Loading...
HomeMy WebLinkAboutContract 29527 rOfTy `3ECRE7'ARY ; " CITY SECRETARY �/ CONTRACT' NO. D.O.E. FILE SPECIFICATIONS CONTR —..:TOR'S BONDING CO. and rCONTRACT DOCUMENTS CONSTRUCTION'S COPY for ,CLIENT DEPAk' l\!iENT UNIT I - SANITARY SEWER REPLACEMENT ORIGINAL UNIT H - PAVING RECONSTRUCTION for WIMBERLY STREET - MERRIMAC STREET TO WINGATE STREET f D.O.E.NO. 2217 1p in a THE CITY OF FORT WORTH, TEXAS pw ROBERT D.GOODE, P.E. A.DOUGLAS RADEMAKER,P.$. DALE A.FISSELER,P.E. DIRECTOR,TRANSPORTATION DIRECTOR,DEPARTMENT OF DIRECTOR AND PUBLIC WORKS DEPARTMENT ENGINEERING WATER DEPARTMENT SEWER PROJECT NO. PS58-070580174640 TPW PROJECT NO. K-1594 r PREPARED BY: . OF r Graham Associates, Inc.pw Consulting Engineers & Planners *:• t Summit Office Park i*=.••.••--••-••F. *t� 1300 Summit Avenue Suite 419 .............. Ct-ARt Fa.�.•�• .. Fort Worth, Texas 76012 5 ............... 357 • .f pw i (817) 332-5756 2003 L� Y I Y��til, City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 1/20/2004 - Ordinance No. 15836 DATE: Tuesday, January 20, 2004 LOG NAME: 30WIMBERLY REFERENCE NO.: **C-19941 SUBJECT: Appropriation Ordinance and Award of Contract to McClendon Construction Company, Inc. for Reconstruction of Wimberly Street (Merrimac Street to Wingate Street) and Associated Sanitary Sewer Improvements RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of $98,823.50 from the Water and Sewer Fund to the Sewer Capital Project Fund; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Project Fund in the amount of$98,823.50 from available funds; and 3. Authorize the City Manager to execute a contract with McClendon Construction Company, Inc. in the amount of$203,179.25 for reconstruction of Wimberly Street, Contract 30, together with associated sanitary sewer improvements. DISCUSSION: On December 19, 2000, the City Council adopted a resolution authorizing the issuance of $45 million in Certificates of Obligation to address critical capital projects, including $8 million for the reconstruction of neighborhood streets to supplement the 1998 Capital Improvement Program (CIP). The 1998 CIP included funds for reconstruction of Wimberly Street from Merrimac Street to Wingate Street, Contract 30. The Water Department has determined that the existing sanitary sewer main in this street needs to be replaced prior to street reconstruction. On October 23, 2003, bids were received on two alternate types of pavement: Alternate A is 5-inch HMAC (hot mix asphalt concrete) over 6-inch subgrade with lime stabilization; and Alternate B is 6-inch concrete pavement over 6-inch lime stabilized subgrade. Bidder Alternate A Alternate B Completion Time (Asphalt Pavment) (Concrete Pavement) McClendon Construction Company, Inc. $199,997.25 $203,179.25 120 Working Days JLB Contracting, LP $204,756.02 $218,425.24 R-con, Inc. $245,180.00 $204,487.75 Jackson Construction, Ltd. $234,680.25 $253,137.50 Rycon, Inc. $270,802.00 $275,428.00 Logname: 30WIMBERLY Page 1 of 2 Stabile &Winn, Inc. $197,276.00 No Bid After review of all bid proposals, staff recommends Alternate B (concrete) for construction since the additional cost to construct the street in concrete is only 2.9% greater than the asphalt bid price, and will result in lower long term maintenance costs over the street's useful life. McClendon Construction Company, Inc. is in compliance with the City's M/WBE Ordinance by committing to 46% M/WBE participation. The City's goal on this project is 16% In addition to the contract amount, $6,876.00 is needed for sanitary sewer line construction inspection and survey. Contingency funds are also included to cover change orders for sanitary sewer line improvements ($6,000.00) and pavement and storm drains improvements ($6,000.00). This project is located in COUNCIL DISTRICT 9, Mapsco 62X. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval and completion of recommendation No. 1 and adoption of the attached appropriation ordinance, funds will be available in the current capital budgets, as appropriated, of the Sewer Capital Projects Fund and the Critical Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers 1&2)PS58 47045 070580174640 $98.823.50 1) PE45 538070 0709020 198 823.50 2)PS58 541200 070580174640 $91.947.50 3) PS58 541200 070580174640 $85.947.50 2)PS58 531350 030580174640 $6,876.00 3) C116 541200 020116040576 $117,231.75 Submitted for City Manager's Office by. Marc Ott (8476) Originating Department Head: A. Douglas Rademaker (6157) Additional Information Contact: A. Douglas Rademaker (6157) Lo2name: 30WIMBERLY PaaP. 9 of 9 M12UUJ "IPM Graham Associates, Inc. NO. 5670 P. 2/3 F ADDENDUM NO.1 To the Flans,Spccificadona&General Contract Documents VVDMERL'Y STREET-MERRIMAC ST.TO'WINGATE ST. Paving Reconstruction, , &Saaitary Server Replacement DOE NO.2217 ' Advertiscd September 25'a and October a ,. Sid Dute.October 23 .2003; 1:30 pm Addendum No.1;Issued October 17,2003 j c This Addendum,forms part of the Geneaal Cmtmct Domumetus&Specifications for the above referenced Project and modifies rhe original General Contract Documents&Specitications. Acimowledge your receipt of this Addendum by completing the requested information az the following locations: (1) In The Space Provided Below (2) General CoMract Documents&Specifications Part B—Bid Proposal,Page P-7,In The Space Provided (3) Tndicaw In Upper Case Bold Lettering On The Outside Of Your Sealed Hid Envelope- "ADDENDUM NO. 1-RECEIVED&ACMOWLEDGLD" PLEASE MA,I%T WEEF THE_FOLLOWING REVISIONS: G$,NERAI,,CONTRACT DOCIMNTS&$PECMCATIONS: +; 1-PART B-PROPOSAL 1. Remove Bld Proposal Page P7 end Replace Wa The Attadnd Bid Proposal P7. A signed copy of this Addendum No. 1 should be included in the sealed bid eavelope at the time of bid submittal. Failure to acknowledge the receipt of this Addendum No. 1 could cause the subject bidder to be considered"NONMPONSIVF-,"resulting in disqualification. ADD ACXNOWLEDGEMENT: A Douglas Rsdemaker,P.E. .s Director,Dept of leering sY CLENDON, PRESIDENT ' conpany_ Approa Rick Trice,PE p� ♦M A ichas:, 0�—.� 01 _q�! � Msrtgger,Consubattt'Services City_ p.aw S S�'�• Telephone#: 1 Z (7_,0 �D �� lrfi`�i`�'C�U (�1•nuf `:i 1'�JL'3 �C✓i1 a Addendum No, 1, Page 1 of i TABLE OF CONTENTS NOTICE TO BIDDERS COMPREHENSIVE NOTICE TO BIDDERS UNIT I - WATER & SEWER REPLACEMENT SPECIAL INSTRUCTIONS TO BIDDERS MBE/WBE BID SPECIFICATIONS PART B - PROPOSAL PART C - GENERAL CONDITIONS PART Cl - SUPPLEMENTARY CONDITIONS PART D - SPECIAL CONDITIONS PART F - BONDS PART G - CONTRACT DOCUMENTS UNIT II - PAVING RECONSTRUCTION SPECIAL INSTRUCTIONS TO BIDDERS PROPOSAL - UNIT H MBE/WBE BID SPECIFICATIONS SPECIAL PROVISIONS - T/PW PROJECTS TECHNICAL SPECIFICATION - SILICONE JOINT SEALING CONTRACT DOCUMENTS NOTICE TO BIDDERS Sealed Proposals for the following: Wimberly Street-Merrimac Street to Wingate Street T&PW Project No: K-1594 Sewer Project No: PS58-070580174640 DOE No. 2217 The Construction of, Unit I—Sanitary Sewer Replacement 820 L.F.- 15"Sanitary Sewer Line Unit II—Paving Reconstruction 2,500 S.Y.-Pavement Reconstruction Addressed to Mr. Gary Jackson, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 p.m. October 23, 2003, and then publicly opened and read aloud at 2:00 p.m., in the Council chambers. Plans, Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. Sets may be purchased on a nonrefundable basis for Thirty dollars ($30.00) per set. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract at any time. Bidders must submit the complete specifications book or risk rejection of bid. The water and sanitary sewer improvements included in this project must be performed by a contractor who is pre-qualified by the Water Department at the time of bid opening. The procedures for pre-qualification are outlined in the"Special Instructions to Bidders". For additional information, please contact Mr. Chuck Stark, P.E., Graham Associates Inc. at(817) 640- 8535, or Mr. Fred Ehia, P.E., City of Fort Worth Department of Engineering at (817) 871-8424. Advertising Dates: September 25, 2003 October 02. 2003 NTB-1 Notice toBiddersl flf,y V y:f`f.1^y COMPREHENSIVE NOTICE TO BIDDERS Sealed Proposals for the following: FOR: Wimberley Street-Merrimac Street to Wingate Street T&PW Project No: K-1594 Sewer Project No: PS58-070580174640 DOE No.2217 Addressed to Mr. Gary Jackson, City Manager of the City of Fort Worth, Texas, will be received at the Purchasing Office until 1:30 a.m.October 23, 2003,and then publicly opened and read aloud at 2:00 p.m.,in the Council chambers. Pians,Specifications and Contract Documents for this project may be obtained at the office of the Department of Engineering, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas. Sets may be purchased on a nonrefundable basis for thirty dollars ($30.00) per set.The documents contain additional information for prospective bidders. All bidders will be required to comply with Provision 5159a of"Vernon's Annotated Civil Statutes"of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No.7278,as amended to City Ordinance No. 7400 (Fort Worth City Code Sections 13-A-21 through*12-A-29), prohibiting discrimination in employment practices. Bid security is required in accordance with Paragraph 2 of the Special Instruction to Bidders. The major work on the above-referenced project shall consist of the following: Unit I—Sanitary Sewer Replacement 820 L.F.- 15"Sanitary Sewer Line Unit II—Paving Reconstruction 2,500 S.Y.-Pavement Reconstruction Included in the above will be all other miscellaneous items of construction as outlined in the Plans and Specifications. The City reserves the right to reject any and/or all bids and waive any and/or all formalities. Bidders shall not separate,detach,or remove any portion,segment,or sheets from the contract document at any time. Bidders j. must complete the proposal sections and submit the complete specifications book or face rejection of the bid as non-responsive. ARD OF CONTRACT:No bid may be withdrawn until the expiration of ninety(90)days from the date bids 60ened. The award of contract,if made,will be within ninety(90)days after the opening of bids,but in no 6dowill the award be made until all the necessary investigations are made as to the responsibility of the bidder 4o whom it is proposed to award the contract. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the Proposal form. Bids that do not acknowledge receipt of all addenda may be rejected as being non-responsive. Information regarding the status of addenda may be obtained by contacting the Department of Engineering at(817) 871-7910. In accord with City of Fort Worth Ordinance No.15530,the City of Fort Worth has goals for the participation of CNTB-1 Comprehensive Notice to Bidders minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM SUBCONTRACTOR/SUPPLIER UTILIZATION FORM,PRIME CONTRACTOR WAIVER FORM,GOOD FAITH EFFORT FORM with Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m.,five(5)City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence thatthe documentation was received by the City. Failure to comply shall render the bid non-responsive. SUBMISSION OF BID: This document is designed as a single construction contract. The proposal has been separated into TWO UNITS,Unit I—Sanitary sewer tine replacements and Unit 11,Street reconstruction.Award of contract,if made, shall be to the responsive bidder for BOTH units.The prospective bidder must submit their bid for the TWO units and complete the Summary page of Bid Proposal Section. I�. For additional information,please contact Mr.Chuck Stark,P.E.,Graham Associates,Inc.at(817)640-8535 or Mr. Fred Ehia, P.E.,City of Fort Worth Department of Engineering at(817) 871-8424. u Gary W.Jackson Gloria Pearson City Manager City Secretary Advertising Dates: Department of Engineering A. Douglas Rademaker, P.E., Director September 25,2003 By: October 02,2003 Rick Trice, P.E., Manager,Consulting Services �II I' CNTB-2 Comprehensive Notice to Bidders UNIT I E WATER & SEW R 2p SPECIAL INSTRtiCTIONS TO BIDDERS 1) PREOUALIFICATION REQUIREMENTS: All contractors submitting bids are required to be prequalified by the Fort Worth Water Department prior to submitting bids. This prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation:a current financial statement,an acceptable experience record,an acceptable equipment schedule and any other documents the Department may deem necessary,to the Director of the Water Department at least seven(7)calendar days prior to the date of the opening of bids. a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status to the submitting company. This statement must be current and not more than one(1)year old. In the case that a bidding date falls within the time a new statement is being prepared,the previous statement shall be updated by proper verification. b) For an experience record to be considered to be acceptable for a given project,it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received. c) The Director of the Water Department shall be the sole judge as to the acceptability for financial qualification to bid on any Fort Worth Water Department project. d) Bids received in excess of the bid limit shall be considered non-responsive and will be rejected as such. e) The City,in its sole discretion,may reject any bid for failure to demonstrate experience and/or expertise. f) Any proposals submitted by a non-prequalified bidder shall be returned unopened,and if inadvertently opened,shall not be considered. g) The City will attempt to notify prospective bidders whose qualifications(financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project on which bids are to be received. Failure to notify shall not be a waiver of any necessary prequalification. 