice shah be considered subsidiary to this contract. 82. NON-PAY ITEM _PUBLIC NOTIFICAT iON RRIOR TO BEGINNING CONSTRUCTION- Prior to beginning construction on any block in the project, the Contractor shall, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by constriction.The notice shall be prepared as follows. The notiflcation notice or flyer shall be posted seven (7) days prior to beginning any construction activity on each block in the project area.The flyer shall be prepared on the Contractor's letterhead and shall include the following Information: Name of Project, DOE No., Scope of Project (i.e, type of construction activity), actual construction duration within the block, the name of the Contractor's 10f27l94 SP-29 �1 foreman and his phone number, the name of the City's inspector and his phone number and the City's after-hours phone number. A sample of the'pre-construction notification' flyer is attached. The Cor-tractor shall submit a schedule showing the construction start and finish time for each block of the project to the inspector. In addition, a copy of the flyer shall be delivered to the City inspector for his review prior to being distributed_ The Contractor will not be allowed to begin construction on any block until the flyer is delivered to all residents of the block. An electronic version of the sample flyer can be obtained from the construction office at 871-8306. _ All work involved with the pre-construction notification flyer shall be considered subsidiary to the contract price and no additional compensation shall be made. 83. NON-PAY ITEM --PRE-CONSTRUCTION NEIGHBORHOOD MEETING: After the pre-construction conference has been held but before construction is allowed to begin on this project a public Meeting will be held at a location to be determined by the Engineer. The Contractor, Inspector, and project manager shall meet with all affected residents and present the projected schedule, including construction start date,and answer any construction related questions. Every effortwill be made to schedule the neighborhood meeting within the two weeks following the pre- construction conference but in no case will construction be allowed to Begin until this meeting is held. 84. NON-PAY iTEM- WASHED ROCS{, All washed rock used for embedment or backfill or as otherwise directed by the Engineer shall washed, crushed stone and shall meet the following gradation and abrasion: (Actual washing not required If gradation Is met) Sieve Size % Retained 1'" 0-10 1/21 40-75 318" 55-90 #4 90-100 #8 95-100 S 'Los Angeles Abrasion Test- 50% Maximum wear per A S.T.M. Designation C-131. 85. NON-PAY ITEM—SAWCUT OF EXISTING CONCRETE: When existing concrete or I I.M.A.C. i�cut, such cuts shall be made with a concrete saw. The Contractor may break out curb and gdtter to the nearest joint if he chooses. All sawing shall be subsidiary to the unit cost of the respective item. 86. NON PAY ITEM— LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES: The Contractor shall be responsible for locating and marking ail previously exposed manholes and water valves in each street of this contract before the recycling process commences for a particular street. The Contractor shall attempt to include the construction engineer(if he Is available) in the observation and marking activity. In any event a street shall be completely marked a minimum to two(2)working days before recycling begins on any street. Marking the curbs with paint is a recommended procedure. It shall be the Contractor's responsibility to notify the utility companies that he has commenced work on the project. As the recycling Is completed (within the same day) the Contractor shall locate the covered manholes and valves and expose them for later adjustment. Upon completion of a street the Op Contractor shall notify the utilities of this completion and indicate that start of the next one in order for the utilities to adjust facilities accordingly. The following are utility contact persons: Company Telephone Dumber Contact Person Southwestern Bell Telephone (817)338.6275 "Hot Line" 10/27/44 SP-30 Texas Utilities (817) 336-9411 ext. 2121 Mr. Roy Kruger Lone Star (817)336-8381 ext. 372 Mr, Jim Bennett Of course, under the terms of this contract,the Contractor shall complete adjustment of the storm drain and Water department facilities, one traffic lane at a time within l=ave (5)working days after completing the laying of proposed H.M.A.C. overlay adjacent to said facilities- Any deviation from the above procedure and allotted working days may result in the shut down of the recycling operation by the Constructioh Engineer, The Contractor shall be responsible for all materials, equipment and labor to perform a most accurate job and all costs to the Contractor shall be figured subsidiary to this contract. 87. NON PAY ITEM--TIE IN INTO STORM DRAIN STRUCTURE= The cost for making lateral tie-Ins to the stoma drain structure shall be subsidiary to the bid price for the respective lines. 88. NDN PAY ITEM —SPRINKLER READ ADJUSTMENT: The adjustment and/or relocation of sprinkler heads encountered shall be paid for under utility adjustment in the proposal section. No other compensation will be provided. 