2. BID SECURITY: A cashier's check,or an acceptable bidder's bond,payable to the City of Fort Worth,in an amount of not less than five(5%)percent of the largest possible total of the bid submitted must accompany the bid,and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten(10)days after the contract has been awarded To be an acceptable surety on the bid bond,the surety must be authorized to do business in the state of Texas. In addition, the surety must(1)hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law;or(2)have obtained reinsurance for any liability in excess of$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City,in its sole discretion,will determine the adequacy of the proof required herein. 3. BONDS: A performance bond,a payment bond,and a maintenance bond each for one hundred (100%)percent of the contract price will be required,Reference C 3-3.7. 4. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: (a) The contractor shall comply with all requirements of Chapter 2258,Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258,Texas Government Code. Such prevailing wage rates are included in these contract documents. (b) The contractor shall,for a period of three(3)years following the date of acceptance of the work, maintain records that show(i)the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract;and(ii)the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of D-3 Right to Audit pertain to this inspection. (c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs(a)and(b)above. (d) With each partial payment estimate or payroll period,whichever is less,an affidavit stating that the contractor has complied with the requirements of Chapter 2258,Texas Government Code. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal,the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601g,Texas Revised Civil Statutes,the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business in located. "Nonresident bidder"means a bidder whose principal place of business is not in this state,but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not apply if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the bid amount is$25,000.00 or less,the contract amount shall be paid within forty- five(45)calendar days after completion and acceptance by the City. 9, AGE: In accordance with the policy("Policy")of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers,members,agents employees,program participants or subcontractors,while engaged in performing this contract,shall, in connection with the employment,advancement or discharge of employees or in connection with the terms,conditions or privileges of their employment,discriminate against persons because of their age except on the bases of a bona fide occupational qualification,retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers,members,agents,employees, subcontractors,program participants,or persons acting on their behalf,shall specify,in solicitations or advertisements for employees to work on this contract,a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirements. Contractor warrants it will fully comply with the policy and will defend,indemnify and hold City harmless against any claims or allegations asserted by third parties or su arising out of Contractor's and/or its subcontractors'alleged failure to comply with the above referenced Policy concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"),Contractor warrants that it and any and all of its subcontractors will not unlawfully discriminate on the basis of disability in the provision of services to the general public,nor in the availability,terms and/or conditions of employment for applicants for employment with,or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's provisions and any other applicable federal,state and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors'alleged failure to comply with the above referenced laws concerning disability discrimination in the performance of this agreement. 11. A/HNORITY AND WOMEN BUSINESS ENTERPRISES: In accord with City of Fort Worth Ordinance No. 11923,as amended,the City of fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary.The bidder shall submit the MBE/WBE UTILIZATION FORM,PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM("Documentation")as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m.,five(5)City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non-responsive. Upon request,Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise(MBE)on the contract and payment thereof. Contractor farther agrees to permit any audit and/or examination of any books,records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts(other than a negligent misrepresentation)and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal, State or local laws or ordinances relating to false statements. Further,any such misrepresentation facts(other than a negligent misrepresentation)and/or commission of fraud will result in the Contractor being determined to be irresponsible and bared from participating in City work for a period of time of not less than three(3)years. 12. FINAL PAYMENT AND ACCEPTANCE: The project shall be deemed accepted by the City of Fort Worth as of the date that the final punch list has been completed,as evidenced by a written statement signed by both the contractor and the City. The warranty period shall begin as of the date that the final punch list has been completed. FORT WORTH —� City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BipDE , APPLICATION OF POLICY r� If the total dollar value of the contract is $25,000 or more,the:M/WBE goat is applicable F4 If the total dollar value of the contract i5 less than.$25100G.;,the M/WBE:goal is not applicab{e POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority and Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. MNVBE PROJECT GOALS The City's MBE/WBE goal on this project is 16 %of the base bid value of the contract. COMPLIANCE TO BID SPECIFICATIONS On.City contracts of$25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated M/WBE goal, or 2. Good Faith Effort documentation,or; 3. Waiver documentation, or; 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order }I for the entire bid to be considered responsive to the specifications. 1 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid met or exceeded: opening date, exclusive of the bid openin2 date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if participation is less than opening date, exclusive of the bid opening date. , statedgoal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if no M/WBE participation: opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid perform all subcontractin /sup lier work: opening date, exclusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed goal. opening date, exclusive of the bid opening date. ,;FAILURE TO COMPLY WITM THE CITY'S.MIWBE ORDINANCE=:WILL RESULT IN THE BID BEING CONSIDERED ��+t: NON-RESPONSIVE TO SPECIFICATIONS" �� }�a'y1" ,"'x;M €4 ; 4 r r n _ sR F Any questions,please contact the M/WBE Office at(817) 871-6104. Rev.5/30/03 ATTACHMENT 1A Page 1 of 4 FORT WORTH City of Fort Worth 1 )_3,�_ A1u : 21 i�CVD Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: Check applicable block to describe prime C 1A a daa 6ovdyvchftw MMI/DBE NON-M/W/DBE PROJECT NAME: BID DATE UAI�- �0 v Z 3 Zoo City's MMBE Proje Goal: Prime's M/WBE Project Utilization: PROJECT NUMBER I' Identify all subcontractors/suppliers you will use on this project Failure to'complete- this form, in ;its entirety.with requested documentation, and received--by the.,.Managing Department on.or,before 5:00 p.m: five (5):City business days after bid opening, exclusive of.-bid opening date, will result in the-bid being considered non-responsive to bid specifications . The undersigned' Offeror agrees,to, enter into a.formal agreement with. the M/WBE firm(.. -listed in this utilization schedulk:conditioned.upon execution_of''_contract with-the City.of Fort .Worth. The;intentional and/or knowing misrepresentation of facts is".grounds for consideration of disqualification-and will result inAhe bid being considered non-responsive to bid specifications > M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each Tier:level Tier is the level of subcontracting below the prime contractor, i.e:, a direct ..payment from.the.prime contractor to a subcontractor-is considered 1.s,tier, a payment by a subcontractor to ,. its supplier is considered 2"d tier . ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. ir If hauling services Iare utilized;,the prime will be given credit as long as the M/WBE listed.owns and ..operates at least one,:fully licensed and,operational truckao be used an the contract. :The".M/WBE may lease :trucks from`another MN1/BE firm, including M/VI/BE owner-operators, and.receive full M/WBE credit The M/WBE may lease trucks from non-M/WbEs,-including.owner operators;. but.will only receive,credit for the fees -e and commissions-earned b the M/WBE-as'-o' utlined in' lease a reement. ir ir F�R� f WORTH ATTACHMENT 1A `�✓— Page 2 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority,Women and non-MAMBEs. Please list MIWBE firms first, use additional sheets if necessary. Certification SUBCONTRACTORISUPPLIER T (check one) Cr. Company Name I N T Detail Detail Address e M W C X f Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax r B B R O E. E E C T 1 A irm-e, 6vrhs cONSfvifaoy WA�cr ' Sewer so P-0- BOX -783 ; ;Q 76,SZ Z—' l Prtq�a I � d (3v,-lesavf j TX ?&097 K:(617) 4qj- OZ92. Fax ($1.2) t++7-0107 ircm Pv4 CO.) P0. 6OX 3576& Si l�[ohG Dallas , TX Z523S at � JaiK� 6 I 'Q$000 Sealavt� �t I P►,: 2I*)04-2410 IF Fax'(7-14) W4-OJ53 (Lcocket Fvel IF IZOJ Ro4a1 Pkwy Fvc� ' ZI1900° EvleSS,TX 7(oci+o Pb : ($1Z}t(,b - 5910 I� FA)" 807 164 -7491 &A4,4 T✓afr L Coto 1 I P.O. BOX ggIV CAdie S s'3 7 00 00 9vvleS oK,TX 7407 IF o06(o F,4) :qp-j) 2.qr 619 to NJ� (Na�c��als $QKd � To�ba� I 701 4tvta,V S+, I Fo✓+ Wo.+I4,TX 7&it l I 6 Z1 X54 UD ! Pty'.6$1-7) 831+-7181 Sov�kevvt S+av- (,o,tcr-ek, QeaJ4 M'X I norp Frec toy t Pkw j 0 ZW Irv�n9 ,TX -75043 � �oKcle�, � �y- � jwno�. } ' Lg7Z) b2.1. 0999 l i ' FORu f WORTH ATTACHMENT 1A --��— Page 3 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority,Women and non-MANBEs. Please list MNVBE firms first, use additional sheets if necessary. Certification F SUBCONTRACTOR/SUPPLIER T (check one) '7 Company Name I N T Detail Detail Address e M W C x F Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax r a s T0 % E E C T 'E A • l,a{luted Stt�� 2400 NE 301- QeiAFOrtf�q F o✓i Wdv+4,TX 7G i 11 S-Fee� 3,-7 po 00 PI,: (sti)$38-- 6811 - Na"son "Pe, Dap-i- 0776 Pre Cas h Po Box 12.0001 (I�las�h°Ie5 a Z q,000 - . 1 Dallas 1 TX Z 531 t -0774 $-5Z9-S$q% 1 - Sz5 57ag {Rite„ Borirlqq/T�emlin FIL+ MICA We, Z �oC" i bvvtcanvillt✓1-TX 75137 TvNn1.l��9 ,5�ZSO P! W10 -04. 413+ F (97Z)-298- 8ao3 J.owr4 RarNbo Trvc kinij gal R lij6oh IZ�Gk sarl� c Z,goo°o Fov� W°v� 4,TX 761 (-0 V/ P4`�817)-SSI -(0539 Kati iof-- (,sppo� HvgheS Supply o0 P.O.gox I s, l 2q 7 Fi hAjs 8�000-- Da l las, TX 7 5345 Z. aka t917)M-72*3 ` hc-x' C317)58"9 -0179 After(cavt IM44 6 Pre ; Pos h P.O.Box 5911, c 2100000 D4114s ,TX 7 52-Z9 �oNsh'v�,F�ot1 T.V. , �' pk ' 244 .93(o - 2915 fix: 47Z -495- 31 2.. FOR r WORTH ATTACHMENT 3 of 3of4 4 Primes are required to identify&L subcontractors/suppliers, regardless of status; i.e., Minority,Women and non-M/WBEs. Please list MIWBE firms first, use additional sheets if necessary. Certification (check one) SUBCONTRACTORISUPPLIER T N T Detail Detail Company Name i C X j Subcontracting Work Supplies Purchased Dollar Amount Address e M W Telephone/Fax r g B T D E E R O F C T F A 110 4e4e Havvt S Nei P.D.Box 12-gS �V�� b LIDUD°= V4vvl'uo�r Tx AW 1 ' PV: 17)249 - L Og l Fax fin) 4+7-qq I Lerma T,'VGIW4 24011 94wlkiA � Fov+wovlkj)( '71#10S#tos ✓ Kati lo;f s 3, 800o0-- 9 Sfeedq Trockiay 1-42-(4Qw Z 4v% ✓ Rau�d�l` 6 3 j $00 00 Fov+ Wo(+fit 7( 104 1 e � �k'(a?� 7_I[, (.BZq -J ' COW40WN T-aMc. , Joe, 2724 gvon A✓� Frojeef giqas 63 Rov+ WwfU ITX -7140-1 I ✓ `t$D (9 17) 42I 4 1;Vf Lek,) q2G - 777-5 I &�P A7TACHMENT1A Page 4 of 4 Total Dollar Amount of M/WBE Subcontractors/Suppliers $ 13 93 L4 Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $ 3 00 � � q o TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ 13 155 The Contractor will not make additions,-.deletions; or substitutions'to this certified(list without .the prior approval of the Minority .and:. Women Btasiness Enterprise Offiice`Manager or designee through`the submittal of a I� Request for Approve/ of Chande/Additlon Any unjustified change or deletion shall be a._matenal breach of contract and may result Ir[`debarment in,aCC" 4_with:*the procedures outlined"in"the ordinance.,-The-contractor shall submit.a.detailed explanation of how the requested change/addition or,deletion will.affect the committe_d MMBE goal If the detail explanation is not submitted, it will affect the final compliance determination.: By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1) year. Au&/&ed�Slggnature Printed ignature ZC ge v Title CorMct Name/Tltle f different) McC lc�t d ou r�Ks+-vvLfl pv� ��.. ►vl c . ► 2,1c., - Z1 - company Name Teleph a and/or Fax P 0 , boy 999 rmoralevC Malendohl'ort5tvuLho".GAM Address E-mail Address �- SwlesoK . TX 710097 Ila 121 j03 city/statw7lp Date PART B - PROPOSAL - UNIT I TO: GARY W. JACKSON City Manager Fort Worth, Texas RE: 15" Sanitary Sewer Replacement (M-132) Wimberly Street- Merrimac Street to Wingate Street Sewer Project No. PS58-070580174640 Pursuant to the foregoing "Notice to Bidders", the undersigned Bidder, has thoroughly examined the plans, specifications and the site, understands the amount of work to be done, and hereby proposes to do all work, furnish all labor, equipment, and materials necessary to fully complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Director, Department of Engineering of the City of Fort Worth. The contractor must be pre-qualified in accordance with the Water Department of the City of Fort Worth requirements. Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish Performance, Maintenance Bond for the water replacement contract only, and Payment Bond approved by the City of Fort Worth for performing and completing the said work within the time stated and for the following sums, to- wit: Unit I Sanitary Sewer Replacement Wimberly Street Project No. PS58-070580174640 Item Approx. Description of Items with Unit Total No. Quantity Bid Prices Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions:) 1) 780 L.F. **15-Inch Sanitary Sewer Pipe, All Trench Depth, Per Linear Foot: In r n►�� Dollars and Cents $ oo $ 2-Lf l 80 oc 2) 30 L.F. **15-Inch Sanitary Sewer Pipe by Dry Bore with 30" Steel Casing Pipe, Per Linear Foot: (� �l t 2e 1/1u�tG�2C -C , Dollars v and ✓lam Cents $3500 -'Q $ 1 0 9 6 0 0— 3) 20 L.F. **8-Inch Sanitary Sewer Pipe, All Trench Depths, Per Linear Foot: etl ✓r a Dollars 00 00 and AO Cents $ $ 4) 2 EA. RemoveExistingManhole, Per Each: — v � UKl Dollars 00 and old Cents $ ZSR $ 90000 5) 4 EA. Standard 4 foot Diameter Manhole, to 6 foot in Depth, Fig. M, Per Each: OKa TkO USA 17J LO lA+ I &thollars 00and Vty Cents $ Q $ —7200 nv BP 2 Item Approx. Description of Items with Unit Total No. Quantity Bid Prices Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in.place, the following items) (D-No. refers to related items in the Part D Special Conditions:) 6) 350 L.F. 4-Inch, PVC Sanitary Sewer Pipe in Private Property by a Licensed Plumber as directed by Engineer Per Linear Foot: rr,, 7i,. tn'ju t-', jcc Dollars and C $ OO 010Cents $ J 7) 300 L.F. 4-Inch, PVC Sanitary Sewer Pipe in Public right-of-way, Per Linear Foot: Dollars and /lv Cents $ ZoeO $ ��U 00 8) 14 EA. 4 Inch Sanitary Sewer Service Tap, Per Each; —FWD kVVLJftJ 14h4_ Dollars 0 and KD Cents $ S��� $ 9) 14 EA. Two way Service Cleanout, Per Each: ---FWO 0 ✓y2 A trr G Dollars 00 and 6&0 Cents $ Zooa_ $ 80 � 10) 5 EA. Relocate Existing Water Meters, as Per Engineer, Per Each: TQ l14uin C,dL rjDollars 00 00 and V1 o Cents $ 700 $ 11) 3 EA. 1" Service Tap (for single service) to Main, as Per Engineer, Per Each: WO k uyi dl-e c� ; r-41 Dollars andVU, Cents $ 250°° $ Sd BP 3 Item Approx. Description of Items with Unit Total No. Ouantity Bid Prices Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions:) 12) 100 L.F. 1" Domestic Type "K" Copper Service Line, as Per Engineer, Per Linear Foot: Dollars 00 00 and AO Cents $ I $ I4oC —' 13) 100 L.F. 3/4" Domestic Type "K" Copper Service within Private Property by Licensed Plumber, as Per Engineer, Per Linear Foot: V e. Dollars oa t 00 Cents $ 2 $ I 14) 50 CY. Crushed Limestone for Miscellaneous Placement, Per Cubic Yard: C-'� Dollars and ✓*-a Cents $ ' 0 0 $ ��� 15) 20 C.Y. Washed Rock (1/2" - 1 1/2") for Miscellaneous Placement, Per Cubic Yard: C)01__ Dollars o and Cents $ I $ �00 16) 4 EA. Watertight Gasketed Manhole Insert, Per Each: Ft �''-o-, Dollars and___o v Cents 17) 4 EA. Concrete Manhole Collar, Per Each: (� —1yo D t4L)(Ad rG fit" Dollars O 00 and n Cents $ S U BP 4 Item Approx. Description of Items with Unit Total No. Quantity Bid Prices Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions:) 18) 4 EA. Vacuum Testing of SS Manhole, Per Each: f D&e �,t JyA.�rt J. Dollars oC) po and '^ Cents $� $ 19) 20 C.Y. Type E (1500#) Concrete for Miscellaneous Placement, Per Cubic Yard: Dollars 1 D� oa and ✓�-a Cents $ $ 20) 20 CY. Type B (2500#) Concrete for Miscellaneous Placement, Per Cubic Yard: C) Dollars 00 DO and X1.0 Cents $ $ 21) 800 L.F. Trench Safety System 5 ft. - 10 ft. Trench Depth, Per Linear Foot: A-P—_ Dollars and AO Cents $ I $ UQ 22) 100 L.F. Temporary Asphaltic Paving Repair, (6" Flexible Base & 2" HMAC), Per Linear Foot: Sl Dollars and Cents $ �0 0 $ Q 0 23) 100 L.F. Permanent Asphaltic Paving Repair, Fig. "2000", Per Linear Foot: l hov�I Dollars '1�_ oa and (�D Cents $ V BP 5 Item Approx. Description of Items with Unit Total No. Quantity Bid Prices Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions:) 24) 830 L.F. Pre-Construction Television Inspection, Per Linear Foot: Dollars c 60 and c7 SL Cents $ J 00 $4�5D 25) 830 L.F. Post-Construction Television Inspection, Per Linear Foot: Dollars and V_Q_ Cents $ 2 ?S $ I 26) 333 S.Y. 2" HMAC Overlay Wi Edge Milling, Per Figure 2000,Per Square Yard: e ✓l Dollars bU Cents $ $ 3 3 3 D�O 27) 50 L.F. Concrete Encasement, as directed by Engineer, Per Linear Foot: :W_Q.�W - 7 Vf., Dollars 00 oa and vl c7 Cents $ $ TOTAL SEWER REPLACEMENT $ 00'5194_7 ** Type of pipe Used: PVC Pipe (SDR-35, Per E1-25, 6-15 inch) PVC Pipe (SDR-26, Per E1-27, 6-15 inch) PVC Pipe (Composite Pipe, Per E1-29, 8-15 inch) DIP Pipe (Class 51, 8-15 inch) BP 6 _. PROPOSAL - UNIT 2 TO: GARY W. JACKSON City Manager Fort Worth, Texas RE: Reconstruction of: Wimberly Street- Merrimac Street to Wingate Street Project No. K-1594 Pursuant to the foregoing "Notice to Bidders", the undersigned Bidder, has thoroughly examined the plans, specifications and the site, understands the amount of work to be done, and hereby proposes to do all work, furnish all labor, equipment, and materials necessary to fully complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Director, Department of Engineering of the City of Fort Worth. The contractor must be pre-qualified in accordance with the Water Department of the City of Fort Worth requirements. Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish Performance, Maintenance Bond for the water replacement contract only, and Payment Bond approved by the City of Fort Worth for performing and completing the said work within the time stated and for the following sums, to-wit: PAVING REPLACEMENT IN WIMBERLY STREET P1 UNIT II -BASE BID WIMBERLY STREET- MERRIMAC STREET TO WINGATE STREET Pay Spec Approx. Description of Items with Unit Total No. Item Ouantity Bid Prices Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place, the following items) 1) 1 LS. Utility Adjustment Per Lump Sum: Four Thousand Dollars and No Cents $ 4.000.00 $ 4,000.00 2) 2 EA. Project Designation Sign Per Each: 1 �o vi Dollars and Cents $ $ Soo 3) 1,449 LF. Remove Existing Concrete Curb and Gutter, Per Linear Foot: _ u Dollars S -75 and Cents $ I $ 2 5 3 5 4) 2,172 SF. Remove Existing Concrete Sidewalks, Leadwalks, Driveways and Valley Gutter, Per Square Foot: V�-c_ Dollars r OD„ and Cents $ 12-5 $ S 5) 1,270 C.Y. Unclassified Street Excavation, Per Cubic Yard: �"DU V �<-z Vl Dollars ov o o. and O,o Cents $-1 4 �$ rD o P2 Pay Spec Approx. Description of Items with Unit Total No. Item Ouantity Bid Prices Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place, the following items) 6) 245 S.F. Standard 4-inch Reinforced Concrete Sidewalks, Leadwalks, and W.C. Ramps, Per Square SLA.,-" T7�u/ Dollars t M _ p 1 — o Q and Vt,y Cents $ $ d _ 7) 2,185 SF. Standard 6" Reinforced Concrete Driveway, Per Square Foot: V\/ Dollars sv sa and I Cents $ $ 8) 2,793 SY. Lime Stabilization, Per Square Yard: Dollars and Wo Cents $ co $ 0779 00 9) 32 TONS Lime for Stabilization at 30#/SY, Per Ton: [[ 7 II�LL E'll �� J`­e,6 Dollars and u Cents $ 10) 300 LF. Construct 6" Sub-Drain as directed by Engineer, PerLinearFoot: Lot& 1 Dollars 0 and Cents $ O_ $ 2�0d 0n 11) 14 EA. Adjust Water Meter, Per Each: Thirty Five Dollars -- and No Cents $ 35.00 $ U.00 P3 � u Pay Spec Approx. Description of Items with Unit Total No. Item Ouantity Bid Prices Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place, the following items) 12) 2 EA. Adjust Water Valve, Per Each: Three Hundred Dollars and No Cents $ 300.00 $ 600.00 13) 4 EA. Adjust Existing Manhole to grade, Per Each: Three Hundred and Fifty Dollars and No Cents $ 350.00 $ 1.400.00 14) 20 SY. 5-Inch Concrete Channel Lining, See Sheet 6, Per Square Yard: b Dollars bU 00- and 1l1[? Cents $ $ 1000 15) 65 CY. Unclassified Channel Excavation, Per Cubic Yard: Dollars oo dv and VW Cents $ $ 2 16) 3 TN. HMAC Pavement, for Road,Transition, Per Ton: r)vtf- JDollars U� Ot7 and 0A Cents $ I $ 17) 212 CY. Provide & Place Top Soil, Per Cubic Yard: Eleven Dollars and No Cents $ 11.00 $ 2.332.00 SUBTOTAL UNIT II - BASE BID $ J<9 P4 ALTERNATE A (ASPHALT PAVEMENT) Pay Spec Approx. Description of Items with Unit Total No. Item Quantity Bid Prices Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place, the following items) 1A) 2,409 SY. 5-Inch HMAC Street Pavement, Per Square Yard: 1 ev-eyt Dollars and Cents $ 1 $ 2.7 O 3 2A) 1,738 LF. 7-Inch Concrete Curb & 18" Concrete Gutter, Per Linear Foot: E—Dov�-I -Cin Dollars and 1Cents $ I 50 $ 2 5 2-o 3A) 49 SY. 7-Inch Concrete Valley Gutter, Per Square Yard: _5��rh4 Dollars r I 0o I -7 Ub and ✓L O Cents $ $ ` l F 50 OSUBTOTAL FOR ALTERNATE A (ASPHALT) ITEMS $ ^I r r l P5 ALTERNATE B (CONCRETE PAVEMENT) Pay Spec Approx. Description of Items with Unit Total No. Item Ouantity Bid Prices Written in Words Price Amount Bid (Furnish and install, including all appurtenant work, complete in place, the following items) 1B) 2,749 SY. Construct 6" Reinforced Concrete Pavement, Per Square Yard: �L�+fin k r Dollars 0 and Lt iz Cents $ 50 $ �O UPJ (o 2B) 1,738 LF. Construct 7" Attached Concrete Curb, Per Linear Foot: W D Dollars OD and Cents $ ZSo $ I ' �L�5 3B) 2,475 LF. Silicone Joint Sealant, Per Linear Foot: 0D I Dollars a°- o o and U a kA,--n Cents $ $ 19 93O 4B) 25 LF. 7" Concrete Curb & 18" Concrete Gutter, Per Engineer, Per Linear Foot: V1 Dollars 1 o p and ink Cents $ 65 $ 7-7�75 0 n S� SUBTOTAL FOR ALTERNATE B (CONCRETE) ITEMS S 5 G, VJU P6 11. 1003 1: 13PM Graham Associates, Inc. NO. 5670 P. 3/3 SUMMARY ROR WLMSE%Ly 313EETMPRMMENTS ALTERNATE A(ASPHALT PAVEMENT). UNIT Y: SEWER IMPROVETTS SUBTOTAL 2S U4Y7 YY; PAVING BASE BID SUBTOTAL S 5 q � Cel '5 UN C'u; SUBTOTAL ALTERNATE A(ASPHALT) 7 4 TOTAL AMOUNT BID THIS PROJECT FOR ALTERNATE A y ALTERNATE B(CONCRETE PAVEMENT) UNIT I; SEWER RaROVPM EN7S SUSTOTAI. S UNIT M PAVING BASE BID SUBTOTAL S".5, G-75 UNIT M SUBTOTAL ALTERNATE 83-5:7(CONCRETE) . 55 (o i 25 TOTAL AMOUNT BID TRYS PRO MCT FOR ALTERNATED S ? O 3�16 1_7 q Z u P7 B - PROPOSAL (Cont.) Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the i delay and additional work caused thereby. The undersigned bidder certified that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. N The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within 120 working days after beginning construction as set forth in the written order to be furnished by the Owner. (Complete A or®below, as applicable:) A. The principal place of business of our company is in the State of Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Nonresident bidders in the State of , our principal place of business, are not required to underbid resident bidders. Cprincipal place of business of our company or our parent company or majority owner is in Texas. Receipt is acknowledge o the following addenda: Addendum No. 1 10li-71-- / &JZ�, (SEAL) If Bidder is Corporation Addendum No. 2 Addendum No. 3 Respectfully submitted, r By: WV A It fvzv- 9AN MCC-MOM. PRESIDENT Title ''^� 0. go)(ff � ggqg &0q-7 Address r Phone: I s 11N, '2-q5 -D0 ('(0 Fax: 29 BP 7 SECTION C .dA GENERAL CONDITIONS �; a 47 _• 4 '4 ♦ ".-i' . '' , ... -7. 