89. NON PAY ITEM-FEE FOR STREET USE PERMITS AND RE-INSPECTIONS: A fee for street 1. use permits is in effect, In addition, a separate fee for re-inspections for parkway construction, such as driveways, sidewalks, etc.,will be required. The fees are as follcws: The street permit fee is$50.00 per peimlt with payment due at the time of permit application. A re-Inspection fee of $25.00 will be assessed when work for which an Inspection called for is incomplete. Payment is due prior to the City performing re-inspection. Payment by the Contractor for all street use permits and re-inspections shall be considered subsidiary to the contract cost and no additional compensation shall be made. 9D, NON PAY ITEM -TEMPORARY EROSION, SEDIMENT AND WATER POLLUTION CONTROL (FOR DISTURBED AREAS LESS THAN I ACRE): A. DESCRIPTION: This item shall consist of temporary soil erosion sediment and water pollution control measures deemed necessary by the Engineer for the duration of the contract. These control measures shall at no time be used as'a substitute for the permanent control measure unless otherwise directed by the engineer and they shall not include measures taken by the CONTRACTOR to control conditions created by his construction operations. The temporary measures shall include dikes, dames, berms, sediment basins, fiber mats,jute netting, temporary seeding, straw mulch, asphalt mulch, plastic liners, rubble liners, baled-hay retards, dikes, slope drains and other devices, B. CONSTRUCTION REQUIRMENTS: The Engineer has the authority to define erodible earth and the authority to Ilmit the surface are of erodible-earth material exposed by preparing right-of-way, clearing and grubbing, the surface aeea of erodible-earth material exposed by excavation, borrow and to direct the CONTRACTOR to provide temporary pollution-control measures to prevent contamination of adjacent streams, other water course, lakes, ponds or other areas of water impoundment_ Such work rr.ay involve the construction of temporary'berms, dikes, darns, sedlment basins, slope drains and use of temporary mulches, mats,seeding or other control devices or methods directed ay the Englneer as necessary to control soil erosion. Temporary pollution-control measures shall be used to prevent or correct erosion that may develop during construction prior to installation of permanent pollution control features, but are not associated with permanent control Features on the project. The l Engineer will IImit the area of preparing right-of-way, clearing and grubbing, excavation and borrow to C 1 D127104 SP-31 be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading, _ mulching, seeding, and other such permanent poll ution-co ntrot measures current in accordance with the accepted schedule. Should seasonal conditions make such limitations unrealistic, temporary soil- erosion-control measures shall be performed as directed by the Engineer. 0. Waste or disposal areas and construction roads shall be located and constructed in a manner that will minimize the amount of sediment entering streams. 0. Frequent fordings of live streams will not be permitted, therefore, temporary bridges or other structures shall be used wherever an appreciable number of stream crossing are necessary. Unless otherwise approved in wrifing by the Engineer, mechanized equipment shall not be operated in live streams. 0. When work areas or material sources are located in or adjacent to live streams, such areas shall be separated from the stream by a dike or other barrier to'keep sediment from entering a flowing stream. Care shall betaken during the construction and removal of such barriers to minimize the muddying of a stream. 0. All waterways shall be cleared as soon as practicable of false work, piling, debris or other obstructions placed during construction operations that are not part of the finished work. ! 0. The Contractor shall take sufhclent precautions to prevent pollution of streams, l lakes and reservoirs with fuels, oils, bitumens, calcium chloride or other harmful I materials. He shall conduct and schedule his operations so as to avold or minimize siltation of streams, lakes and reservoirs and to avold interference with movement of migratory fish. SUBMITTAL_: Prior to the start of the applicable construction, the Contractor shall submit for approval his schedules for accomplishment of soii-erosion-control work and his plan to keep the area of erodible-earth material to a minimum. He shall also submit for acceptance his proposed method of soil-erosion control on construction and haul roads and materlaI sources and his plan for disposal of waste materials. No work shall be started until the soil-erosion control schedules and methods of operations have been reviewed and approved by the Engineer. F. MEASUREMENT AND PAYMENT-. All work, materials and equipment necessary to provlde temporary erosion control shall be considered subsidiary to the contract and no extra pay will be given for this work. 91. NON PAY ITEM TRAFFIC CONTROL: The Contractor will be required to obtain a "Street Use Permit" prior to starting work. As part of the "Street Use Permit' a traffic control plan is required, The Contractor shall be responsible for providing traffic control during the construction of this project consistent with the provisions set forth in the "Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways," codified as Article 6701d Vernon's Civil Statutes, pertinent sections being Section Nos. 27, 29, 30 and 31, A traffic central plan shall be submitted for review to Mr, Charles R. Burkett, City Traffic Engineer at (817),392-8712, at the pre-construction conference. Although work will not begln until the traffic control plan has been reviewed,the Contractor's time will begin In accordance with the time frame established in the Notice to the Contractor. 