4 ` .. _ f• l� J�i���,��C t�J{�51'�5,. y PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER, 1, 1987 TABLE OF CONTENTS C1-1 DEFINITIONS C1-1.1 Definition of Terms C1-1 (1) C1-1.2 Contract Documents Cl-1 (1) C1-1.3 Notice to Bidders C1-1 (2) C1-1.4 Proposal C1-1 (2) C1-1.5 Bidder C1-1 (2) C1-1.6 General Conditions C1-1 (2) C1-1.7 Special Conditions C1-1 (2) C1-1.8 Specifications C1-1 (2) C1-1.9 Bond C1-1 (2) C1-1.10 Contract C1-1 (3) C1-1.11 Plans C1-1 (3) C1-1.12 City C1-1 (3) C1-1.13 City Council Cl-1 (3 ) C1-1.14 Mayor C1-1 (3) C1-1.15 City Manager C1-1 (3) C1-1.16 City Attorney C1-1 (3) C1-1.17 Director of Public Works C1-1 (4) C1-1.18 Director, City Water Department C1-1 (4) C1-1.19 Engineer C1-1 (4) C1-1.20 Contractor C1-1 (4) C1-1.21 Sureties C1-1 (4) C1-1.22 The Work or Project C1-1 (4) C1-1.23 Working Day C1-1 (4) C1-1.24 Calendar Day C1-1 (4) C1-1.25 Legal Holiday C1-1 (4) C1-1.26 Abbreviations C1-1 (5) C1-1.27 Change Order C1-1 (6 ) C1-1.28 Paved Streets and Alleys C1-1 (6) C1-1.29 Unpaved Streets and Alleys C1-1 (6) C1-1.30 City Streets Cl-1 (6) C1-1.31 Roadway C1-1 (6 ) C1-1.32 Gravel Street C1-1 (6) C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2 (1) C2-2.2 Interpretation of Quantities C2-2 (1) C2-2.3 Examination of Contract Documents and Site C2-2 (2) C2-2.4 Submitting of Proposal C2-2 (3) C2-2.5 Rejection of Proposals C2-2 (3) C2-2.6 Bid Security C2-2 (3 ) (1) C2-2.7 Delivery of Proposal C2-2 (4 ) - C2-2. 8 Withdrawing Proposals C2-2 (4 ) C2-2. 9 Telegraphic Modification of Proposals C2-2 (4 ) C2-2.10 Public Opening of Proposal C2-2 (4 ) C2-2. 11 Irregular Proposals C2-2 (4 ) C2-2.12 Disqualification of Bidders C2-2 (5) C3-3 AWARD AND EXECUTION OF DOCUMENTS C3-3. 1 Consideration of Proposals C3-3 (1) C3-3. 2 Minority Business Enterpise Women-Owned Business Enterprise compliance C3-3 (1) C3-3. 3 Equal Employment Provisions C3-3 (1) C3-3. 4 Withdrawal of Proposals C3-3 (2) C3-3.5 Award of Contract C3-3 (2) C3-3. 6 Return of Proposal Securities C3-3 (2) C3-3. 7 Bonds C3-3 (2) C3-3. 8 Execution of Contract C3-3 (4 ) C3-3. 9 Failure to Execute Contract C3-3 (4 ) C3-3. 10 Beginning Work C3-3 (4 ) C3-3.11 Insurance C3-3 (4) C3-3. 12 Contractor ' s Obligations C3-3 (7 ) C3-3.13 Weekly Payroll C3-3 (7) C3-3.14 Contractor 's Contract Administration C3-3 (7) C3-3.15 Venue C3-3 (8) C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4 (1) C4-4. 2 Special Provisions C4-4 (1) C4-4. 3 Increased or Decreased Quantities C4-4 (1) C4-4. 4 Alteration of Contract Documents C4-4 (2) C4-4.5 Extra Work C4-4 (2) C4-4.6 Schedule of Operations C4-4 (3) C4-4. 7 Progress Schedules for Water and Sewer Plant Facilities C4-4 (4) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5 (1) C5-5. 2 Conformity with Plans C5-5 (1) C5-5. 3 Coordination of Contract Documents C5-5 (2) C5-5. 4 Cooperation of Contractor C5-5 (2) C5-5.5 Emergency and/or Rectification Work C5-5 (3) C5-5.6 Field Office C5-5 (3) C5-5.7 Construction Stakes C5-5 (3) C5-5.8 Authority and Duties of Inspectors C5-5 (4) C5-5.9 Inspection C5-5 (5) C5-5.10 Removal of Defective and Unauthorized Work C5-5 (5) C5-5.11 Substitute Materials or Equipment C5-5 (5) C5-5.12 Samples and Tests of Materials C5-5 (6) C5-5.13 Storage of Materials C5-5 (6) C5-5.14 Existing Structures and Utilities C5-5 (7) C5-5.15 Interruption of Service C5-5 (7) C5-5.16 Mutual Responsibility of Contractors C5-5 (8) C5-5.17 Cleanup C5-5 (8) C5-5.18 Final Inspection C5-5 (9) (2) C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY C6-6.1 Laws to be Observed C6-6 (1) C6-6. 2 Permits and Licenses C6-6 (1 ) C6-6. 3 Patented Devices, Materials and Processes C6-6 (1) C6-6. 4 Sanitary Provisions C6-6 (2 ) C6-6. 5 Public Safety and Convenience C6-6 (2) C6-6. 6 Privileges of Contractor in Streets, Alleys, and Right-of-Way C6-6 (3) C6-6.7 Railway Crossings C6-6 (4 ) C6-6.8 Barricades, Warnings and Watchmen C6-6 (4 ) C6-6.9 Use 'of Explosives, Drop Weight, etc. C6-6 (5) C6-6.10 Work Within Easements C6-6 (6 ) C6-6.11 Independent Contractor C6-6 (8 ) C6-6.12 Contractor's Responsibility for Damage Claims C6-6 (8 ) C6-6.13 Contractor' s Claim for- Damages C6-6 (10) C6-6.14 Adjustment of Relocation of Public Utilities, etc. C6-6 (10 ) C6-6.15 Temporary Sewer Drain Connections C6-6 (10 ) C6-6.16 Arrangement and Charges of Water Furnished by City C6-6 (11) C6-6.17 Use of a Section of Portion of the Work C6-6 (11 ) C6-6.18 Contractor' s Responsibility for Work C6-6 (11) C6-6.19 No Waiver of Legal Rights C6-6 (12) C6-6.20 Personal Liability of Public Officials C6-6 (12) C6-6.21 State Sales Tax C6-6 (12) C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7 (1) C7-7.2 Assignment of Contract C7-7 (1) C7-7.3 Prosecution of the Work C7-7 (1) C7-7. 4 Limitations of Operations C7-7 (2) C7-7.5 Character of Workman and Equipment C7-7 (2) C7-7. 6 Work Schedule C7-7 (3 ) C7-7.7 Time of Commencement and Completion C7-7 (4) C7-7. 8 Extension of time of Completion C7-7 (4 ) C7-7.9 Delays C7-7 (4) C7-7.10 Time of Completion C7-7 (5) C7-7.11 Suspension by Court Order C7-7 (6) C7-7.12 Temporary Suspension C7-7 (6) C7-7.13 Termination of Contract due to National Emergency C7-7 (7) C7-7.14 Suspension of Abandonment of the Work and Annulment of Contract C7-7 (7) C7-7.15 Fulfillment of Contract C7-7 (9 ) C7-7.16 Termination for Convenience of the Onwer C7-7 (10) C7-7.17 Safety Methods and Practices C7-7 (13 ) C8-8 MEASUREMENT AND PAYMENT C8-8.1 Measurement of Quantities C8-8 (1) C8-8.2 Unit Prices - (3 ) C8-8 . 3 Lump Sum C8-8 (1) C8-8 . 4 Scope of Payment C8-8 (1) C8-8.5 Partial Estimates and Retainage C8-8 (2) C8-8 . 6 Withholding Payment C8-8 (3 ) C8-8 .7 Final Acceptance C8-8 (3) C8-8. 8 Final Payment C8-8 ( 3) C8-8. 9 Adquacy of Design C8-8 (4) C8-8.10 General Guaranty C8-8 (4 ) C8-8.11 Subsidiary Work C8-8 (5 ) C8-8 .12 Miscellaneous Placement of Material C8-8 (5) C8-8.13 Record Documents C8-8 (5 ) e a (4) ,., PART C - GENERAL CONDITIONS C1-1 DEFINITIONS SECTION C1-1 DEFINITIONS C1-1 . 1 DEFINITIONS OF TERMS : Whenever in these Contract Documents the following terms or pronouns in place of them are used , the intent and meaning shall be understood and interpreted as follows: C1-1. 2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents , such as specifications , bonds , addenda , plans , etc . , which govern the terms and performance of the contract . These are contained in the General Contract Documents and the Special Contract Documents. a. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects and includethe following items: - PART A NOTICE TO BIDDERS (Sample) White PART B - PROPOSAL (Sample) White PART C - GENERAL CONDITIONS (CITY) Canary Yellow (Developer) Brown PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATIONS E1-White E2-Golden Rod E2A-White PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White PART G - CONTRACT (Sample) White b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General Contract Documents and include the following items: PART A - NOTICE TO BIDDERS (Advertisement) Same as above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS PART G - CONTRACT PART H - PLANS (Usually bound separately) C1-1 (1) C1-1 . 3 NOTICE TO BIDDERS : All of the legal publications either actually published in public advertising mediums or furnished direct to interested parties pertaining to the work contemplated under the Contract Documents constitutes the notice to bidders. C1-1 . 4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal , which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. C1-1 . 5 BIDDER: Any person , persons , firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documents , constitutes a bidder. C1-1 . 6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes , and requirements of the City of Fort Worth' s charter and promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions , the latter shall take precedence and shall govern. C1-1 . 7 SPECIAL CONDITIONS : Special conditions are the specific requirements which are necessary for the particular project covered by the Contract Documents and not specifically covered in the General Conditions . When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1 . 8 SPECIFICATIONS: The Specifications is that section or part of the Contract Documents which sets forth in detail the requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed and useful project. Whenever reference is made to standard specifications, regulations, requirements , statutes, etc . , such referred to documents shall become a part of the Contract Documents just as though they were embodied therein. C1-1. 9 BOND: The bond or bonds are the written guarantee or security furnished by the Contractor for the prompt and C1-1 (2) faithful performance of the contract and include the following: a. Performance Bond (see paragraph C3-3.7) b. Payment Bond (see paragraph C3-3 .7) C. Maintenance Bond (see paragraph C3-3.7 ) d. Proposal or Bid Security (see Special Instructions to Bidders, Part A and C2-2.6) C1-1. 10 CONTRACT: The Contract is the formal signed agreement between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project to be completed under the Contract Documents. C1-1. 11 PLANS : The plans are the drawings or reproductions therefrom made by the Owner 's representative showing in detail the location , dimension and position of the various elements of the project , including such profiles , typical cross-sections, layout diagrams, working drawings, preliminary drawings and such supplemental drawings as the Owner may issue r t•o clarify other drawings or for the purpose of showing changes in the work hereinafter authorized by the Owner. The plans are usually bound separately from other parts of the Contract Documents , but they are a part of the Contract Documents just as though they were bound therein. C1-1 . 12 CITY: The City of Fort Worth, Texas , a municipal corporation, authorized and chartered under the Texas State Statutes, acting by and through its governing body or its City Manger, each of which is required by charter to perform specific duties . Responsibility for final enforcement of Contracts involving the City of Fort Worth is' by Charter vested in the City Manager. The terms City and Owner are synonymous. C1-1 . 13 CITY COUNCIL: The duly elected and qualified governing body of the City of Fort Worth, Texas. C1-1 . 14 MAYOR : The officially elected Mayor , or in his absence, the Mayor Pro tem of the City of Fort Worth, Texas. r■ C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth, Texas , or his duly .. authorized representative. C1-1. 16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas , or his duly authorized representative. All 1P Cl-1 (3 ) `N, C1-1 . 17 DIRECTOR OF PUBLIC WORKS: The duly appointed official of the City of Fort Worth, referred to in the Charter as the City Engineer, or his duly authorized representative. C1-1 . 18 DIRECTOR, CITY WATER DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort Worth , Texas , or his duly authorized representative , assistant, or agents. C1-1. 19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water bepartment , or their duly authorized assistants , agents , engineers , inspectors , or superintendents, acting within the scope of the particular duties entrusted to them. C1-1 . 20 CONTRACTOR: The person , persons , partnership , company, firm, association, or corporation , entering into a contract with the owner for the execution of the work, acting directly or through a duly authorized representative. A sub-contractor is a person, firm, corporation, or others under contract with the principal contractor , supplying labor and materials or only labor, for work at the site of the project. C1-1 . 21 SURETIES: The Corporate bodies which are bound by such bonds are required with and for the Contractor . The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therein. C1-1. 22 THE WORK OR.'PROJECT: The completed work contemplated in and covered by the Contract Documents , including but not limited to the furnishing of all labor, materials , tools , equipment, and incidentals necessary to produce a completed and serviceable project. C1-1. 23 WORKING DAY: A working day is defined as a calendar day, not including Saturdays, Sundays , and legal holidays, in which the weather or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven ( 7 ) hours between 7 : 00 a.m. and 6 : 00 p.m. , with exceptions as permitted in paragraph C7-7.6. C1-1. 24 CALENDAR DAYS : A calendar day is any day of the week or month, no days being excepted. C1-1. 25 LEGAL HOLIDAYS: Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for observance by City employees as follows: C1-1 (4) 1. New Year ' s Day January 1 2. M. L. King, Jr. Birthday Third Monday in January 3. Memorial Day Last Monday in May 4. Independence Day July 4 5. Labor Day First Monday in September 6. Thanksgiving Day Fourth Thursday. in November 7. Thanksgiving Friday Fourth Friday in November S. Christmas Day December 25 9. Such other days in lieu of holidays as the City Council may determine When one of the above, named holidays or a special holiday is declared by the City Council , falls on Saturday, the holiday shall be observed on the preceding Friday or if it falls on Sunday, it shall be observed on the following Monday, by those employees working on working day operations . Employees working calendar day operations will consider the calendar holiday as the holiday. C1-1. 26 ABBREVIATIONS: Wherever the abbreviations defined herein appear in Contract Documents, the intent and meaning shall be as follows: rAASHTO - American Association of MGD - Million Gallons Per State Highway Transportation Day Officials - ASCE American Society of Civil CFS - Cubic Foot per Engineers Second LAW _ In Accordance With - ASTM American Society of Min. - Minimum Testing Materials Mono. Monolithic AWWA - American Water Works % - Percentum Association R - Radius - ASA American Standards Association I.D. - Inside Diameter HI - Hydraulic Institute O. D . - Outside Diameter Asph. - Asphalt Elev.- Elevation Ave. - Avenue F - Fahrenheit Blvd. - Boulevard C - Centigrade CI - Cast Iron In. - Inch CL - Center Line Ft. - Foot GI - Galvanized Iron St. - Street Lin. - Linear or Lineal CY - Cubic Yard 46 lb. - Pound Yd. - Yard MH - Manhole SY - Square Yard Max. - Maximum L.F. - Linear Foot D.I. - Ductile Iron Cl-1 (5) C1-1 . 27 CHANGE ORDER : A " Change Order " is a written supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more than 25% of the amount of the particular item or items in the original proposal. All "Change Orders" shall be prepared by the City from information as necessary furnished by the Contractor. C1-1. 28 PAVED STREETS AND ALLEYS : A paved street or alley shall be defined as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: 1. Any type of asphaltic concrete with or without separate base material. 2. Any type of. asphalt surface treatment , not including an oiled surface , with or without separate base material. 3. Brick, with or without separate base material. 4. Concrete, with or without separate base material. 5. Any combination of the above. C1-1. 29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, roadway or other surface is any area except those defined above for "Paved Streets and Alleys. " C1-1. 30 CITY STREETS:' A city street is defined as that area between the right-of-way lines as the street is dedicated. C1-1. 31 ROADWAY: The roadway is defined as the area between parallel lines two ( 21 ) feet back of the curb lines or four ( 4 ' ) feet back of the average edge of pavement where no curb exists. C1-1. 32 GRAVEL STREET: A gravel street is any unpaved street to which has been added one or more applications of gravel or similar material other than the natural material found on the street surface before any improvement was made. C1-1 (6 ) SECTION C .- GENERAL CONDITIONS C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2. 1 PROPOSAL FORM: The Owner will furnish bidders with proposal . form, which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder ' s general understanding of the project to be completed, provide a space for furnishing the amount of bid security , and state the basis for entering into a formal contract. The Owner will furnish forms for the Bidder ' s "Experience Record, " "Equipment Schedule, " and "Financial Statement, " all of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for opening of bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status . This . statement must be current and not more than one ( 1 ) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Liquid assets in the amount of ten (10% ) percent of the estimated project cost will be required. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as that of the project for which bids are to be received , and such experience must have been on projects completed not more than five ( 5 ) years prior to the date on which are to be received . The Director of the Water department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project on which he submits a bid. C2--2 . 2 INTERPRETATION OF QUANTITIES: The quantities of work and materials to be furnished as may be listed in the proposal C2-2(1) forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans . The quantities of work to be performed and materials to be furnished may be increased or • decreased as hereinafter provided, without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. C2-2. 3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: Bidders are advised that the Contract Documents on file with the Owner shall constitute all 'of the information which the Owner will furnish. All additional information and data which the owner will supply after promulgation of the formal contract documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. Bidders are required, prior to the filing of proposal, to read and become familiar with the Contract Documents , to visit the site of the project and examine carefully all local conditions , to inform themselves by their own independent research and investigations, tests, boring, and by such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project . They must judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time required for its completion, and obtain all information required to make an intelligent proposal. No information given by the Owner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the Owner. Bidders shall rely exclusively and solely upon their own estimates , investigation , research , tests , explorations, and other data " which are necessary for full and complete information upon which the proposal is to be based. It is mutually agreed that the submission of a proposal is prima-facie evidence that the bidder has made the investigations , examinations and tests herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not be allowed. The logs of Soil Borings, if any, showing on the plans are for general information only and may not be correct. Neither the C2-2(2) Owner nor the Engineer guarantee that the data shown is representative of conditions which actually exist. C2-2. 4 SUBMITTING OF PROPOSAL: The Bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the form shall be correctly filled in and the Bidder shall state the prices , written in ink in both words and numerals , for which he proposes *to do the work contemplated or furnishe the materials required. All such prices shall be written legibly. In case of discrepancy between the price written in words and the price written in numerals, the price most advantageous to the City shall govern. If a proposal is submitted by an individual, his or her name must be signed by him (her) or his (her) duly authorized agent. If a proposal is submitted by a firm, association , or partnership, the name and address of each member must be given , and the proposal must be signed by a member of the firm, association , or partnership , or by a person duly authorized . If a proposal is submitted by a company or corporation, the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. C2-2. 5 REJECTION OF PROPOSALS : Proposals may be rejected if they show any alteration of words or figures, additions not called for , conditional or uncalled for alternate bids, incomplete bids, erasures , or irregularities of any kind, or contain unbalance value of any items . Proposal tendered or delivered after the official time designated for receipt of proposal shall be returned to the Bidder unopened. ,., C2-2. 6 BID - SECURITY: No proposal will be considered unless it is accompanied by a "Proposal Security" of the character and � n the amount indicated in the "Notice to Bidders" and the "Proposal. " The Bid Security is required by the Owner as evidence of good faith on the part of the Bidder, and by way ° of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the three lowest bidders will be retained until the contract is awarded or other disposition is made thereof . The bid security of all other bidders may be returned promptly after the canvass of bids. C2-2(3 ) FB, �""NI IR, VE.. C2-2 . 7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered , accompanied by its proper Bid Security , to the City Manager or his representative in the official place of business as set forth in the "Notice to Bidders . " It is the Bidder ' s sole responsibility to deliver the proposal at the proper time to the proper place . The mere fact that a proposal was dispatched will not be considered. The Bidder must have the proposal actually delivered. Each proposal. shall be in a sealed envelope plainly marked with the word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders. " The envelope shall be addressed to the City Manager, City Hall, Fort Worth, Texas. C2-2 . 8 WITHDRAWING PROPOSALS : Proposals actually filed with the City Manager cannot be withdrawn prior to the time set for opening proposals . A request for non-consideration of a proposal must be made in writing , addressed to the City Manager , and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non-consideration are opened and publicly read aloud, the proposals for which non-consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C2-2. 9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such i telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48 ) hours after the proposal opening time, no further consideration will. be given to the proposal. C2-2.10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly filed and for which no "Non-consideration Request" has been received will be publicly opened and read aloud by the City Manager or his authorized representative at the time and place indicated in the "Notice to Bidders. " All proposals which have been opened and read will remain on file with the r Owner until the contract has been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids. _- C2-2 .11 IRREGULAR PROPOSALS: Proposals shall be considered as being "Irregular" if they show any omissions , alterations of form, additions , or conditions not called for, unauthorized alternate bids, or irregularities of any kind. However , the C2-2( 4 ) Owner reserves the right to waive any and all irregularities and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an irregularity which cannot be waived. C2 -2 . 12 DISQUALIFICATION OF BIDDERS : Bidders may be disqualified and their proposals not considered for any of , but not limited to, the following reason: a. Reasons for believing that collusion exists among bidders. b. Reasonable grounds for believing that any bidder is interested in more than one proposal for work contemplated. C. The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. d. The bidder being in arrears on any existing contract or having defaulted on a previous contract. e. The bidder having performed a prior contract in an unsatisfactory manner. f . Lack of competency as revealed by the financial statement, experience record, equipment schedule, and such inquiries as the Owner may see fit to make. g. Uncompleted work which, in the judgment of the Owner, will prevent or hinder the prompt completion of additional work if awarded. h. The bidder not filing with the Owner, one week in advance of the hour of the opening of proposals the following: 1. Financial Statement showing the financial condition of the bidder as specified in .Part "A" - Special Instructions. 2. A current experience record showing especially the projects of a nature similar to the one under consideration , which have been successfully completed by the Bidder. 3. An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of a bidder who, in the judgment of the Engineer, is disqualified under the requirements stated herein, shall be set aside and not opened. C2-2(S) 1 1 1 1 1 1 1 1 1 1 1 1 1 i 1 1 1 1 1 PART C - GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS w SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS: C3-3 . 1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of the quoted prices , the quantities shown in the proposal, and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for the best interest of the Owner. C3-3 . 2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner, upon request , complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and or a a Woman-owned Business Enterprise (WBE) on the contract and the payment therefor. Contractor further agrees, upon request by Owner , to allow and audit and/or an examination of any books, records, or files in the possession of Contractor that will substantiate the actual work performed by the MBE or WBE. Any material misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal , state or local laws and ordinances relating to false statements; further , any such misrepresentation may be grounds for disqualification of Contractor at Owner ' s discretion for bidding on future Contracts with the Owner for a period of time of not less than six (6) months. C3-3 . 3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with Current City Ordinance prohibiting discrimination in employment practices. C3-3 (1) The Contractor shall post the required notice to that effect on the project site , and, at his request , will be provided assistance by the City of Fort Worth ' s Equal Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. C3-3 . 4 WITHDRAWAL OF PROPOSALS : After a proposal has been read by the Owner it cannot be withdrawn by the Bidder within forty-five ( 45 ) days after the date on which the proposals were opened. C3-3 . 5 AWARD OF CONTRACT: The Owner reserves the right to withholdfinal action on the proposals for a reasonable time , not to exceed forty-five ( 45 ) days after the date of opening proposals, and in no event will an award be made until after investigations have been made as to the responsibility of the proposed awardee. The award of the contract, if an award is made, will be to the lowest and best responsible bidder. The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. C3-3 . 