10127104 SP-32 " The Contractor will not remove any regulatory sign, instructional sign, street narne sign or other sign, which has been erected by the City, if It is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works Department, Signs and Markings Division, (Phone Number 871-7738) to remove the sign. in the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above-referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. if the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work.Is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place until such reinstallation is completed. Work shall not be performed on certain locations/streets during "peak traffic periods" as determination by the City Traffic Engineer and in accordance with the applicable provision of the "City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work Areas." Y 10/27/04 SP-33 VW 00 (To he printed on Contractor's Letterhead) r- Date: P` DOE No- PROSE CT o:PROJECT NAME: Water/Sanitary Sewer and Paving/Storm Drain Improvements for: 1VI PSCO LOCATION: LIMITS Or CONST.: Estimated Duration of Construction on your Street: days Ep" - r I � � � � NK� l THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF PORT WORTH, OUR COMPANY WILL < REPLACE WATER .. AND/OR SEWER LINES - RECONSTRUCT THE STREET> ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS € FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTWNS ABOUT ACCESS, SECURITY, SAFETY " OR ANY OTHER ISSUE, PLEASE {CALL: Mr. <CONTRACTOR'S SUPE MTENDENT> AT TELEPHONE NO.> r OR rMr. <CITY INSPECTORS AT -TELEPHONE NO.> L F AFTER 4:30 PM OR ON WEEKENDS, PLEASE {CALL 871-7970 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL, 10/27104 SP-34 PART F CERTIFICATE OF INSURANCE CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAWS PERFORMANCE BOND PAYMENT BOND MAINTENANCE BOND VENDOR COMPLIANCE TO STATE LAW IMPORTANT NOTICES r I r r-, r . r- CERTIFICATE OF INSURANCE ACORD. CERTIFICATE OF LIABILITY INSURANCEDATE(MM1001Y'YYY) 5/25/2005 PRODUCER. (817)335-8520 FAX {817}336-5501 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Tucker Agency. Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR P.O. Box 2285 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Fort Worth TX 75113 INSURERS AFFORDING COVERAGE NAIC# INSURED INSURER A Zurich American Ins Co STABILE & WINN, INC INSURER B Texas Mutual Ins Co PO BOX 79380 INSURERC:RSUI Indemnity INSURER D: SAGINAW T.X. 76179-0380 IN51LIRER E COVERAGES Oft THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED T4 THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY RECOREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TD WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY_PAID CLAIMS INSR ADO'L POLICY EFFECTIVE POLICY EXPIRATION On LTR INSRD'. TYPE OF INSURANCE POLICY NUMBER DATE WMIDWYY} GATE(MMIDO/YY LIMITS A GENERALLIABOUTY CP03994330 6/28J04 6128105 EACHOGCURRENCE S 1,000,0001 DAMAGE TO RENTED 300,000 X COMMERCIAL GENERAL LIABILITY PREMISES Ea gC."eF.1 f CLAIMS MADE F OCCUR ABED EXP Any one person $ 10,000 PERSONAL BAOV INJURY 5 110001000 GENERAL AGGREGATE is 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS PR�D- POLICY x JECT 10C A AUTOMfl81LELIABfLdTY TAP3994331 6120/04 6/28f05 COMBINED SINGLE LIMIT 13 1,000,000 K 'ANY AUTO (Ed auoftnII ALL OWNED AUT05 BODILY INJURY 5 SCHEDULED AUTOS (Perpermn) X HIRED AUTOS BODILY INJURY S % NON-OWNED AL'TgS (Per accldernl) PROPERTY DAMAGE S (Per acclden!) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT S ANY AUTO OTHER THAN EA ACC $ AUTO ONLY,. AGGIS C EXCESSIUMBRELLA LIABILITY NHHD26288 6/28/04 6/28/05 EACH OCCURRENCE $ 2.000,000 X7 OCCUR E CLAIMS MADE AGGREGATE Is 2,000,000 S I DEDUCTIBLE 5 RETENTION 5 _ 3 B WOR KERS COMP E NSATION A N D TSF0001133176 6/28 04 5 28/05 % WC LIMIT f]TH- 70C LIMITS FIR T EMPLOYERS'LIABILITY £.L.EACH ACCIDENT 5 1 00 0.0 0 0 ANY PROPRIETOWPARTNERlEXECUTIVE )FFICERIMEMBER EXCLUDED? E.L.DISEASE-EA EMPLOYEE$ 1,000,000 I"yes,describe under SPECIAL PROVISIONS Wcyw E L DISEASE-POLICY LIMIT I S 1,000,000 OTHER DESCRIPTION OF 0PERATIO NSILOCATIONSIVE HICLESIEXCLUSIONS ADDED BY ENDORSEMENTfSPECIAL PROVISIONS Project $P264-541200-60917-0006683 Y C200-541200-20940-0006083 Pavement Reconstruction and Water Line Replacement oriMinden Street (1)1-35 Service Road to Cole Street) -- City of Fort Worth, its officials, employees and servants are additional insured where required by contract. Waiver of subrogation in favor of City of Fort Worth and others where required by contract- CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE City of Fort Worth EXPIRATION DATE THEREOF, THE ISSUING INSURER WALL ENDEAVOR TO MAIL Contract Administrator 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT 1000 Throckmorton Street FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE Fort Worth, TX 76102 INSURER,ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE _ Tobin Tucker/CS ACO RD 25(2001108) 9 ACORD CORPORATION 1988 0-.-INS025,[71UF.)05 ELECTRONIC LASER FORMS.INC..-(8001327-0576 Page I of 2 r CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuant to V.T.C.A. Labor Code §406.96 (2000), as amended, Contractor certifies that it provides workers' compensation insurance coverage for all of its employees employed on City of Fort Worth Department of Engineering No. 4401 and City of Fort Worth Project No. Water:P264-541200-60917-0006083 T/PW: C200-541200-20940-0006083. CONTRACTOR Stabile &Winn, Inc B IlMnSILE Title: r Date: STATE OF TEXAS § § COUNTY OF TARRANT § Before me, the undersigned authority, on this day personally appeared L.J74--k , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he executed the same as the act and deed of Stabile & Winn, Inc for the purposes and consideration therein expressed and in the capacity therein stated. Given Under My Hand and Seal of Office this 4� day of J , 20 oS Gp��i4—A� Notary Public in a d for the State of Texas STATE ) s Bond #PRF08781313 PERFORMANCF AOND THE STATE-OF TEXAS KNOW ALL BY THESE PRESENTS: COUNTY OF TA.RRANT Colonial American Casualty That we (1) Stabile & Winn, Inc as Principal herein, and {Z; and Surety Company , a corporation organized under the laws of the State of(3) Maryland ,and who is authorized to issue surety_ bonds in the State B of Texas, Surety herein, are held and fmyAy bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the surn of: Three Hundred UiEhtnine Thousand One Hundred Fiftyeight................................................................................................................................................051100 ($389.158.05]Dollars for the payment of which sum we bind ourselves, our heirs, executors,administrators, successors and assigns,jointly and severally, fluunnly by these presents. r M WHEREAS, Principal has entered into a certain contract with the Obligee dated the 24 of May, 2005 a copy of which is attached hereto and made a part hereof,for the construction of: Pavement Reconstruction and Water Line Replacement an Minden Street(IH-35 Service Road to Cole Street NOW THEREFORE, the condition of this obligation is such, if the said Principle shall faithfully perform the work in accordance with the plans, specifications, and contract documents and shall fully indemnify and hold harmless the Obligee from all costs and damages which Obligee may suffer by reason of Principal's default, and reimburse and repay Obligee for all outlay and expense that Obli;ee may incur in making good such default„ then this obligation shall be void,otherwise, to remain in full force and effect. r r PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended., and all liabilities on this bond shall be determined in accordance with the provisions of such statute,to the same extent as if it were copied at length herein. IN WITLESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instnunent. 1 SIGNED and SEALED this 24of Mav,2005. ATTEST: V4, "r'� Stabile& Winn,Inc (Principal)Secretary PRIN . } BY: e John W. Stabile, President (SEAL) F0 BOX 79384 Sat=inaw,TX 76179 (Address) Colonial American Casualty and Surety Company C/ itness as to Principal Surety Address BY, ATTEST: ttomey-in-fact}(5) Tracy Tucker (Surety) Secretary P 0 Box 22$5 Ft Worth TK 76,113 (Address) ($EAI.) NOTE: Date of Bond must not be prior to date of Contract (i) Correct Name of Contractor (2) Correct name of Surety (3) State of incorporation of Surety Telephone number of surety must be stated. In addition,an original copy of Power of Attorney shall be attached to Baud by Attorney-in-Fact. r The date of bond shall not be prior to date of Contract. Witness as to Surety P Q Box 22$5 Ft Worth, TX 76113 (Address) r r r r Bond # PRF08781313 PAYMENT BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT That we, (1) Stabile 'sic Winn, Inc, as Principal herein, and (2) Colonial American Casualty and Surety_ Coma corporation organized and existing under the laws of the State of(3) Maryland , as surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the amount of Three Hundred Eightynine Thousand One Hundred Fiftyeielit and. 051100 Dollars (5$389,158.05) for the payment whereof, the said Principal and Surety bind themselves and their heirs, executors, administrators,successors and assigns,jointly and severally, firrnly by these presents: WHEREAS, the Principal has entered into a certain written contract with the Obligee dated the 24th day of May,2045,which contract is hereby referred to and made a part hereof as if fully and to the same extent as if copied at length, for the following project: r Pavement Recvnstruedion and Water Line Replacement on Minden Street(IH-35 Service Road to Cole Street) +f NOW, THEREFORE, "THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully make payment to each and every claimant(as defined in Chapter 2253,Texas Government Code, as amended)supplying labor or materials in the prosecution of the work under the contract, then this obligation shalt be void;otherwise, to remain in full force and effect, PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute, to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duty authorized representatives of the Principal and the Surety have executed this instrument. SIGNED and SEALED this 24th day of,Mal 2005. Stabile &Winn, Inc PRIN AL T ATTEST: B Name: John W. Stabile (Principal) Secreta Title: President (S E A Q Address: P© BOX 79380 Saginaw, TX 76179 Atnpfas to Principal Colonial American Casualty and Surety Company SURETY P ATTEST: l Name' Trac Fucker rt Secretary Attorn y in Fact (S E A L) Address: P a Box 2285 Ft Worth, TX 76113 g�' c Witness as to Surety Telephone Number: 8171336-8520 NOTE: (1) Correct name of Principal (Contractor). (2) Correct name of Surety. (3) State of incorporation of Surety Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be attached to Bond by the Attorney-in-Fact. .. The date of bond shall not be prior to date of