6 RETURN OF PROPOSAL SECURITIES: As soon as proposed price totals have been determined for comparison of bids , the Owner may, at its discretion, return the proposal security which accompanied the proposals which, in its judgment , would not be considered for the award . All other proposal securities, usually those of the three lowest bidders , will be retained by the Owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of the bids, after which they will be returned by the City Secretary. C3-3 . 7 BONDS : With the execution and delivery of the Contract Documents, the Contractor shall furnish to, and file with the Owner in the amounts herein required, the following bonds: a. PERFORMANCE BOND : A good and sufficient performance bond in an amount not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise , guaranteeing the full and faithful execution of the work and performance of the contract, and for the protection of the Owner and all other persons against damage by reason of negligence of the Contractor , or improper execution of the work or the use of inferior materials . This performance C3-3 (2) bond shall guarantee the payment for all labor , materials , equipment, supplies , and services used in the construction of the work, and shall remain in full force and effect until provisions as above stipulated are accomplished and final payment is made on the project by the City. b. MAINTENANCE BOND : A good and sufficient maintenance bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt , full and faithful performance of the general guaranty which is set forth in paragraph C8-8.10. C. PAYMENT BOND: A good and sufficient payment bond, in an amount not less than 100 percent of the amount of the contract , as evidenced by the proposal tabulation or otherwise , guaranteeing the prompt, full and faithful payment of all claimants as defined in Article 5160, Revised Civil Statutes of Texas , 1925 , as amended by House Bill 344 Acts 56th Legislature, Regular Session , 1959 , effective April 27 , 1959 , and/or the latest version thereof, supplying labor and materials in the prosecution of the work provided for in the contract being constructed under these specifications . Payment Bond shall remain in force until all payments as above stipulated are made. d. OTHER BONDS : Such other bonds as may be required by these Contract Documents shall be furnished by the Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the owner . All bonds shall be made on the forms furnished by the Owner and shall be executed by an approved surety company doing business in the • City of Fort Worth , Texas, and which is acceptable to the owner . In order to be acceptable, the name of the surety shall be included on the current U . S . Treasury list of acceptable sureties, and the amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury list for that company. Each bond shall be properly executed by both the Contractor and Surety Company. Should any surety on the contract be determined unsatisfactory at any time by the Owner, notice will be given _ractor to that effect and the Contractor shall immedi p ovide- o ➢ �.o C3-3 (3) new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties , as required, have qualified and have been accepted by the Owner. The contract shall not be operative nor will any payments be due or paid until approval of the bonds by the Owner. C3-3 . 8 EXECUTION OF CONTRACT: Within ten (10 ) days after the Owner has by appropriate resolution, or otherwise, awarded the contract., the Contractor shall execute and file with the Owner the Contract and such bonds as may be required in the Contract Documents. i No contract shall be binding upon the owner until it has been attested by the City Secretary , approved as to form and legality by the City Attorney, and executed for the Owner by either the Mayor or City Manager. C3-3 . 9 FAILURE TO EXECUTE CONTRACT : The failure of the Awardee to execute the required bond or bonds or to sign the required contract within ten (10 ) days after the contract is awarded shall be considered by the Owner as an abandonment of his proposal, and the Owner may annul the Award. By reason of the uncertainty of the market prices of material and labor , and it .being impracticable and difficult to accurately determine the amount of damages occuring to the Owner by reason of said awardee ' s failure to execute said bonds and contract within ten ( 10 ) days , the proposal security accompanying the proposal shall be the agreed amount of damages which Owner will suffer by reason of such failure on the part of the Awardee and shall thereupon immediately be forfeited to the Owner. The filing of a proposal will be considered as an acceptance of this provision by the Bidder. C3-3 . 10 BEGINNING WORK: The Contractor shall not commence work until authorized in writing to do so by the Owner . Should the Contractor fail to commence work at the site of the project within the time stipulated in the written authorization usually termed the "Work Order" or "Proceed Order" , it is agreed that the Surety Company will , within ten ( 10 ) days after the commencement date set forth in such written authorization, commence the physical execution of the contract. C3-3 . 11 INSURANCE: The Contractor shall not commence work under this contract until he has obtained all the insurance required under the Contract Documents , and such insurance has been approved by the Owner. The prime Contractor shall be responsible for delivering to the Owner the sub-contractors ' C3-3 (4 ) certificate of insurance for approval . The prime contractor shall indicate on the certificate of insurance included in the documents for execution whether or not his insurance covers sub-contractors . It is the intention of the Owner that the insurance coverage required herein shall include the coverage of all sub-contractors. a. COMPENSATION INSURANCE : The Contractor shall maintain , during the life of this contract , Workers•' Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub-contractors. In case any class of employees engaged in hazardous work on the project under this contract is not protected under the Workers ' Compensation Statute, the Contractor shall provide adequate employer ' s general liability insurance for the protection of such of his employees not so protected. b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor shall procure and shall maintain during the life of this contract Contractor ' s Comprehensive General Liability Insurance (Public Liability and Property Damage Insurance) in an amount not less than $ 500 , 000 covering each occurrence on account of bodily injury, including death, and in an amount not less than $ 500 , 000 covering each occurrence on account of property damage with $2,000 ,000 umbrella policy coverage. C. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as separate policies or by additional endorsement to one of the above-mentioned policies, and in the amount as set forth for public liability and property damage, the following insurance: 1. Contingent Liability ( covers General Contractor ' s Liability for acts of sub-contractors) . 2, Blasting, prior to any blasting being done. 3. Collapse of buildings or structures adjacent to excavation ( if excavations are to be performed adjacent to same) . 4. Damage to underground utilities for $500,000. C3-3 (5) �� 5. Builder 's risk (where above-ground structures are involved) . 6. Contractual Liability ( covers all indemnification requirements of Contract) . d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY DAMAGE: The Contractor shall procure and maintain, .� during the life of this Contract, Comprehensive Automobile Liability insurance in an amount not less than $ 250 , 000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $500 , 000 on account of one accident , and automobile property damage insurance in an amount not less than $100,000. e. SCOPE OF INSURANCE AND SPECIAL HAZARD : The insurance required under the above paragraphs shall provide adequate. protection for the Contractor and his sub-contractors , respectively, against damage claims which may arise from operations under this contract, whether such operations be by the insured or by anyone directly or indirectly employed by him, and also against any of the following special hazards which may be encountered in the performance of the Contract. f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with satisfactory proof of coverage by insurance required in these Contract Documents in amounts and by carriers satisfactory to the Owner . ( Sample attached. ) All insurance requirements made upon the Contractor shall apply to the sub- contractor , should the Prime Contractor ' s insurance not cover the sub-contractor's work operations. g. LOCAL AGENT FOR INSURANCE AND BONDING : The insurance and bonding companies with whom the Contractor ' s insurance and performance, payment, maintenance and all such other bonds are written shall be represented by an agent or agents having an office located within the city limits of the C3-3 ( 6) City of Fort Worth, Tarrant County, Texas . Each such agent shall be a duly qualified, one upon whom service of process may be had , and must have authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth, or any other claimant, any claims that the City of Fort Worth or other claimant or any property owner who has been damaged , may have against the Contractor , insurance, and/or bonding company. If the local insurance representative is not so empowered by the insurance or bonding companies, then such authority must be vested in a local agent or claims officer residing in the Metroplex, the Fort Worth-Dallas area . The name of the agent or agents shall be set forth on all of such bonds and certificates of insurance. C3-3 .12 CONTRACTOR' S OBLIGATIONS : Under the Contract, the ,Contractor shall pay for all materials , labor and services when due. C3-3 . 13 WEEKLY PAYROLL: A certified copy of each payroll covering payment of wages to all person engaged in work on the project at the site of the project shall be furnished to the Owner's representative within seven ( 7 ) days after the close of each payroll period. A copy or copies of the applicable _ minimum wage rates as set forth in the Contract Documents shall be kept posted in a conspicuous place at the site of the project at all times during the course of the Contract . Copies of the wage rates will be furnished the Contractor, by r the Owner; however, posting and protection 'of the wage rates shall. be the responsibility of the' Contractor. R C3-3 .14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor, whether a person , persons, partnership , company , firm , association , corporation or other who is approved to do, business with and enters into a contract with the City for M construction of water and/or sanitary sewer facilities, will have or shall establish a fully operational business office within the Fort Worth-Dallas metropolitan area . The Contractor shall charge, delegate, or assign this office (or he may delegate his Project Superintendent ) with full authority to transact all business actions required in the i performance of the Contract. This local authority shall be 1 made responsible to act for the Contractor in all matters Pertaining to the work governed by the Contract whether it be administrative or otherwise and as such shall be empowered, thus delegated and directed, to settle all material, labor or other expenditures, all claims against the work or any other ri C3-3 (7) matter associated such as maintaining adequate and appropriate insurance or security coverage for the project . Such local authority for administration of the work under the Contract shall be maintained until all business transactions executed as part of the Contract are complete. Should the Contractor ' s principal base of operations be other than in the Fort Worth-Dallas metropolitan area, notification of the Contractor ' s assignment of local authority shall be made in writing to the Engineer in advance of any work on the project, all appropriately signed and sealed, as applicable, by the Contractor ' s responsible officers with the understanding that this written assignment of authority to a local representative shall become part- of the project Contract as though bound directly into the project documents . The intent of these requirements is that all matters associated with the Contractor ' s administration, whether it be oriented in furthering the work, or other, be governed direct by local authority. This same requirement is imposed on insurance and surety coverage. Should the Contractor's local representative fail to perform to the satisfaction of Engineer, the Engineer, at his sole discretion , may demand that such local representative be replaced and the Engineer may, at his sole discretion , stop all work until a new local authority _ satisfactory to the Engineer is assigned. No credit of working time will be for periods in which work stoppages are in effect for this reason. C3-3 . 