Contract. >t Bond # PRF08781313 MAINTENANCE BOND THE STATE OF TEXAS COUNTY OF TARE ANI- That Stabile & Winn, Inc ("Contractor"), as principal, and Colonial American Casualty and Surety Company, a corporation organized under the laws of the State of Maryland _, ("Surety"), do hereby acknowledge themselves to be held and bound to pay unto the City of Fart Worth, a Municipal Corporation chartered by virtue of Constitution and laws of the State of Texas, ("City") in Tarrant County, Texas, the sum of Three Hundred Eightynine Thousand One Hundred Fiftyeight and. 051100 Dollars ($$389,158.05), lawful money of the United States, for payment of which sum well and truly be made unto said City and its successors, said Contractor and Surety do hereby bind themselves, their heirs, executors, administrators, assigns and successors, jointly and severally. This obligation is conditioned, however, that: WHEREAS said Contractor has this day entered into a written Contract with the City of Fort Worth, dated the 24th of May, 2005, a copy of which is hereto attached and made a part hereof, for the performance of the following described public improvements: Pavement Reconstructhon and Water tine Replacement on Minden Street f IH-35 Service Road to Cole Street] the same being referred to herein and in said contract as the Work and being designated as project number(s) P264-541200-60917-0006083 I C200.541200-20940-0006083 and said contract, including all of the specifications, conditions, addenda, change orders and written instruments referred to therein as Contract Documents being incorporated herein and being made a part hereof; and, WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the worn that it will remain in good repair and condition for and during a period of after the date of the final acceptance of the work by the City; and WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term of Two f21 years; and WHEREAS, said Contractor binds itself to repair or reconstruct the Work in whole or in - part at any time within said period, if in the opinion of the Director of the City of Fort Worth Department of Engineering, it be necessary; and, r WHEREAS, said Contractor binds itself, upon receiving notice of the need therefore to repair or reconstruct said Work as herein provided. NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or reconstruct said Work in accordance with all the terms and conditions of said Contract, these presents shall be null and void, and have no farce or effect. Otherwise, this Bond shall be and remain in full force and effect, and the City shall have and recover from Contractor and Surety damages in the premises as prescribed by said Contract. This obligation shall be a continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted. PP IN WITNESS WHEREOF, this instrument is executed in 8 counterparts, each of which shall be deemed an original, this 24 day of May, A.D. 2005. 5 ATTEST: Stabile 8. Winn, Inc (S E A L) Contractor B u r Secretary me. John W. Stabile Title: President Colonial American Casualty and WITNESS: Surety Company (S E A L) Surety 1 Name: Tr Y Tracker Title: Attorney-in-Fact P 0 Box 2285 Ft Worth, TX 76113 Address r Power of Attorney FIDELITY AND DEPOSIT COMPANY OF MARYLAND COLONIAL AMERICAN CASUALTY AND SURETY COMPANY KNOW ALL MEN BY THESE PRESENTS:That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND,and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY.corporation-,of the SttA'KttlQVIaryland. by FRANK E. MARTIN JR..Vice President.and GREGORY E. MURRAY, Assistant Svcrcta!� inlU.111 �iui�thority granted by Article Vt, Section 2.o the By-Laws of said Companies. which are saflam',�r ii �mzletsu sed-}r�{'i�Fand are hereby cert itied to he in Full force and effect on the date hereof,dc ° •- i [e cit p td*Wrr y TUCKER, Tobin TUCKER and W.Lawrence BROWN, `c lawful agent and Auorney-'sn Tact.to make,execute, seal and delivers tssfFtalfiait acct and deed: any and all bands and undertakings,EXCEPT b�dd 'r � Md"f� p(t-If tt0 S0 rrtunity Survivors and Community Guardians. and thT� c[i bDn�s i 031�t gs in pursuance nF these presents,shall he as binding upon said Companies„as Fully fi� ICY, purposes,as if they had been duly executed and acknowledged by the re8ularly elected off 8fti� ',t't�ny at its ollice in Bahi more, Md.,in their own proper persons. This power of attorney revokes that issued o=q of Tracy TUCKED.Tobin TUCKER. W. Lawrence BROWN.dated May 30, 2003. The said Assistant Secretary does hereby certify that the extract set Forth on the reverse side hereof is a true copy of Article VI, Section 2.of the By-Laws of said Companies.and is now in force. IN WITNESS WHEREOF, the said Vice-President and Assistant Secretary have hereunto subscribed their names and affixed the Corporate Seals of the Said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY.this f Ith slay of October.A.D_ 20041 . A"T"TEST; FIDELITY AND DEPOSIT COMPANY OF MARYLAND COLONIAL AMERICAN CASUALTY AND SURETY COMPANY 'Tq atpos/, iw rVgsroaU r ?K916 *� r _ 11 & moo By: Gregory E. Alurrav Assistant Secrelun` Frcaizls C. Martin Jr, Vice Pre.sil;iem Stats:of Marylandj 5s: City cif Baltimore On this I IIh day of October, A.D. 2004, before the subscriber, a Notary Public of Ilse State of Maryland, duly commissioned and qualified, came FRANK E. MARTIN JR.. Vice President, and GREGORY E. MURRAY, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, to me personally known to he the individuals and officers described in and who executed the preceding instrument, and they each acknowledged thee execution of the same. and being by me duly sworn, severally and each for himself"deposeth and saith. that they are the said officers of the Companies aforesaid,and that the seals affixed to the preceding instrument is the Corporate Seals of said Companies. and that the said Corporate Seals and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF. 1 have hereunto set my hand and affixed my Official Seal the day and year first above written. 1P Dennis R. Hawlen Noreen'Public My Commission Expires- February I,2005 POA-F 168-2829 EXTRACT FROM BY-LAWS OF FIDELITY AND DEPOSIT COMPANY OF MARYLAND "Article Vt, Section 2. The Chairman of the Board, or the President, or any Executive Vice-President,OF any of the Senior Vice-Presidents or Vice-Presidents specially authorized so to do by the 'Board of Directors or by the Executive Committee, shall have power, by and with the concurrence of the Secretary or any one of the Assistant Secretaries, to appoint Resident Vice-Presidents, Assistant Vice-Presidents and Attorneys-in-Fact as the business of the Company may require, or to authorize any person or persons to execute on behalf o1 the Company any bonds, undertaking, recognixances, stipulations, policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in the nature of Mort gages....and to affix the seal of the.Company therelo," EXTRACT FROM BY-LAWS OF COLONIAL AMERICAN CASUALTY AND SURETY COMPANY "Article VI. Section 2. The Chairman cif the Board, or the President, or any Executive Vice-President, or any of the Senior Vice-Presidents or Vice-Presidents specially authorized so to do by the Board of Directors or by the Executive: Committee. shall have power, by and with the concurrence of the Secretary or any one of the Assistant Secretaries, to appoint Resident Vice-Presidents, Assistant Vice-Presidents and Attorneys-in-Face as the business of the Company may require, or to authorize any person or persons to execute on hehalf of the Company any bonds, undertaking, recognisances, stipulations, policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in the nature of morigages,...and to affix the seal of the Company thereto." CERTIFICATE 1, the undersigned. Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND. and the +COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, do hereby certify that the foregoing Power of Attorney is still in full force and ell'ect on the date of this certificate; and I do further certify that the Vice-President who executed the said Power of Attorney was one:of the additional Vice-Presidents specially authorized by the Board of Directors to appoint any Attorney-in-Fact as provided in Article V1, Section 2, of the respective By-Laws of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, and the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY_ This Power of Attorney and Certificate may he signed by facsimile under and by authority of the Following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly galled and held on the 10th day of May. 1990 and of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 51h day of May. 1994, RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vicc-President, Secretary, or Assistant 'Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and eek binding upon the Company with the same force and effect as though manually affixed."" IN TESTIMONY WHEREOF.I have hereunto suhscribtd my name and affixed the corporate seals of the said Companies. this 24 th day of May 2005 A.rse.+rruar,SNrrr+cutis llJ D Fidelity and Deposit Company of Maryland Home Of =P.Q.Box 1227,da3timore,MD 21203-1227 r-APORTAINT NOTICE To obtain information or make a complaint: You may call the Fidelity and Deposit Company of Maryland, Colonial American Casualty and Surety Company, and/or Zurich American Insurance Company's toll-free telephone number for information or to make a complaint at: r 1-800-654-5155 You may contact the Texas Department of Insurance to obtain information on companies, coverages,r ghts, or complaints at: 1-840-252-3439 00 r You may write the Texas Department of Insurance: P.O. Box 149104 Austin, TX 78714-9104 FAX 9(512) 475-1771 PRE.AUUM OR CLAIM DISPUTES: Should you have a dispute concerning the premium or ` about a claim, you should first contact Fidelity and Deposit Company of Maryland or Colonial American. Casualty and Surety Company. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does .W not become a part or condition of the attached document_ CITY OF FORT WORTH,TEXAS CONTRACT THE STATE OF TEXAS KNOW ALL BY THESE PRESENTS COUNTY OF TARRANT This agreement made and entered into this the 24 day of May A.D., 2005, by and between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and existing under and by virtue of a special charter adopted by the qualified voters within said City on the 11`x'day of December, A.D. 1924, under the authority (vested in said voters by the "Home Rule" provision) of the Constitution of Texas, and in accordance with a resolution duly passed at a regular meeting of the City Council of said city . and the City of Fort Worth being hereinafter termed Owner, Stabile & Winn, Inc, HEREINAFTER CALLED Contractor. WITNESSETH: That said parties have agreed as follows: 1. That for and in consideration of the payments and agreements hereinafter ;mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows: Pavement Reconstruction and Water Line Replacement on Minden Street(IH-35 Service Road to Cole Street 2. ip That the work herein contemplated shall consist of furnishing as an independent contractor all rM labor, tools, appliances and materials necessary for the construction and completion of said project in accordance with the Plans and Specifications and Contract Documents prepared by the Department of Engineering for the Transportation and Public Warks Department of the City of Fort Worth adopted by the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are P' hereto attached and made a part of this contract the same as if written herein. 