15 VENUE : Venue of any action hereinunder shall be exclusively in Tarrant County, Texas. C3-3 (8 ) PART C - GENERAL CONDITIONS C4-4 SCOPE OF WORK SECTION C4-4 SCOPE OF WORK - C4-4 . 1 INTENT OF CONTRACT DOCUMENTS : It is the definite intention of these Contract Documents to provide for a complete, useful project which the Contractor undertakes to construct or furnish , all in full compliance with the requirements and intent of the Contract Documents . It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents, shall do all extra or special work as may be considered by the Owner as necessary to complete the project in a satisfactory and acceptable manner. The Contractor shall, unless otherwise specifically stated in these Contract Documents, furnish all labor, tools, materials, machinery, equipment , special services , and incidentals necessary to the prosecution and completion of the project. C4-4 . 2 SPECIAL PROVISIONS: Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional proposed work which is not covered by these Contract Documents, then "Special Provisions" covering all such work will be prepared by the Owner previous to the time of receiving bids or proposals for such work and furnished to the Bidder in the form of Addenda. All such "Special Provisions" shall be considered to be a part of the Contract Documents just as though they were originally written therein. C4-4. 3 INCREASED OR DECREASED QUANTITIES: The Owner reserves r the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the �. work as altered, increased or decreased at the unit prices. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items. When such changes increase or decrease the original quantity of any item or items of work to be done or materials to be furnished by the 25 percent or more, then either party to the contract shall upon written request to the other party be entitled to a revised consideration upon that portion of the work above or below the 25 percent of the original quantity stated in the proposal; such revised consideration to be determined by special agreement or as hereinafter provided for "Extra Work. " No allowance will be made fqx--_.any_c.h n in anticipated profits nor shall such changes; ba' considered as .Cap C4-4 (1) waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes In depth categories , shall be interpreted herein as applying to the overall quantities or sanitary sewer pipe in each pipe size, but not to the various depth categories. C4-4 . 4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the Owner reserves the right to make such changes in the Contract Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, provided such changes do not materially alter the original Contract Documents or change the general nature of the project as a whole. Such changes shall not be considered as waiving or invalidating any condition or provision of the Contract Documents. C4-4 . 5 EXTRA WORK: Additional work made necessary by changes and alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents, shall be defined as "Extra Work" and shall be performed by the Contractor in accordance with these Contract Documents or approved additions thereto; provided, however, that before any extra work is begun a "Change Order" shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the following methods: a. Unit bid price previously approved. b. An agreed lump sum. C. The actual reasonable cost of (1) labor, (2) rental of equipment used on the extra work for the time so used at Associated General Contractors of America current equipment rental rates ; ( 3 ) materials entering permanently into the project, and (4 ) actual cost of insurance , bonds , and social security as determined by the Owner , plus a fixed fee to be agreed upon but not to exceed 10% of the - actual cost of such extra work. The fixed fee is not to include any additional profit to the Contractor for rental of equipment owned by him and used for the extra work. The fee shall be full and complete compensation to cover the cost of superintendence, overhead, other profit, general _ and all other expense not included in (1 ) , (2) , ( 3 ) , and ( 4 ) above. The Contractor shall keep accurate cost records on the form and in the method C4-4 (2 ) �' suggested by the Owner and shall give the Owner • access to all accounts , bills , vouchers , and records relating to the Extra Work. No "Change Order" shall become effective until it has been approved and signed by each of the Contracting parties . No claim for Extra Work of any kind will be allowed unless ordered in writing by the Owner . In case any orders or instructions , either oral or written, appear to the Contractor to involve Extra Work for which he should receive compensation, he shall make written request to the Engineer for written orders authorizing such Extra Work , prior to beginning such work. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof , and the r Engineer insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep an accurate account of the actual reasonable cost thereof as provided under method ( Item C ) . Claims for extra work will not be paid unless the Contractor shall file his claim with the Owner within five ( 5 ) days before the time for making the first estimate after such work is done and unless the claim is supported by satisfactory vouchers and certified payrolls covering all labor and materials expended upon the said Extra Work. The Contractor shall furnish the Owner such installation records of all deviations from the original Contract Documents as may be necessary to enable the Owner to prepare for permanent record a corrected set of plans showing the actual installation. The compensation agreed upon for ' extra work' whether or not iniitiated by a 'change order ' shall be a full , complete and final payment for all costs Contractor incurs as a result or relating to the change or extra work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost , or any other effect on changed or unchanged work as a result or the change or extra work. C4-4 . 6 SCHEDULE OF OPERATIONS: Before commencing any work under this contract, the Contractor shall submit to the Owner and receive the Owner ' s approval thereof, a "Schedule of Operations , " showing by a straight line method the date of commencing and finishing each of the major elements of the contract. There shall be also shown the estimated monthly cost of work for which estimates are to be expected. There i - C4-4 (3 ) shall be presented also a composite graph showing the anticipated progress of construction with the time being plotted horizontally and the percentage of completion plotted vertically. The progress charts shall be prepared on 8-1/2" x 11" sheets and at least five black or blue line prints shall be furnished to the Owner. C4-4 . 7 PROGRESS SCHEDULES FOR WATER AND SEWER PLANT FACILITIES: Within ten ( 10 ) days prior to submission of first monthly progress payment , the Contractor shall prepare and submit to the Owner for approval six copies of the schedule in which the Contractor proposes to carry on the work, the date of which he will start the several major activities ( including procurement of materials, plans, and equipment) and the contemplated dates for completing the same. The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work r progresses, the Contractor shall enter on the diagram the actual progress at the end of each partial payment period or at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments in contract time approved by the Engineer. Three copies of the updated schedule shall be delivered at such intervals as directed by the Owner. As a minimum, the construction schedule shall incorporate t all work elements and activities indicated in the proposal and in the technical specifications. Prior to the final drafting of the detailed construction schedule, the Contractor shall review the draft schedule with the Engineer to ensure the Contractor' s understanding of the contract requirements. The following guidelines shall be adhered to in preparing the construction schedule: a. Milestone dates and final project completion dates shall be developed to conform to time constraints , sequencing requirements and completion time. b. The construction process shall be divided into activities with time durations of approximately fourteen (14 ) days and construction values not to exceed $50 , 000 . Fabrication , delivery and submittal activities are exceptions to this guideline: C4-4 (4 ) C. Durations shall be in calendar days and normal holidays and weather conditions over the duration of the contract shall be accounted for within the duration of each activity. d. One critical path shall be shown on the construction schedule. e. Float time is defined as the amount of time between the earliest start date and the latest start date of a chain of activities of the CPM construction schedule. Float time is not for the exclusive use or benefit of either the Contractor or the Owner. f. Thirty days shall be used for submittal review unless otherwise specified. The construction schedule shall as a minimum be divided into general categories as indicated in the Proposal and Technical Specifications and each general category shall be broken down into activities in enough detail to achieve activities of approximately fourteen (14) days duration. For each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that follow the guidelines of this Section. For each of the trades or subcontracts , the construction schedule shall indicate the following procurements , construction and preacceptance activities and events in their logical sequence for equipment and materials. 1. Preparation and transmittal of submittals. 2. Submittal review periods. 3 . Shop fabrication and delivery. 4 . Erection or installation. 5. Transmittal of manufacturer ' s operation and maintenance instructions. 6. Installed equipment and materials testing. 7. Owner' s operator instruction (if applicable) . 8. Final inspection. 'IN Cji"t Fla C4-4 (5 ) ca. 9 . Operational testing. P g 10. Final inspection. If , in the opinion of the Owner , work accomplished falls behind that scheduled , the Contractor shall take such action as necessary to improve his progress. In addition, the Owner may require the Contractor to submit a revised schedule demonstrating his program and proposed plan to make up lag in scheduled progress and to insure completion of the work within the contract time . If the Owner finds the proposed plan not acceptable , he may require the Contractor to increase the work force, the construction plant and equipment , the number of work shifts or the overtime operations °without additional cost to the Owner. Failure of the Contractor to comply with these requirements shall be considered grounds for determination by the Owner that the Contractor is failing to prosecute the work with such diligence as will insure its completion within the time specified. C4-4 (6) r r PART C - GENERAL CONDITIONS C5-5 CONTROL OF WORK AND MATERIALS a, SECTION C5-5 CONTROL OF WORK AND MATERIALS C5-5.-1 AUTHORITY .OF ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict compliance with PF the Contract Documents. He shall decide all questions which arise as to the quality and acceptability of materials furnished , work performed, rate of progress of the work, overall sequence of the construction,' interpretation of the .Contract Documents , acceptable fulfillment of the contract, compensation, mutual rights between Contractor and Owner under these Contract Documents , supervision of the work, resumption of operations, and all other questions or disputes which may arise . Engineer will not be responsible for Contractor ' s means , methods , techniques , sequences or procedures of construction, or the safety precaution and prbgrams incident thereto, and he will not be responsible for Contractor ' s failure to perform the work in accordance with the contract documents. He shall determine the amount and quality of the work completed and materials furnished , and his decisions and estimates shall be final. His estimates in such event shall be a condition to the right of the Contractor to receive money due him under the Contract. The Owner shall have executive authority to enforce and make effective; .such necessary decisions and orders as the Contractor fails-to carry out promptly. Y In the event of any dispute between the Engineer and Contractor over the decision of the Engineer on any such matters , the Engineer must, within a reasonable time, upon written request of the Contractor, render and deliver to both the Owner and Contractor, a written decision on the matter in controversy. C5-5. 2 CONFORMITY WITH PLANS: The finished project in all cases shall conform with lines , grades , cross-sections , finish , and dimensions shown on the plans or any other requirements otherwise described in the Contract Documents . Any deviation from the approved Contract Documents required by the Engineer during construction will in all cases be determined by the Engineer and authorized by the Owner by Change Order. r• �.