3. w The Contractor hereby agrees and binds himself to commence the construction of said work within ten (10) days after being notified in writing to do so by the Department of Engineering of the City r of Fort Worth. 4. 4 �' MEMO r. The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Department of Engineering of the City of Fort Worth and the City Council of the City of Fart Worth within a penod of days. If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract r, Documents within the time so stipulated, plus any additional time allowed as provided in the General Conditions, there shall be deducted from any monies due or which may thereafter become due him, the sum of_ Per working day, not as a penalty but as liquidated damages, the Contractor and his Surety shall be liable to the Owner for such deficiency, 5. A Should the Contractor fail to begin the work herein provided for within the time herein fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans, r Specifications and Contract Documents, then the Owner shall have the right to either demand the surety to take over the work and complete same in accordance with the Contract Documents or to take charge of and complete the work in such a manner as it may deem proper, and if in the completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said plans and specifications made r a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost. POP b Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the +r project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death. arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such in'rs ddnru a or death is causedLi►i whole or in part, by lite ire�fi�errce or alleged ne�l�er:ce o/' Owner, its officers servants, or employees Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of .� any of the terms and conditions of this Contract, wl:ether or_not any such injury or damake is caused in whole or in part by the ne li ence or alfa ed negligence of Owner, its officers, servalits or employees.. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance earner. a The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against wham a claim for damages is outstanding as a result of work performed under a City Contract. r* a. _ w s and/or materials furnished in the prosecution of the work, such bonds being as provided and required in Article 51-60 of the Revised Civil Statutes of Texas, as amended, in the form included in the Contract Documents, and such bonds shall be for 100 percent of the total contract price, and said surety shall be a surety company duly and legally authorized to do business in the State of Texas, and acceptable to the City Council of the City of Fort Worth. 8. Said City agrees and binds itself to pay, and the said Contractor agrees to receive, for all of the aforesaid work, and for all additions thereto or deductions therefrom, the price shown on the Proposal 'R submitted by the successful bidder hereto attached and made a part hereof. Payment will be made in monthly installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice from the Contractor. The agreed upon total contract amount(including/excluding) alternates n/a, shall be Three Hundred Eiebtynine Thousand One Hundred_ Fif ell lit -- - ............................................................................................................05110+0 Doi l ars, 9. It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or assigned to anyone else by said Contractor without the written consent of the Director of the Department of Engineering. 10. The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is classified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto and made a part hereof the same as if it were copied verbatim herein. w 11. w It is mutually agreed and understood that this agreement is made and entered into by the parties s hereto with references to the existing Charter and Ordinances of:he City of Fort Worth and the laws of the State of Texas with references to and governing all matters affecting this Contract, and the Contractor agrees to Lily comply with all the provisions of the same. IN WITNESS THEREOF, the City of Fort Worth has caused this instrument to be signed in 8 counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the corporate sea] of the City of Fort Worth attached. The Contractor has executed this instrument through its duly authorized officers in 8 counterparts with its corporate seal attached. ,� f'p ,.1, V ii�.�`�•ta�l� A .4411 1 Dane in Fart Worth,Texas, this the 24 day of May,A.D.,21705. RECOMMENDED: CITY OF FORT WORTH BY DIRECTOR,DEPARTMENT OF CITY MANAGER ENGINEERING a APPROVE MarcC/� A. t, As is t City Man g TRANSPORTATION/PUBLIC WORKS DIRECTOR ATTEST: '. Stabile& Winn,Inc PO BOX 79380 Sailinaav, TX 76179 CONTRACTOR y CITY SECRETARY (S E A L) BY Contract Authorizatioaa John W. Stabile, President nates TITLE APPROVED AS TO FORM AND P 0 Box 79380 Saginaw, TX 76179-0380 LEGALITY: ADDRESS w A.S T. ClT A RNEY November 1960 go Revised May 1986 Revised September 1992 r APPENDIX A 1 . F 1 4 R L 4 s r i APPENDIX B r APPENDIX C r r R E 1 f f R r S r r r r on rt °. w RT -HWORT CIT'C .p-f' FORT WORTH DF,P�I . FEN T OP ENGINEERING �. Conk-?�.jbcTjDN SERVICES/SOIL LABORATORY FAY, NO: 81+/392-7854 DI�T'F: �[��cerrber 21, 284�4 ' TO:. a> art.L Sahu FROM; Kevin Blue PAX NCI: E�17187�.-751 DIVE-OWN i CONSTRUCTION S8PVICES, SOIL LABORATORY WORK- 11HONE: 817/871-7920 r L- w NUM)S OF PAGES TRANSMIT70D 1XCLUDING THIS COVER SHEET J L r 1p 1 I r r I . i 'd 968L ILS LIS s]N XVd 110I13l ISH43 9 0 Q Rd IE:E 301 M—IN30 r CITY OF FORT WORTH CONSTRUCTION SERVICES LABORATORY RESULTS FOR �. TEST HOLE AND PLASTICITY INDEX I P„e PRojo." ` MINDEN STREET (SOUTH FREEWAY TO COLE) DOES %0 . 4►',01 FUMY, 03 �.., .i _ .p....._ .e..._. LAB NO: —386-14 �--ZATION: 712 MINDEN ST. S14 - Y-- - _-•-. .._ , L 9.. :� HMAC .. 1#;.x;0" YELLOWISH BROWN SANDY CLAY r .�. -� �'�RB[fRG LIMITS:---EL-- 44-5 PL: 23'.8 FI: 2G.7J~SHRKG: 13.[}% 4,r NSSELL COLOR CHART: 113 VERY PALE BROWN CLAY d9',T-P -W4IGHT: N/A #/cFT LAB No: 39675 8I8 MINDEN STI CL HMAC TAN SANDY CLAY DARK SHOWN CLAY i�` -:;!R€URG LIMITS: LL: G5.9 PL. 39_.4PI:26-5 SHRKG: 18.0% MtAlaSf Ij COLOR CHART: 5/2 GRAYISH BROWN CLAY EIGHT: 142.0 #/CFT I' f,E 3 LAB NO: 38576 927 MYNDEN ST. N/ a:" ►i0'r BROWN SANDY CLAY W/GRAVEL sx 5;0" DARK BROWN CLAY `ABURG LIMITS; LI,: 65.5 PL: 32.9 PI: 32. 6 rSHRKG: 19.01 iA vio-nL COLOR CHART: 513 BROWN CLAY L ati.;T. WEIGHT: 135.4 #/CFT �+0lr, $ 4 LAB NO: 38577 1011: 021« MINDEN ST. CL II 0.J0'" DARK BRONW SANDY CLAY W/GRAVEL f' BARK BROWN CLAY BURG LIMI`T`S: LL: 55.0 PL: 31. 4 PI: 23.5 SHRKG: l ff-EAISE,LL COLOR CHAR`. 512 GRAYISH BROWN CLAY ll IIX - WEIGHT. 1.34.0 VCFT rE DOE k '-14011 w APPS:?uAI., r� eJE ROUTING DATfj �Tg.STED: 06-23--04 AHE CALDERON DATV REPORTED: 07-07--04 CAREN SMALL a� TEV-r,';: BY: HERNANDEZ FILE PM r A I 5S8L [L8 LIS `DH XVj NOIR ISHO) o g Wd Z£.E an, jO-IZ-)gG f 1 1 F � 1 1 � � � t ilk � � 1 � 4 ! r W Ps ZURICH I THIS IMPORTANT DISCLOSURE NOTICE IS PART OF YOUR BOND FM We are making the following informational disclosures in compliance with The Terrorism Risk Insurance Act of 2002. No action is required on your part. Disclosure of Terrorism Premium go The premium charge for risk of loss resulting from acts of terrorism(as defined in the Act) under this bond is $—waived_. This amount is reflected in the total premium for this bond. Disclosure of Availability of Coverage for Terrorism Losses As required by the Terrorism Risk Insurance Act of 2002, we have made available to you coverage for losses resulting from acts of terrorism (as defined in the Act) with terms, arnounts, and limitations that do not differ ruatenally as those for losses arising from events other than acts of terrorism. Disclosure of Federal Share of Insurance Company's Terrorism Losses The Terrorism Risk Insurance Act of 2002 establishes a mechanism by which the United States government will r. share in insurance company losses resulting from acts of terrorism (as-defined in the.Act)after a insurance company has paid losses in excess of an annual aggregate deductible. For 2002,the insurance company deductible is 1%of direct earned premium in the prior year; for 2003, 7%of direct earned premium in the prior year; for 2004, 10%of direct earned premium in the prior year; and for 2005, 15%of direct earned premium in the prior year. The federal share of an insurance company's losses above its deductible is 90%. In the event the United States government participates in losses, the United States government may direct insurance companies to collect a terrorism surcharge from policyholders. The Act does not currently provide for insurance industry or United States government participation in terrorism losses that exceed $100 billion in any one calendar year. Definition of Act of Terrorism The Terrorism R-isk Insurance Act defines "act of terrorism" as any act that is certified by the Secretary of the Treasury, in concurrence with the Secretary of State and the Attorney General of the United States: 1. to be an act of terrorism; 2. to be a violent act or an act that is dangerous to human life,property or infrastructure; 3. to have resulted in damage within the United States, or outside of the United States in the case of an air carrier(as defined in section 40112 of title 49,United 17 States Code) or a United States flag vessel (or a vessel based principally in the United States,on which United States income tax is paid and whose 'in surance or coverage is subject to regulation in the United States), or the prcrmises of a United States mission; and 4. to have been committed by an individual or individuals acting on behalf of any foreign person or foreign interest as part of an effort to coerce the civilian population of the United States or to influence the policy or affect the conduct of the United States Government by coercion. But, no act shall be certified by the Secretary as an act of terrorism if the act is committed as part of the course of a war declared by Congress (except for workers' compensation) or property and casualty insurance losses resulting from the act, in the aggregate, do not exceed $5,000,000. These disclosures are informational only and do not modify your bored or affect your rights under the bond. .. Copyright Zurich American Insurance Company 2003 -0050749.doc