� C5-5 1) r C5-5 . 3 COORDINATION OF CONTRACT DOCUMENTS : The Contract Documents are made up of several sections , which , taken together , are intended to describe and provide for a complete and useful project, and any requirements appearing in one of i the sections is as binding as though it occurred in all sections. In case of discrepancies , figured dimension shall govern over scaled dimensions , plans shall govern over specifications, special conditions shall govern over general conditions and standard specifications, and quantities shown on the plans shall govern over those shown in the proposal . The contractor shall not take advantage of any apparent error or omission in the Contract Documents , and the Owner shall be permitted to make such corrections or interpretations as may be deemed necessary for the fulfillment of the intent of the Contract Documents . In the event the Contractor discovers an apparent error or discrepancy, he shall immediately call this condition to the attention of the Engineer. In the event of a conflict in the drawings, specifications, or other portions of the Contract Documents which were not reported prior to the award of Contract, the Contractor shall be deemed to have quoted the most expensive resolution of the conflict. C5-5 . 4 COOPERATION OF CONTRACTOR: The Contractor will be furnished with three sets of the Contract Documents and shall have available on the site of the project at all times one set of such Contract Documents. The Contract shall give to the work the constant attention necessary to facilitate the progress thereof and shall cooperate with the Engineer , his inspector , and other Contractors in every possible way. The Contractor shall at all times have competent personnel available to the project site for proper performance of the work. The Contractor shall provide and maintain at all times at the site of the project a competent , English-speaking superintendent and an assistant who are fully authorized to act as the Contractor 's agent on the. work . Such superintendent and his assistant shall be capable of reading and understanding the Contract Documents and shall receive and fulfill instructions from the Owner, the Engineer, or his authorized representatives . Pursuant to this responsibility of the Contractor, the Contractor shall designate in writing to the project superintendent, to act as the Contractor ' s F agent on the work. Such assistant project superintendent shall be a resident of Tarrant County, Texas and shall be subject to call, as is the project Superintendent, at any time of the day or night on any day of the week on which the Engineer determines that circumstances require the presence on the project site of a representative of the Contractor to C5-5 (2) adequately provide for the safety or convenience of the traveling public or the owners of property across which the project extends or the safety of property contiguous to the project routing. The Contractor shall provide all facilities to enable the Engineer and his inspector to examine and inspect the workmanship and materials entering into the work. C5-5 . 5 EMERGENCY AND/OR RECTIFICATION WORK: When , in the opinion of the Owner or Engineer , a condition of emergency exists related to any part of the work, the Contractor, or the Contractor through -his designated representative , shall respond with dispatch to a verbal request made by the Owner or Engineer to alleviate the emergency condition . Such a response shall occur day or night, whether the project is scheduled on a calendar-day or on a working-day basis. Should the Contractor fail to respond to a request from the Engineer to rectify any discrepancies , omissions , or corrections necessary to conform with the requirements of the project specifications or plans , the Engineer shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours , the City may -take such remedial action with City forces or by contract. The City shall then deduct an. amount equal to the entire costs for such remedial action, plus 25% , from any funds due the Contractor on the project. C5-5 . 6 FIELD OFFICE: The Contractor shall provide, at no extra compensation, an adequate field office for use of the Engineer, if specifically called for. The field office shall be not less than 10 by 14 feet in floor area, substantially constructed, well heated , air conditioned, lighted, and weather-proof, so that documents will not be damaged by the elements. C5-5 . 7 CONSTRUCTION STAKES: The City, through its Engineer, will furnish the Contractor with all lines , grades , and measurements necessary to the proper prosecution and control of the work contracted for under these Contract Documents, and lines, grades and measurements will be established by means of stakes or other customary method of marking as may be found consistent with good practice. C5-5 (3 ) These stakes or markings shall be set sufficiently in advance of construction operations to avoid delay . Such stakes or markings as may be established for the Contractor ' s use or guidance shall be preserved by the Contractor until he is authorized by the Engineer to remove them. whenever, in the opinion of the Engineer, any stakes or markings have been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees , the full cost of replacing such stakes or marks plus 25% will be charged ' against the Contractor, and the full amount will be deducted from payment due the Contractor. C5-5 . 8 AUTHORITY AND DUTIES OF CITY INSPECTORS : City Inspectors will be authorized to inspect all work done and to be done and all materials furnished. Such inspection may extend to all or any part of the work, and the preparation or manufacturing of the materials to be used or equipment to be installed. A City Inspector may be stationed on the work to report to the Engineer as to the progress of the work and the manner in which it is being performed, to report any evidence that the materials being furnished or the work being performed by the Contractor fails to fulfill the requirements of the Contract Documents , and to call the attention of the Contractor to any such failure or other infringements. Such inspection or lack of inspection will not relieve the Contractor from any obligation to perform the work in accordance with' the requirements of the Contract Documents. In case of any dispute arising between the Contractor and the City Inspector as to the materials or equipment furnished or the manner of performing the work, the City Inspector will have authority to reject materials or equipment to suspend work until the question at issue can be referred to and be decided by the Engineer . The City Inspector will not , however, be authorized to revoke, alter , enlarge , or release any requirement of these Contract Documents, nor to approve or accept any portion or section of the work, nor to issue any instructions contrary to the requirements of the Contract Documents . He will in no case act as superintendent or foreman or perform any other duties for the Contractor, or interfere with the management or operation of the work. He will not accept from the Contractor any compensation in any form for performing any duties . The Contractor shall regard and obey the directions and instructions of the City Inspector or Engineer when the same are consistent with the obligations of the Contract Documents , provided, however, should the Contractor object to any orders or instructions of the City Inspector.,, the Contractor may within six days make written appeal to the Engineer for his decision on the matter in controversy. C5-5 (4 ) PP C5-5 . 9 INSPECTION: The Contractor shall furnish the Engineer with every reasonable facility for ascertaining whether or not the work as performed is in accordance with the requirements m of the Contract Documents . If the Engineer so requests , the Contractor shall, at any time before acceptance of the work, remove or uncover such portion of the finished work as may be directed. After examination, the Contractor shall restore said portions of the work to the standard required by the Contract -Documents. Should the work exposed or examined prove acceptable, the uncovering or removing and replacing of the covering or making good of the parts removed shall be paid for as extra work, but should be work so exposed ~ or examined prove to be unacceptable, the uncovering or removing and the replacing of all adjacent defective or damaged parts shall be at the Contractor ' s expense. No work shall be done or materials used without suitable supervision or inspection. I� CS-5 . 10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK: All work, materials , or equipment which has been rejected shall be remedied or removed and replaced in an acceptable manner by the Contractor at his own expense. Work done beyond the lines and grades given or as shown on the plans , except as herein specifically provided, or any Extra Work done without written authority, will be considered as unauthorized and done at the expense of the Contractor and will not be paid for by the Owner . Work so done may be ordered removed at the Contractor ' s expense. Upon the failure on the part of the Contractor to comply with any order of the Engineer made under the provisions of this paragraph , the Engineer will have the authority to cause defective work to be remedied or removed and replaced and unauthorized work to be removed, and the cost thereof may be deducted from any money due or to become due to the Contractor . Failure to require the removal of any defective or unauthorized work shall not constitute acceptance of such works. C5 - 5 . 11 SUBSTITUTE MATERIALS OR EQUIPMENT : If the Specifications, law, ordinance, codes or regulations permit +" Contractor to furnish or use a substitute that is equal to any material or equipment specified, and if Contractor wishes to furnish or use a proposed substitute , he shall, prior to the preconstruction conference , make written application to ENGINEER for approval of such substitute certifying in writing that the proposed substitute will perform adequately the functions called for by the general design, be similar and of a equal substance to that specified and, be suited to the same use and capable of performing the same function as that specified; and identifying all variation „ �-- t ¢r _pro�posed C5-5 (5 ) substitute from that specified and indicating available maintenance service . No substitute shall be ordered or installed without the written approval of Engineer who will be the judge of the equality and may require Contractor to furnish such other data about the proposed substitute as he considers pertinent . No substitute shall be ordered or installed without such performance guarantee and bonds as Owner may require which shall be furnished at. Contractor ' s expense.' Contractor shall indemnify and hold harmless Owner and Engineer and anyone directly or indirectly employed by either of them from and against the claims , damages, losses and expenses ( including attorneys fees) arising out of the use of substituted materials or equipment. C5-5 . 12 SAMPLES AND TESTS OR MATERIALS: Where, in the opinion of the Engineer, or as called for in the Contract Documents , tests of materials or equipment are necessary, such tests will be made at the expense of and paid for direct to the testing agency by the Owner unless otherwise specifically provided. The failure of the Owner to make any tests of materials shall be in no way relieve the Contractor of his responsibility of furnishing materials and equipment fully conforming to the requirements of the Contract Documents. Tests and sampling of materials , unless otherwise specified , will be made in accordance with the latest methods prescribed by the American Society for Testing Materials or specific requirements of the Owner. The Contractor shall provide such facilities as the Engineer may require for collecting and forwarding samples and shall not , without specific written permission of the Engineer, use the materials represented by the samples until tests have been made and the materials approved for use. The Contractor will furnish adequate samples without charge to the Owner. In case of concrete, the aggregates , design minimum, and the mixing and transporting equipment shall be approved by the Engineer before any concrete is placed, and the Contactor shall be responsible for replacing any concrete which does not meet the requirements of the Contract Documents. Tests shall be made at least 9 days prior to the placing of concrete , using samples from the same aggregate , cement, and mortar which are to be used later in the concrete. Should the source of supply change, new tests shall be made prior to the use of the new materials. C5-5 .13 STORAGE OF MATERIALS: All materials which are to be used in the construction operation shall be stored so as to insure the preservation of the quality and fitness of the work. When directed by the Engineer, they shall be placed on wooden platforms or other hard, clean durable surfaces and not on the C5-5 (6 )